th
                                                        8 Grade Math Curriculum Map
                                                          Isaac School District No. 5
Quarter 1
Unit Name and Description: Compare and Order Real Numbers

Cluster 1
Big Ideas/Enduring Understandings                                                      Essential Question(s)

Real numbers are classified as either rational or irrational numbers.                  Describe how multiplying or dividing a number by less than one affects the
                                                                                       number?
The value of all numbers is dependent on its place value.
                                                                                       Why is checking the reasonableness of answer important?

                                                                                       How do we use scientific notation to express equivalent forms of rational
                                                                                       number?

                                                                                       How do we compare and order real numbers?




   Italics        = POs taught at earlier grade level        I= Important P.O.             []   = Increased skill rigor                   Revised 06-16-11
   Underlining    = Cognitive rigor                         N= Nice to Know P.O.                                                          Isaac School District No. 5
                                                                                   E
AZ                                                Essential Learning                                              Key                     Technology
EIN
           Standard                    Knowledge                                      Skills                                 Vocabulary                 Resources
E           S1C1PO1         Real numbers; Large and        Compare real numbers including very large and small             Natural number
                            small integers; Decimals;      integers, and decimals, and fractions close to zero             Counting number
                            Fractions                                                                                      Whole Numbers
 I           S1C1PO2        Rational numbers; Irrational   Clrdsify realnumbers including very large and small, and
                                                           O aser real numbers as rational or irrational                   Integers
                            numbers; Real numbers                                                                          Rational numbers
                                                                                                                           Irrational number
 I           S1C1PO3        Real number system;            Model the relationship between the subsets of the real number   Real number
                            Relationship; Subsets          system                                                          Standard notation
                                                                                                                           Scientific notation
                                                                                                                           Estimation




     Italics       = POs taught at earlier grade level      I= Important P.O.            []    = Increased skill rigor                  Revised 06-16-11
     Underlining   = Cognitive rigor                       N= Nice to Know P.O.                                                         Isaac School District No. 5
                                                                                  E
E           S1C2PO1        Prime number; Composite      Solve problems with factors, multiples, divisibility or
                           numbers; Multiples and       remainders, prime numbers, and composite numbers
                           Factors; Divisibility and
                           Remainders
I           S1C3PO2        Rational numbers;            Estimate the location of rational and common irrational
                           irrational numbers;          numbers on a number line
                           number line

I           S1C2PO4        Standard notation;           Convert standard notation to scientific notation and vice versa
                           Scientific notation;         (include positive and negative exponents)
                           Positive and negative
                           exponents
I           S1C2PO2        Multiplying and dividing     Describe the effect of multiplying and dividing a rational
                           rational                     number by
                           numbers                         • a number less than zero
                                                           • a number between zero and one
                                                           • a number greater than one

I           S1C3PO1        Estimation; Situation        Make estimates appropriate to a given situation




    Italics       = POs taught at earlier grade level    I= Important P.O.             []    = Increased skill rigor      Revised 06-16-11
    Underlining   = Cognitive rigor                     N= Nice to Know P.O.                                              Isaac School District No. 5
                                                                               E
th
                                                        8 Grade Math Curriculum Map
                                                          Isaac School District No. 5
Quarter 1
Unit Name and Description: Solving Algebraic Equations and Inequalities

Cluster 2
Big Ideas/Enduring Understandings                                                    Essential Question(s)

Algebraic equations, inequalities, and graphs are representative of real life        What is absolute value? Why do we have absolute value?
situations.
                                                                                     How do we use simple interest to track the growth of our money?

                                                                                     How can we use equations to solve real life problems?


             AZ                                           Essential Learning                                                     Key                  Technology
EIN
          Standard                     Knowledge                                      Skills                                  Vocabulary              Resources
 E            S3C3PO3          Linear equations;         Analyze situations involving linear equations and                  Linear equations
                               Inequalities; Real        inequalities using the properties of the real number system        Inequalities
                               number system                                                                                Equations
                                                          Simplify problems involving linear equations and                  Expression
                                                          inequalities using the properties of the real number system       Percent increase
                                                                                                                            Percent decrease
                                                          Solve problems involving linear equations and inequalities        Absolute value
                                                          using the properties of the real number system                    Solution
  E           S3C3PO1          Algebraic expressions;    Write algebraic expressions, equations, or inequalities that       Principle
                               Equations;                represent a situation                                              Interest rates
                               Inequalities
                                                          Identify algebraic expressions, equations, or inequalities that
                                                          represent a situation



Italics          = POs taught at earlier grade level      I= Important P.O.              []    = Increased skill rigor                  Revised 06-16-11
Underlining      = Cognitive rigor                       N= Nice to Know P.O.                                                           Isaac School District No. 5
                                                                                E
E            S3C3PO5          Inequalities; Number line    Graph an inequality on a number line

 E            S1C1PO4          Absolute value               Model problems involving absolute value

                                                             Solve problems involving absolute value

  I           S1C2PO3          Simple interest rates;        Solve problems involving percent increase, percent decrease,
                               Percent                       and simple interest rates
                               increase/decrease;
                               Ending balance
 E            S3C3PO2          Expressions; Rational        Evaluate an expression containing variables by substituting
                               numbers;                     rational numbers for the variables
                               Variables
 E            S1C2PO5          Square roots; Cube roots;     Simplify numerical expressions using the order of operations
                               Grouping                      that include grouping symbols, square roots, cube roots,
                               symbols; Positive             absolute values, and positive exponents
                               exponents; Absolute
  I           S3C4PO2          value; Order of operations
                               Simple rates                  Solve problems involving simple rates



  I           S5C2PO6          Informal mathematical        Communicate the answer(s) to the question(s) in a problem
                               language;                    using appropriate representations, including symbols and
                               Formal mathematical          informal and formal mathematical language
                               language; Symbols;
                               Representations




Italics          = POs taught at earlier grade level         I= Important P.O.            []    = Increased skill rigor     Revised 06-16-11
Underlining      = Cognitive rigor                          N= Nice to Know P.O.                                            Isaac School District No. 5
                                                                                   E
th
                                                         8 Grade Math Curriculum Map
                                                           Isaac School District No. 5
Quarter 2
Unit Name and Description: Ratios and Proportions
Cluster 3
Big Ideas/Enduring Understandings                                                    Essential Question(s)

Ratios and proportions are used to determine the relationship between ideas.         How do unit multipliers help me convert?

                                                                                     How can we translate real-life situations into algorithms?

                                                                                     How do we convert between customary and metric systems?
             AZ                                            Essential Learning                                                    Key                   Technology
EIN
          Standard                     Knowledge                                      Skills                                  Vocabulary               Resources
 E            S4C4PO2          Geometric problems;        Solve geometric problems using ratios and proportions             Ratios
                               Ratios; Proportions                                                                          Proportions
                                                                                                                            Corresponding
  I           S4C4PO1          Problems; Measurement       Solve problems involving conversions within the same
                                                                                                                            sides/angles
                               system; Conversions         measurement system
                                                                                                                            Congruency
  I           S4C1PO3          Proportional reasoning;    Use proportional reasoning to determine congruence and            Similarity
                               Similar Triangles;         similarity of triangles                                           Geometric
                               Congruence;                                                                                  Problems
 E            S5C1PO1          Algorithm; Proportional    Create an algorithm to solve problems involving indirect          Algorithm
                               reasoning; Density;        measurements, using proportional reasoning, dimensional           Density
                               Dimensional analysis       analysis, and the concepts of density and rate.                   Scale Factor
  I           S5C2PO8          Problem solving;           Describe when to use proportional reasoning to solve a            Unit Rate
                               Proportional               problem.                                                          Density
                               reasoning                                                                                    Dimensional



Italics          = POs taught at earlier grade level       I= Important P.O.             []    = Increased skill rigor                   Revised 06-16-11
Underlining      = Cognitive rigor                        N= Nice to Know P.O.                                                           Isaac School District No. 5
                                                                                 E
th
                                                          8 Grade Math Curriculum Map
                                                            Isaac School District No. 5
Quarter 2
Unit Name and Description: Pythagorean Theorem

Cluster 4
Big Ideas/Enduring Understandings                                                     Essential Question(s)

The Pythagorean Theorem can be used to calculate the distance between two             How the Pythagorean Theorem applies to right triangles?
points.
                                                                                      How do we apply the Pythagorean Theorem to calculate the distance of a line

                                                                                      segment?

             AZ                                             Essential Learning                                                   Key                   Technology
EIN
          Standard                      Knowledge                                      Skills                                 Vocabulary               Resources
 E            S4C3PO2           Pythagorean Theorem;       Use the Pythagorean Theorem to [calculate] the distance         Pythagorean
                                Coordinate                 between two points in the coordinate plane                      Theorem
                                plane; Distance; Points                                                                    Leg(s)
                                                                                                                           Hypotenuse
 E            S4C1PO4           Pythagorean Theorem        Use the Pythagorean Theorem to solve problems
                                                                                                                           Midpoint

 I            S4C3PO1           Midpoint; Conjecture;      Make a conjecture about how to [calculate] the midpoint
                                Coordinate plane           between any two points in the coordinate plane

                                                            Test a conjecture about how to [calculate] the midpoint
                                                            between any two points in the coordinate plane
 I            S5C2PO13          Pythagorean Theorem;       Verify the Pythagorean Theorem using a valid argument
                                Valid argument




Italics           = POs taught at earlier grade level       I= Important P.O.             []     = Increased skill rigor                 Revised 06-16-11
Underlining       = Cognitive rigor                        N= Nice to Know P.O.                                                          Isaac School District No. 5
                                                                                  E
th
                                                       8 Grade Math Curriculum Map
                                                         Isaac School District No. 5
Quarter 2
Unit Name and Description: Functions and Linear Relationships
Cluster 5
Big Ideas/Enduring Understandings                                                  Essential Question(s)

Functions represent given situations from real life.                               How do we determine if a graph is a function?

Two variables are related.                                                         How do we determine if a graph is proportional?

                                                                                   Explain how to determine if an equation is linear.

                                                                                   How many output values are assigned to a function?

                                                                                   How does changing the slope of a line affect its steepness?

             AZ                                                          Essential Learning                                   Key                     Technology
EIN       Standard                                                                                                         Vocabulary                 Resources
                                     Knowledge                                      Skill
                                                                                     s




Italics        = POs taught at earlier grade level       I= Important P.O.             []   = Increased skill rigor                     Revised 06-16-11
Underlining    = Cognitive rigor                        N= Nice to Know P.O.                                                            Isaac School District No. 5
                                                                               E
E            S3C4PO1          Linear equations;           Interpret, the relationship between a linear equation          Slope-intercept
                               Linear relationships;       and its graph.                                                 form
                               Slope; Intercept                                                                           Standard form
                                                            Identifying slope and intercepts                              Slope
                                                                                                                          Y-intercept
                                                            Computing slope and intercepts                                Proportionality
                                                                                                                          Linear equations
 I            S3C2PO5          Proportional relationships; Demonstrate that proportional relationships are linear using
                                                                                                                          Linear functions
                               Linear; Equations;          equations, graphs, or tables
                                                                                                                          Functions
                               Graphs; Tables
                                                                                                                          Function table
                                                                                                                          Domain
                                                                                                                          Range
                                                                                                                          Input Output
                                                                                                                          Geometric
                                                                                                                          sequences
                                                                                                                          Arithmetic
                                                                                                                          sequences
                                                                                                                          Linear
                                                                                                                          relationships
                                                                                                                          Rate of change
                                                                                                                          Direct Variation
                                                                                                                          Constant Variation
                                                                                                                          Non-linear
                                                                                                                          Vertical Line Test




Italics          = POs taught at earlier grade level        I= Important P.O.             []   = Increased skill rigor                  Revised 06-16-11
Underlining      = Cognitive rigor                         N= Nice to Know P.O.                                                         Isaac School District No. 5
                                                                                  E
E            S3C3PO4          Representations;             Translate between different representations of linear
                               Linear equations;            equations using symbols, graphs, tables, or written
                               Graphs, Tables, Written      descriptions
                               descriptions

 I            S3C2PO3          Rule; Algebraic notation;   Write the rule for a simple function using algebraic notation
                               Simple functions

 I            S3C2PO2          Relationship; Graph;        Determine if a relationship represented by a graph or table is
                               Table;                      a function
                               Function
 I            S3C2PO4          Linear and nonlinear        Identify functions as linear or nonlinear and contrast
                               functions; graphs,          distinguishing properties of functions using equations,
                               or tables                   graphs, or tables

 I            S3C1PO1          Numerical and geometric     Recognize and describe numerical and geometric sequences
                               sequences; Tables,          using tables, graphs, words, or symbols.
                               Graphs, Words, Symbols;
                               Conjectures                  Create and analyze numerical and geometric sequences
                                                            using tables, graphs, words, or symbols.

  I           S5C2PO12         Conclusions;                 Make conjectures about these sequences
                                                                   conclusions and generalizations about linear
                               Generalizations;             relationships
                               Linear relationships
                                                            Validate conclusions and generalizations about
                                                            linear relationships




Italics          = POs taught at earlier grade level        I= Important P.O.             []    = Increased skill rigor     Revised 06-16-11
Underlining      = Cognitive rigor                         N= Nice to Know P.O.                                             Isaac School District No. 5
                                                                                  E
th
                                                         8 Grade Math Curriculum Map
                                                           Isaac School District No. 5
Quarter 2
Unit Name and Description: Geometric Shapes
Cluster 6
Big Ideas/Enduring Understandings                                                    Essential Question(s)

Geometric shapes are evident in everyday life.                                       How does the area of the base affect an objects volume?

Geometric formulas can be manipulated to solve for the unknown attribute of          How do you use a rectangle to calculate the surface area of a cylinder?
a shape.
                                                                                     Will a given transformations affect an objects size or shape?

                                                                                     How does doubling the diameter of a circle affect its area?


             AZ                                            Essential Learning                                                    Key                   Technology
EIN
          Standard                     Knowledge                                      Skills                                  Vocabulary               Resources
 E            S4C1PO2          Geometric planes and       Predict results of combining, subdividing, and changing           Rectangular prism
                               solids                     shapes of plane figures and solids                                Triangular prism
                                                                                                                            Cylinder
                                                                                                                            Surface area
 E            S4C4PO3          Rectangular prisms;        Calculate the surface area and volume of rectangular prisms,      Volume
                               Cylinders;                 right triangular prisms, and cylinders                            Radius
                               Right triangular prisms                                                                      Diameter
                                                                                                                            Chords




Italics          = POs taught at earlier grade level       I= Important P.O.             []    = Increased skill rigor                   Revised 06-16-11
Underlining      = Cognitive rigor                        N= Nice to Know P.O.                                                           Isaac School District No. 5
                                                                                 E
E            S4C1PO1          Radius; Diameter; Chords; Identify for the attributes of circles: radius, diameter, chords,     Tangent
                               Tangents; Secants;         tangents, secants, inscribed angles, central angles, intercepted     Secants
                               Inscribed angles; Central; arcs, circumference, and area                                        Inscribed angles
                               angles; Intercepted arcs;                                                                       Central
                                                          [Solve for the circumference and the area of a circle]               anglesIntercepted
                                                                                                                               arcs
                                                                                                                               Circumference
 N            S4C2PO2          Transformations;             Describe the transformations that create a given tessellation
                                                                                                                               Rotations (turn)
                               Tessellations
                                                                                                                               Origin
                                                                                                                               Rotational
                                                                                                                               symmetry
                                                                                                                               Reflective
 N            S4C2PO1          Rotations; Origin; 45        Model the result of rotations in multiples of 45 degrees of a 2-   symmetry
                               degrees, 2-                  dimensional figure about the origin                                Tessellations
                               Dimensional figure                                                                              Midpoint
                                                                                                                               Pi (π)
                                                                                                                               Parallelogram
                                                                                                                               Trapezoid
 N            S4C2PO3          Lines of symmetry;           Identify lines of symmetry in plane figures                        Rhombus
                               Plane figures;                                                                                  Quadrilateral
                               2-Dimensional figures        [Determine] lines of symmetry in plane figures                     Prism
                                                                                                                               Complex polygon
                                                            Classify types of symmetries of 2-dimensional figures              Composite figure
                                                                                                                               Polyhedron




Italics          = POs taught at earlier grade level        I= Important P.O.              []    = Increased skill rigor                  Revised 06-16-11
Underlining      = Cognitive rigor                         N= Nice to Know P.O.                                                           Isaac School District No. 5
                                                                                  E
th
                                                          8 Grade Math Curriculum Map
                                                            Isaac School District No. 5
Quarter 3
Unit Name and Description: Data Display
Cluster 7
Big Ideas / Enduring Understandings                                                   Essential Question(s)

Data allows us to analyze the past and make predictions about the future.             How do we determine which graph is the most appropriate representation of a
                                                                                      given data set?
There are multiple ways to represent data.
                                                                                      How do we determine which measure of central tendency is most
                                                                                      representative of a given data set?

                                                                                      How do outliers affect the mean of a data set?

                                                                                      Will each measure of central tendency be representative of your data set?

             AZ                                             Essential Learning                                                    Key                  Technology
EIN
          Standard                     Knowledge                                       Skills                                  Vocabulary              Resources
 E            S2C1PO3          Summary statistics;         Describe how summary statistics relate to the shape of the       Box and whisker
                               Shape of distribution       distribution                                                     plot
                                                                                                                            First quartile
                                                                                                                            Median
                                                                                                                            Third quartile
  I           S2C1PO2          Summary statistics; Data    Make inferences by comparing the same summary statistic for      Lower extreme
                               sets; Inferences            two or more data sets                                            Upper extreme
                                                                                                                            Inter-quartile range
                                                                                                                            Random sampling




Italics          = POs taught at earlier grade level        I= Important P.O.             []    = Increased skill rigor                  Revised 06-16-11
Underlining      = Cognitive rigor                         N= Nice to Know P.O.                                                          Isaac School District No. 5
                                                                                  E
I            S2C1PO1          Displays of data; Box and Solve problems by selecting and constructing, displays of              Sample
                               whisker plots; Scatterplots data, including box and whisker plots and scatterplots               Biased surveys
                                                                                                                                Circle graphs
                                                               Solve problems by interpreting and calculating displays of       Time-distance
                                                               data, including box and whisker plots and scatterplots           graph
                                                                                                                                Directed graph
 N            S2C1PO4          Information; Sources of        Determine whether information is represented effectively and      Experiment
                               bias; Representations of       appropriately given a graph or a set of data by identifying       Experimental
                               data; Graphs; (Histograms;     sources of bias and compare and contrast the effectiveness of     design
                               Circle graphs; Stem-           different representations of data                                 Scatterplots
                               and-leaf plot; Scatterplots;
                               Line) graph; Double line
                               graph; Venn diagram
 N            S3C2PO1          Graph; Context;                Sketch a graph that models a given context

                                                               Interpret a graph that models a given context

                                                               Describe a context that is modeled by a given graph

 I            S5C2PO7          Information; Symbols;           Isolate mathematical information taken from symbols,
                               Diagrams;                       diagrams, and graphs to make inferences, draw conclusions,
                               Graphs; Inferences;             and justify reasoning
                               Conclusions; Reasoning
                               (Frequency tables; Venn        Organize mathematical information taken from symbols,
                               diagrams; Bar graphs;          diagrams, and graphs to make inferences, draw conclusions,
                               Circle                         and justify reasoning
 I            S2C4PO1          graphs; Vertex-edge
                               Directed graphs; Problems      Use directed graphs to solve problems

 N            S5C2PO1          Problem situation;              Analyze a problem situation to determine the question(s) to be
                               Questions                       answered

 N            S2C1PO5          Experimental design             Evaluate the design of an experiment




Italics          = POs taught at earlier grade level           I= Important P.O.             []    = Increased skill rigor                 Revised 06-16-11
Underlining      = Cognitive rigor                            N= Nice to Know P.O.                                                         Isaac School District No. 5
                                                                                     E
th
                                                          8 Grade Math Curriculum Map
                                                            Isaac School District No. 5
Quarter 3
Unit Name and Description: Probability

Cluster 8
Big Ideas/Enduring Understandings                                                     Essential Question(s)

Probability can be used to predict the outcome of an event.                           How does changing the total outcome of an event affect the probability?

The total number of outcomes affects the probability of an event.                     How do dependent events affect the probability of a compound event?

                                                                                      What is the difference between theoretical and experimental probability?

                                                                                      What is the difference between combinations and permutations?
            AZ                                             Essential Learning                                                    Key                  Technology
EIN       Standard                     Knowledge                                       Skills                                 Vocabulary              Resources
 E            S2C2PO1          Theoretical probability;     Determine theoretical and experimental conditional             Theoretical
                               Experimental                 probabilities in compound probability experiments              probability
                               probability; Compound                                                                       Experimental
                               probability;                                                                                probability
                                                                                                                           Compound events
                                                                                                                           Independent events
 I            S2C2PO2                                                                                                      Dependent events
                               Probability; Outcome;       Interpret probabilities within a given context
                                                                                                                           Mutually exclusive
                               Experiment; Predictions;
                                                                                                                           Fundamental
                               Context Experiments          Compare the outcome of an experiment to predictions made
                                                            prior to performing the experiment                             counting principle




Italics          = POs taught at earlier grade level        I= Important P.O.             []    = Increased skill rigor                 Revised 06-16-11
Underlining      = Cognitive rigor                         N= Nice to Know P.O.                                                         Isaac School District No. 5
                                                                                  E
I            S2C2PO3           Possible outcomes; Sample Use all possible outcomes (sample space) to determine the          Possible outcomes
                                space; Probability;       probability of dependent and independent events                    Tree diagram.
                                Dependent events;                                                                            Permutations
                                Independents events                                                                          Combinations
                                                                                                                             Factorial notation
 E            S2C3PO2           Problems; Factorial        Solve counting problems algebraically including factorial
                                                                                                                             Sample space
                                notation;                  notation
                                Counting principal
                                                           Represent counting principles algebraically including factorial
                                                           notation
 I            S2C3PO1           Counting problems          Represent, analyze, and solve counting problems with or
                                                           without ordering repetitions




 N            S5C2PO9           Conjectures; Information; Make conjectures based on information collected from
                                Explorations; Experiments explorations and experiments

                                                           Test conjectures based on information collected from
                                                           explorations and experiments
 N            S5C2PO10          Logical conclusions;       Solve logic problems involving multiple variables, conditional
                                Conditional statements;    statements, conjectures, and negation using words,
                                Conjectures; Negation;     charts, and pictures
                                Charts; Pictures

 I            S5C2PO11          Simple valid arguments;    Identify simple valid arguments using If… then statements.
                                If… then statements




Italics           = POs taught at earlier grade level      I= Important P.O.             []    = Increased skill rigor                   Revised 06-16-11
Underlining       = Cognitive rigor                       N= Nice to Know P.O.                                                           Isaac School District No. 5
                                                                                 E
th
                                                           8 Grade Math Curriculum Map
                                                             Isaac School District No. 5
Quarter 3
Unit Name and Description: Logical Evaluations
Cluster 9
Big Ideas/Enduring Understandings                                                      Essential Question(s)

There are various strategies for problem solving.                                      Why do we use different mathematical strategies to solve a problem?

Logical processes help them to eliminate unreasonable solutions.                       How do we identify pertinent and extraneous information from a question?

             AZ                                            Essential Learning                                                     Key                 Technology
EIN       Standard                                                                                                                                    Resources
                                       Knowledge                               Skill                                           Vocabulary
 E            S5C2PO2                                                            s
                               Mathematical strategies; Analyze and compare mathematical strategies for efficient Expressions
                               Problem solving              problem solving                                                  Guess and check
                                                                                                                             Substitute
                                                             Select and use one or more strategies to solve a problem        Extraneous
                                                                                                                             information
 I            S5C2PO3          Relevant, missing, and       Identify relevant, missing, and extraneous information related   Pertinent
                               extraneous information;      to the solution to a problem                                     information
                                                                                                                             Relevant
 I            S5C2PO4          Problem situation;           Represent a problem situation using multiple representations     information
                               Representations;                                                                              Conditional
                               Process; Reasonableness;      Describe the process used to solve the problem                  statement

                                                             Verify the reasonableness of the solution
 I            S5C2PO5          Problem solving strategy;    Apply a previously used problem-solving strategy in a new
                                                            context




Italics          = POs taught at earlier grade level         I= Important P.O.             []    = Increased skill rigor                Revised 06-16-11
Underlining      = Cognitive rigor                          N= Nice to Know P.O.                                                        Isaac School District No. 5
                                                                                   E
th
                                                     8 Grade Math Curriculum Map
                                                       Isaac School District No. 5
Quarter 4
Unit Name and Description: Algebra and Equations

Cluster 10
Big Ideas/Enduring Understandings                                                Essential Question(s)

Functions model real life situations.                                            How are inequalities represented on the coordinate plane?

Algebra is essential in using functional notation.                               Why do problems involving absolute value have two answers?

Absolute value represents the distance from zero.                                What is the relationship between rate of change and slope?

                                                                                 What is the relationship between tables, functions, and graphs?




Italics        = POs taught at earlier grade level     I= Important P.O.             []   = Increased skill rigor                   Revised 06-16-11
Underlining    = Cognitive rigor                      N= Nice to Know P.O.                                                          Isaac School District No. 5
                                                                             E
AZ                                          Essential Learning                                               Key                  Technology
EIN
          Standard                     Knowledge                                Skills                                 Vocabulary              Resources
 E     MHS-S4C3PO5 Linear equation;                  Graph a linear equation or linear inequality in two             Slope-intercept
                   Linear inequalities;              variables                                                       form
                   Two variables                                                                                     Linear inequalities
                                                                                                                     Standard form
 I      MHS-S3C3PO5 Linear equations; absolute       Solve linear equations and equations involving absolute value   System of
                    value; Variable                  with one variable                                               equations
                                                                                                                     Absolute value
                                                                                                                     Constant rate of
                                                                                                                     change
                                                                                                                     Functional notation
                                                                                                                     Domain




Italics       = POs taught at earlier grade level    I= Important P.O.             []    = Increased skill rigor                 Revised 06-16-11
Underlining   = Cognitive rigor                     N= Nice to Know P.O.                                                         Isaac School District No. 5
                                                                           E
E      MHS-S3C4PO1 Slope; Intercepts; Graph;         Determine the slope and intercepts of the graph of a linear
                    Slope; Constant rate              function, interpreting slope as a constant rate of change
                    of change; Linear
                    functions




 I      MHS-S3C2PO3 Functions notation;               Use function notation; evaluate a function at a specified value
                    Functions; Value; Domain          in its domain




 I      MHS-S3C3PO3 Equations; Table of values; Write an equation given a table of values, two points on the
                    Points; Line; Slope; Graph line, the slope and a point on the line, or the graph of the line




 I      MHS-S3C3PO6 Linear inequalities;             Solve linear inequalities in one variable
                    Variable




Italics        = POs taught at earlier grade level    I= Important P.O.              []   = Increased skill rigor       Revised 06-16-11
Underlining    = Cognitive rigor                     N= Nice to Know P.O.                                               Isaac School District No. 5
                                                                            E

8th grade math curriculum map 2011 2012

  • 1.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 1 Unit Name and Description: Compare and Order Real Numbers Cluster 1 Big Ideas/Enduring Understandings Essential Question(s) Real numbers are classified as either rational or irrational numbers. Describe how multiplying or dividing a number by less than one affects the number? The value of all numbers is dependent on its place value. Why is checking the reasonableness of answer important? How do we use scientific notation to express equivalent forms of rational number? How do we compare and order real numbers? Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 2.
    AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S1C1PO1 Real numbers; Large and Compare real numbers including very large and small Natural number small integers; Decimals; integers, and decimals, and fractions close to zero Counting number Fractions Whole Numbers I S1C1PO2 Rational numbers; Irrational Clrdsify realnumbers including very large and small, and O aser real numbers as rational or irrational Integers numbers; Real numbers Rational numbers Irrational number I S1C1PO3 Real number system; Model the relationship between the subsets of the real number Real number Relationship; Subsets system Standard notation Scientific notation Estimation Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 3.
    E S1C2PO1 Prime number; Composite Solve problems with factors, multiples, divisibility or numbers; Multiples and remainders, prime numbers, and composite numbers Factors; Divisibility and Remainders I S1C3PO2 Rational numbers; Estimate the location of rational and common irrational irrational numbers; numbers on a number line number line I S1C2PO4 Standard notation; Convert standard notation to scientific notation and vice versa Scientific notation; (include positive and negative exponents) Positive and negative exponents I S1C2PO2 Multiplying and dividing Describe the effect of multiplying and dividing a rational rational number by numbers • a number less than zero • a number between zero and one • a number greater than one I S1C3PO1 Estimation; Situation Make estimates appropriate to a given situation Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 4.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 1 Unit Name and Description: Solving Algebraic Equations and Inequalities Cluster 2 Big Ideas/Enduring Understandings Essential Question(s) Algebraic equations, inequalities, and graphs are representative of real life What is absolute value? Why do we have absolute value? situations. How do we use simple interest to track the growth of our money? How can we use equations to solve real life problems? AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S3C3PO3 Linear equations; Analyze situations involving linear equations and Linear equations Inequalities; Real inequalities using the properties of the real number system Inequalities number system Equations Simplify problems involving linear equations and Expression inequalities using the properties of the real number system Percent increase Percent decrease Solve problems involving linear equations and inequalities Absolute value using the properties of the real number system Solution E S3C3PO1 Algebraic expressions; Write algebraic expressions, equations, or inequalities that Principle Equations; represent a situation Interest rates Inequalities Identify algebraic expressions, equations, or inequalities that represent a situation Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 5.
    E S3C3PO5 Inequalities; Number line Graph an inequality on a number line E S1C1PO4 Absolute value Model problems involving absolute value Solve problems involving absolute value I S1C2PO3 Simple interest rates; Solve problems involving percent increase, percent decrease, Percent and simple interest rates increase/decrease; Ending balance E S3C3PO2 Expressions; Rational Evaluate an expression containing variables by substituting numbers; rational numbers for the variables Variables E S1C2PO5 Square roots; Cube roots; Simplify numerical expressions using the order of operations Grouping that include grouping symbols, square roots, cube roots, symbols; Positive absolute values, and positive exponents exponents; Absolute I S3C4PO2 value; Order of operations Simple rates Solve problems involving simple rates I S5C2PO6 Informal mathematical Communicate the answer(s) to the question(s) in a problem language; using appropriate representations, including symbols and Formal mathematical informal and formal mathematical language language; Symbols; Representations Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 6.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 2 Unit Name and Description: Ratios and Proportions Cluster 3 Big Ideas/Enduring Understandings Essential Question(s) Ratios and proportions are used to determine the relationship between ideas. How do unit multipliers help me convert? How can we translate real-life situations into algorithms? How do we convert between customary and metric systems? AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S4C4PO2 Geometric problems; Solve geometric problems using ratios and proportions Ratios Ratios; Proportions Proportions Corresponding I S4C4PO1 Problems; Measurement Solve problems involving conversions within the same sides/angles system; Conversions measurement system Congruency I S4C1PO3 Proportional reasoning; Use proportional reasoning to determine congruence and Similarity Similar Triangles; similarity of triangles Geometric Congruence; Problems E S5C1PO1 Algorithm; Proportional Create an algorithm to solve problems involving indirect Algorithm reasoning; Density; measurements, using proportional reasoning, dimensional Density Dimensional analysis analysis, and the concepts of density and rate. Scale Factor I S5C2PO8 Problem solving; Describe when to use proportional reasoning to solve a Unit Rate Proportional problem. Density reasoning Dimensional Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 7.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 2 Unit Name and Description: Pythagorean Theorem Cluster 4 Big Ideas/Enduring Understandings Essential Question(s) The Pythagorean Theorem can be used to calculate the distance between two How the Pythagorean Theorem applies to right triangles? points. How do we apply the Pythagorean Theorem to calculate the distance of a line segment? AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S4C3PO2 Pythagorean Theorem; Use the Pythagorean Theorem to [calculate] the distance Pythagorean Coordinate between two points in the coordinate plane Theorem plane; Distance; Points Leg(s) Hypotenuse E S4C1PO4 Pythagorean Theorem Use the Pythagorean Theorem to solve problems Midpoint I S4C3PO1 Midpoint; Conjecture; Make a conjecture about how to [calculate] the midpoint Coordinate plane between any two points in the coordinate plane Test a conjecture about how to [calculate] the midpoint between any two points in the coordinate plane I S5C2PO13 Pythagorean Theorem; Verify the Pythagorean Theorem using a valid argument Valid argument Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 8.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 2 Unit Name and Description: Functions and Linear Relationships Cluster 5 Big Ideas/Enduring Understandings Essential Question(s) Functions represent given situations from real life. How do we determine if a graph is a function? Two variables are related. How do we determine if a graph is proportional? Explain how to determine if an equation is linear. How many output values are assigned to a function? How does changing the slope of a line affect its steepness? AZ Essential Learning Key Technology EIN Standard Vocabulary Resources Knowledge Skill s Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 9.
    E S3C4PO1 Linear equations; Interpret, the relationship between a linear equation Slope-intercept Linear relationships; and its graph. form Slope; Intercept Standard form Identifying slope and intercepts Slope Y-intercept Computing slope and intercepts Proportionality Linear equations I S3C2PO5 Proportional relationships; Demonstrate that proportional relationships are linear using Linear functions Linear; Equations; equations, graphs, or tables Functions Graphs; Tables Function table Domain Range Input Output Geometric sequences Arithmetic sequences Linear relationships Rate of change Direct Variation Constant Variation Non-linear Vertical Line Test Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 10.
    E S3C3PO4 Representations; Translate between different representations of linear Linear equations; equations using symbols, graphs, tables, or written Graphs, Tables, Written descriptions descriptions I S3C2PO3 Rule; Algebraic notation; Write the rule for a simple function using algebraic notation Simple functions I S3C2PO2 Relationship; Graph; Determine if a relationship represented by a graph or table is Table; a function Function I S3C2PO4 Linear and nonlinear Identify functions as linear or nonlinear and contrast functions; graphs, distinguishing properties of functions using equations, or tables graphs, or tables I S3C1PO1 Numerical and geometric Recognize and describe numerical and geometric sequences sequences; Tables, using tables, graphs, words, or symbols. Graphs, Words, Symbols; Conjectures Create and analyze numerical and geometric sequences using tables, graphs, words, or symbols. I S5C2PO12 Conclusions; Make conjectures about these sequences conclusions and generalizations about linear Generalizations; relationships Linear relationships Validate conclusions and generalizations about linear relationships Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 11.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 2 Unit Name and Description: Geometric Shapes Cluster 6 Big Ideas/Enduring Understandings Essential Question(s) Geometric shapes are evident in everyday life. How does the area of the base affect an objects volume? Geometric formulas can be manipulated to solve for the unknown attribute of How do you use a rectangle to calculate the surface area of a cylinder? a shape. Will a given transformations affect an objects size or shape? How does doubling the diameter of a circle affect its area? AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S4C1PO2 Geometric planes and Predict results of combining, subdividing, and changing Rectangular prism solids shapes of plane figures and solids Triangular prism Cylinder Surface area E S4C4PO3 Rectangular prisms; Calculate the surface area and volume of rectangular prisms, Volume Cylinders; right triangular prisms, and cylinders Radius Right triangular prisms Diameter Chords Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 12.
    E S4C1PO1 Radius; Diameter; Chords; Identify for the attributes of circles: radius, diameter, chords, Tangent Tangents; Secants; tangents, secants, inscribed angles, central angles, intercepted Secants Inscribed angles; Central; arcs, circumference, and area Inscribed angles angles; Intercepted arcs; Central [Solve for the circumference and the area of a circle] anglesIntercepted arcs Circumference N S4C2PO2 Transformations; Describe the transformations that create a given tessellation Rotations (turn) Tessellations Origin Rotational symmetry Reflective N S4C2PO1 Rotations; Origin; 45 Model the result of rotations in multiples of 45 degrees of a 2- symmetry degrees, 2- dimensional figure about the origin Tessellations Dimensional figure Midpoint Pi (π) Parallelogram Trapezoid N S4C2PO3 Lines of symmetry; Identify lines of symmetry in plane figures Rhombus Plane figures; Quadrilateral 2-Dimensional figures [Determine] lines of symmetry in plane figures Prism Complex polygon Classify types of symmetries of 2-dimensional figures Composite figure Polyhedron Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 13.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 3 Unit Name and Description: Data Display Cluster 7 Big Ideas / Enduring Understandings Essential Question(s) Data allows us to analyze the past and make predictions about the future. How do we determine which graph is the most appropriate representation of a given data set? There are multiple ways to represent data. How do we determine which measure of central tendency is most representative of a given data set? How do outliers affect the mean of a data set? Will each measure of central tendency be representative of your data set? AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S2C1PO3 Summary statistics; Describe how summary statistics relate to the shape of the Box and whisker Shape of distribution distribution plot First quartile Median Third quartile I S2C1PO2 Summary statistics; Data Make inferences by comparing the same summary statistic for Lower extreme sets; Inferences two or more data sets Upper extreme Inter-quartile range Random sampling Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 14.
    I S2C1PO1 Displays of data; Box and Solve problems by selecting and constructing, displays of Sample whisker plots; Scatterplots data, including box and whisker plots and scatterplots Biased surveys Circle graphs Solve problems by interpreting and calculating displays of Time-distance data, including box and whisker plots and scatterplots graph Directed graph N S2C1PO4 Information; Sources of Determine whether information is represented effectively and Experiment bias; Representations of appropriately given a graph or a set of data by identifying Experimental data; Graphs; (Histograms; sources of bias and compare and contrast the effectiveness of design Circle graphs; Stem- different representations of data Scatterplots and-leaf plot; Scatterplots; Line) graph; Double line graph; Venn diagram N S3C2PO1 Graph; Context; Sketch a graph that models a given context Interpret a graph that models a given context Describe a context that is modeled by a given graph I S5C2PO7 Information; Symbols; Isolate mathematical information taken from symbols, Diagrams; diagrams, and graphs to make inferences, draw conclusions, Graphs; Inferences; and justify reasoning Conclusions; Reasoning (Frequency tables; Venn Organize mathematical information taken from symbols, diagrams; Bar graphs; diagrams, and graphs to make inferences, draw conclusions, Circle and justify reasoning I S2C4PO1 graphs; Vertex-edge Directed graphs; Problems Use directed graphs to solve problems N S5C2PO1 Problem situation; Analyze a problem situation to determine the question(s) to be Questions answered N S2C1PO5 Experimental design Evaluate the design of an experiment Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 15.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 3 Unit Name and Description: Probability Cluster 8 Big Ideas/Enduring Understandings Essential Question(s) Probability can be used to predict the outcome of an event. How does changing the total outcome of an event affect the probability? The total number of outcomes affects the probability of an event. How do dependent events affect the probability of a compound event? What is the difference between theoretical and experimental probability? What is the difference between combinations and permutations? AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E S2C2PO1 Theoretical probability; Determine theoretical and experimental conditional Theoretical Experimental probabilities in compound probability experiments probability probability; Compound Experimental probability; probability Compound events Independent events I S2C2PO2 Dependent events Probability; Outcome; Interpret probabilities within a given context Mutually exclusive Experiment; Predictions; Fundamental Context Experiments Compare the outcome of an experiment to predictions made prior to performing the experiment counting principle Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 16.
    I S2C2PO3 Possible outcomes; Sample Use all possible outcomes (sample space) to determine the Possible outcomes space; Probability; probability of dependent and independent events Tree diagram. Dependent events; Permutations Independents events Combinations Factorial notation E S2C3PO2 Problems; Factorial Solve counting problems algebraically including factorial Sample space notation; notation Counting principal Represent counting principles algebraically including factorial notation I S2C3PO1 Counting problems Represent, analyze, and solve counting problems with or without ordering repetitions N S5C2PO9 Conjectures; Information; Make conjectures based on information collected from Explorations; Experiments explorations and experiments Test conjectures based on information collected from explorations and experiments N S5C2PO10 Logical conclusions; Solve logic problems involving multiple variables, conditional Conditional statements; statements, conjectures, and negation using words, Conjectures; Negation; charts, and pictures Charts; Pictures I S5C2PO11 Simple valid arguments; Identify simple valid arguments using If… then statements. If… then statements Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 17.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 3 Unit Name and Description: Logical Evaluations Cluster 9 Big Ideas/Enduring Understandings Essential Question(s) There are various strategies for problem solving. Why do we use different mathematical strategies to solve a problem? Logical processes help them to eliminate unreasonable solutions. How do we identify pertinent and extraneous information from a question? AZ Essential Learning Key Technology EIN Standard Resources Knowledge Skill Vocabulary E S5C2PO2 s Mathematical strategies; Analyze and compare mathematical strategies for efficient Expressions Problem solving problem solving Guess and check Substitute Select and use one or more strategies to solve a problem Extraneous information I S5C2PO3 Relevant, missing, and Identify relevant, missing, and extraneous information related Pertinent extraneous information; to the solution to a problem information Relevant I S5C2PO4 Problem situation; Represent a problem situation using multiple representations information Representations; Conditional Process; Reasonableness; Describe the process used to solve the problem statement Verify the reasonableness of the solution I S5C2PO5 Problem solving strategy; Apply a previously used problem-solving strategy in a new context Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 18.
    th 8 Grade Math Curriculum Map Isaac School District No. 5 Quarter 4 Unit Name and Description: Algebra and Equations Cluster 10 Big Ideas/Enduring Understandings Essential Question(s) Functions model real life situations. How are inequalities represented on the coordinate plane? Algebra is essential in using functional notation. Why do problems involving absolute value have two answers? Absolute value represents the distance from zero. What is the relationship between rate of change and slope? What is the relationship between tables, functions, and graphs? Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 19.
    AZ Essential Learning Key Technology EIN Standard Knowledge Skills Vocabulary Resources E MHS-S4C3PO5 Linear equation; Graph a linear equation or linear inequality in two Slope-intercept Linear inequalities; variables form Two variables Linear inequalities Standard form I MHS-S3C3PO5 Linear equations; absolute Solve linear equations and equations involving absolute value System of value; Variable with one variable equations Absolute value Constant rate of change Functional notation Domain Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E
  • 20.
    E MHS-S3C4PO1 Slope; Intercepts; Graph; Determine the slope and intercepts of the graph of a linear Slope; Constant rate function, interpreting slope as a constant rate of change of change; Linear functions I MHS-S3C2PO3 Functions notation; Use function notation; evaluate a function at a specified value Functions; Value; Domain in its domain I MHS-S3C3PO3 Equations; Table of values; Write an equation given a table of values, two points on the Points; Line; Slope; Graph line, the slope and a point on the line, or the graph of the line I MHS-S3C3PO6 Linear inequalities; Solve linear inequalities in one variable Variable Italics = POs taught at earlier grade level I= Important P.O. [] = Increased skill rigor Revised 06-16-11 Underlining = Cognitive rigor N= Nice to Know P.O. Isaac School District No. 5 E