SlideShare a Scribd company logo
Abanoub Ghobrial Israel Khalil
Senior Planning Engineer, M.Sc., PRMG.
Third Settlement – New Cairo – Cairo – Egypt
Tel : 002- 01278739087 / 01271097951
E-mail : Abanoub.ghobrial@yahoo.com
Linkedin: abanoub-ghobrial-m-sc-prmg-a1901811a
OBJECTIVE
 Seeking a challenging dynamic position in civil engineering within a progressive,
forward thinking company to apply my technical background and skills.
EDUCATION
Helwan University Sept. 2014 – Mar. 2020
 M.Sc. of Civil Engineering from El-Mataria Faculty of Engineering.
The American University in Cairo Jun. 2016 - Dec. 2017
 Professional program in project management (PRMG), Grade: A-
o PRIMAVERA Advanced (CADE 014)
o Cost Management for Engineering Projects (PRMG 035)
o Project Bids & Contract (PRMG 080)
o Project Management International Standard (PRMG 025)
o Management of Project Resources (PRMG 020)
o Project Planning & Control Techniques (PRMG 010)
El-Shorouk Academy Sept.2009 - May 2014
 B.Sc. of Civil Engineering, Structural Division. Grade: Very Good with Honors
(81,44%), RC concrete project, Excellent grade.
WORK EXPERIENCE
ORASCOM CONSTRUCTION Aug. 2018 – Oct. 2020
 Job Title: Planning Engineer at R5 Project 2, New Capital.
 Project owner: NUCA.
 Contract: Re-measured.
 Overview for R05
The project consists of two phases, Phase one is core and shell, Phase two is
turnkey. OC construct 13 cluster with total built up area 1,200,000 M2
.
The major activities include concrete work with post tension slabs, excavation,
backfilling, insulation, masonry, plaster, doors, gypsum board, painting, ceramic,
aluminum, GFRC, Electrical and low current wires, panel boards, IT racks,
electrical fixtures, low current fixtures, intercom, fire alarms, access control,
earthing, CCTV fixtures, elevators, parking management, photo voltaic, lightning
protection, UPS system, MCC, generators and transformers, fire extinguishing
foam, and HVAC. The project total budget cost about 10 Billion EGP.
Responsibilities
 Control and monitor of project time plan including verifying and checking of
progress update, construction works to insure that project time frame is pertinent
and reachable.
 Analyzed construction activities actual duration and delays.
 Preparing the following reports:
o Site update.
o Progress percentages.
o Histograms and s-curve.
o Resource profile “planned Vs. earned “.
o Shoring and scaffolding cycles efficiency.
o Weekly and monthly reports.
o Dashboard and look ahead reports.
o Resource monitoring & follow up reports
 Follow the following reports:
o Inventory reports for critical items.
o Manpower and relevant man-days of sub-contractors.
 Prepare baseline schedule and mitigation plan.
 Prepare Revised schedule.
 Prepare review meeting presentation.
 Prepare E.O.T.
ORASCOM CONSTRUCTION Dec. 2017 - Jul. 2018
 Job Title: Junior Planning Engineer at Al-Almein Hotel Refurbishment, North
Coast.
 Project owner: EMAAR.
 Contract: Re-measured.
 Overview for Project
Refurbishment of hotel, villas, chalet & infrastructure. the Activities include site
work, repair and strengthening work, RC Concrete, ceramic, aluminum doors and
windows, plastering, masonry, painting, metal fabrication, gypsum board,
furniture, firefighting system, cameras sound system, plumbing fixtures and
accessories, electrical devices, and HVAC. total budget cost about 1.2 Billion EGP.
Responsibilities
 Prepare weekly progress report.
 Prepare monthly progress report.
 Prepare Dashboard report.
 Prepare baseline schedule & following up the project.
 Updating baseline schedule up to dates.
 Prepare mitigation plan.
 Mentoring all project parties.
 Prepare histograms and S-curve.
ORASCOM CONSTRUCTION Apr.2016 - Nov. 2017
 Job Title: Junior Site Civil Engineer at Palm Hills golf views project, 6 October
City.
 Project owner: PHD.
 Overview for Project
Construct 360 villas, town homes, blocks, the activities include site work, concrete
works, wood, aluminum doors, windows, plastering, masonry, Painting, metal
fabrication, Cornish, drainage and water pipes, walkways, interlock, and fences.
The total budget cost about 1.4 Billion EGP.
Responsibilities
 Manage and construct 20 Villas with optimum time, cost and high quality.
 Concrete works (strip footing, isolating footing, combined footing, columns, flat
slabs, solid slabs, retaining walls, secant piles, slab on grade, stairs excavation,
backfilling, and walkaway).
 Receipt different kind of finishing (brick buildings, plaster, marble, painting,
aluminum doors & windows, isolation works, ceramic, cornish, and tiles).
 Applying project works in accordance with drawings and specification.
SELF EMPLOYED Jul.2014 - Jan. 2015
 Job Title: Project Engineer at Villa 199, El-banfsig 4, 1st
Settlement, New Cairo
 Project owner: Dr. Gehan Youssef
 Overview for Project
Finishing work for a villa with total built up area 1200 m2. The total budget cost
about 3 Million EGP.
Responsibilities
 Receipt different kind of finishing (plaster, marble, painting, aluminum doors &
windows, isolation works, ceramic).
 Manage all parties to complete all activities on time with high quality & low cost.
 Supervise all technician and skilled labor.
ACTIVITIES
 Enjaz Masr Volunteer on “It’s My Business Program” for school students. Feb 2020
 UN online Volunteering “English to Arabic short translation” Feb 2020
 Work Force Passport internship (graduation project, how to make a business plan,
Effective communication skills “Dell Carnige“, work essential skills and road
map to career success) at The Youth Academy. Nov. 2014
 3rd Egy science festival at American University in Cairo. Mar. 2014
 Social transformation engagement at American University in Cairo. Oct. 2013
TECHNICAL COURSES
 Business Writing Aug. 2020
 Environmental Protection Oct. 2017
 OHSAS 18001 Jul. 2017
 OSHA Mar. 2017
 Risk Assessment Dec. 2016
 ETABS Mar. 2014
 CSI Column Mar. 2014
 PRIMAVERA V6 Sept.2012
 AUTOCAD Sept. 2012
 SAP 2000 Sept. 2012
LANGUAGE SKILLS
 English: Intermediate (level 4, Berlitz). Dec. 2014
PUPLICATIONS
American Journal of Engineering Research (AJER) Jul. 2020
 Manuscript “Effect of Stirrups Shape and Branches on The Behaviour of
Rectangular RC Columns “.
 Author: Abanoub Ghobrial, Nagy Fouad, Ata El-Kariem,
Volume-9, Issue-7, July 2020, PP-170-180.
PERSONAL SKILLS
 Project Planning.
 Project Mentoring and Control.
 Construction Management.
 CPM Scheduling.
 Delays Analysis.
 Reporting.
 Documentation
 Mailing
 Technical Writing.
 Scientific Research.
 Scientific Analysis
PERSONAL DATA
 Date of birth: October 21th
, 1990
 Marital status: Single
 Military Status: Accomplished in Mar. 2016
Membership
 Egyptian Youth Council.
 Egyptian Civil Engineers Society.
 Arab Engineers Federation.
 Egyptian Engineers Syndicate.
REFERENCES
 Samir Sobhy, Senior Project Controls Manager.
ORASCOM CONSTRUCTION.
Mobil: 002-01222759295.
 George Ibrahim, Planning Area Manager.
EHAF CONSULTING.
Mobil: 002-01283130337.
 Mina Mickhael , Planning Team Leader.
ORASCOM CONSTRUCTION.
Mobil: 002-01277336589.
 Nagy Fouad, Professor of Civil Engineering.
GERMAN UNIVERSITY IN CAIRO.
Mobil: 002-01223198257.
 Magdi Genidy , Assoc. Professor.
HELWAN UNIVERSITY.
Mobil: 002-01000080596.

All references are available upon request.

More Related Content

What's hot

civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
Rinu Chacko
 
Resume For Document Controller (Updated)
Resume For Document Controller (Updated)Resume For Document Controller (Updated)
Resume For Document Controller (Updated)
Rizwan Younas
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23
Manjeet Singh
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin Executive
Santhosh Prabhakaran
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
Sadiq Ali
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Rakesh Arora
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
Tanveer Ahmed Niazi
 
CV (Document Controller)
CV (Document Controller)CV (Document Controller)
CV (Document Controller)
Mohammad Aslam maslam
 
Mechanical/HVAC Engineer
Mechanical/HVAC EngineerMechanical/HVAC Engineer
Mechanical/HVAC Engineer
Waqar Sardar
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
sajid hasan
 
Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)
emorkil
 
CV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANCV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMAN
wasif
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
Mohammed Shaker
 
Abdul Haseen - Quantity Surveyor CV
Abdul Haseen - Quantity Surveyor CVAbdul Haseen - Quantity Surveyor CV
Abdul Haseen - Quantity Surveyor CV
Abdul Haseen Abdul Hakeem
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
iftekhar Ahmad Baig
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin Infrastructure,Housing,water,Industrial
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
S Ajith
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
MALIK NADEEM
 

What's hot (20)

civil engineer Cv
civil engineer Cvcivil engineer Cv
civil engineer Cv
 
Resume For Document Controller (Updated)
Resume For Document Controller (Updated)Resume For Document Controller (Updated)
Resume For Document Controller (Updated)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23Curriculum vitae[new updated cv)23
Curriculum vitae[new updated cv)23
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin Executive
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Sadiq-CV- Document Controller
Sadiq-CV- Document ControllerSadiq-CV- Document Controller
Sadiq-CV- Document Controller
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
CV (Document Controller)
CV (Document Controller)CV (Document Controller)
CV (Document Controller)
 
Mechanical/HVAC Engineer
Mechanical/HVAC EngineerMechanical/HVAC Engineer
Mechanical/HVAC Engineer
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)Ammar yasser - Civil engineer - may 2018 (cv)
Ammar yasser - Civil engineer - may 2018 (cv)
 
CV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMANCV FOR AUTOCAD DRAFTSMAN
CV FOR AUTOCAD DRAFTSMAN
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Abdul Haseen - Quantity Surveyor CV
Abdul Haseen - Quantity Surveyor CVAbdul Haseen - Quantity Surveyor CV
Abdul Haseen - Quantity Surveyor CV
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 

Similar to Abanoub ghobrial , Senior planning engineer

Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning Engineer
AbanoubGhobrial1
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
Ehab Radwan
 
islam ibrahim younes
islam ibrahim younesislam ibrahim younes
islam ibrahim younes
islam younes
 
CV-Eng.Sarah
CV-Eng.SarahCV-Eng.Sarah
CV-Eng.Sarah
Sarah Medhat
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
Amgad Barakat
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
Bishoy Wagdy Aziz
 
04-2016
04-201604-2016
CURRICULAM VITAE - M
CURRICULAM VITAE - MCURRICULAM VITAE - M
CURRICULAM VITAE - M
sridhar Devaraj
 
Eslam ramadan civil engineer
Eslam ramadan   civil engineerEslam ramadan   civil engineer
Eslam ramadan civil engineer
Eslam Ramadan Helmy ,PRMG®
 
Karthickeyan resume
Karthickeyan resumeKarthickeyan resume
Karthickeyan resume
Karthick Keyan
 
السي في
السي فيالسي في
السي في
Hazem salah
 
CV Planning Engineer Mohammad Abu Khashem
CV Planning Engineer Mohammad Abu KhashemCV Planning Engineer Mohammad Abu Khashem
CV Planning Engineer Mohammad Abu Khashem
Mohammad Abu Khashem
 
cv 16
cv 16cv 16
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
Mahmoud Mohamed
 
C.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed ElsayedC.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed Elsayed
Mohamed Essayed
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
Hosam Ahmed
 
Eng.Yasser Adel 2009 (CV)
Eng.Yasser Adel 2009 (CV)Eng.Yasser Adel 2009 (CV)
Eng.Yasser Adel 2009 (CV)
yasser adel
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
Waell Azmy
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
Paul Baffour Asare
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
Ali.M Maruoof
 

Similar to Abanoub ghobrial , Senior planning engineer (20)

Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning Engineer
 
Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
islam ibrahim younes
islam ibrahim younesislam ibrahim younes
islam ibrahim younes
 
CV-Eng.Sarah
CV-Eng.SarahCV-Eng.Sarah
CV-Eng.Sarah
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 
04-2016
04-201604-2016
04-2016
 
CURRICULAM VITAE - M
CURRICULAM VITAE - MCURRICULAM VITAE - M
CURRICULAM VITAE - M
 
Eslam ramadan civil engineer
Eslam ramadan   civil engineerEslam ramadan   civil engineer
Eslam ramadan civil engineer
 
Karthickeyan resume
Karthickeyan resumeKarthickeyan resume
Karthickeyan resume
 
السي في
السي فيالسي في
السي في
 
CV Planning Engineer Mohammad Abu Khashem
CV Planning Engineer Mohammad Abu KhashemCV Planning Engineer Mohammad Abu Khashem
CV Planning Engineer Mohammad Abu Khashem
 
cv 16
cv 16cv 16
cv 16
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
C.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed ElsayedC.V. Civil Engineer Mohamed Elsayed
C.V. Civil Engineer Mohamed Elsayed
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
 
Eng.Yasser Adel 2009 (CV)
Eng.Yasser Adel 2009 (CV)Eng.Yasser Adel 2009 (CV)
Eng.Yasser Adel 2009 (CV)
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
BAFFOUR CV
BAFFOUR CVBAFFOUR CV
BAFFOUR CV
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 

Recently uploaded

5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
awadeshbabu
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 

Recently uploaded (20)

5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
[JPP-1] - (JEE 3.0) - Kinematics 1D - 14th May..pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 

Abanoub ghobrial , Senior planning engineer

  • 1. Abanoub Ghobrial Israel Khalil Senior Planning Engineer, M.Sc., PRMG. Third Settlement – New Cairo – Cairo – Egypt Tel : 002- 01278739087 / 01271097951 E-mail : Abanoub.ghobrial@yahoo.com Linkedin: abanoub-ghobrial-m-sc-prmg-a1901811a OBJECTIVE  Seeking a challenging dynamic position in civil engineering within a progressive, forward thinking company to apply my technical background and skills. EDUCATION Helwan University Sept. 2014 – Mar. 2020  M.Sc. of Civil Engineering from El-Mataria Faculty of Engineering. The American University in Cairo Jun. 2016 - Dec. 2017  Professional program in project management (PRMG), Grade: A- o PRIMAVERA Advanced (CADE 014) o Cost Management for Engineering Projects (PRMG 035) o Project Bids & Contract (PRMG 080) o Project Management International Standard (PRMG 025) o Management of Project Resources (PRMG 020) o Project Planning & Control Techniques (PRMG 010) El-Shorouk Academy Sept.2009 - May 2014  B.Sc. of Civil Engineering, Structural Division. Grade: Very Good with Honors (81,44%), RC concrete project, Excellent grade. WORK EXPERIENCE ORASCOM CONSTRUCTION Aug. 2018 – Oct. 2020  Job Title: Planning Engineer at R5 Project 2, New Capital.  Project owner: NUCA.  Contract: Re-measured.  Overview for R05 The project consists of two phases, Phase one is core and shell, Phase two is turnkey. OC construct 13 cluster with total built up area 1,200,000 M2 . The major activities include concrete work with post tension slabs, excavation, backfilling, insulation, masonry, plaster, doors, gypsum board, painting, ceramic, aluminum, GFRC, Electrical and low current wires, panel boards, IT racks, electrical fixtures, low current fixtures, intercom, fire alarms, access control, earthing, CCTV fixtures, elevators, parking management, photo voltaic, lightning protection, UPS system, MCC, generators and transformers, fire extinguishing foam, and HVAC. The project total budget cost about 10 Billion EGP.
  • 2. Responsibilities  Control and monitor of project time plan including verifying and checking of progress update, construction works to insure that project time frame is pertinent and reachable.  Analyzed construction activities actual duration and delays.  Preparing the following reports: o Site update. o Progress percentages. o Histograms and s-curve. o Resource profile “planned Vs. earned “. o Shoring and scaffolding cycles efficiency. o Weekly and monthly reports. o Dashboard and look ahead reports. o Resource monitoring & follow up reports  Follow the following reports: o Inventory reports for critical items. o Manpower and relevant man-days of sub-contractors.  Prepare baseline schedule and mitigation plan.  Prepare Revised schedule.  Prepare review meeting presentation.  Prepare E.O.T. ORASCOM CONSTRUCTION Dec. 2017 - Jul. 2018  Job Title: Junior Planning Engineer at Al-Almein Hotel Refurbishment, North Coast.  Project owner: EMAAR.  Contract: Re-measured.  Overview for Project Refurbishment of hotel, villas, chalet & infrastructure. the Activities include site work, repair and strengthening work, RC Concrete, ceramic, aluminum doors and windows, plastering, masonry, painting, metal fabrication, gypsum board, furniture, firefighting system, cameras sound system, plumbing fixtures and accessories, electrical devices, and HVAC. total budget cost about 1.2 Billion EGP. Responsibilities  Prepare weekly progress report.  Prepare monthly progress report.  Prepare Dashboard report.  Prepare baseline schedule & following up the project.  Updating baseline schedule up to dates.  Prepare mitigation plan.  Mentoring all project parties.  Prepare histograms and S-curve.
  • 3. ORASCOM CONSTRUCTION Apr.2016 - Nov. 2017  Job Title: Junior Site Civil Engineer at Palm Hills golf views project, 6 October City.  Project owner: PHD.  Overview for Project Construct 360 villas, town homes, blocks, the activities include site work, concrete works, wood, aluminum doors, windows, plastering, masonry, Painting, metal fabrication, Cornish, drainage and water pipes, walkways, interlock, and fences. The total budget cost about 1.4 Billion EGP. Responsibilities  Manage and construct 20 Villas with optimum time, cost and high quality.  Concrete works (strip footing, isolating footing, combined footing, columns, flat slabs, solid slabs, retaining walls, secant piles, slab on grade, stairs excavation, backfilling, and walkaway).  Receipt different kind of finishing (brick buildings, plaster, marble, painting, aluminum doors & windows, isolation works, ceramic, cornish, and tiles).  Applying project works in accordance with drawings and specification. SELF EMPLOYED Jul.2014 - Jan. 2015  Job Title: Project Engineer at Villa 199, El-banfsig 4, 1st Settlement, New Cairo  Project owner: Dr. Gehan Youssef  Overview for Project Finishing work for a villa with total built up area 1200 m2. The total budget cost about 3 Million EGP. Responsibilities  Receipt different kind of finishing (plaster, marble, painting, aluminum doors & windows, isolation works, ceramic).  Manage all parties to complete all activities on time with high quality & low cost.  Supervise all technician and skilled labor. ACTIVITIES  Enjaz Masr Volunteer on “It’s My Business Program” for school students. Feb 2020  UN online Volunteering “English to Arabic short translation” Feb 2020  Work Force Passport internship (graduation project, how to make a business plan, Effective communication skills “Dell Carnige“, work essential skills and road map to career success) at The Youth Academy. Nov. 2014  3rd Egy science festival at American University in Cairo. Mar. 2014  Social transformation engagement at American University in Cairo. Oct. 2013
  • 4. TECHNICAL COURSES  Business Writing Aug. 2020  Environmental Protection Oct. 2017  OHSAS 18001 Jul. 2017  OSHA Mar. 2017  Risk Assessment Dec. 2016  ETABS Mar. 2014  CSI Column Mar. 2014  PRIMAVERA V6 Sept.2012  AUTOCAD Sept. 2012  SAP 2000 Sept. 2012 LANGUAGE SKILLS  English: Intermediate (level 4, Berlitz). Dec. 2014 PUPLICATIONS American Journal of Engineering Research (AJER) Jul. 2020  Manuscript “Effect of Stirrups Shape and Branches on The Behaviour of Rectangular RC Columns “.  Author: Abanoub Ghobrial, Nagy Fouad, Ata El-Kariem, Volume-9, Issue-7, July 2020, PP-170-180. PERSONAL SKILLS  Project Planning.  Project Mentoring and Control.  Construction Management.  CPM Scheduling.  Delays Analysis.  Reporting.  Documentation  Mailing  Technical Writing.  Scientific Research.  Scientific Analysis PERSONAL DATA  Date of birth: October 21th , 1990  Marital status: Single  Military Status: Accomplished in Mar. 2016
  • 5. Membership  Egyptian Youth Council.  Egyptian Civil Engineers Society.  Arab Engineers Federation.  Egyptian Engineers Syndicate. REFERENCES  Samir Sobhy, Senior Project Controls Manager. ORASCOM CONSTRUCTION. Mobil: 002-01222759295.  George Ibrahim, Planning Area Manager. EHAF CONSULTING. Mobil: 002-01283130337.  Mina Mickhael , Planning Team Leader. ORASCOM CONSTRUCTION. Mobil: 002-01277336589.  Nagy Fouad, Professor of Civil Engineering. GERMAN UNIVERSITY IN CAIRO. Mobil: 002-01223198257.  Magdi Genidy , Assoc. Professor. HELWAN UNIVERSITY. Mobil: 002-01000080596. All references are available upon request.