The Abergeldie-HEB Joint Venture brings together the Australian and New Zealand resources and experience of two award-winning marine and civil contractors. They have over 500 personnel with expertise in project management, construction, and marine infrastructure. Some of their recent projects include repairing damage to the jetty, wharf, and ship loader at Lucinda Bulk Sugar Terminal in North Queensland after a cyclone, and undertaking design and construction works to repair and develop the coal exporting facilities at Cashin Quay No. 1 Wharf in Lyttelton, New Zealand following earthquakes in 2010 and 2011.
Turnkey total swimming pool refurbishment project to prestigious school in th...DAVID GREEN
TOTAL SWIMMING POOL REFURBISHMENT TO FIRE DAMAGED SWIMMING POOL. EXCAVATING AROUND POOL TO REPLACE ALL UNDERGROUND STEEL PIPEWORK WITH UPVC, ACID WASH AND FULLY ABASE POOL SURFACES IN READINESS FOR FIBRE GLASSING POOL TANK, RELAY POOL SURROUND USING SPECIALIST CONCRETE, FIBREGLASS POOL TANK AND POOL EDGE COPING STONES, GEL COAT INSTALL NEW INLETS, OUTLETS, SKIMMERS AND VACCUUM POINT, LAY RUBBER CRUMB TO POOL SURROUND, DISMANTLE AND DISPOSE OF FIRE DAMAGED POOL BUILDING,ERECT NEW BESPOKE POOL BUILDING, SUPPLY AND INSTALL NEW POOL FILTRATION PLANT AND FIELD WIRING
Overarching vision to establish a widely recognized destination providing dynamic and engaging arts, cultural, educational, and community experiences and economic development opportunities.
Exploring the adaptive reuse potential of the remaining vacant campus buildings and enhancement of the Ox Road frontage.
Turnkey total swimming pool refurbishment project to prestigious school in th...DAVID GREEN
TOTAL SWIMMING POOL REFURBISHMENT TO FIRE DAMAGED SWIMMING POOL. EXCAVATING AROUND POOL TO REPLACE ALL UNDERGROUND STEEL PIPEWORK WITH UPVC, ACID WASH AND FULLY ABASE POOL SURFACES IN READINESS FOR FIBRE GLASSING POOL TANK, RELAY POOL SURROUND USING SPECIALIST CONCRETE, FIBREGLASS POOL TANK AND POOL EDGE COPING STONES, GEL COAT INSTALL NEW INLETS, OUTLETS, SKIMMERS AND VACCUUM POINT, LAY RUBBER CRUMB TO POOL SURROUND, DISMANTLE AND DISPOSE OF FIRE DAMAGED POOL BUILDING,ERECT NEW BESPOKE POOL BUILDING, SUPPLY AND INSTALL NEW POOL FILTRATION PLANT AND FIELD WIRING
Overarching vision to establish a widely recognized destination providing dynamic and engaging arts, cultural, educational, and community experiences and economic development opportunities.
Exploring the adaptive reuse potential of the remaining vacant campus buildings and enhancement of the Ox Road frontage.
Sensitive Conversion of Fortifications presentation Oct17denizbeck
The event held in partnership with Hampshire Buildings Preservation Trust (HBPT) looks at Former Defence establishments and regeneration of their heritage, focusing particularly on the South East Region’s experience of land disposal. The presentations considers the potential social, economic and environmental benefits of these redevelopments and share experience of defence site redevelopment and models of good sustainable practice.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Using recycled concrete aggregates (RCA) for pavements is crucial to achieving sustainability. Implementing RCA for new pavement can minimize carbon footprint, conserve natural resources, reduce harmful emissions, and lower life cycle costs. Compared to natural aggregate (NA), RCA pavement has fewer comprehensive studies and sustainability assessments.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
2. MARINE
ABERGELDIE / HEB JV 01
MARINE
Sustainable infrastructure in fragile coastal
and marine evironments.
The Abergeldie-HEB Joint Venture brings together the
Australian and New Zealand resources and experience of
two award-winning marine and civil contractors offering:
Financial strength,
More than 500 multi-disciplined project management
and construction personnel,
Sophisticated third-party-accredited
management systems,
In-house owned and operated marine
construction equipment,
Specialist supplier networks on both sides of the
Tasman, and
Innovation and reliability to meet complex
project challenges.
The Joint Venture’s projects are managed from regional
offices and plant depots in Sydney, Newcastle, Canberra,
Brisbane and Townsville in Australia, and Auckland,
Tauranga, Hamilton, Christchurch and Blenheim in New
Zealand, with a steel fabrication factory in Sydney and a
precast facility in Tauranga.
SEA WALLS
Balmain Sea Walls
(Sydney, Australia)
Construction of new sea walls
for the Water Police Headquarters
on Sydney Harbour, including
installation of driven piles, concrete
headstocks below low tide level,
precast sea wall panels and
repairs to existing seawalls
including formwork, concrete and
pressure grouting.
Scarborough Fisherman’s Jetty
Redevelopment
(Brisbane, Australia)
Removal and reinstatement of
150m armoured rock sea wall, new
drilled foundations and retaining
walls to stabilise a failed road
embankment at the water’s edge.
The works were conducted above
and below the tidal water line.
Lucinda Bulk Sugar
Terminal (North QLD,
Australia) from the shore.
3. The Abergeldie- HEB Joint Venture brings together the Australian and New Zealand
resources and experience of two award-winning marine and civil contractors
MARINE ABERGELDIE / HEB JV 03 ABERGELDIE / HEB JV 02
MARINE
WHARVES
Oxley Wharf (Brisbane, Australia)
Refurbishment of the floating wharf
and ferry landing at Riverside Rocks
on the Brisbane River, including
repairs to corroded reinforcement,
approach road works, hand rails,
steel walkways, embankment
stabilisation and rock anchors.
Wharf No. 4 Replacement
(Napier, New Zealand)
Design and construction for an
extension and strengthening of the
existing No.4 wharf and reclamation
of adjacent tidal land. The project
was undertaken as an alliance with
the Port of Napier, based on
effective use of collaborative
contracting, value engineering and
risk management principles.
Bottom right - before shot
Sulphur Point Wharf Development
Ext No. 2 (Tauranga, New Zealand)
Design and construction of a 170m
long berth extension to the busy
Sulphur Point Container Terminal.
Work includes extensive piling
operations, the construction of
marginal embankments and
concrete pavements, a mooring
dolphin and associated services.
Lucinda Bulk Sugar Terminal (North QLD, Australia)
Abergeldie and HEB have recently worked together to undertake repairs to the cyclone damaged 5.76 km
long jetty, wharf and associated infrastructure including a travelling gantry ship loader at Lucinda Bulk
Sugar Terminal. Works included extensive repairs to steel and concrete marine structures, electrical and
mechanical equipment, replacement of cathodic protection installations, replacement of damaged ship’s
berthing facilities, above and below water repairs to piling, removal and replacement of multiple pre-cast
concrete wharf decking modules. In addition to this, repairs to and replacement of steel walkways, access
platforms, stairs and ladders were carried out. A jack-up barge on spud legs provided a stable work
platform for cranes and piling equipment.
Cashin Quay No.1 (Lyttelton, New Zealand)
Design and construction of repair and development works
to the coal exporting facilities at Cashin Quay No. 1 Wharf,
following the earthquakes of September 2010 and February
2011. The works included temporary support of the wharf
and coal loader to keep it operational whilst the new works
were completed. New concrete foundations and seawall
slabs were constructed and extensive piling and headstock
work was undertaken to re-connect the new structure with
areas of reclamation.
4. MARINE ABERGELDIE / HEB JV 04
DRY DOCKS / MARINAS
Garden Island Dry Dock
(Sydney, Australia)
Refurbishment of the naval base
No.2 floating caisson, including
repairs to and replacement of an
extensive network of pipework
and valve systems on and
below deck for the flood and
pump-out mechanisms.
Whangamata Marina
(New Zealand)
Excavation of more than 165,000
cu m of foreshore sand to form a
new marina basin, placement of
6,600 cu m of rock armouring,
construction of piled and precast
concrete travel dock lift,
hard stand boat storage, car parks
and landscaping.
Lucinda Bulk Sugar Terminal
(North QLD, Australia)
Works in progress
5. Abergeldie Offices HEB Offices
Canberra
1/92 Hoskins St
PO Box 56
Mitchell ACT 2911
P: +61 (2) 6241 1755
F: +61 (2) 6241 0712
Townsville
1/13 Civil Rd
PO Box 7264
Garbutt QLD 4814
P: +61 (7) 4771 9700
F: +61 (7) 4728 6313
mail@abergeldie.com
Brisbane
97 Old Toombul Rd
Northgate QLD 4013
PO Box 135
Banyo QLD 4014
P: +61 (7) 3621 0000
F: +61 (7) 3621 4100
www.abergeldie.com
www.heb.co.nz
Sydney (Head Office)
1/5 George Young St
PO Box 10
Regents Park NSW 2143
P: +61 (2) 8717 7777
F: +61 (2) 8717 7718
Newcastle
1/16 Huntingdale Dr
PO! Box 326
Thornton NSW 2322
P: +61 (2) 4966 3899
F: +61 (2) 4966 3859
!
Auckland (Head Office)
Firth St
PO Box 226
Drury, Auckland 2247
P: +64 (9) 295 9000
F: +64 (9) 295 9881
Tauranga
21 Aerodrome Rd
PO Box 4049
Mount Maunganui South
P: +64 (7) 575 2325
F: +64 (7) 574 3931
Christchurch
307 Flaxton Road
Rangiora
Christchurch 7691
P: +64 (3) 313 7601
F: +64 (3) 313 7020