1. Instrumentation & Control (I&C) Engineer with more than 30 years of
experience in nuclear power plant design engineering and plant retrofit
modifications including digital upgrade, cyber-security assessment,
trouble-shooting and support to construction, start-up and operations.
Accomplished in design modifications including installation, field support,
startup testing and project close-out.
Experience
1988-Present.
AECOM Nuclear Center, Fort Mill, South Carolina, I&C Consulting
Engineer II, April 2014-Present.
Provide engineering and design support to the Instrumentation and
Controls discipline.
Duke Energy, Harris, H.P. Robinson, and Brunswick Nuclear
Plants, Turbine Control System (TCS) Replacement Project.
Task lead for review/revision/generation of Plant Operating
Procedures (POMs), Maintenance Procedures and Vendor Technical
Manuals (VTMs) impacted by the digital upgrade of the turbine
control system (TCS). Generated new Operation & Maintenance
Manuals for TCS. Responsibilities include prepare/review
Engineering Design Change documents. Working knowledge of
design change process in Duke Energy’s Consolidated Asset Suite
(CAS) and Passport system.
Duke Energy, Brunswick Nuclear Power Plant, Southport, North
Carolina.
Completed the Engineering Change packages for the Diode Function
Generator (DFG) curve upgrade project for BNP.
Tennessee Valley Authority (TVA), Watts Bar Nuclear Power
Plant Unit 1, Sprint City, Tennessee.
Assisted with the completion of Design Change package for rad
monitor replacement project. Reviewed calculations including TI-28
Setpoint Uncertainty calculation.
Duke Energy, Harris, H.P. Robinson, and Brunswick Nuclear
Plants. Actively and professionally provided I&C discipline support
for various EC packages.
Detroit Edison, Fermi 2 Nuclear Power Plant, Newport Michigan,
I&C Consulting Engineer II/I&C Engineer IV, September 2001-
March 2014.
Khwaja S. Haque
741 Brochardt Blvd,
Knoxville, TN 37934
C: 865-405-7807
H: 865-966-9319
E: ksh3452@gmail.com
Education
B.S., Electrical Engineering, Regional
Institute of Technology, India, 1977
B.S., General Sciences, University of
Calcutta, India, 1973
Environmental Law Overview,
Pellissippi Community College,
Knoxville, Tennessee, 1994
Modern Control System and Power
System Dynamics and Stability
courses, Illinois Institute of
Technology, Chicago, Illinois, 1982
Years of Experience 35
2. Khwaja S. Haque
Page 2 of 5
Provided engineering and design support to the Instrumentation and
Controls discipline at the Fermi 2 Nuclear Power Plant in Monroe,
Michigan. Responsibilities included preparation and issuance of
Engineering Design Packages (EDPs) for various plant modifications
including digital upgrades for safety and non-safety related systems,
structures, and components. Managed project scope, budget and
schedule. Provided direction in engineering and design of plant I&C
systems, modifications, technical support and guidance to junior staff
engineers and design personnel. Interfaced with engineering
disciplines and client organizations to perform and document
compliance with industry regulations, design and design verification.
Responsible I&C Engineer for the implementation of Nuclear
Regulatory Commission (NRC) Order regarding reliable hardened
containment vents and mitigation strategies for beyond-design-basis
external events. Responsibilities, among other engineering/design
duties, include preparation of Overall Integrated Plan for Fermi 2 in
response to NRC Order related to Fukushima-Daiichi accident.
Authored various design modification packages which include:
Measurement Uncertainty Recapture (MUR) Power Uprate Project,
analog to digital upgrades per NEI 01-01 (EPRI TR-102348), cyber-
security assessment per NEI 08-09, replacement and installation of
345 KV, 874 MVA Main Station Unit Transformer, installation of
transformer monitoring system, replacement and installation of
Integrated Plant Computer System (IPCS), Generator Core Monitor,
Margin Improvement for Safety Related Motor Operated Valves,
replacement/refurbishment of Refueling Bridge Platform. Actively
supported implementation and testing for successful modification
installation and Return to Service. Performed 10CFR50.59 review of
plant design changes including Screening and Safety Evaluation.
Actively participated in UFSAR Validation Project, verifying UFSAR
with design input documents and as-constructed drawings
10CFR50.54 (f). Responsibilities included resolution and closure of
Condition Assessment Resolution Document (CARD) related to
UFSAR Validation Project.
Detroit Edison, Monroe Power Plant (fossil), Selective Catalytic
Reduction (SCR), DeNox Project, Monroe, Michigan.
Designed, purchased, and installed process ammonia gas detection
system for the Urea to Ammonia conversion (U2A) facility.
Exelon, Quad Cities Units 1 & 2, Cordova, Illinois and LaSalle
County Station Units 1 & 2, Marseilles, Illinois, Engineer IV,
January 2001-September 2001.
Authored design modification packages for the partial discharge
analyzer and generator stator leak monitoring systems for the main
generator.
Exelon, Byron, and Braidwood Units 1 & 2 Nuclear Plants,
Illinois.
Authored contact loading analysis for the Solid State Protection
System (SSPS) slave relay used.
Authored Design Analysis to determine qualified life for the
Westinghouse AR relays used as slave relays in Solid State
Protection System (SSPS).
3. Khwaja S. Haque
Page 3 of 5
Northeast Utilities, Millstone 2, Waterford, Connecticut,
Engineer II, March 1996-February 1998.
Completed EEQ walk downs collecting and documenting electrical,
physical characteristics and name plate data for EEQ equipment and
components to support EEQ Program for the restart effort.
Authored design modification packages related to EEQ programs.
PSE&G, Hope Creek Nuclear Plant, Lower Alloways Creek, New
Jersey, Engineer II, January 1996-March 1996. Authored design
modification packages for the radwaste system.
Tennessee Valley Authority, Watts Bar Nuclear Plant Unit 1,
Spring City, Tennessee, Engineer II, April 1988-June 1994 and
January 1995-January 1996.
I&C engineering and design of control schematics, logic, block
diagrams, one line, process instrumentation and control diagrams
(P&IDs). Responsibilities included design of plant auxiliaries
involving motor control centers, low and medium voltage
switchgears, main control board, local control panels, distribution
panels, batteries, chargers, etc.
Designed protective relaying and metering schemes, analog and
digital process instrumentation and control loops (including sensors,
transmitters, signal isolators and conditioners, indicators, recorders,
and associated panel instrumentations).
Performed Human Factors Engineering Reviews (NUREG
0696/0700) for the main control board modifications.
Responsible for preparing and reviewing various modification
packages to upgrade and install Post Accident Monitoring (PAM)
instrumentation to satisfy Reg. Guide 1.97 and NUREG-0588
requirements.
Prepared purchase requisitions involving the generation of
engineering specifications, data sheets. Interfaced with vendors for
component operating characteristics and material availability,
documentation (environmental and seismic test reports commercial
grade dedication), and expediting. Performed engineering review
and evaluation of vendor submittal and provided technical
recommendations for award of contract.
Designed electrical power transfer schemes providing voltage
sensing, live “fast bus” transfer of essential loads in the event of loss
of offsite power/station blackout.
Prepared design modifications for the Class 1E Emergency Bus
Load Sequencing scheme, to assure conformance with Emergency
Diesel Generator dynamic analysis and electrical auxiliary system
voltage and load characteristics (Electrical Distribution System
Functional Inspection, EDSFI).
Savannah River Project, Augusta, Georgia, Engineer II, June
1994-January 1995.
Responsible for reviewing procurement specifications and I&C
design packages for the K-Tank Farms.
Stone & Webster Engineering Corp., Houston, Texas, Electrical
Engineer 1987-1988.
4. Khwaja S. Haque
Page 4 of 5
Texas Utilities & Electric Company, Comanche Peak Steam
Electric Station Units 1 & 2, Glen Rose, Texas. Responsible for
walk down effort for documenting and resolving non-conforming
conditions involving cable raceways, conduits, switchgear, MCC,
electrical and I & C components to support construction and startup
effort.
Sargent & Lundy Engineers, Chicago, Illinois, Design Engineer,
1983-1987.
Responsible for final design, preparation and checking of various
schematics and wiring diagrams. Responsible for design and layout of
low and medium voltage power distribution systems. Also responsible for
processing of vendor drawings, which involved checking against existing
specifications and applicable standards. Recommended modifications for
construction approval.
Actively supported plant walk down for verification of cable separation
criteria and recommended corrective actions.
Manufacturing Industry Experience
Universal Transformer Inc., Chicago, Illinois, Foreman, 1981-1983.
Responsible for the design of small power transformers with full
responsibility and supervision of manufacturing and shipment of
transformers per production schedule. Assisted in improving assembly
methods, processes, and assembly line production.
Responsible for physical and electrical inspection and testing of
transformers and materials to conform to specifications, in addition to the
preparation of bills of materials and cost estimates. Mechanical and
electrical maintenance and repair of machines on shop floor. Duties
included the supervision of fifteen manufacturing employees.
Field Assignment Experience Station/Unit
Detroit Edison Co., Fermi Unit 2, Consulting Engineer II/Engineer IV,
September 2001-March 2014
Commonwealth Edison, Quad Cities/LaSalle, Engineer IV, January
2001-September 2001
Detroit Edison Co., Fermi Unit 2, Engineer IV, September 2000-
December 2000
Commonwealth Edison, Dresden Units 2 & 3, Engineer IV,
June 2000-September 2000
Detroit Edison Co., Fermi Unit 2, Engineer II, February 1998-
June 2000
Northeast Utilities, Millstone Unit 2, Engineer II, March 1996-June
1998
PSE&G, Hope Creek, Engineer II, January 1996-March 1996
TVA, Watts Bar Unit 1, Engineer II, January 1995-January 1996
Westinghouse, Savannah River, Engineer II, June 1994-January
1995
TVA, Watts Bar Unit 1, Engineer II, April 1988-June 1994
Texas Utilities & Electric Company, Comanche Peak Units 1 & 2,
Electrical Engineer, October 1987-January 1988
Illinois Power Co., Clinton Unit 1, Design Engineer, July 1986-
April 1987
Detroit Edison Co., Fermi Unit 2, Design Engineer, March 1986-
June 1986
5. Khwaja S. Haque
Page 5 of 5
CG & E Co., Zimmer Unit 1, Design Engineer, June 1983-
January 1984