Abanoub Ghobrial Israel Khalil
Third Settlement – New Cairo – Cairo – Egypt
Tel : 002- 01278739087 / 01271097951
E-mail : Abanoub.ghobrial@yahoo.com
Linkedin: abanoub-ghobrial-m-sc-prmg-a1901811a
OBJECTIVE
 Seeking a challenging dynamic position in civil engineering within a progressive,
forward thinking company to apply my technical background and skills.
EDUCATION
Helwan University Sept. 2014 – Mar. 2020
 M.Sc. of Civil Engineering from El-Mataria Faculty of Engineering.
The American University in Cairo Jun. 2016 - Dec. 2017
 Professional program in project management (PRMG), Grade: A-
El-Shorouk Academy Sept.2009 - May 2014
 B.Sc. of Civil Engineering, Structural Division. Grade: Very Good with Honors
(81,44%), RC concrete project, Excellent grade.
WORK EXPERIENCE
ORASCOM CONSTRUCTION Aug. 2018 - Present
 Job Title: Planning Engineer at R5 Project 2, New Capital.
 Project owner: NUCA.
 Contract: Re-measured.
 Overview for R05
Construct 13 cluster with total built up area 1,200,000 M2
, the activities include
concrete work with post tension slabs, excavation, and backfilling. The total budget
cost about 3.6 Billion EGP. Consist of 5 project as portfolio.
Responsibilities
 Control and monitor of project time plan including verifying and checking of
progress update, construction works to insure that project time frame is pertinent
and reachable.
 Analyzed construction activities actual duration and delays.
 Preparing the following reports:
o Site update.
o Progress percentages.
o Histograms and s-curve.
o Resource profile “planned Vs. earned “.
o Shoring and scaffolding cycles efficiency.
o Weekly and monthly reports.
o Dashboard and look ahead reports.
 Follow the following reports:
o Inventory reports for critical items.
o Manpower and relevant man-days of sub-contractors.
 Prepare baseline schedule and mitigation plan.
ORASCOM CONSTRUCTION Dec. 2017 - Jul. 2018
 Job Title: Junior Planning Engineer at Al-Almein Hotel Refurbishment, North
Coast.
 Project owner: EMAAR.
 Contract: Re-measured.
 Overview for Project
Refurbishment of hotel, villas, chalet & infrastructure. the Activities include site
work, repair and strengthening work, RC Concrete, ceramic, aluminum doors and
windows, plastering, masonry, painting, metal fabrication, gypsum board,
furniture, firefighting system, cameras sound system, plumbing fixtures and
accessories, electrical devices, and HVAC. total budget cost about 1.2 Billion EGP.
Responsibilities
 Prepare weekly progress report.
 Prepare monthly progress report.
 Prepare Dashboard report.
 Prepare baseline schedule & following up the project.
 Updating baseline schedule up to dates.
 Prepare mitigation plan.
 Mentoring all project parties.
 Prepare histograms and S-curve.
ORASCOM CONSTRUCTION Apr.2016 - Nov. 2017
 Job Title: Junior Site Civil Engineer at Palm Hills golf views project, 6 October
City.
 Project owner: PHD.
 Overview for Project
Construct 360 villas, town homes, blocks, the activities include site work, concrete
works, wood, aluminum doors, windows, plastering, masonry, Painting, and metal
fabrication. The total budget cost about 1.4 Billion EGP.
Responsibilities
 Concrete works (strip footing, isolating footing, combined footing, columns, flat
slabs, solid slabs, retaining walls, secant piles, slab on grade, stairs excavation,
backfilling, and walkaway).
 Receipt different kind of finishing (brick buildings, plaster, marble, painting,
aluminum doors & windows, isolation works, ceramic, cornish, and tiles).
 Applying project works in accordance with drawings and specification.
SELF EMPLOYED Jul.2014 - Jan. 2015
 Job Title: Project Engineer at Villa 199, El-banfsig 4, 1st
Settlement, New Cairo
 Project owner: Dr. Gehan Youssef
 Overview for Project
Finishing work for a villa with total built up area 1200 m2. The total budget cost
about 3 Million EGP.
Responsibilities
 Receipt different kind of finishing (plaster, marble, painting, aluminum doors &
windows, isolation works, ceramic).
 Manage all parties to complete all activities on time with high quality & low cost.
ACTIVITIES
 Enjaz Masr Volunteer on “It’s My Business Program” for school students. Feb 2020
 Work Force Passport internship (graduation project, how to make a business plan,
Effective communication skills “Dell Carnige“, work essential skills and road
map to career success) at The Youth Academy. Nov. 2014
 3rd Egy science festival at American University in Cairo. Mar. 2014
 Social transformation engagement at American University in Cairo. Oct. 2013
TECHNICAL COURSES
 PRIMAVERA Advanced (CADE 014) Dec. 2017
 Environmental Protection Oct. 2017
 OHSAS 18001 Jul. 2017
 Cost Management for Engineering Projects (PRMG 035) Jun. 2017
 Project Bids & Contract (PRMG 080) May 2017
 Project Management International Standard (PRMG 025) May 2017
 OSHA Mar. 2017
 Management of Project Resources (PRMG 020) Dec. 2016
 Risk Assessment Dec. 2016
 Project Planning & Control Techniques (PRMG 010) Jun. 2016
 ETABS Mar. 2014
 CSI Column Mar. 2014
 PRIMAVERA V6 Sept.2012
 AUTOCAD Sept. 2012
 SAP 2000 Sept. 2012
LANGUAGE SKILLS
 English: Intermediate (level 4, Berlitz). Dec. 2014
PUPLICATIONS
American Journal of Engineering Research (AJER) Jul. 2020
 Manuscript “Effect of Stirrups Shape and Branches on The Behaviour of
Rectangular RC Columns “.
 Author: Abanoub Ghobrial, Nagy Fouad, Ata El-Kariem,
Volume-9, Issue-7, July 2020, PP-170-180.
PERSONAL SKILLS
 Project Planning.
 Construction Management.
 CPM Scheduling.
 Delays Analysis.
 Reporting.
 Technical Writing.
 Scientific Research.
 Scientific Analysis
PERSONAL DATA
 Date of birth: October 21th
, 1990
 Marital status: Single
 Military Status: Accomplished in Mar. 2016
REFERENCES
 Samir Sobhy, Senior Project Controls Manager.
ORASCOM CONSTRUCTION.
Mobil: 002-01222759295.
 George Ibrahim, Planning Area Manager.
EHAF CONSULTING.
Mobil: 002-01283130337.
 Michael Youssry, Planning Team Leader.
ORASCOM CONSTRUCTION.
Mobil: 002-01229163262.
 Mina Mickhael , Planning Team Leader.
ORASCOM CONSTRUCTION.
Mobil: 002-01277336589.
 Nagy Fouad, Professor of Civil Engineering.
GERMAN UNIVERSITY IN CAIRO.
Mobil: 002-01223198257.
 Magdi Genidy , Assoc. Professor.
HELWAN UNIVERSITY.
Mobil: 002-01000080596.
All references are available upon request.

Abanoub Ghobrial, Planning Engineer

  • 1.
    Abanoub Ghobrial IsraelKhalil Third Settlement – New Cairo – Cairo – Egypt Tel : 002- 01278739087 / 01271097951 E-mail : Abanoub.ghobrial@yahoo.com Linkedin: abanoub-ghobrial-m-sc-prmg-a1901811a OBJECTIVE  Seeking a challenging dynamic position in civil engineering within a progressive, forward thinking company to apply my technical background and skills. EDUCATION Helwan University Sept. 2014 – Mar. 2020  M.Sc. of Civil Engineering from El-Mataria Faculty of Engineering. The American University in Cairo Jun. 2016 - Dec. 2017  Professional program in project management (PRMG), Grade: A- El-Shorouk Academy Sept.2009 - May 2014  B.Sc. of Civil Engineering, Structural Division. Grade: Very Good with Honors (81,44%), RC concrete project, Excellent grade. WORK EXPERIENCE ORASCOM CONSTRUCTION Aug. 2018 - Present  Job Title: Planning Engineer at R5 Project 2, New Capital.  Project owner: NUCA.  Contract: Re-measured.  Overview for R05 Construct 13 cluster with total built up area 1,200,000 M2 , the activities include concrete work with post tension slabs, excavation, and backfilling. The total budget cost about 3.6 Billion EGP. Consist of 5 project as portfolio. Responsibilities  Control and monitor of project time plan including verifying and checking of progress update, construction works to insure that project time frame is pertinent and reachable.  Analyzed construction activities actual duration and delays.  Preparing the following reports: o Site update. o Progress percentages. o Histograms and s-curve. o Resource profile “planned Vs. earned “. o Shoring and scaffolding cycles efficiency. o Weekly and monthly reports. o Dashboard and look ahead reports.
  • 2.
     Follow thefollowing reports: o Inventory reports for critical items. o Manpower and relevant man-days of sub-contractors.  Prepare baseline schedule and mitigation plan. ORASCOM CONSTRUCTION Dec. 2017 - Jul. 2018  Job Title: Junior Planning Engineer at Al-Almein Hotel Refurbishment, North Coast.  Project owner: EMAAR.  Contract: Re-measured.  Overview for Project Refurbishment of hotel, villas, chalet & infrastructure. the Activities include site work, repair and strengthening work, RC Concrete, ceramic, aluminum doors and windows, plastering, masonry, painting, metal fabrication, gypsum board, furniture, firefighting system, cameras sound system, plumbing fixtures and accessories, electrical devices, and HVAC. total budget cost about 1.2 Billion EGP. Responsibilities  Prepare weekly progress report.  Prepare monthly progress report.  Prepare Dashboard report.  Prepare baseline schedule & following up the project.  Updating baseline schedule up to dates.  Prepare mitigation plan.  Mentoring all project parties.  Prepare histograms and S-curve. ORASCOM CONSTRUCTION Apr.2016 - Nov. 2017  Job Title: Junior Site Civil Engineer at Palm Hills golf views project, 6 October City.  Project owner: PHD.  Overview for Project Construct 360 villas, town homes, blocks, the activities include site work, concrete works, wood, aluminum doors, windows, plastering, masonry, Painting, and metal fabrication. The total budget cost about 1.4 Billion EGP. Responsibilities  Concrete works (strip footing, isolating footing, combined footing, columns, flat slabs, solid slabs, retaining walls, secant piles, slab on grade, stairs excavation, backfilling, and walkaway).  Receipt different kind of finishing (brick buildings, plaster, marble, painting, aluminum doors & windows, isolation works, ceramic, cornish, and tiles).  Applying project works in accordance with drawings and specification.
  • 3.
    SELF EMPLOYED Jul.2014- Jan. 2015  Job Title: Project Engineer at Villa 199, El-banfsig 4, 1st Settlement, New Cairo  Project owner: Dr. Gehan Youssef  Overview for Project Finishing work for a villa with total built up area 1200 m2. The total budget cost about 3 Million EGP. Responsibilities  Receipt different kind of finishing (plaster, marble, painting, aluminum doors & windows, isolation works, ceramic).  Manage all parties to complete all activities on time with high quality & low cost. ACTIVITIES  Enjaz Masr Volunteer on “It’s My Business Program” for school students. Feb 2020  Work Force Passport internship (graduation project, how to make a business plan, Effective communication skills “Dell Carnige“, work essential skills and road map to career success) at The Youth Academy. Nov. 2014  3rd Egy science festival at American University in Cairo. Mar. 2014  Social transformation engagement at American University in Cairo. Oct. 2013 TECHNICAL COURSES  PRIMAVERA Advanced (CADE 014) Dec. 2017  Environmental Protection Oct. 2017  OHSAS 18001 Jul. 2017  Cost Management for Engineering Projects (PRMG 035) Jun. 2017  Project Bids & Contract (PRMG 080) May 2017  Project Management International Standard (PRMG 025) May 2017  OSHA Mar. 2017  Management of Project Resources (PRMG 020) Dec. 2016  Risk Assessment Dec. 2016  Project Planning & Control Techniques (PRMG 010) Jun. 2016  ETABS Mar. 2014  CSI Column Mar. 2014  PRIMAVERA V6 Sept.2012  AUTOCAD Sept. 2012  SAP 2000 Sept. 2012 LANGUAGE SKILLS  English: Intermediate (level 4, Berlitz). Dec. 2014
  • 4.
    PUPLICATIONS American Journal ofEngineering Research (AJER) Jul. 2020  Manuscript “Effect of Stirrups Shape and Branches on The Behaviour of Rectangular RC Columns “.  Author: Abanoub Ghobrial, Nagy Fouad, Ata El-Kariem, Volume-9, Issue-7, July 2020, PP-170-180. PERSONAL SKILLS  Project Planning.  Construction Management.  CPM Scheduling.  Delays Analysis.  Reporting.  Technical Writing.  Scientific Research.  Scientific Analysis PERSONAL DATA  Date of birth: October 21th , 1990  Marital status: Single  Military Status: Accomplished in Mar. 2016 REFERENCES  Samir Sobhy, Senior Project Controls Manager. ORASCOM CONSTRUCTION. Mobil: 002-01222759295.  George Ibrahim, Planning Area Manager. EHAF CONSULTING. Mobil: 002-01283130337.  Michael Youssry, Planning Team Leader. ORASCOM CONSTRUCTION. Mobil: 002-01229163262.  Mina Mickhael , Planning Team Leader. ORASCOM CONSTRUCTION. Mobil: 002-01277336589.  Nagy Fouad, Professor of Civil Engineering. GERMAN UNIVERSITY IN CAIRO. Mobil: 002-01223198257.  Magdi Genidy , Assoc. Professor. HELWAN UNIVERSITY. Mobil: 002-01000080596. All references are available upon request.