Take a look at the design for the extension of the Martin Goodman Trail. When complete, a separated off-street Martin Goodman Trail will stretch from Lower Spadina through the Bathurst intersection on the south side of Queens Quay.
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...Fairfax County
The Fairfax County Park Authority restored an eroded 185-foot stream channel within the Pinecrest Golf Course that is owned by the Park Authority. The restoration project stabilized the stream bank and installed rock walls and structures to improve the channel. Native plants were also planted to enhance habitat. The project was completed on time and within budget in April 2016 to address erosion issues along Turkeycock Run.
Pohick Creek Restoration Project - Phase 1Fairfax County
The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County Public Works completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole Jr. Pollution Control Plant by June 13, 2016.
Pohick Creek Tributary Stream Restoration ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services restored over 1,300 linear feet of degraded tributary of Pohick Creek using natural channel design techniques. This included establishing a stable channel geometry, reconnecting the channel to its floodplain, installing in-stream structures, and replanting native vegetation. The project aims to reduce erosion and improve habitat while also decreasing nitrogen, phosphorus, and sediment runoff into Pohick Creek. Construction involved excavating the existing channel, installing grade control structures, and cleaning out the existing stormwater pond.
This document describes an expansion project of the Stringfellow Road Park and Ride Facility in Fairfax County, VA. The expansion added over 300 new parking spaces, a new transit building, bus bays and shelters, low impact development features like biofilters and porous pavement. The project was completed in May 2016 with a total budget of $7.2 million.
The Sunset Hills Road Walkway project in Fairfax County, VA was substantially completed on May 2, 2016. The project included constructing 1,570 feet of pedestrian walkway and curb ramps, installing 136 feet of stormwater pipe and structures, resurfacing 303 feet of the W&OD trail, and adding a rest area with bench and water fountain and two bus pads for future bus service. The project was led by the Department of Transportation and Utilities Design and Construction Division of Fairfax County.
9499 Beach Mill Road Channel Restoration ProjectFairfax County
This document provides details about a channel restoration project located at 9499 Beach Mill Road in Great Falls, VA. The project aims to address an incised and eroded channel by raising the channel's bottom elevation with select fill and installing cross vane structures, cascading step-pool structures, and a stone-lined energy dissipation basin. The project will stabilize the channel and prevent future flooding and safety hazards from very steep banks. Environmental Quality Resources, LLC is the contractor for the project which is managed by DPWES staff including Project Manager Ratna Pottumuthu and Construction Manager Yudhie Brownson.
The Meadow Run (0273DP) Pond Improvement project in Fairfax County, VA was substantially completed on February 25, 2019. The project replaced a deteriorating control structure and primary spillway, increased the storage volume, and incorporated water quality improvements like extended detention and wetland plantings. It also upgraded the maintenance access with a geoblock road. The project aimed to improve water quality in the Bull Neck Run Watershed by accommodating more stormwater runoff and lengthening its flow path through the pond.
The document discusses 15 potential strategies to address traffic congestion issues in Moraga, California. It describes 3 main issues: heavy northbound traffic, left turns blocking lanes, and closely spaced intersections with pedestrian phases. The 15 strategies include coordinating traffic signals, changing street directions, adding turn lanes, realigning intersections, improving pedestrian/bike infrastructure, and modifying school schedules/transportation. Each strategy provides estimates of congestion reduction impact and implementation costs.
Fairfax County Park Authority, Turkeycock Run Stream Valley - Pinecrest Golf ...Fairfax County
The Fairfax County Park Authority restored an eroded 185-foot stream channel within the Pinecrest Golf Course that is owned by the Park Authority. The restoration project stabilized the stream bank and installed rock walls and structures to improve the channel. Native plants were also planted to enhance habitat. The project was completed on time and within budget in April 2016 to address erosion issues along Turkeycock Run.
Pohick Creek Restoration Project - Phase 1Fairfax County
The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County Public Works completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole Jr. Pollution Control Plant by June 13, 2016.
Pohick Creek Tributary Stream Restoration ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services restored over 1,300 linear feet of degraded tributary of Pohick Creek using natural channel design techniques. This included establishing a stable channel geometry, reconnecting the channel to its floodplain, installing in-stream structures, and replanting native vegetation. The project aims to reduce erosion and improve habitat while also decreasing nitrogen, phosphorus, and sediment runoff into Pohick Creek. Construction involved excavating the existing channel, installing grade control structures, and cleaning out the existing stormwater pond.
This document describes an expansion project of the Stringfellow Road Park and Ride Facility in Fairfax County, VA. The expansion added over 300 new parking spaces, a new transit building, bus bays and shelters, low impact development features like biofilters and porous pavement. The project was completed in May 2016 with a total budget of $7.2 million.
The Sunset Hills Road Walkway project in Fairfax County, VA was substantially completed on May 2, 2016. The project included constructing 1,570 feet of pedestrian walkway and curb ramps, installing 136 feet of stormwater pipe and structures, resurfacing 303 feet of the W&OD trail, and adding a rest area with bench and water fountain and two bus pads for future bus service. The project was led by the Department of Transportation and Utilities Design and Construction Division of Fairfax County.
9499 Beach Mill Road Channel Restoration ProjectFairfax County
This document provides details about a channel restoration project located at 9499 Beach Mill Road in Great Falls, VA. The project aims to address an incised and eroded channel by raising the channel's bottom elevation with select fill and installing cross vane structures, cascading step-pool structures, and a stone-lined energy dissipation basin. The project will stabilize the channel and prevent future flooding and safety hazards from very steep banks. Environmental Quality Resources, LLC is the contractor for the project which is managed by DPWES staff including Project Manager Ratna Pottumuthu and Construction Manager Yudhie Brownson.
The Meadow Run (0273DP) Pond Improvement project in Fairfax County, VA was substantially completed on February 25, 2019. The project replaced a deteriorating control structure and primary spillway, increased the storage volume, and incorporated water quality improvements like extended detention and wetland plantings. It also upgraded the maintenance access with a geoblock road. The project aimed to improve water quality in the Bull Neck Run Watershed by accommodating more stormwater runoff and lengthening its flow path through the pond.
The document discusses 15 potential strategies to address traffic congestion issues in Moraga, California. It describes 3 main issues: heavy northbound traffic, left turns blocking lanes, and closely spaced intersections with pedestrian phases. The 15 strategies include coordinating traffic signals, changing street directions, adding turn lanes, realigning intersections, improving pedestrian/bike infrastructure, and modifying school schedules/transportation. Each strategy provides estimates of congestion reduction impact and implementation costs.
Gallows Road and Prosperity Avenue ImprovementsFairfax County
The Gallows Road and Prosperity Avenue improvements Project extended a four-foot concrete median along Gallows Road near the intersection of Prosperity Avenue to prevent illegal left turns. The Improvements include extending the existing median, resetting existing sign, eradicating existing pavement markings and placing new pavement marking around the new median.
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
This document provides information from a training on stormwater management facility maintenance. It includes the schedule for a training session covering the history of stormwater regulations, facility inspections, and common maintenance issues for various facility types. It then focuses on above ground facilities like wet and dry ponds, describing typical components, potential deficiencies, and recommended remedies. Constructed wetlands are also discussed, along with their functions, components, potential deficiencies, and remedies. The training aims to increase awareness of proper privately maintained stormwater facility upkeep.
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Fairfax County
The Fairfax County Department of Public Works and Environmental Services built a new 72-foot diameter dome structure to store 2,500 tons of salt at the Dulles Maintenance Facility. The $2.9 million project included constructing the prefabricated geodesic dome, a portable conveyor, feeding hopper, water and electrical lines, and landscaping. The dome structure and associated facilities were completed in December 2020 to improve salt storage and help protect local streams and water quality.
South Lakes Drive Walkway was substantially completed on September 17, 2021. The project included construction of 3,370 linear feet of sidewalk, pedestrian ramps, pedestrian signals, handrail, bus shelter and loading pads, curbs and gutters, asphalt milling and paving, pavement markings and signage, fire hydrant relocation, and drainage adjustment.
Pohick Creek Restoration Project Phase I June 2016Fairfax County
The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole, Jr. Pollution Control Plant, removing and replacing existing riprap. The project was substantially completed on June 13, 2016.
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services upgraded over 3000 linear feet of stormwater infrastructure in the Franklin Park and Chesterbrook neighborhoods to reduce flooding, improve stormwater flow and water quality. The project was completed on time and on budget in December 2016 through the construction of swales, infiltration trenches, underground storage chambers and permeable surfaces. The project is estimated to reduce nitrogen, phosphorus and sediment runoff into local waterways.
Substantial Completion: Lorton Road ProjectFairfax County
The Lorton Road Improvement Project in Fairfax County, VA widened portions of Lorton Road, Furnace Road, and Workhouse Road to 4 lanes with medians, turn lanes, bike lanes, and stormwater management features. The $30 million project was completed in March 2017 and included constructing new bridges over Giles Run and the Greenway Trail. The project improved safety and traffic flow along 2.5 miles of roadway.
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
The Woodglen Lake Dredging & Restoration project in Fairfax County, VA removed over 40,000 cubic yards of sediment from Woodglen Lake. The project improved maintenance access and installed a sediment forebay to simplify future dredging. Dredged sediment was disposed of innovatively at the County-owned I-95 Landfill Complex. Stream restoration and landscaping around the lake also enhanced the area. The project reduces annual sediment and nutrient loads in downstream waters.
Clairemont ad hoc subcommittee presentation 11/2/16 omedina91
The presentation provided an update on the Clairemont Mesa Specific Plan process and introduced preliminary concepts for land use, urban design, and mobility. Key areas of focus included mixed-use near the Balboa Avenue Station, engaging Rose Creek, and improving pedestrian, bicycle, and road infrastructure throughout the plan area. Next steps involve preparing the specific plan and environmental impact report over the next year with ongoing community input.
The Clairemont CPG Ad Hoc Subcommittee – Balboa Station Area Specific Plan held a meeting on Wednesday, July 19, 2017, at St. David's Episcopal Church. At the meeting, city staff provided an update on the plan and went over proposed concepts.
Pacific Beach ad hoc subcommittee presentation 11/3/16omedina91
The document summarizes a presentation given to the Pacific Beach Community Planning Group Ad Hoc Subcommittee on potential changes to the Pacific Beach community plan. It discusses the specific plan process, study area context, areas of no change and focus areas. It then provides preliminary concepts for land use, urban design, and mobility, including engaging the creek, mixed-use near the trolley station, frontage improvements, a mobility hub, pedestrian and bicycle facilities, roadway improvements, and gateways/signage. Next steps outlined include preparing the specific plan and completing environmental review.
BELMONT TOWN CENTER: Site Work ProgressKeith Paris
A 53,000-square-foot Harris Teeter will anchor this site. There will be a gas station and up to ten retail or food clients alongside the grocer. A 4,300 square foot sit-down restaurant will be on the southern end of the site. Five additional buildings will be constructed for retail or office space.
On Tuesday, May 24, 2016, the project team presented preliminary recommendations to the public at a Pacific Beach Community Planning Group ad hoc Subcommittee meeting.
The Huntsman Lake Dredging project in Fairfax County, VA involved removing over 43,000 cubic yards of sediment from Huntsman Lake to increase its sediment storage capacity to over 100 years. It also included restoring the shoreline, improving aquatic habitat, and upgrading access and maintenance of the lake. The project enhances sediment and nutrient removal to improve water quality downstream.
Pike Branch at Wilton Road Stream Stabilization ProjectFairfax County
This document provides information about a stream stabilization project along Pike Branch in Fairfax County, VA. The project aims to stabilize approximately 1,300 feet of stream between Telegraph Road and Wilton Road to improve watershed conditions, reduce flooding and erosion, create wildlife habitat, and enhance water quality. The document discusses regulatory drivers for stormwater management, details the project objectives and timeline, describes existing conditions along the stream, and outlines proposed stabilization structures and retaining wall repairs. Next steps outlined include completing design plans and scheduling construction.
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
The Miller Heights Outfall Rehabilitation Project was completed on time and within budget. The project involved stabilizing over 250 feet of eroded channel near Miller Road and Miller Heights Road. Natural stream channel design was used, including rock cross vanes, weirs, and plantings to reduce erosion and improve water quality. The project addressed safety concerns and stabilized the channel while providing environmental benefits.
Waterfront Toronto is currently leading the largest waterfront revitalization project in North America. Join Waterfront Toronto’s President & CEO John Campbell as he discusses the challenges and opportunities of master planning 800 hectares of land and delivering sustainable, future ready communities on Toronto’s waterfront.
This document provides guidance on different types of writing: expository, presentation, and persuasive. For expository writing, it advises choosing an interesting topic, finding facts from reliable sources, developing a thesis statement, and creating an outline. For presentations, it recommends determining two to three main points, starting with an attention-grabbing statement, making eye contact, and practicing. Regarding persuasive writing, the steps are to state your opinion as a clear claim, provide well-arranged reasons, and back them up with facts, ending with an interesting conclusion.
Gallows Road and Prosperity Avenue ImprovementsFairfax County
The Gallows Road and Prosperity Avenue improvements Project extended a four-foot concrete median along Gallows Road near the intersection of Prosperity Avenue to prevent illegal left turns. The Improvements include extending the existing median, resetting existing sign, eradicating existing pavement markings and placing new pavement marking around the new median.
Do not include any personal information as all posted material on this site is considered to be part of a public record as defined by section 27 of the Municipal Freedom of Information and Protection of Privacy Act.
We reserve the right to remove inappropriate comments. Please see Terms of Use for City of Toronto Social Media Sites at http://www.toronto.ca/e-updates/termsofuse.htm.
Contractor Awareness Training Above Ground Facilities Part 1 2016Fairfax County
This document provides information from a training on stormwater management facility maintenance. It includes the schedule for a training session covering the history of stormwater regulations, facility inspections, and common maintenance issues for various facility types. It then focuses on above ground facilities like wet and dry ponds, describing typical components, potential deficiencies, and recommended remedies. Constructed wetlands are also discussed, along with their functions, components, potential deficiencies, and remedies. The training aims to increase awareness of proper privately maintained stormwater facility upkeep.
Stream & Water Quality Improvements Dulles Maintenance Facility (DMF) Salt St...Fairfax County
The Fairfax County Department of Public Works and Environmental Services built a new 72-foot diameter dome structure to store 2,500 tons of salt at the Dulles Maintenance Facility. The $2.9 million project included constructing the prefabricated geodesic dome, a portable conveyor, feeding hopper, water and electrical lines, and landscaping. The dome structure and associated facilities were completed in December 2020 to improve salt storage and help protect local streams and water quality.
South Lakes Drive Walkway was substantially completed on September 17, 2021. The project included construction of 3,370 linear feet of sidewalk, pedestrian ramps, pedestrian signals, handrail, bus shelter and loading pads, curbs and gutters, asphalt milling and paving, pavement markings and signage, fire hydrant relocation, and drainage adjustment.
Pohick Creek Restoration Project Phase I June 2016Fairfax County
The document summarizes Phase I of the Pohick Creek Restoration Project in Fairfax County, Virginia. The project involved constructing a rock wall and bench along the creek bank, installing live stakes and native plants, and adding soil lifts for stabilization. The project team from Fairfax County completed earthworks and bank stabilization along a section of Pohick Creek near the Noman M. Cole, Jr. Pollution Control Plant, removing and replacing existing riprap. The project was substantially completed on June 13, 2016.
Franklin Park and Chesterbrook Neighborhood Stormwater Improvement ProjectFairfax County
The Fairfax County Department of Public Works and Environmental Services upgraded over 3000 linear feet of stormwater infrastructure in the Franklin Park and Chesterbrook neighborhoods to reduce flooding, improve stormwater flow and water quality. The project was completed on time and on budget in December 2016 through the construction of swales, infiltration trenches, underground storage chambers and permeable surfaces. The project is estimated to reduce nitrogen, phosphorus and sediment runoff into local waterways.
Substantial Completion: Lorton Road ProjectFairfax County
The Lorton Road Improvement Project in Fairfax County, VA widened portions of Lorton Road, Furnace Road, and Workhouse Road to 4 lanes with medians, turn lanes, bike lanes, and stormwater management features. The $30 million project was completed in March 2017 and included constructing new bridges over Giles Run and the Greenway Trail. The project improved safety and traffic flow along 2.5 miles of roadway.
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
The Woodglen Lake Dredging & Restoration project in Fairfax County, VA removed over 40,000 cubic yards of sediment from Woodglen Lake. The project improved maintenance access and installed a sediment forebay to simplify future dredging. Dredged sediment was disposed of innovatively at the County-owned I-95 Landfill Complex. Stream restoration and landscaping around the lake also enhanced the area. The project reduces annual sediment and nutrient loads in downstream waters.
Clairemont ad hoc subcommittee presentation 11/2/16 omedina91
The presentation provided an update on the Clairemont Mesa Specific Plan process and introduced preliminary concepts for land use, urban design, and mobility. Key areas of focus included mixed-use near the Balboa Avenue Station, engaging Rose Creek, and improving pedestrian, bicycle, and road infrastructure throughout the plan area. Next steps involve preparing the specific plan and environmental impact report over the next year with ongoing community input.
The Clairemont CPG Ad Hoc Subcommittee – Balboa Station Area Specific Plan held a meeting on Wednesday, July 19, 2017, at St. David's Episcopal Church. At the meeting, city staff provided an update on the plan and went over proposed concepts.
Pacific Beach ad hoc subcommittee presentation 11/3/16omedina91
The document summarizes a presentation given to the Pacific Beach Community Planning Group Ad Hoc Subcommittee on potential changes to the Pacific Beach community plan. It discusses the specific plan process, study area context, areas of no change and focus areas. It then provides preliminary concepts for land use, urban design, and mobility, including engaging the creek, mixed-use near the trolley station, frontage improvements, a mobility hub, pedestrian and bicycle facilities, roadway improvements, and gateways/signage. Next steps outlined include preparing the specific plan and completing environmental review.
BELMONT TOWN CENTER: Site Work ProgressKeith Paris
A 53,000-square-foot Harris Teeter will anchor this site. There will be a gas station and up to ten retail or food clients alongside the grocer. A 4,300 square foot sit-down restaurant will be on the southern end of the site. Five additional buildings will be constructed for retail or office space.
On Tuesday, May 24, 2016, the project team presented preliminary recommendations to the public at a Pacific Beach Community Planning Group ad hoc Subcommittee meeting.
The Huntsman Lake Dredging project in Fairfax County, VA involved removing over 43,000 cubic yards of sediment from Huntsman Lake to increase its sediment storage capacity to over 100 years. It also included restoring the shoreline, improving aquatic habitat, and upgrading access and maintenance of the lake. The project enhances sediment and nutrient removal to improve water quality downstream.
Pike Branch at Wilton Road Stream Stabilization ProjectFairfax County
This document provides information about a stream stabilization project along Pike Branch in Fairfax County, VA. The project aims to stabilize approximately 1,300 feet of stream between Telegraph Road and Wilton Road to improve watershed conditions, reduce flooding and erosion, create wildlife habitat, and enhance water quality. The document discusses regulatory drivers for stormwater management, details the project objectives and timeline, describes existing conditions along the stream, and outlines proposed stabilization structures and retaining wall repairs. Next steps outlined include completing design plans and scheduling construction.
Miller Heights Outfall Rehabilitation Project 2014Fairfax County
The Miller Heights Outfall Rehabilitation Project was completed on time and within budget. The project involved stabilizing over 250 feet of eroded channel near Miller Road and Miller Heights Road. Natural stream channel design was used, including rock cross vanes, weirs, and plantings to reduce erosion and improve water quality. The project addressed safety concerns and stabilized the channel while providing environmental benefits.
Waterfront Toronto is currently leading the largest waterfront revitalization project in North America. Join Waterfront Toronto’s President & CEO John Campbell as he discusses the challenges and opportunities of master planning 800 hectares of land and delivering sustainable, future ready communities on Toronto’s waterfront.
This document provides guidance on different types of writing: expository, presentation, and persuasive. For expository writing, it advises choosing an interesting topic, finding facts from reliable sources, developing a thesis statement, and creating an outline. For presentations, it recommends determining two to three main points, starting with an attention-grabbing statement, making eye contact, and practicing. Regarding persuasive writing, the steps are to state your opinion as a clear claim, provide well-arranged reasons, and back them up with facts, ending with an interesting conclusion.
A PowerPoint presentation discusses bullying and provides advice on how to handle it. It recommends that if someone is being bullied, tell an adult about the situation so they can help address it. The presentation concludes by stating that everyone should work together to put an end to bullying.
The document outlines the structure of the church from the local congregation level up to the global Lutheran World Federation. It discusses how the local congregation is involved in worship, education, and community outreach. It then explains that congregations are part of a larger synod and denomination called the Evangelical Lutheran Church in America, which undertakes efforts in global mission, publishing, and resources. At the highest level, the Lutheran World Federation acts as a communion of 140 member churches across 79 countries seeking to serve the needs of its nearly 69 million members worldwide.
Waterfront Toronto's president John Campbell gave a presentation to FaskenMartineau about revitalizing Toronto's waterfront. The presentation discussed how Waterfront Toronto is engaged in one of the most significant city building projects in the world and compared it to projects in Canary Wharf, London and Battery Park, New York City. It also touched on creating an intelligent community through building smart infrastructure, digital inclusion, and the proposed Waterfront Innovation Centre.
This document provides guidance on developing a prayer life, including suggestions for different types of prayer. It discusses praying daily and using structures like the Lord's Prayer, ACTS prayer model and Jesus Prayer to focus prayers. The document warns that developing regular prayer could become a habit and change one's life, leading to a deeper prayer life including contemplative prayer. It also provides tips for praying alone and together in groups, such as using "we" and avoiding empty phrases. The overall message is that developing the discipline of regular prayer is important and starts with dedicating time for prayer each day.
Citation Gurus provides citation and reference help for students and researchers. They offer citation guides for all major styles like APA, MLA, Chicago, and more. Users can get help with citations, references, and bibliographies through their website or by contacting them directly.
This document summarizes revitalization efforts of Toronto's waterfront by Waterfront Toronto. Key projects include developing 23 new or improved parks, redeveloping the East and West Bayfront areas with new housing, parks and other amenities, and ongoing work to redevelop the Central Waterfront area. Major challenges include public cynicism, limited resources and complex projects. Waterfront Toronto takes a collaborative approach focused on public consultation, master planning, building parks and sustainable infrastructure to transform the waterfront into a major city asset.
The document provides dos and don'ts for pedestrians, cyclists, and drivers on the new Queens Quay in Toronto. Don'ts include walking or driving on the streetcar right-of-way or Martin Goodman Trail. Do's include looking both ways before crossing, yielding to pedestrians, obeying signals, and being courteous.
Lloyd's has over 325 years of history in the insurance industry. It began in 1688 in London as a place for underwriters to gather and insure ships and cargo. Lloyd's role expanded over centuries to insure major disasters like the 1906 San Francisco earthquake and the sinking of the Titanic in 1912. More recently, the 9/11 terrorist attacks were Lloyd's largest ever single loss. Lloyd's continues to provide reinsurance and help manage risks for catastrophes through its syndicate system of underwriters.
Developing a game - From concept to marketPascal Luban
The document discusses the process of developing a video game from concept to market, outlining the key stages including concept, prototype, development, tuning and debugging, release, and post-launch support. It provides questions to consider and pitfalls to avoid at each stage, emphasizing the importance of gameplay testing, documentation, and ongoing community management.
1,2,3,4...5 essential steps to define the concept for a freemium gamePascal Luban
Free-to-Play is not a game genre, it is a business model that can be applied to nearly all game categories - Action, strategy, puzzles, social and sport games - but traditional design rules do not necessarily apply to them. Actually, most freemium games must be designed around the specific design constraints imposed by this business model.
In this talk, I will cover the key design dimensions that set free-to-play games apart from traditional games and I will describe the step-by-step method I use when I work on the concept of a freemium game.
This document summarizes a student's final project on green chemistry. It introduces green chemistry principles and applications in industry, environmentally friendly catalysis, and biomass. It discusses how green chemistry aims to prevent waste and increase energy efficiency. Green catalysis techniques like heterogeneous catalysis are highlighted which improve productivity while reducing costs and pollution. The conclusion emphasizes how applying green chemistry can reduce environmental damage and fuel consumption.
Cosmetics are substances used to enhance the human body's appearance without affecting its structure or functions. They include products for the face, hair, and teeth. Recently, the use of botanical cosmetics has increased due to their mild and non-toxic nature. Both natural and phyto-ingredients from plants like acacia, neem, henna, chamomile, ginseng, sandalwood, wheat germ, and rhubarb are used in cosmetics due to their active constituents and benefits like conditioning hair, protecting skin from UV rays, and acting as antioxidants.
glass as pharmaceutical packaging materialNilanjana Guha
This document discusses glass packaging for pharmaceuticals. It notes that glass is commonly used because it is chemically inert, economically, provides superior protection, and is approved by the FDA. There are four main types of glass used: type I is borosilicate glass which has high resistance and is suitable for parenteral use due to low leaching; type II is treated soda-lime glass which is treated to prevent weathering or blooming; type III is untreated soda-lime glass with average chemical resistance suitable for anhydrous parenterals; type IV is plain soda-lime glass used for oral and topical formulations.
The document summarizes plans to replace the York/Bay/Yonge ramps connecting the Gardiner Expressway to the downtown Toronto waterfront. Key points include:
- The 2013 study recommended removing the elevated ramps and installing a new shorter ramp to Harbour Street ending at Lower Simcoe Street, among other improvements.
- Construction will take place from April 2017 to January 2018. It will involve demolishing the existing ramps and building the new Lower Simcoe ramp. Harbour Street will also be widened.
- Traffic will be impacted as the York/Bay/Yonge ramp will close for the duration of construction. Detours will be in place and traffic management strategies employed to mitigate congestion.
This document summarizes coastal wetland adaptation strategies presented at two municipal workshops in October 2014. The strategies included upland actions like facilitating marsh migration and removing barriers, as well as in-marsh actions like drainage improvements, elevation enhancement, and erosion control. Specific project examples were provided from locations around Rhode Island where marsh migration was being facilitated or impeded, and adaptation techniques like creek excavation and land protection were undertaken. Partnerships between municipalities, land trusts, and state agencies were noted as important for implementing projects costing $5,000 to $15,000 each to adapt coastal marshes to sea level rise.
The document outlines plans to reconnect Glasgow with the River Clyde through new developments, activities, and infrastructure improvements. Key projects include regenerating areas like Oatlands and Tradeston, promoting the river for recreation like rowing, and improving access through new bridges and walkways to link both sides of the river and better connect communities to the waterfront. The overall goal is to recognize the river's importance and enhance it as a positive asset for the city.
Leaside - Laird Construction Liaison Committee Meeting - May 2018Crosstown TO
The document provides updates on construction activities at the Leaside and Laird stations for the Crosstown LRT project. For Leaside station, piling and excavation work is underway and expected to last 3-4 months. Watermain work requiring overnight shutoffs is also planned for May. Lane reductions and turn restrictions will be implemented during subsequent construction stages. Progress photos show excavation and shoring work. For Laird station, 24-hour tunneling is underway and will continue until late 2019, with noise monitoring and community communications ongoing. Progress photos depict excavation at the secondary and main entrances.
The Springfield Forest Schupps Add. 1115DP Summerton Way Pond project retrofitted an existing dry pond in Fairfax County, VA to improve stormwater quality and detention. The retrofit removed the existing concrete trickle ditch, regraded the facility to lengthen the flow path and maximize pond volume, excavated three micro-pools, installed an endwall, concrete apron, and trash rack at the riser, constructed an access road, and restored the site with seed and plantings. The project aims to remove phosphorus, nitrogen, and suspended solids from stormwater runoff.
This document provides an overview and outlines preliminary plans for the Umina Beach Village Transport Management and Accessibility Plan (TMAP) and Civic Place Master Plan. It summarizes consultation feedback calling for improved pedestrian access and traffic flow. The transport plan evaluates traffic and parking issues and proposes road upgrades and traffic diversions. The civic plan proposes relocating the library to a new public square while retaining parking. Three redevelopment options are presented ranging from minimal changes to a larger redevelopment.
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)Crosstown TO
The document provides updates on construction activities for Section One and Section Two of the at-grade portion of the Eglinton Crosstown LRT project. For Section One from Brentcliffe Road to Sunnybrook Park Stop, work includes installing light poles and sidewalks, excavating for a retaining wall, and restoring areas around bridges. For Section Two from Aga Khan Park & Museum Stop to O'Connor Stop, work includes platform installation, guideway wall construction, and sidewalk/curb/driveway work between Bermondsey Rd and Victoria Park Ave. The Science Centre Station update outlines work like mechanical installation, deck removal, and tunnel/terminal construction.
Suggested fine-tuning of bridge and park designs to best activate the Provide...Barnaby Evans
A review of the planned I-195 pedestrian bridge and park designs with suggestions for improvements by Barnaby Evans. These are fine-tunings of the current planned designs focused on maximizing net benefit for the community
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardinerEast
The document provides an overview of the Future of the Gardiner East Environmental Assessment and Urban Design Study. It discusses:
- The study area, which is the section of the Gardiner Expressway East/Lake Shore Boulevard extending from west of Lower Jarvis Street to Leslie Street.
- The goals of the study, which are to revitalize the waterfront, reconnect the city with the lake, balance modes of travel, achieve sustainability, and create value.
- Consultation activities conducted so far, including stakeholder meetings, public forums, online engagement, and social media, engaging over 5,000 individuals.
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
Scotts Run @ Old Meadow Road Stream Restoration was substantially completed on March 30, 2022. The Scotts Run project consisted of restoring, enhancement, and stabilizing of approximately 2,930 linear feet of eroding stream using Natural Channel Design criteria. This project included two phases: Phase I was funded by proffers from a private development and Phase II was County funded. Also included was the removal of invasive non-native plants and the installation of new plantings to stabilize the stream and floodplain.
A New Reservoir Project 30 Years in the Making - Tom Kula and Mike RickmanTWCA
This document provides an overview and update on the Bois d'Arc Lake water supply project being undertaken by the North Texas Municipal Water District. The key points are:
1) Population growth in the region is driving the need for new water supplies to meet future demand projections of 3.7 million people by 2070.
2) The $1.6 billion Bois d'Arc Lake project will provide a new reservoir with a firm yield of 108 million gallons per day, with construction starting in 2018 and water delivery expected by 2022.
3) Extensive permitting and mitigation efforts were required, including over 17,000 acres set aside for wetland and habitat restoration. Construction is now underway on various
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
This document summarizes a public information meeting held by the Fairfax County Department of Transportation regarding a project to realign Old Courthouse Road near Besley Road and Wolftrap Elementary School. The project goals are to eliminate flooding, improve safety, and meet current road design standards. Concerns from the community such as speeding, pedestrian access, and environmental impacts were addressed. The presentation provided project details including timelines, designs, and responses to community questions and comments.
Royal Lake Dredging and Restoration Project Update-June 2014Fairfax County
The meeting agenda covered the Royal Lake restoration project, including dredging phases to remove sediment, alternatives for wet or dry dredging, and habitat and shoreline restoration. The project goals are to restore sediment capacity, improve water quality and habitat, and provide long-term maintenance. Final design is underway with dredging projected to start in late summer 2015.
Merrywood Force Main Rehabilitation ProjectFairfax County
The Merrywood Force Main Rehabilitation project included rehabilitation of 1,080 linear feet of 6-inch force main, its discharge manhole, and the installation of a future bypass system in front of the pump station.
The document summarizes an upcoming stream restoration and basin retrofit project along Peyton Run in Fairfax County, VA. The project will restore 2,841 linear feet of stream channel and retrofit one detention basin. Construction is expected to take approximately 400 days to complete. During that time, there may be temporary access roads, stockpile areas, and safety fencing installed. Native plantings will be used to revegetate the areas and enhance wildlife habitat. Examples of previously completed similar projects show the areas become naturally vegetated within a few years. Contact information is provided for any additional questions.
North Beauregard Street at North Chambliss Street Spot ImprovementFairfax County
This document summarizes a spot improvement project at the intersection of North Beauregard Street and North Chambliss Street in Fairfax County, VA. The project constructed a new concrete island, curb, sidewalk, and pedestrian flashing beacon to reduce the crossing distance and improve pedestrian safety. Construction was completed in October 2021 by contractor M&F Concrete. The project was managed by Fairfax County Department of Transportation and the Construction Division.
This document summarizes upcoming construction activities at the St. Clair Reservoir located in Sir Winston Churchill Park. The construction will involve rehabilitating and waterproofing the aging reservoir infrastructure over a 3 year period from Fall 2015 to Spring 2018. During construction, park features will be temporarily removed and soil from excavation will be stored onsite. The project aims to preserve the structural integrity of the reservoir and extend its service life while improving sustainability through green infrastructure features.
East Cowes - Proposed development - Solent Gateways - Dec 2014onthewight
The document proposes improvements to connectivity between Southampton and the Isle of Wight through the Solent Gateways project. This includes enhancing the public areas around the Red Funnel ferry terminals in East Cowes and Southampton to improve the transport interchanges and stimulate regeneration. Specific proposals for East Cowes include upgrading Bridge Square, York Square, and Trinity Wharf near the ferry terminal with new public spaces, pedestrian priority areas, and a cohesive waterfront design using materials like stone, timber and steel. The project aims to complete an existing masterplan and improve traffic flow, public transport access, and the quality of the town center environment.
- The document provides a construction update for the Eglinton Crosstown LRT project in Toronto, including progress at various stations along the eastern section from Science Centre station to Kennedy station.
- Construction is ongoing with excavation, structural works, guideway and track installation underway or completed at most stations. Interior station works and finishes are nearing completion at Science Centre station.
- The project involves a 19km LRT route, 10km underground and 9km at surface, with 15 underground stations and 10 surface stops. A maintenance facility is also being constructed.
The document summarizes several Community Development Block Grant (CDBG) projects completed by the City of Palm Bay over multiple fiscal years to improve infrastructure and public facilities in low-to-moderate income neighborhoods. Projects included street paving, drainage improvements, construction of parks and green spaces, home rehabilitation, and handicap accessibility retrofits. The CDBG funds from HUD were used to leverage additional investments and benefits for qualifying residents.
Similar to Martin Goodman Trail West – Project Overview (20)
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEFebless Hernane
CapCut is an easy-to-use video editing app perfect for beginners. To start, download and open CapCut on your phone. Tap "New Project" and select the videos or photos you want to edit. You can trim clips by dragging the edges, add text by tapping "Text," and include music by selecting "Audio." Enhance your video with filters and effects from the "Effects" menu. When you're happy with your video, tap the export button to save and share it. CapCut makes video editing simple and fun for everyone!
PDF SubmissionDigital Marketing Institute in NoidaPoojaSaini954651
https://www.safalta.com/online-digital-marketing/advance-digital-marketing-training-in-noidaTop Digital Marketing Institute in Noida: Boost Your Career Fast
[3:29 am, 30/05/2024] +91 83818 43552: Safalta Digital Marketing Institute in Noida also provides advanced classes for individuals seeking to develop their expertise and skills in this field. These classes, led by industry experts with vast experience, focus on specific aspects of digital marketing such as advanced SEO strategies, sophisticated content creation techniques, and data-driven analytics.
ARENA - Young adults in the workplace (Knight Moves).pdfKnight Moves
Presentations of Bavo Raeymaekers (Project lead youth unemployment at the City of Antwerp), Suzan Martens (Service designer at Knight Moves) and Adriaan De Keersmaeker (Community manager at Talk to C)
during the 'Arena • Young adults in the workplace' conference hosted by Knight Moves.
Technoblade The Legacy of a Minecraft Legend.Techno Merch
Technoblade, born Alex on June 1, 1999, was a legendary Minecraft YouTuber known for his sharp wit and exceptional PvP skills. Starting his channel in 2013, he gained nearly 11 million subscribers. His private battle with metastatic sarcoma ended in June 2022, but his enduring legacy continues to inspire millions.
Visual Style and Aesthetics: Basics of Visual Design
Visual Design for Enterprise Applications
Range of Visual Styles.
Mobile Interfaces:
Challenges and Opportunities of Mobile Design
Approach to Mobile Design
Patterns
Storytelling For The Web: Integrate Storytelling in your Design ProcessChiara Aliotta
In this slides I explain how I have used storytelling techniques to elevate websites and brands and create memorable user experiences. You can discover practical tips as I showcase the elements of good storytelling and its applied to some examples of diverse brands/projects..
Maximize Your Content with Beautiful Assets : Content & Asset for Landing Page pmgdscunsri
Figma is a cloud-based design tool widely used by designers for prototyping, UI/UX design, and real-time collaboration. With features such as precision pen tools, grid system, and reusable components, Figma makes it easy for teams to work together on design projects. Its flexibility and accessibility make Figma a top choice in the digital age.
2. ONE WATERFRONT – CENTRAL WATERFRONT MASTER PLAN
Queens Quay / Water’s Edge / Marine + Habitat
3. QUEENS QUAY CENTRAL WATERFRONT
YO YO MA TO BAY
FUTURE PHASE
EAST BAYFRONT QUEENS QUAY
BAY TO PARLIAMENT
Yo Yo Ma Lane
Stadium Road
Bay St
Yonge St
Jarvis St
Parliament St
TRANSITION ZONE
INTERIM MGT
INTERIM IMPROVEMENTS UNDERWAY
UPCOMING INTERIM MGT
QUEENS QUAY REVITALIZATION
Boundaries + Phasing
The interim work is designed to create safe connections between the Queens Quay Revitalization scope currently underway between Bay and Spadina and the existing conditions to the east and west.
4. CENTRAL WATERFRONT (YO YO MA LANE TO BAY)
Status: Construction Underway – Will Be Complete Summer 2015
Rendering of approved design.
Construction in progress.
5. TRANSITION ZONE (BAY TO YONGE)
Status: Complete
Rendering of approved design.
Current condition – construction completed; final finishes required
6. INTERIM MARTIN GOODMAN TRAIL/PEDESTRIAN CONNECTION (YONGE TO JARVIS)
Status: Complete – Restorations Will Be Made After Hydro Work
Rendering of approved design.
Current condition – construction completed.
7. INTERIM IMPROVEMENTS (JARVIS TO PARLIAMENT)
Status: Construction Underway – Will Be Complete Spring 2015
Current condition.
Rendering of proposed improvements.
8. MARTIN GOODMAN TRAIL WEST OF SPADINA
Status: Construction Starts Late 2014
Current condition.
Rendering of proposed improvements.
9. THE PROJECT HAS TWO PARTS: A - Off-street Martin Goodman Trail (Yo Yo Ma Lane to Bathurst Street)
B- On-street bike lanes (Bathurst Street to Stadium Road)
Yo Yo Ma Lane
Lower Spadina Avenue
Stadium Road
10. PART A: OFF-STREET, SOUTH SIDE MARTIN GOODMAN TRAIL
Yo Yo Ma Lane to Bathurst Street
11. Push curb line + catch basin
TYPICAL CROSS SECTION
Here’s how the street has been designed to accommodate the Martin Goodman Trail
Existing condition
Work needed to accommodate the Martin Goodman Trail
Install mountable curb
Relocate light pole
12. UNIQUE CONDITIONS
There are 4 areas worth noting – as they present unique challenges
4. Harbourfront Marina Quay parking lot
3. Dan Leckie
2. Harbourfront Community centre
1. Bathurst intersection
13. 1. BATHURST INTERSECTION
The design must work around an existing Hydro pole and retaining wall and will include a crossing for pedestrians and cyclists
Existing retainwall Basketball court
Buffer zone
Existing Hydro pole
15. 2. HARBOURFRONT COMMUNITY CENTRE
Maintain the parking lay-by and create a buffer zone between it and the Martin Goodman Trail
Lay-by
Green
Buffer zone
16. MARTIN GOODMAN TRAIL WEST OF SPADINA
Dan Leckie intersection
Challenges/program
3. DAN LECKIE INTERSECTION – EXISTING CONDITION
17. 3. DAN LECKIE INTERSECTION – EXISTING CONDITION
The design responds to the existing dockwall by proposing a cantilevered sidewalk. It also includes a new dedicated turning lane to improve traffic flow
Dedicated turning lane N- bound
Pedestrian crossing
Buffer zone
Buffer zone
Existing dockwall
Existing traffic controller
18. MARTIN GOODMAN TRAIL WEST OF SPADINA
Dan Leckie intersection
Cantilevered sidewalk – illustration from the water
19. 4. HARBOURFRONT MARINA QUAY PARKING LOT
The design had to address the entrance to the Marina Quay Parking Lot
20.
21. PART B: ON-STREET, SOUTH SIDE MARTIN GOODMAN TRAIL
Bathurst Street to Stadium Road
22. Bathurst to Stadium Road
The on-street bike lanes will be amalgamated and moved to the south side of the street. They will be separated from traffic by flexi-post barriers.
23. Existing Martin Goodman Trail
The on-street bike lanes will connect to the Martin Goodman Trail and into Coronation Park