SlideShare a Scribd company logo
1 of 5
Download to read offline
1/5
Mobile: +966543952805
E-Mail: Eng.Hosam_Ahmed@yahoo.com
Hossam Ahmed Mahmoud Khalaf
Makkah, Saudi Arabia
Personal Information
 Current Job Title: Senior Cost Control engineer
 Nationality: Egyptian.
 Military Status: Exempt.
 Date of Birth: 13th
August 1984.
 Age: 31 years.
 Marital status: Married.
Education
 B.Sc. in mechanical design and production engineering,
Shoubra faculty of engineering, Benha University.
 Graduation year: 2006.
 Accumulative grade: Good.
 Graduation project: Design and manufacturing of plastic injection mold.
 Project grade: Excellent.
Languages
Mother tongue: Arabic.
Computer Skills
 Primavera project planner (P3)
 Primavera project management (P6&P7).
 Microsoft Office package (Word, excel, PowerPoint, Access).
 CNC programming (awareness).
 Solid works (awareness).
Speaking Reading Writing
fluent v.good good fluent v.good good fluent v.good good
ARABIC √ √ √
ENGLISH √ √ √
2/5
Personal Skills
 Creativeness thinking.
 Prefers to work in teamwork.
 Good communication skills.
 Capability of solving the problems in scientific reasonable ways.
 Cannot work without goals, objectives and targets.
 Willing to learn and more integration.
 Hard working.
 Keeps good human relationships with my teamwork’s members.
Training befor grad.
 Maintenance of huge printing machines, Heidelberg Yusuf Alaam
Company.
 Manufacturing of all types of gears, The Egyptian Germany Company for
gears.
 Design and manufacturing of plastic injection molds, ABB Arab Company.
Courses: Course Location
MANAGERIAL TRAINING
- Preliminary Preparation of newly appointed employees.
Career Development & and
Consultations Academy -Egypt
-
Developing the managerial skills of engineers. (December
2007).
The American supplier institute
(ASI – Egypt).
- Letters and Correspondence Writing Skills. (March 2008).
The American supplier institute
(ASI – Egypt).
TECHNICAL TRAINING
- Life cycle cost analysis. (March 2007) The Egyptian engineers society
- Value engineering. (March 2007) The Egyptian engineers society
- Principles of Project planning. (March 2007)
The Petroleum Projects And Technical
Consultations Company (PETROJET).
-
Primavera Project Management (P6). (May
2008)
The American University in Cairo
(A.U.C)
- Resource Management
The American University in Cairo
(A.U.C)
- Project bids & contracts.
The American University in Cairo
(A.U.C)
-
Advanced Primavera Project Management
(P6). (JAN 2010)
The American University in Cairo
(A.U.C)
- Primavera Contract Management ver. 14.1 SEMCO MANAGEMENT UK LTD
-
Cost Certification Refresher Seminars/Exam
Preparation
AACE international
3/5
Professional Experience
From October 2013 till Now (In Saudi Binladin Group)
Job Title : Senior Cost Control engineer
Project Name: King Abdullah for Mataf Extension.
Location : Makkah- S.A.
Owner Name : Saudi ministry of finance.
Consultant: Dar Al-Handasah.
Project Brief : Increasing MATAF area in the holy mosque in Makkah in
order to increase the pilgrim’s allowable capacity including demolition of old
Haram, relocation of utilities and new constructions. Total expected built up area
is 119,518 m2.
Project Start/Finish Date : November 2012 up to Now.
Duties in the Project : Following up the project Manpower and calculating
the manpower productivity rate then calculating the actual items dry cost unit,
Submitting recommendations to the cost control manager according to the cost
control report analysis to avoid/decrease the cost variance.
From September 2012 till October 2013 (In Saudi Binladin Group)
Job Title : Planning & follow up engineer
Project Name: King Abdullah for Mataf Extension.
Location : Makkah- S.A.
Owner Name : Saudi ministry of finance.
Consultant : Dar Al-Handasah.
Project Brief : Increasing MATAF area in the holy mosque in Makkah in
order to increase the pilgrim’s allowable capacity including demolition of old
Haram, relocation of utilities and new constructions. Total expected built up area
is 119,518 m2.
Project Start/Finish Date : November 2012 up to Now.
Duties in the Project : Making the project time schedule and Following up
the project activities to avoid any delay in the time of the project and calculating
the manpower productivity rate.
4/5
From January 2011 till September 2012 (In Saudi Binladin Group)
Job Title : Planning & follow up engineer
Project Name: Construction of King saud university for girls .
Location : Riyadh- S.A.
Owner Name : King saud university.
Consultant : Saud consult company.
Project Brief : Construction of Girl's University Campus with total built-up
area of approx. 1,200,000 m2.
Project Start/Finish Date : Oct 2008 – Jun 2012.
Duties in the Project : Follow up the project activities and making the
project monthly progress update and issuing the monthly expected revenue to the
owner and recording the actual weekly executed quantities comparing with the
planned weekly quantities and analyze the delay and the obstacles and try to solve
it with the construction managers and issuing also the weekly report.
From May 2009 till January 2011 (In PETROJET Headquarter)
Job Title : Planning & follow up engineer
Project Name: Construction of EPC lamp-sum polystyrene plant project.
Location : Alex - Egypt
Owner/Client Name : Estrynice Company / UHDE Company
Project Brief : Construction of all Civil, Mechanical, electrical and
instrument work of polystyrene complex project with120, 000 ton production
capacity.
Project Start/Finish Date : May 2009 – July 2011.
Duties in the Project : Follow up all project activities and make the project
progress and delay analysis report to the planning &follow-up general manager
and then to CEO – reviews and approves the required project budget with the
required resource plane.
From May 2009 till January 2011 (In PETROJET Headquarter)
Job Title : Planning & follow up engineer
Project Name: El Amal Field development project
Location : Ghareb - Egypt
Owner/Client Name : Amapetco / Amapetco
Project Brief : El Amal Field development project (civil, mechanical,
electrical work of the plant)
Project Start/Finish Date: Jan 2009 – March 2010.
Duties in the Project : Follow up all project activities and make the project
progress and delay analysis report to the planning &follow-up general manager
5/5
and then to CEO – reviews and approves the required project budget with the
required resource plane.
From October 2007 till May 2009 (In PETROJET Headquarter)
Job Title : Cost Control Engineer
Project Name: Construction of Polypropylene Plant.
Location : Port said - Egypt
Owner/Client Name : The Egyptian company for petrochemicals / Uhde
Project Brief : Construction of Propane Dehydrogenation &
Polypropylene Plant –PDH –PP Project (650 Million L.E).
Project Start/Finish Date : July 2007 – March 2010.
Duties in the Project : Follow up the factory projects progress and
Preparing detailed cost plan and detailed monthly cost control reports (Earned
Value Reports) for the project and tracking of procurement and construction costs
, preparing variance reports for the material and equipment and manpower usage
and suggest any needed corrective actions.
From January 2007 till June 2008 (In PETROJET Headquarter)
Job Title : Cost Control Engineer
Project Name: Construction of Bani-Suif Silos
Location : Bani-Suif - Egypt
Owner/Client Name : The Egyptian company for silos and storage
Project Brief : Construction of Bani-Suif silos (Civil & mechanical
and Electrical work of 12 silos with 60,000 ton storage Capacity).
Project Start/Finish Date : November 2006 - June 2008
Duties in the Project : Follow up the project progress and Preparing
detailed cost plan and detailed monthly cost control reports (Earned Value
Reports) for the project and tracking of procurement and construction costs ,
preparing variance reports for the material and equipment and manpower usage
and suggest any needed corrective actions.
References
“Furnished upon request”

More Related Content

What's hot (20)

Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
Mohammad Odeh CV Eng
Mohammad Odeh CV  EngMohammad Odeh CV  Eng
Mohammad Odeh CV Eng
 
Rami cv
Rami cvRami cv
Rami cv
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
mohamed dakrory cv
mohamed dakrory cvmohamed dakrory cv
mohamed dakrory cv
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
Mohammad adwan-CV (1)
Mohammad adwan-CV (1)Mohammad adwan-CV (1)
Mohammad adwan-CV (1)
 
سيرتي الذاتية الجديدة77
سيرتي الذاتية الجديدة77سيرتي الذاتية الجديدة77
سيرتي الذاتية الجديدة77
 
hatim marouf 4
hatim marouf 4hatim marouf 4
hatim marouf 4
 
Yousef Abu Alwafa Resume
Yousef Abu Alwafa ResumeYousef Abu Alwafa Resume
Yousef Abu Alwafa Resume
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsman
 
CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122CV Eng Abanob Adel Edward1122
CV Eng Abanob Adel Edward1122
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed Nasser
 
Mina Mourad CV
Mina Mourad CVMina Mourad CV
Mina Mourad CV
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
 

Viewers also liked

Top 8 cost engineer resume samples
Top 8 cost engineer resume samplesTop 8 cost engineer resume samples
Top 8 cost engineer resume samplesgedihutes
 
CV - Abdul Munaf .A [Chef]
CV - Abdul Munaf .A [Chef]CV - Abdul Munaf .A [Chef]
CV - Abdul Munaf .A [Chef]Abdul Adham
 
ROUBA DARWICH 2014 updated CV
ROUBA DARWICH 2014 updated CVROUBA DARWICH 2014 updated CV
ROUBA DARWICH 2014 updated CVRouba Darwich
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
C V Mohannad Ahmad ALmomani
C V Mohannad  Ahmad  ALmomaniC V Mohannad  Ahmad  ALmomani
C V Mohannad Ahmad ALmomanimmomani
 
Khalid Anaya_Resume_2016
Khalid Anaya_Resume_2016Khalid Anaya_Resume_2016
Khalid Anaya_Resume_2016Khalid Anaya
 
Sources for TEFL PhD Exam
Sources for TEFL PhD Exam Sources for TEFL PhD Exam
Sources for TEFL PhD Exam Ehsan Abbaspour
 
Top 8 production associate resume samples
Top 8 production associate resume samplesTop 8 production associate resume samples
Top 8 production associate resume samplesjomkerro
 
Helana Assad CV updated - 15-4-2015
Helana Assad CV updated - 15-4-2015Helana Assad CV updated - 15-4-2015
Helana Assad CV updated - 15-4-2015Helana Masry
 

Viewers also liked (20)

Top 8 cost engineer resume samples
Top 8 cost engineer resume samplesTop 8 cost engineer resume samples
Top 8 cost engineer resume samples
 
B Cronje CV
B Cronje CVB Cronje CV
B Cronje CV
 
snr arc cv
snr arc cvsnr arc cv
snr arc cv
 
CV - Abdul Munaf .A [Chef]
CV - Abdul Munaf .A [Chef]CV - Abdul Munaf .A [Chef]
CV - Abdul Munaf .A [Chef]
 
ROUBA DARWICH 2014 updated CV
ROUBA DARWICH 2014 updated CVROUBA DARWICH 2014 updated CV
ROUBA DARWICH 2014 updated CV
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
C V Mohannad Ahmad ALmomani
C V Mohannad  Ahmad  ALmomaniC V Mohannad  Ahmad  ALmomani
C V Mohannad Ahmad ALmomani
 
Rashid Iqbal New
Rashid Iqbal NewRashid Iqbal New
Rashid Iqbal New
 
Abdulsalam Ali Al Zahrani
Abdulsalam Ali Al ZahraniAbdulsalam Ali Al Zahrani
Abdulsalam Ali Al Zahrani
 
Khalid Anaya_Resume_2016
Khalid Anaya_Resume_2016Khalid Anaya_Resume_2016
Khalid Anaya_Resume_2016
 
Hassan CV
Hassan CVHassan CV
Hassan CV
 
M.Dalaty CV
M.Dalaty CVM.Dalaty CV
M.Dalaty CV
 
Dr. Khaled CV
Dr. Khaled CVDr. Khaled CV
Dr. Khaled CV
 
2016 CV UPDATE
2016 CV UPDATE2016 CV UPDATE
2016 CV UPDATE
 
CV
CVCV
CV
 
Sources for TEFL PhD Exam
Sources for TEFL PhD Exam Sources for TEFL PhD Exam
Sources for TEFL PhD Exam
 
Top 8 production associate resume samples
Top 8 production associate resume samplesTop 8 production associate resume samples
Top 8 production associate resume samples
 
Helana Assad CV updated - 15-4-2015
Helana Assad CV updated - 15-4-2015Helana Assad CV updated - 15-4-2015
Helana Assad CV updated - 15-4-2015
 
Anil nair cv
Anil nair  cvAnil nair  cv
Anil nair cv
 
MUHAMMAD CV (1)
MUHAMMAD CV (1)MUHAMMAD CV (1)
MUHAMMAD CV (1)
 

Similar to HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final

Similar to HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final (20)

Mustafa_original CV
Mustafa_original CV Mustafa_original CV
Mustafa_original CV
 
yasser radwan
yasser radwanyasser radwan
yasser radwan
 
islam ibrahim younes
islam ibrahim younesislam ibrahim younes
islam ibrahim younes
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
CV.Mohammed
CV.MohammedCV.Mohammed
CV.Mohammed
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Ariel Almes -CV_update
Ariel Almes -CV_updateAriel Almes -CV_update
Ariel Almes -CV_update
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa
 
C.V Mr. Rabih Makhoul
C.V Mr. Rabih MakhoulC.V Mr. Rabih Makhoul
C.V Mr. Rabih Makhoul
 
01. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-201601. Karim Absawi updated on 22-04-2016
01. Karim Absawi updated on 22-04-2016
 
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
 
Mohamed Sabry CV
Mohamed Sabry CVMohamed Sabry CV
Mohamed Sabry CV
 
السي في
السي فيالسي في
السي في
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
OSAMA ABBAD-PLANNING ENG
OSAMA ABBAD-PLANNING ENGOSAMA ABBAD-PLANNING ENG
OSAMA ABBAD-PLANNING ENG
 
Professional resume
Professional resumeProfessional resume
Professional resume
 
Romany cv
Romany cvRomany cv
Romany cv
 
Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_
 
Updated CV for 11.11.16
Updated CV for 11.11.16 Updated CV for 11.11.16
Updated CV for 11.11.16
 

HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final

  • 1. 1/5 Mobile: +966543952805 E-Mail: Eng.Hosam_Ahmed@yahoo.com Hossam Ahmed Mahmoud Khalaf Makkah, Saudi Arabia Personal Information  Current Job Title: Senior Cost Control engineer  Nationality: Egyptian.  Military Status: Exempt.  Date of Birth: 13th August 1984.  Age: 31 years.  Marital status: Married. Education  B.Sc. in mechanical design and production engineering, Shoubra faculty of engineering, Benha University.  Graduation year: 2006.  Accumulative grade: Good.  Graduation project: Design and manufacturing of plastic injection mold.  Project grade: Excellent. Languages Mother tongue: Arabic. Computer Skills  Primavera project planner (P3)  Primavera project management (P6&P7).  Microsoft Office package (Word, excel, PowerPoint, Access).  CNC programming (awareness).  Solid works (awareness). Speaking Reading Writing fluent v.good good fluent v.good good fluent v.good good ARABIC √ √ √ ENGLISH √ √ √
  • 2. 2/5 Personal Skills  Creativeness thinking.  Prefers to work in teamwork.  Good communication skills.  Capability of solving the problems in scientific reasonable ways.  Cannot work without goals, objectives and targets.  Willing to learn and more integration.  Hard working.  Keeps good human relationships with my teamwork’s members. Training befor grad.  Maintenance of huge printing machines, Heidelberg Yusuf Alaam Company.  Manufacturing of all types of gears, The Egyptian Germany Company for gears.  Design and manufacturing of plastic injection molds, ABB Arab Company. Courses: Course Location MANAGERIAL TRAINING - Preliminary Preparation of newly appointed employees. Career Development & and Consultations Academy -Egypt - Developing the managerial skills of engineers. (December 2007). The American supplier institute (ASI – Egypt). - Letters and Correspondence Writing Skills. (March 2008). The American supplier institute (ASI – Egypt). TECHNICAL TRAINING - Life cycle cost analysis. (March 2007) The Egyptian engineers society - Value engineering. (March 2007) The Egyptian engineers society - Principles of Project planning. (March 2007) The Petroleum Projects And Technical Consultations Company (PETROJET). - Primavera Project Management (P6). (May 2008) The American University in Cairo (A.U.C) - Resource Management The American University in Cairo (A.U.C) - Project bids & contracts. The American University in Cairo (A.U.C) - Advanced Primavera Project Management (P6). (JAN 2010) The American University in Cairo (A.U.C) - Primavera Contract Management ver. 14.1 SEMCO MANAGEMENT UK LTD - Cost Certification Refresher Seminars/Exam Preparation AACE international
  • 3. 3/5 Professional Experience From October 2013 till Now (In Saudi Binladin Group) Job Title : Senior Cost Control engineer Project Name: King Abdullah for Mataf Extension. Location : Makkah- S.A. Owner Name : Saudi ministry of finance. Consultant: Dar Al-Handasah. Project Brief : Increasing MATAF area in the holy mosque in Makkah in order to increase the pilgrim’s allowable capacity including demolition of old Haram, relocation of utilities and new constructions. Total expected built up area is 119,518 m2. Project Start/Finish Date : November 2012 up to Now. Duties in the Project : Following up the project Manpower and calculating the manpower productivity rate then calculating the actual items dry cost unit, Submitting recommendations to the cost control manager according to the cost control report analysis to avoid/decrease the cost variance. From September 2012 till October 2013 (In Saudi Binladin Group) Job Title : Planning & follow up engineer Project Name: King Abdullah for Mataf Extension. Location : Makkah- S.A. Owner Name : Saudi ministry of finance. Consultant : Dar Al-Handasah. Project Brief : Increasing MATAF area in the holy mosque in Makkah in order to increase the pilgrim’s allowable capacity including demolition of old Haram, relocation of utilities and new constructions. Total expected built up area is 119,518 m2. Project Start/Finish Date : November 2012 up to Now. Duties in the Project : Making the project time schedule and Following up the project activities to avoid any delay in the time of the project and calculating the manpower productivity rate.
  • 4. 4/5 From January 2011 till September 2012 (In Saudi Binladin Group) Job Title : Planning & follow up engineer Project Name: Construction of King saud university for girls . Location : Riyadh- S.A. Owner Name : King saud university. Consultant : Saud consult company. Project Brief : Construction of Girl's University Campus with total built-up area of approx. 1,200,000 m2. Project Start/Finish Date : Oct 2008 – Jun 2012. Duties in the Project : Follow up the project activities and making the project monthly progress update and issuing the monthly expected revenue to the owner and recording the actual weekly executed quantities comparing with the planned weekly quantities and analyze the delay and the obstacles and try to solve it with the construction managers and issuing also the weekly report. From May 2009 till January 2011 (In PETROJET Headquarter) Job Title : Planning & follow up engineer Project Name: Construction of EPC lamp-sum polystyrene plant project. Location : Alex - Egypt Owner/Client Name : Estrynice Company / UHDE Company Project Brief : Construction of all Civil, Mechanical, electrical and instrument work of polystyrene complex project with120, 000 ton production capacity. Project Start/Finish Date : May 2009 – July 2011. Duties in the Project : Follow up all project activities and make the project progress and delay analysis report to the planning &follow-up general manager and then to CEO – reviews and approves the required project budget with the required resource plane. From May 2009 till January 2011 (In PETROJET Headquarter) Job Title : Planning & follow up engineer Project Name: El Amal Field development project Location : Ghareb - Egypt Owner/Client Name : Amapetco / Amapetco Project Brief : El Amal Field development project (civil, mechanical, electrical work of the plant) Project Start/Finish Date: Jan 2009 – March 2010. Duties in the Project : Follow up all project activities and make the project progress and delay analysis report to the planning &follow-up general manager
  • 5. 5/5 and then to CEO – reviews and approves the required project budget with the required resource plane. From October 2007 till May 2009 (In PETROJET Headquarter) Job Title : Cost Control Engineer Project Name: Construction of Polypropylene Plant. Location : Port said - Egypt Owner/Client Name : The Egyptian company for petrochemicals / Uhde Project Brief : Construction of Propane Dehydrogenation & Polypropylene Plant –PDH –PP Project (650 Million L.E). Project Start/Finish Date : July 2007 – March 2010. Duties in the Project : Follow up the factory projects progress and Preparing detailed cost plan and detailed monthly cost control reports (Earned Value Reports) for the project and tracking of procurement and construction costs , preparing variance reports for the material and equipment and manpower usage and suggest any needed corrective actions. From January 2007 till June 2008 (In PETROJET Headquarter) Job Title : Cost Control Engineer Project Name: Construction of Bani-Suif Silos Location : Bani-Suif - Egypt Owner/Client Name : The Egyptian company for silos and storage Project Brief : Construction of Bani-Suif silos (Civil & mechanical and Electrical work of 12 silos with 60,000 ton storage Capacity). Project Start/Finish Date : November 2006 - June 2008 Duties in the Project : Follow up the project progress and Preparing detailed cost plan and detailed monthly cost control reports (Earned Value Reports) for the project and tracking of procurement and construction costs , preparing variance reports for the material and equipment and manpower usage and suggest any needed corrective actions. References “Furnished upon request”