The Dead Run Drive Outfall Restoration project was substantially completed on August 27, 2018. The primary goals of this project were to address public safety concerns, stabilize an eroded channel by using natural stream design techniques, promote the growth of native vegetation and improve water quality. The natural channel design techniques used, such as a reinforced bed mix riffle sections and step pools, reduce the flow velocity, provide stability, and enhance water quality along the streams leading to the Chesapeake Bay. The disturbed areas of the site were restored with native shrubs, plants and trees.
The purpose of this emergency project was to replace approximately 60-ft. segment of 8-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. The project was substantially complete on May 14, 2021.
The Dead Run Drive Outfall Restoration project was substantially completed on August 27, 2018. The primary goals of this project were to address public safety concerns, stabilize an eroded channel by using natural stream design techniques, promote the growth of native vegetation and improve water quality. The natural channel design techniques used, such as a reinforced bed mix riffle sections and step pools, reduce the flow velocity, provide stability, and enhance water quality along the streams leading to the Chesapeake Bay. The disturbed areas of the site were restored with native shrubs, plants and trees.
The purpose of this emergency project was to replace approximately 60-ft. segment of 8-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. The project was substantially complete on May 14, 2021.
The Midhill Place Outfall Restoration project was substantially completed on October 26, 2018. The primary goals of this project were to address public safety concerns, stabilize an eroded channel by using natural stream design techniques and promote the growth of native vegetation. The natural channel design techniques used, such as a reinforced bed mix riffle sections and step pools, reduce the flow velocity, provide stability, and enhance water quality along the streams leading to the Chesapeake Bay. The disturbed areas of the site were restored with native shrubs, plants and trees.
The project consists primarily of the interior renovation and reconfiguration of an
existing one story institutional residential care facility with minor site improvements.
The building is approximately 9,500 square feet (SF) previously housing a Boys
Probation House. The renovation will provide for a Crisis Care Program providing
adult crisis stabilization treatment services through the Fairfax County Community
Services Board (CSB). The key elements of the overall project scope include:
Interior renovation with selective demolition and floor plan changes
Interior finish upgrades
New toilet rooms and existing bathroom ADA update
Building system upgrades for MEP, fire protection and security
Roofing and dormer improvements
Parking lot re-striping, new fencing and concrete pads
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Fairfax County
The project consists of a pre-engineered 72 ft diameter dome structure for storage of 2,500 tons of salt, portable conveyor, portable conveyor feeding hopper, water line extension and associated electrical and plumbing work. The key elements of the overall project scope include:
New Prefabricated Geodesic Dome
Portable Conveyor
Portable Feeding Hopper
One Salt Containment Concrete Pad
Two Underground Saline Water Storage Tanks
Additional Transitional Screening Trees & Landscaping
The Green Hill Estates Sewer Emergency project addressed a broken 8-inch sewer pipe and the erosion of the adjacent stream. The emergency was discovered during routine sewer cleaning and inspection. A break, along with several other defects, were noted in the sewer. In addition, the creek had eroded and had partially exposed the pipe. The stream was diverted and restored, and the broken pipe segment was replaced with a section of PVC pipe. The project was substantially completed August 10, 2021.
Turnkey total swimming pool refurbishment project to prestigious school in th...DAVID GREEN
TOTAL SWIMMING POOL REFURBISHMENT TO FIRE DAMAGED SWIMMING POOL. EXCAVATING AROUND POOL TO REPLACE ALL UNDERGROUND STEEL PIPEWORK WITH UPVC, ACID WASH AND FULLY ABASE POOL SURFACES IN READINESS FOR FIBRE GLASSING POOL TANK, RELAY POOL SURROUND USING SPECIALIST CONCRETE, FIBREGLASS POOL TANK AND POOL EDGE COPING STONES, GEL COAT INSTALL NEW INLETS, OUTLETS, SKIMMERS AND VACCUUM POINT, LAY RUBBER CRUMB TO POOL SURROUND, DISMANTLE AND DISPOSE OF FIRE DAMAGED POOL BUILDING,ERECT NEW BESPOKE POOL BUILDING, SUPPLY AND INSTALL NEW POOL FILTRATION PLANT AND FIELD WIRING
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Terra Grande Pond PSP and Riser ReplacementFairfax County
The Terra Grande Pond PSP and Riser Replacement Project was substantially completed on May 18, 2021. The purpose of this project was to perform necessary capital maintenance, increase the performance of the pond, enhance the facility, and isolate future maintenance needs.
Martin Goodman Trail West – Project OverviewWaterfrontTO
Take a look at the design for the extension of the Martin Goodman Trail. When complete, a separated off-street Martin Goodman Trail will stretch from Lower Spadina through the Bathurst intersection on the south side of Queens Quay.
The Midhill Place Outfall Restoration project was substantially completed on October 26, 2018. The primary goals of this project were to address public safety concerns, stabilize an eroded channel by using natural stream design techniques and promote the growth of native vegetation. The natural channel design techniques used, such as a reinforced bed mix riffle sections and step pools, reduce the flow velocity, provide stability, and enhance water quality along the streams leading to the Chesapeake Bay. The disturbed areas of the site were restored with native shrubs, plants and trees.
The project consists primarily of the interior renovation and reconfiguration of an
existing one story institutional residential care facility with minor site improvements.
The building is approximately 9,500 square feet (SF) previously housing a Boys
Probation House. The renovation will provide for a Crisis Care Program providing
adult crisis stabilization treatment services through the Fairfax County Community
Services Board (CSB). The key elements of the overall project scope include:
Interior renovation with selective demolition and floor plan changes
Interior finish upgrades
New toilet rooms and existing bathroom ADA update
Building system upgrades for MEP, fire protection and security
Roofing and dormer improvements
Parking lot re-striping, new fencing and concrete pads
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Fairfax County
The project consists of a pre-engineered 72 ft diameter dome structure for storage of 2,500 tons of salt, portable conveyor, portable conveyor feeding hopper, water line extension and associated electrical and plumbing work. The key elements of the overall project scope include:
New Prefabricated Geodesic Dome
Portable Conveyor
Portable Feeding Hopper
One Salt Containment Concrete Pad
Two Underground Saline Water Storage Tanks
Additional Transitional Screening Trees & Landscaping
The Green Hill Estates Sewer Emergency project addressed a broken 8-inch sewer pipe and the erosion of the adjacent stream. The emergency was discovered during routine sewer cleaning and inspection. A break, along with several other defects, were noted in the sewer. In addition, the creek had eroded and had partially exposed the pipe. The stream was diverted and restored, and the broken pipe segment was replaced with a section of PVC pipe. The project was substantially completed August 10, 2021.
Turnkey total swimming pool refurbishment project to prestigious school in th...DAVID GREEN
TOTAL SWIMMING POOL REFURBISHMENT TO FIRE DAMAGED SWIMMING POOL. EXCAVATING AROUND POOL TO REPLACE ALL UNDERGROUND STEEL PIPEWORK WITH UPVC, ACID WASH AND FULLY ABASE POOL SURFACES IN READINESS FOR FIBRE GLASSING POOL TANK, RELAY POOL SURROUND USING SPECIALIST CONCRETE, FIBREGLASS POOL TANK AND POOL EDGE COPING STONES, GEL COAT INSTALL NEW INLETS, OUTLETS, SKIMMERS AND VACCUUM POINT, LAY RUBBER CRUMB TO POOL SURROUND, DISMANTLE AND DISPOSE OF FIRE DAMAGED POOL BUILDING,ERECT NEW BESPOKE POOL BUILDING, SUPPLY AND INSTALL NEW POOL FILTRATION PLANT AND FIELD WIRING
Cameron Run Tributary At La Vista Drive: Stream RestorationFairfax County
Anticipated Schedule for Construction (estimate 34 weeks)
Restoration schedules can overlap with multiple crews
Plantings occur in spring, fall, and/or winter (live stakes) seasons
Includes 1-year warranty on structures and vegetation
Vegetation warranty starts when planting ends (may be delayed for season)
Terra Grande Pond PSP and Riser ReplacementFairfax County
The Terra Grande Pond PSP and Riser Replacement Project was substantially completed on May 18, 2021. The purpose of this project was to perform necessary capital maintenance, increase the performance of the pond, enhance the facility, and isolate future maintenance needs.
Martin Goodman Trail West – Project OverviewWaterfrontTO
Take a look at the design for the extension of the Martin Goodman Trail. When complete, a separated off-street Martin Goodman Trail will stretch from Lower Spadina through the Bathurst intersection on the south side of Queens Quay.
Fort Benning Adds Energy-Efficient Barracks - Building Information Modeling (...McKenney's Inc
Starting in April 2009, McKenney’s, Inc performed HVAC, sheet metal and piping installation on multiple energy-efficient barracks, which included a total of 125 dorm-style rooms with kitchenettes at Fort Benning, a US Army Base in Georgia.
McKenney’s provided a turnkey design/build solution to replace an outdated chiller plant in the operating classroom complex of a government training center.
Soaring Past Obstacles - Design-Assist Services in Davidson, NCMcKenney's Inc
McKenney’s provided design/assist services and installed a condenser water cooling system and controls at MSC’s new corporate headquarters in North Carolina.
McKenney’s has proven time and again that it is a valuable partner and resource when it comes to complicated Training Barracks Upgrade Program (TBUP) barracks renovation projects.
The work on this project included investigation and repair to an 8-inch sewer line in Waterway Drive which had been previously lined with a plastic liner system. The project location was in Waterway Drive from Cavalier Court to the vicinity of Half Moon Circle. The project involved setting up a bypass system to remove sewage from the line so the pipe could be properly cleaned and inspected. Following this process, it was determined the plastic liner was causing capacity issues. It was determined that the liner could be repaired using internal methods and no excavation was needed. In addition, the five manholes associated with the segments of pipe in the project area were also rehabilitated. This project was substantially complete on June 25, 2021.
The purpose of this emergency project was to replace approximately 60-ft segment of 8-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. This project was substantially complete on May 14, 2021.
Design-Assist Masters a New Process - Process Cooling Project in Adairsville,...McKenney's Inc
McKenney’s completed a process cooling project for a metal casting system at a Georgia aluminum product manufacturing plant. For more information visit http://www.mckenneys.com.
Post-Tensioning Case Study - Repair, Rehabilitation, and Strengthening
2013 Award of Merit: Rehabilitation of a Parking Garage in Downtown Milwaukee, W
Location: Milwaukee, WI
Submitted by: Wiss, Janney, Elstner Associates, Inc.
Owner: Northwestern Mutual
Engineer(s): Wiss, Janney, Elstner Associates, Inc.
Contractor: General Contractor- Structurewerks; PT Subcontractor- STRUCTURAL
PT Supplier: VSL
The purpose of this emergency project was to replace approximately 60-ft segment of 10-inch wastewater sewer pipe that was broken and to retrieve a Closed-Circuit Television Inspection (CCTV) camera that was stuck in the pipe during routine maintenance work. This project was substantially complete on May 14, 2021.
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
McKenney’s installed very complex, industry-leading computer room air conditioning (CRAC) units at a new data center under construction in Alpharetta, Georgia.
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
A zero-energy building (ZEB) produces enough renewable energy to meet its own annual energy consumption requirements by using all cost-effective measures to reduce energy usage through energy efficiency. Learn more at http://blog.mckenneys.com/2018/06/reducing-building-energy-consumption-in-zero-energy-buildings-zeb/
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
Through an energy savings performance contract, McKenney’s Building Performance Solutions provided a turnkey solution to an aging, inefficient heating system at a large maximum security prison in Georgia.
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
McKenney’s, Inc. Critical Systems offers a comprehensive approach for constructing or renovating high-quality mechanical systems for data centers and operations centers that meet the most exacting demands and schedules.
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
McKenney’s is the right choice for reliable, well-designed rainwater and condensate harvesting systems because they bring a powerful combination of experience, commitment and innovation.
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
Protect your investment and consider a plumbing preventive maintenance program for your facility. Check out our plumbing services page for more information at http://plumbing.mckenneys.com/
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
McKenney’s Interiors & Special Projects (ISP) team responds quickly to a wide range of mechanical needs, including interior renovations, infrastructure repairs, replacements and retrocommissioning projects.
McKenney’s is building a wide range of energy-efficient mechanical systems using green practices for the 325,000-square-foot medical center in Braselton, Georgia.
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
The McKenney’s team installed plumbing and HVAC systems for a new 10-story, mixed-use office and retail tower at a high-profile destination in Atlanta, Georgia.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
The world of search engine optimization (SEO) is buzzing with discussions after Google confirmed that around 2,500 leaked internal documents related to its Search feature are indeed authentic. The revelation has sparked significant concerns within the SEO community. The leaked documents were initially reported by SEO experts Rand Fishkin and Mike King, igniting widespread analysis and discourse. For More Info:- https://news.arihantwebtech.com/search-disrupted-googles-leaked-documents-rock-the-seo-world/
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.