SlideShare a Scribd company logo
1 of 3
451 Meadowv iew Lane
Decatur, TN 37322
PH: 423-334-9027
 Steve Carpenter
Objective
SUPERVISOR / MANAGER
Experience 2012-Present TVA Watts Bar Nuclear Plant Spring City, TN
Supervisor, I&C Maintenance
2011-2012 Sun Technical Spring City, TN
I&C Procedure Writer - Watts Bar Unit 2
2006-2011 Bowater Newsprint Calhoun, TN
Maintenance EI Supervisor – Kraft Mill, Pulp Dryer, CLO2 Plant
 Reassigned to this job because of lost production resulting from
instrumentation and electrical equipment failures. Since reassignment,
numerous production records have been achieved with budget cooks
increasing from 56/day to 68/day.
2005-2006 Bowater Newsprint Calhoun, TN
Pulping Operations Shift Supervisor
 Responsible for day-to-day operation of the Kraft Mill, Chlorine Dioxide
Plant, Pulp Dryer, TMP, Recycle, and Chip Prep areas. Coordinates shift
maintenance activities and trouble-shoots equipment performance issues
as needed.
2001-2005 Bowater Newsprint Calhoun, TN
Mill Site Coordinator – Mill Management
 Mill Manager for his shift of ~ 150 employees responsible for leading and
coordinating all mill wide activities relating to safety, quality, process and
equipment, in order to optimize the overall effectiveness of Calhoun
Operations. Developed hourly lead personnel in each department and
delegated responsibilities while holding them accountable for expected
results. My shift maintained the best safety record and production tonnage
of the 4 shifts operating at the mill.
1994–2001 Bowater Newsprint Calhoun, TN
Maintenance EI Supervisor – Kraft Mill, Pulp Dryer, CLO2 Plant
 Managed his crew very effectively and efficiently; demanding safety first.
 Developed and initiated Process Safety Management procedures for this
critical equipment in the Kraft Mill and CLO2 Plant.
 Excellent troubleshooting and decision-making skills.
 Assigned to the CLO2 Plant Production Increase Project, which was
successfully completed below budget and ahead of schedule.
1987–1994 Bowater Newsprint Calhoun, TN
EI Maintenance Technician
 DCS/PLC construction coordinator for the new $250,000,000 Kraft Mill
project.
 Responsible for submitting and implementing many process optimization
ideas for the Kraft Mill and Chem Prep areas.
 Assigned to the EI support group and served as acting foreman for the
crew which was responsible for the “high tech” EI equipment in the mill.
1986–1987 TVA Watts Bar Nuclear Plant Spring City, TN
Journeyman Instrument Mechanic
 Developed and implemented checkout procedures for several critical
interlock systems for nuclear reactor safety. (Approved by the NRC)
 Worked as training representative for Instrument Mechanic apprentices.
 Worked as lead instrument mechanic for the pre-operational and checkout
crew.
1984–1986 Miller Brewing Company Irwindale, CA
Instrumentation/Electrical Supervisor
 Responsible for the Instrumentation/Electrical Department maintenance
annual budget of $15 million dollars
 Automated the refrigeration compressor staging/sequencing operation,
which resulted in documented cost savings of over $750,000 annually.
 Improved pasteurizer temperature controls to provide uniform zone
temperatures, which resulted in better quality, runnability, and reduced
rejects.
1982–1984 Miller Brewing Company Albany, GA
Instrumentation/Electrical Supervisor
 Developed a computerized program for tracking the monthly department
budget.
 Implemented PLC program documentation and back-ups for all plant
areas.
 Designed, developed, and implemented a hydraulic system for calibration
of the grain scales in the brewhouse which resulted in consistent product
quality and significant cost savings by reducing grain usage. This design
was duplicated at all 7 breweries corporate wide.
1980–1982 Miller Brewing Company Albany, GA
Instrumentation Technician
 Developed a more reliable and accurate level control system for the
packaging line can fillers, which resulted in 25% less rejects.
 Improved the ink jet can coding printer performance and reliability by
implementing a feed forward control scheme. This control strategy was
duplicated at all breweries corporate wide.
 Improved the coal fired boiler operations by implementing and optimizing
the oxygen controls.
 Promoted to supervisor in 1982.
1977–1980 TVA Watts Bar Nuclear Plant Spring City, TN
Instrument Mechanic / Instrument Mechanic Apprentice
 Nominated for TVA apprentice of the year for 2 consecutive years.
 Installed and tested upgrades for the nuclear reactor ex-core neutron
monitoring system.
 Designed and built an electronic seismic test fixture for calibration and
testing of the seismic recording instrumentation located throughout the
reactor building. (Approved by the NRC)
Education 1972–1975 Meigs Consolidated High School Decatur, TN
 Graduated with honors.
 Ranked 5th in class.
1975-1976 Tennessee Institute of Electronics Knoxville, TN
 Graduated ranked 2nd in class.
Interests Church, boating, swimming, fishing, classic trucks, computers, camping,
PaPaw x 3.

More Related Content

What's hot

What's hot (20)

Audie Maxey Resume
Audie Maxey ResumeAudie Maxey Resume
Audie Maxey Resume
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0Forrest Suehs Resume 2016 - Prof Advan Rev 0
Forrest Suehs Resume 2016 - Prof Advan Rev 0
 
CV_E. R Caoile_rev
CV_E. R Caoile_revCV_E. R Caoile_rev
CV_E. R Caoile_rev
 
Mike Lathia_9.2.16
Mike Lathia_9.2.16Mike Lathia_9.2.16
Mike Lathia_9.2.16
 
rcallueng resume
rcallueng resumercallueng resume
rcallueng resume
 
Rama_Rao_0553758017
Rama_Rao_0553758017Rama_Rao_0553758017
Rama_Rao_0553758017
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012
 
RESUME _2016 Rev (A1)
RESUME  _2016 Rev (A1)RESUME  _2016 Rev (A1)
RESUME _2016 Rev (A1)
 
petrock patricia resume final
petrock patricia resume finalpetrock patricia resume final
petrock patricia resume final
 
SECS White Paper For Folders
SECS White Paper For FoldersSECS White Paper For Folders
SECS White Paper For Folders
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Rudy CV2-1
Rudy CV2-1Rudy CV2-1
Rudy CV2-1
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
Daniel Baze
Daniel BazeDaniel Baze
Daniel Baze
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Allmendinger, Jack resume Sept 2016
Allmendinger, Jack resume Sept 2016Allmendinger, Jack resume Sept 2016
Allmendinger, Jack resume Sept 2016
 
WARREN2016AFebResume
WARREN2016AFebResumeWARREN2016AFebResume
WARREN2016AFebResume
 

Viewers also liked

Viewers also liked (7)

Eduardo P ABELLAR RESUME NEW
Eduardo P ABELLAR RESUME NEWEduardo P ABELLAR RESUME NEW
Eduardo P ABELLAR RESUME NEW
 
NAES Presentation 1
NAES Presentation 1NAES Presentation 1
NAES Presentation 1
 
Masterclass invitation final
Masterclass invitation finalMasterclass invitation final
Masterclass invitation final
 
EAPA
EAPAEAPA
EAPA
 
Havas WW / Knowledge Bombs !
Havas WW / Knowledge Bombs !Havas WW / Knowledge Bombs !
Havas WW / Knowledge Bombs !
 
K12
K12K12
K12
 
Top 3 Causes of Aircraft Vibration
Top 3 Causes of Aircraft VibrationTop 3 Causes of Aircraft Vibration
Top 3 Causes of Aircraft Vibration
 

Similar to SteveResumeLinked

John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood ResumeJohn Hopwood
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resumepursery
 
George blane resume 1
George blane resume 1George blane resume 1
George blane resume 1Blane Arnold
 
I&C Tech Roger Pelletier
I&C Tech Roger PelletierI&C Tech Roger Pelletier
I&C Tech Roger PelletierRoger Pelletier
 
Senior Controls System Designer
Senior Controls System DesignerSenior Controls System Designer
Senior Controls System DesignerRoger Pelletier
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Kemp todd resume 3
Kemp todd resume 3Kemp todd resume 3
Kemp todd resume 3Todd Kemp
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
CV - David Kime - January 16_1
CV - David Kime - January 16_1CV - David Kime - January 16_1
CV - David Kime - January 16_1David Kime
 
JaxSmith Resume
JaxSmith  ResumeJaxSmith  Resume
JaxSmith ResumeJack Smith
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016John Meyer
 
Robert Marcus Resume (4-1-15)
Robert Marcus Resume (4-1-15)Robert Marcus Resume (4-1-15)
Robert Marcus Resume (4-1-15)Robert Marcus
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan
 
Justin Smith resume
Justin Smith resumeJustin Smith resume
Justin Smith resumeJustin Smith
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 

Similar to SteveResumeLinked (20)

John Hopwood Resume
John Hopwood ResumeJohn Hopwood Resume
John Hopwood Resume
 
_Phillip L Ursery Resume
_Phillip L Ursery Resume_Phillip L Ursery Resume
_Phillip L Ursery Resume
 
George blane resume 1
George blane resume 1George blane resume 1
George blane resume 1
 
I&C Tech Roger Pelletier
I&C Tech Roger PelletierI&C Tech Roger Pelletier
I&C Tech Roger Pelletier
 
Senior Controls System Designer
Senior Controls System DesignerSenior Controls System Designer
Senior Controls System Designer
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Domiciano Bejer - CV
Domiciano Bejer - CVDomiciano Bejer - CV
Domiciano Bejer - CV
 
SR Johnson Resume
SR Johnson ResumeSR Johnson Resume
SR Johnson Resume
 
Kemp todd resume 3
Kemp todd resume 3Kemp todd resume 3
Kemp todd resume 3
 
SHAFFEE CV
SHAFFEE CVSHAFFEE CV
SHAFFEE CV
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
CV - David Kime - January 16_1
CV - David Kime - January 16_1CV - David Kime - January 16_1
CV - David Kime - January 16_1
 
JaxSmith Resume
JaxSmith  ResumeJaxSmith  Resume
JaxSmith Resume
 
jmeyercons10112016
jmeyercons10112016jmeyercons10112016
jmeyercons10112016
 
Robert Marcus Resume (4-1-15)
Robert Marcus Resume (4-1-15)Robert Marcus Resume (4-1-15)
Robert Marcus Resume (4-1-15)
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016Kevin McClellan - Resume May 2016
Kevin McClellan - Resume May 2016
 
Justin Smith resume
Justin Smith resumeJustin Smith resume
Justin Smith resume
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 

SteveResumeLinked

  • 1. 451 Meadowv iew Lane Decatur, TN 37322 PH: 423-334-9027  Steve Carpenter Objective SUPERVISOR / MANAGER Experience 2012-Present TVA Watts Bar Nuclear Plant Spring City, TN Supervisor, I&C Maintenance 2011-2012 Sun Technical Spring City, TN I&C Procedure Writer - Watts Bar Unit 2 2006-2011 Bowater Newsprint Calhoun, TN Maintenance EI Supervisor – Kraft Mill, Pulp Dryer, CLO2 Plant  Reassigned to this job because of lost production resulting from instrumentation and electrical equipment failures. Since reassignment, numerous production records have been achieved with budget cooks increasing from 56/day to 68/day. 2005-2006 Bowater Newsprint Calhoun, TN Pulping Operations Shift Supervisor  Responsible for day-to-day operation of the Kraft Mill, Chlorine Dioxide Plant, Pulp Dryer, TMP, Recycle, and Chip Prep areas. Coordinates shift maintenance activities and trouble-shoots equipment performance issues as needed. 2001-2005 Bowater Newsprint Calhoun, TN Mill Site Coordinator – Mill Management  Mill Manager for his shift of ~ 150 employees responsible for leading and coordinating all mill wide activities relating to safety, quality, process and equipment, in order to optimize the overall effectiveness of Calhoun Operations. Developed hourly lead personnel in each department and delegated responsibilities while holding them accountable for expected results. My shift maintained the best safety record and production tonnage of the 4 shifts operating at the mill.
  • 2. 1994–2001 Bowater Newsprint Calhoun, TN Maintenance EI Supervisor – Kraft Mill, Pulp Dryer, CLO2 Plant  Managed his crew very effectively and efficiently; demanding safety first.  Developed and initiated Process Safety Management procedures for this critical equipment in the Kraft Mill and CLO2 Plant.  Excellent troubleshooting and decision-making skills.  Assigned to the CLO2 Plant Production Increase Project, which was successfully completed below budget and ahead of schedule. 1987–1994 Bowater Newsprint Calhoun, TN EI Maintenance Technician  DCS/PLC construction coordinator for the new $250,000,000 Kraft Mill project.  Responsible for submitting and implementing many process optimization ideas for the Kraft Mill and Chem Prep areas.  Assigned to the EI support group and served as acting foreman for the crew which was responsible for the “high tech” EI equipment in the mill. 1986–1987 TVA Watts Bar Nuclear Plant Spring City, TN Journeyman Instrument Mechanic  Developed and implemented checkout procedures for several critical interlock systems for nuclear reactor safety. (Approved by the NRC)  Worked as training representative for Instrument Mechanic apprentices.  Worked as lead instrument mechanic for the pre-operational and checkout crew. 1984–1986 Miller Brewing Company Irwindale, CA Instrumentation/Electrical Supervisor  Responsible for the Instrumentation/Electrical Department maintenance annual budget of $15 million dollars  Automated the refrigeration compressor staging/sequencing operation, which resulted in documented cost savings of over $750,000 annually.  Improved pasteurizer temperature controls to provide uniform zone temperatures, which resulted in better quality, runnability, and reduced rejects. 1982–1984 Miller Brewing Company Albany, GA Instrumentation/Electrical Supervisor  Developed a computerized program for tracking the monthly department budget.  Implemented PLC program documentation and back-ups for all plant areas.  Designed, developed, and implemented a hydraulic system for calibration of the grain scales in the brewhouse which resulted in consistent product quality and significant cost savings by reducing grain usage. This design was duplicated at all 7 breweries corporate wide.
  • 3. 1980–1982 Miller Brewing Company Albany, GA Instrumentation Technician  Developed a more reliable and accurate level control system for the packaging line can fillers, which resulted in 25% less rejects.  Improved the ink jet can coding printer performance and reliability by implementing a feed forward control scheme. This control strategy was duplicated at all breweries corporate wide.  Improved the coal fired boiler operations by implementing and optimizing the oxygen controls.  Promoted to supervisor in 1982. 1977–1980 TVA Watts Bar Nuclear Plant Spring City, TN Instrument Mechanic / Instrument Mechanic Apprentice  Nominated for TVA apprentice of the year for 2 consecutive years.  Installed and tested upgrades for the nuclear reactor ex-core neutron monitoring system.  Designed and built an electronic seismic test fixture for calibration and testing of the seismic recording instrumentation located throughout the reactor building. (Approved by the NRC) Education 1972–1975 Meigs Consolidated High School Decatur, TN  Graduated with honors.  Ranked 5th in class. 1975-1976 Tennessee Institute of Electronics Knoxville, TN  Graduated ranked 2nd in class. Interests Church, boating, swimming, fishing, classic trucks, computers, camping, PaPaw x 3.