Andrew Hart has over 20 years of experience in electrical field engineering and construction management roles for nuclear power plants. He has led start-up testing activities, overseen modifications, and provided technical guidance to craft workers. He also owned a small business providing custom shelving and bathroom installations for 13 years.
Kim jesteśmy? W czym się specjalizujemy? Co nas wyróżnia? Co możemy zaproponować Tobie/Twojej firmie? Sprawdź ofertę biura Polyland! Czekamy na kontakt - mailowy/telefoniczny lub poprzez formularz dostępny na naszej stronie internetowej.
Kim jesteśmy? W czym się specjalizujemy? Co nas wyróżnia? Co możemy zaproponować Tobie/Twojej firmie? Sprawdź ofertę biura Polyland! Czekamy na kontakt - mailowy/telefoniczny lub poprzez formularz dostępny na naszej stronie internetowej.
Menurut keputusan KMB, masalah Irian Barat ditunda penyelesaiannya. Tapi bertahun-tahun kemudian Belanda tidak mau merundingkannya dan malah membentuk Negara Papua.
Face Adrenalin Responsible Tourism PolicyFaceAdrenalin
Face Adrenalin - https://www.faceadrenalin.com/- operates the world's highest bungy bridge at Bloukrans, South Africa.
We pioneered and established bungy jumping in South Africa when we opened for business in 1990. We’ve operated the highest commercial bungy bridge in the world - Bloukrans Bungy, in the Tsitsikamma section of the Garden Route - since 1997, and we’re thus deeply aware of the value and importance of our relationships with both the people and natural environment of this beautiful region. Having always supported the principles of the triple bottom line (financial, social, and environmental accountability), and given that we accept the definition of responsible tourism as ‘creating better places to live in, and better places to visit,’ we are thus also committed to supporting the principles of responsible tourism as defined in the Cape Town Declaration of 2002.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
1. ANDREW A. (ANDY) HART
5554 RAMSEY ST.NW *CLEVELAND,TN 37312
423-284-7759 * aahart@gmx.com
SUMMARY
20 years of field and office experience providingtechnical guidance and leadership. Coordinating activities with
Vendors. Implementing Electrical designs. TroubleshootingComponents, testingand evaluatingPower and Control
circuits. Participatingin constructability meetings.Providingcraft oversight.
13 years as a small business owner. Past member of Tennessee Home Builders Association.President of Ocoee Region
Builders Association in Cleveland Tn. 2000 and 2001.
EXPERIENCE
ELECTRICAL FIELD ENGINEER Nov 2009 – Dec 2015
Bechtel Power Corporation, Watts Bar Nuclear Plant, Spring City, TN
Support Start-up activities for Hot Functional Testing and Fuel Load for Unit 2
Assigned to electrical start-up group.Responsible for performance and documentation of scheme verification and
functional testing of power and control circuits under jurisdictional control ofpreoperational start-up engineering.
Performed troubleshooting of components and equipment to insuresystems areready to support fuel load. Supervising
craft and provided technical direction whileinsuringthat Unit/2 activities did not interrupt Unit/1 operatingsystems.
Performed Environmental Qualification inspections for electrical equipment important tosafety and required to be in
compliance with 10 CFR 50.49.
Electrical Field Engineer for CRDR group (Control Room Design Review)
Interfacing with Design and construction and provide craft oversight to implement the WestinghouseIncore
Information Surveillanceand Engineering System (WINCISE) and The Post Accident Monitoring System (Common Q).
Installation of signal processingsystem cabinets,including (58) Incore Installation ThimbleAssemblies (IITA) that
measure core power distribution and transmits signals totheCommon Q system.
Lead Electrical Field Engineer for CCE group (Construction Completions Electrical)
Managed electrical field engineering group and provided technical guidance and leadership for raceway installation,
cable pulls, along with testingand cableterminations. Coordinated plan of day activities with craft supervision.
Interactingwith schedulingand planning to insureworkpriorities based on systems turnover.
Project Field Engineer signature authority by Bechtel sitePFE for electrical field change request.
Coordinate walkdown inspection activities with NRCconcerning unresolved electrical issues.
Electrical Field Engineer for CRDR group (Control Room Design Review)
Interfacing with construction toupgradethe Unit 2 Main Control Room. Modification of existing panels, removal and
reinstallation ofhand switches and controls. Coordinating activities with vendor for installation ofWinsted pedestal
raised floor, new consoles and operator workstation. Providingtechnical guidance to craft during replacement of hand
switches,recorders and indicators and critical class 1E wiring,insuringthat separation requirements weremaintained,
whileminimizingdifferences between Unit 1 and Unit 2.
OWNER/OPERATOR Jan 1996 – Nov 2009
AB&T Shelving, Cleveland, TN
Custom closet company providingdesign and installation ofclosets shelving, heavy glass shower doors, mirrors and
bathroom accessories. Provided door lock installation includingkeying. Scheduled meetings and furnish estimates to
home owners and contractors.Supervise fabrication and installation ofmaterials.Maintained inventory for production
requirements.
2. FIELD ENGINEER 1996 - 1997
Stone and Webster, Watts Bar Nuclear Plant, Spring City, TN
Sequoyah Nuclear Plant, Soddy Daisy, TN
Watts Bar Nuclear Plant, Spring City, TN
Modifications Group for 1st Refueling Outage of Unit 1. Responsiblefor Walkdown of Design Change Notices,
Attended Constructability Meetings,Planned Work Orders, Coordinated Field Activities, interfaced with Quality
Control and System Engineers, Final Review of completed Work Orders to insureDCN Implementations.
Sequoyah Nuclear Plant, Soddy Daisy, TN
Field verification of component nameplatedata,location and other relevant date required to populate Master
Equipment List data base. Assignment of Safety Classification,Seismic Category and Quality Application Based on
Review of Design Output Documents. Interface with Site Engineering to satisfy Master Equipment List data base
changes.
Watts Bar Nuclear Plant, Spring City, TN
Assigned to Electrical Modification Group for Mid-Cycle Outage for Unit 1. Responsiblefor Preliminary Review of
Design Change Notices to Insure Constructability.Technical Review of Work Orders to Ensure Procedure Compliance.
Provided technical direction to craft for field implementation of work orders.
FIELD ENGINEER 1992 - 1995
Watts Bar Nuclear Plant, Spring City TN
Raytheon Engineers & Construction, Inc.
Implementation of Design Change Notices to support Modification activities for Conduit, Cable Tray,and Supports.
Approval Authority for Issuance of Field Design Changes to support Field Installation.Lead Field Engineer for Walk
down and CorrectiveActions required to support Modification’s system/area completion to insurePlant readiness for
Fuel Loading
LEAD FIELD ENGINEER 1989 - 1992
ABB IMPELL, Comanche Peak, Glen Rose TX
Interfaced between Impell and Construction.Responsiblefor Review/Design of new and existing Raceway Installation
to support System Completion. Interfaced with Construction duringPerformanceof work activities and ensure
compliance to technical requirements as depicted per Impell’s pre engineering design for raceway and support
installation.
ADDITIONAL EXPERIENCE
FIELD ENGINEER 1988
EBASCO SERVICES, INC., Browns Ferry, Tanner, AL & Comanche Peak, Glen Rose, TX
FIELD ENGINEER 1986 - 1987
Automatic Sprinkler Corps of America, South Texas Project, Palacious, TX
FIELD ENGINEER 1984 - 1986
Piping Designs Services, Comanche Peak, Glen Rose, TX
Additional work history prior to 1984 available on request.
Education:
Cottonwood High School-1975