SlideShare a Scribd company logo
Page 1 of 3
B I S H O Y W A G D Y A Z I Z IS H A K
Location: Dubai, United Arab Emirates.
Cairo, Egypt.
Mobile: +971 503196607,+201285603321
E-mail: Abo_wagdy111@yahoo.com ,Abo_wagdy111@hotmail.com
Strong credentials in Delivering Optimal Results & Business Value in High-growth environments
PROJECT ENGINEER
Residential Towers | Gasoline Stations |Church & School Buildings
 A highly accomplished and dynamic CivilEngineering professional with a successfulcareer spanning 4 years in Egypt.
 Current Assignment: Project engineer with Al Boustan for constructions, Egypt.
 Expertise in planning, executing and spearheading construction of high value projects.
 Extensive experience in planning and scheduling work, allocating resources so that project deadlines are met within
allocated budgets adhering to quality standards.
 Excellent communicationand coordination skills; regularly community with clients, consultants, sub -contractors and
statutory agencies keeping all stakeholder updated of project status.
 Recognized as an effective problem solver, with excellent communication and presentation skills.
AREAS OF EXPERTISE
Project Management
Construction Works Supervision
Cost Control Strategies
Stakeholders/ Vendor Management
Quality Management
Manpower Management
Resource Planning
Quality Assurance & Control
Construction Management
Progress Monitoring/Review
Senior Management Reporting
Safety Standards /Compliance
Multi-site Management
EXPERIENCE SUMMARY
AL SHAFAR GENERAL CONTRACTING L.L.C.
Senior-Site Engineer – Buildings (November 2016)
Project: Mohamed Bin Rashid Library.
Project Outlay: AED 900 Millions
Job Profile
 Managing construction projects from development to delivery.
 Review drawings for the work assigned and to be implemented.
 Good planning and Division of site works.
 Consider applying the standards of safety and occupational health.
 Choose the team and collaborators.
 Direct and monitor on-site construction and ensure compliance with schedule and standard practices
AL SHAFAR GENERAL CONTRACTING L.L.C.
Senior-Site Engineer – Buildings (July 2016-October 2016)
Project: Renovation of Ballroom Bani Yass at Grant Hyatt hotel.
Project Outlay: AED 40 Millions
Job Profile
 Managing construction projects from development to delivery.
 Review drawings for the work assigned and to be implemented.
 Good planning and Division of site works.
 Consider applying the standards of safety and occupational health.
 Choose the team and collaborators.
 Put thetimeschedulefor thecompletion ofthebusiness,takingintoaccounttheapplicationoftheapplicablespecifications
with accuracy.
Page 2 of 3
AL SHAFAR GENERAL CONTRACTING L.L.C.
Site Engineer – Buildings (Sep 2014 – July 2016)
Project: Commercial / Residential Building (3B+G+M+4P+32 typical floors).
Project Outlay: AED 355 Millions
Job Profile
 Managing construction projects from development to delivery.
 Review drawings for the work assigned and to be implemented.
 Good planning and Division of site works.
 Consider applying the standards of safety and occupational health.
 Choose the team and collaborators.
 Put thetimeschedulefor thecompletion ofthebusiness,takingintoaccounttheapplicationoftheapplicablespecifications
with accuracy.
 Direct and monitor on-site construction and ensure compliance with schedule and standard practices
AL BOUSTAN FOR CONSTRUCTIONS COMPANY
Project Engineer – Buildings (August 2010 - August 2014)
Project: Maryohana Church, Assiut,Egypt.
Project Outlay: EGP 8 Millions
Project: Safia Zaghloul Preparatory Common school construction project in Assiut.
Project Outlay: EGP 5 Millions
Job Profile
 Managing construction projects from development to delivery.
 Review drawings for the work assigned and to be implemented.
 Good planning and Division of site works.
 Consider applying the standards of safety and occupational health.
 Choose the team and collaborators.
 Put thetimeschedulefor thecompletion ofthebusiness,takingintoaccounttheapplicationoftheapplicablespecifications
with accuracy.
 Direct and monitor on-site construction and ensure compliance with schedule and standard practices
Project Engineer (December 2012-July 2013)
Project: Public Services Complex construction project in Assiut and Qena
Project Outlay: EGP 5 Millions
Job Profile
 Led theCivil &Finishingteams tosupervisesiteactivities and ensurethattaskswerecompleted in linewith the schedule.
 Followed-up mock-up modification, approval & coordination with architect designer.
 Ensured all required operation related material was available on time through consistent follow-up and construction
activities were completed within the deadlines.
 Conducted quality audits of civil and finishing construction works.
Project Engineer (Feb 2012 - Nov 2012)
Project: Two Gasoline stations construction project in the eastern desert road linking Cairo and Assiut
Project Outlay: EGP 12 Millions
Job Profile
 Monitored quality of work and ensured these were in accordance with contract specifications and drawings.
 Identified / recorded defects; ensured that rectifications were carried out in accordance with agreed procedures.
 Maintained records of work carried out, and ensured that plant and other resources were properly recorded.
 Ensured that the work was carried out as per approved QA/QC and HSE plans of the project.
Project Engineer (Jun 2011 - Jan 2012)
Project: Six residential towers construction project in Assiut
Page 3 of 3
Project Outlay: EGP 15 Millions
Job Profile
 Monitored quality of work and ensured these were in accordance with contract specifications and drawings.
 Identified / recorded defects; ensured that rectifications were carried in accordance with agreed procedures.
 Maintained records of work carried out, and ensured that plant and other resources were properly recorded.
 Ensured that the work is carried out as per approved QA/QC and HSE plans of the project.
Assistant Project Engineer (Oct 2010 - May 2011)
Project: Two residential towers construction project in Assiut
Project Outlay: EGP 6 Millions
Job Profile:
 Monitored quality of work ensuring that it adhered to contract specifications and drawings.
 Involved in defect rectification,maintenance of record of works carried out, and ensured QA / QC and HSE plans of the
project.
Junior Engineer (Jun 2010 - Sep 2010)
Project: Reinforced concrete shelters and baths construction project for the soldiers assembled in Assiut
Project Outlay: EGP 3 Millions
Job Profile:
 Monitored quality of work ensuring that it adhered to contract specifications and drawings.
EDUCATION
 Bachelor Degree in Civil Engineering (Construction and Building Engineering)
Assiut University Degree: Very Good
 Project name: Analysis and Design of Special Structures, Degree: Very good
 PMP (Project ManagementProfessional) at the American University in Cairo.
OTHER PARTICULARS
 Year of Birth: 1987
 Nationality: Egyptian
 Computer Proficiency: Primavera6; MS Office; Autocade 2D; Sap 2000 & Internet
 Driving License: Valid in Egypt

More Related Content

What's hot

Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NationalLaboratory
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERKhaled mohamed
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Adli Fataftah Civil Engineer-CV
Adli Fataftah  Civil  Engineer-CVAdli Fataftah  Civil  Engineer-CV
Adli Fataftah Civil Engineer-CVdsd dfd
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copyayman hussien
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Sadek
 
Cost Control eng. and Contracts Mngmnt Engineer CV 2008 (Jun.15)
Cost Control eng. and Contracts Mngmnt  Engineer CV 2008 (Jun.15)Cost Control eng. and Contracts Mngmnt  Engineer CV 2008 (Jun.15)
Cost Control eng. and Contracts Mngmnt Engineer CV 2008 (Jun.15)Sherif Ahmed Shair
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
Wasi Sami
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida finalAhmad Eida
 
سيرتي الذاتية الجديدة77
سيرتي الذاتية الجديدة77سيرتي الذاتية الجديدة77
سيرتي الذاتية الجديدة77samawaal omer
 
Naseer resume 2
Naseer resume 2Naseer resume 2
Naseer resume 2
Mohd Naseeruddin
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHosam Ahmed
 

What's hot (20)

Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTINGNATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
NATIONAL LABORATORY FOR SOIL AND BUILDING MATERIALS TESTING
 
CV Eng. Musalm New
CV Eng. Musalm NewCV Eng. Musalm New
CV Eng. Musalm New
 
Vali
ValiVali
Vali
 
CV Ahmed Site
CV Ahmed SiteCV Ahmed Site
CV Ahmed Site
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGERCIVIL ENGINEER-PROJECT MANAGER
CIVIL ENGINEER-PROJECT MANAGER
 
Cost Control Engineer
Cost Control Engineer Cost Control Engineer
Cost Control Engineer
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Adli Fataftah Civil Engineer-CV
Adli Fataftah  Civil  Engineer-CVAdli Fataftah  Civil  Engineer-CV
Adli Fataftah Civil Engineer-CV
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Nabil Noshey Sadek -1
Nabil Noshey Sadek -1Nabil Noshey Sadek -1
Nabil Noshey Sadek -1
 
Cost Control eng. and Contracts Mngmnt Engineer CV 2008 (Jun.15)
Cost Control eng. and Contracts Mngmnt  Engineer CV 2008 (Jun.15)Cost Control eng. and Contracts Mngmnt  Engineer CV 2008 (Jun.15)
Cost Control eng. and Contracts Mngmnt Engineer CV 2008 (Jun.15)
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
سيرتي الذاتية الجديدة77
سيرتي الذاتية الجديدة77سيرتي الذاتية الجديدة77
سيرتي الذاتية الجديدة77
 
Naseer resume 2
Naseer resume 2Naseer resume 2
Naseer resume 2
 
yasser radwan
yasser radwanyasser radwan
yasser radwan
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
 

Similar to Resume - Bisho Wagdy Aziz (1)

Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CVvimal nc
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
Mohamed Abdelaziz
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad
 
MEP Construction Manager - JD
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JDericaeksander
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia
 
Mohammed imad ahmed
Mohammed imad ahmedMohammed imad ahmed
Mohammed imad ahmed
Imaad Ahmed
 
Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
Mohamed Shipl , PMP
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
ShahbazAhmad953994
 

Similar to Resume - Bisho Wagdy Aziz (1) (20)

Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
biju DGM
biju DGMbiju DGM
biju DGM
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
MEP Construction Manager - JD
MEP Construction Manager - JDMEP Construction Manager - JD
MEP Construction Manager - JD
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016Prajeesh K. CV - Sep 2016
Prajeesh K. CV - Sep 2016
 
Hafiz- resume
Hafiz- resumeHafiz- resume
Hafiz- resume
 
Mohammed imad ahmed
Mohammed imad ahmedMohammed imad ahmed
Mohammed imad ahmed
 
Mohamed Shipl PMP CV
Mohamed Shipl PMP CVMohamed Shipl PMP CV
Mohamed Shipl PMP CV
 
SAQIB (2) (1)
SAQIB (2) (1)SAQIB (2) (1)
SAQIB (2) (1)
 
HUSSAIN KHAROUF CV (1)
HUSSAIN KHAROUF CV (1)HUSSAIN KHAROUF CV (1)
HUSSAIN KHAROUF CV (1)
 
Abdulrahman Shakboua15
Abdulrahman Shakboua15Abdulrahman Shakboua15
Abdulrahman Shakboua15
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 

Resume - Bisho Wagdy Aziz (1)

  • 1. Page 1 of 3 B I S H O Y W A G D Y A Z I Z IS H A K Location: Dubai, United Arab Emirates. Cairo, Egypt. Mobile: +971 503196607,+201285603321 E-mail: Abo_wagdy111@yahoo.com ,Abo_wagdy111@hotmail.com Strong credentials in Delivering Optimal Results & Business Value in High-growth environments PROJECT ENGINEER Residential Towers | Gasoline Stations |Church & School Buildings  A highly accomplished and dynamic CivilEngineering professional with a successfulcareer spanning 4 years in Egypt.  Current Assignment: Project engineer with Al Boustan for constructions, Egypt.  Expertise in planning, executing and spearheading construction of high value projects.  Extensive experience in planning and scheduling work, allocating resources so that project deadlines are met within allocated budgets adhering to quality standards.  Excellent communicationand coordination skills; regularly community with clients, consultants, sub -contractors and statutory agencies keeping all stakeholder updated of project status.  Recognized as an effective problem solver, with excellent communication and presentation skills. AREAS OF EXPERTISE Project Management Construction Works Supervision Cost Control Strategies Stakeholders/ Vendor Management Quality Management Manpower Management Resource Planning Quality Assurance & Control Construction Management Progress Monitoring/Review Senior Management Reporting Safety Standards /Compliance Multi-site Management EXPERIENCE SUMMARY AL SHAFAR GENERAL CONTRACTING L.L.C. Senior-Site Engineer – Buildings (November 2016) Project: Mohamed Bin Rashid Library. Project Outlay: AED 900 Millions Job Profile  Managing construction projects from development to delivery.  Review drawings for the work assigned and to be implemented.  Good planning and Division of site works.  Consider applying the standards of safety and occupational health.  Choose the team and collaborators.  Direct and monitor on-site construction and ensure compliance with schedule and standard practices AL SHAFAR GENERAL CONTRACTING L.L.C. Senior-Site Engineer – Buildings (July 2016-October 2016) Project: Renovation of Ballroom Bani Yass at Grant Hyatt hotel. Project Outlay: AED 40 Millions Job Profile  Managing construction projects from development to delivery.  Review drawings for the work assigned and to be implemented.  Good planning and Division of site works.  Consider applying the standards of safety and occupational health.  Choose the team and collaborators.  Put thetimeschedulefor thecompletion ofthebusiness,takingintoaccounttheapplicationoftheapplicablespecifications with accuracy.
  • 2. Page 2 of 3 AL SHAFAR GENERAL CONTRACTING L.L.C. Site Engineer – Buildings (Sep 2014 – July 2016) Project: Commercial / Residential Building (3B+G+M+4P+32 typical floors). Project Outlay: AED 355 Millions Job Profile  Managing construction projects from development to delivery.  Review drawings for the work assigned and to be implemented.  Good planning and Division of site works.  Consider applying the standards of safety and occupational health.  Choose the team and collaborators.  Put thetimeschedulefor thecompletion ofthebusiness,takingintoaccounttheapplicationoftheapplicablespecifications with accuracy.  Direct and monitor on-site construction and ensure compliance with schedule and standard practices AL BOUSTAN FOR CONSTRUCTIONS COMPANY Project Engineer – Buildings (August 2010 - August 2014) Project: Maryohana Church, Assiut,Egypt. Project Outlay: EGP 8 Millions Project: Safia Zaghloul Preparatory Common school construction project in Assiut. Project Outlay: EGP 5 Millions Job Profile  Managing construction projects from development to delivery.  Review drawings for the work assigned and to be implemented.  Good planning and Division of site works.  Consider applying the standards of safety and occupational health.  Choose the team and collaborators.  Put thetimeschedulefor thecompletion ofthebusiness,takingintoaccounttheapplicationoftheapplicablespecifications with accuracy.  Direct and monitor on-site construction and ensure compliance with schedule and standard practices Project Engineer (December 2012-July 2013) Project: Public Services Complex construction project in Assiut and Qena Project Outlay: EGP 5 Millions Job Profile  Led theCivil &Finishingteams tosupervisesiteactivities and ensurethattaskswerecompleted in linewith the schedule.  Followed-up mock-up modification, approval & coordination with architect designer.  Ensured all required operation related material was available on time through consistent follow-up and construction activities were completed within the deadlines.  Conducted quality audits of civil and finishing construction works. Project Engineer (Feb 2012 - Nov 2012) Project: Two Gasoline stations construction project in the eastern desert road linking Cairo and Assiut Project Outlay: EGP 12 Millions Job Profile  Monitored quality of work and ensured these were in accordance with contract specifications and drawings.  Identified / recorded defects; ensured that rectifications were carried out in accordance with agreed procedures.  Maintained records of work carried out, and ensured that plant and other resources were properly recorded.  Ensured that the work was carried out as per approved QA/QC and HSE plans of the project. Project Engineer (Jun 2011 - Jan 2012) Project: Six residential towers construction project in Assiut
  • 3. Page 3 of 3 Project Outlay: EGP 15 Millions Job Profile  Monitored quality of work and ensured these were in accordance with contract specifications and drawings.  Identified / recorded defects; ensured that rectifications were carried in accordance with agreed procedures.  Maintained records of work carried out, and ensured that plant and other resources were properly recorded.  Ensured that the work is carried out as per approved QA/QC and HSE plans of the project. Assistant Project Engineer (Oct 2010 - May 2011) Project: Two residential towers construction project in Assiut Project Outlay: EGP 6 Millions Job Profile:  Monitored quality of work ensuring that it adhered to contract specifications and drawings.  Involved in defect rectification,maintenance of record of works carried out, and ensured QA / QC and HSE plans of the project. Junior Engineer (Jun 2010 - Sep 2010) Project: Reinforced concrete shelters and baths construction project for the soldiers assembled in Assiut Project Outlay: EGP 3 Millions Job Profile:  Monitored quality of work ensuring that it adhered to contract specifications and drawings. EDUCATION  Bachelor Degree in Civil Engineering (Construction and Building Engineering) Assiut University Degree: Very Good  Project name: Analysis and Design of Special Structures, Degree: Very good  PMP (Project ManagementProfessional) at the American University in Cairo. OTHER PARTICULARS  Year of Birth: 1987  Nationality: Egyptian  Computer Proficiency: Primavera6; MS Office; Autocade 2D; Sap 2000 & Internet  Driving License: Valid in Egypt