SlideShare a Scribd company logo
Big Picture
Tungurahua
 DVD on monitoring and
the 3P’s
Risk management
Volcanoes
Earthquakes
Exam style questions
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and
planning can reduce the risks from a tectonic hazard.
Management strategies
 Techniques of controlling,
responding to, or dealing with
an event.
Key Vocabulary
All key words
MUST be
highlighted or
underlined.
Page 20 - 21
a
 You can describe how monitoring, prediction, protection and planning
can reduce the risks from a tectonic hazard.
 You use a limited range of specialist terms
 You have a reasonable accuracy in the use of spelling, punctuation and
grammar.
 You can explain how monitoring, prediction, protection and planning can
reduce the risks from a tectonic hazard.
 You use a good range of specialist terms
 You have a considerable accuracy in spelling, punctuation and grammar.
 You can evaluate how monitoring, prediction, protection and planning
can reduce the risks from a tectonic hazard.
 You use a wide range of specialist terms where appropriate.
 Accurate use of spelling, punctuation and grammar.
L3 - Detailed
Answer
L2 - Clear
Answer
L1 - Basic
Answer
Learning Outcomes – Success Criteria
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Page 20 - 21
Risk management – Volcanoes & Earthquakes
Create a revision resource
identifying how volcano and
earthquake risks can be
managed.
Use your sheet, the
internet and the resources
on page 20-21 to complete
this.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Page 20 - 21
Risk management – Volcanoes & Earthquakes
Use the next slide to
fill in the rows for
your definitions of the
4 management
strategies.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Monitoring
 Using scientific equipment to detect warning signs of events such
as a volcanic eruption.
Prediction
 Using historical evidence and monitoring, scientists can make
predictions about when and where a tectonic hazard may happen.
Protection
 Designing buildings that will withstand tectonic hazards.
Planning
 Identifying and avoiding places most at risk.
Key Vocabulary
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Page 20 - 21
Risk management – Earthquakes
Use the next slide, the
following video and
pages 20-21 in the
textbook to fill in the
rows for Earthquakes.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Risk management -
Earthquakes
Page 20 - 21
Extension: Use all of
the resources to
create an annotated
sketch of an
earthquake proof
building in your
book. Earthquake proof building
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Page 20 - 21
Risk management – Volcanoes
Use the next slide, the
following video and
pages 20-21 in the
textbook to fill in the
rows for Volcanoes.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Risk management - Volcanoes
Warning signs of a volcanic eruption
Monitoring and protection
Extension: Include
this annotated
sketch in your book
Exam tip
Mitigate is another word for ‘reducing the impacts’.
Using it in an exam is quicker!
The decision to mitigate against a hazard will be based on an analysis of the
risks, the costs, and the benefits.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Explain how buildings and other structures shown in Figure
1 might have been designed to reduce the effects of
earthquakes or volcanic eruptions. [4] 4 marks
Exam Style Question
Figure 1. Yokohama, a city in Japan.
Yokohama is close to Mount Fuji, an
active volcano. The area is also prone
to earthquakes.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Explain how buildings and other structures shown in Figure 1 might
have been designed to reduce the effects of earthquakes or volcanic
eruptions. [4]
Explain how buildings and other structures shown in
Figure 1 might have been designed to reduce the
effects of earthquakes or volcanic eruptions. [4]
Level 1 Basic (1 – 2 marks)
 There is basic description of one or two building features.
 Simple statements that are descriptive.
 Statements are general and separate in a random order.
Level 2 Clear (3– 4 marks)
 There is a clear description of specific building features and
an explanation of how they might help reduce the effects of
tectonic hazards.
Statements are developed.
 Linked statements with some explanation.
 Shows a sound understanding.
L2 - Clear
Answer
L1 - Basic
Answer
Exam Style Question 4 marks
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
How Can We Manage the Risk?
LO: To know how monitoring, prediction, protection and planning can reduce the
risks from a tectonic hazard.
Positive– Write down areas of the lesson you have been successful in,
name the key terms or named examples you are now confident in using. What
areas have you worked hard on improving? Named examples, geographical
terms, facts, statistics, explanations, comparison?
Error – Write down areas you are less confident with, certain case studies
or examples you may need to go over again to fully understand. Do you use
enough explanation using named examples and facts in all your answers? Do
you push yourself or are you reliant on the teacher for guidance or pressure
to progress?
Next – Where can you move yourself forward over the next lesson, week or
month. What are you going to start including which will improve your detail
and work?
Making the Grade:
How am I doing in this lesson?
The buildings in the picture are built on a destructive plate
boundary.
One way the buildings may have been specially adapted is___
__________________________________________________
__________________________________________________
This design feature will reduce the effects of an earthquake by
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Another way the buildings may have been specially adapted is
__________________________________________________
__________________________________________________
This design feature will reduce the effects of an earthquake by
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Additional features that they may have include____________
__________________________________________________
__________________________________________________
_
The buildings in the picture are built on a destructive plate
boundary.
One way the buildings may have been specially adapted is___
__________________________________________________
__________________________________________________
This design feature will reduce the effects of an earthquake by
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Another way the buildings may have been specially adapted is
__________________________________________________
__________________________________________________
This design feature will reduce the effects of an earthquake by
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Additional features that they may have include____________
__________________________________________________
__________________________________________________
_

More Related Content

Similar to 7. Risk management

Resilience Systems Analysis Workshop presentation 9th of July.pptx
Resilience Systems Analysis Workshop presentation 9th of July.pptxResilience Systems Analysis Workshop presentation 9th of July.pptx
Resilience Systems Analysis Workshop presentation 9th of July.pptx
ArunkumarCH5
 
Project Risk Management Handbook
Project Risk Management HandbookProject Risk Management Handbook
Project Risk Management Handbook
Daniel Ackermann
 
Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...
Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...
Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...
GianRelator1
 
DRRR-MODULE8-FINAL.pdf
DRRR-MODULE8-FINAL.pdfDRRR-MODULE8-FINAL.pdf
DRRR-MODULE8-FINAL.pdf
Dep ED
 
BBA 4226, Risk Management 1 Course Learning Outcomes .docx
 BBA 4226, Risk Management 1 Course Learning Outcomes .docx BBA 4226, Risk Management 1 Course Learning Outcomes .docx
BBA 4226, Risk Management 1 Course Learning Outcomes .docx
aryan532920
 
HM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizing
HM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizingHM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizing
HM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizing
SusanaFurman449
 
BBA 4226, Risk Management 1 Course Learning Outcomes
 BBA 4226, Risk Management 1 Course Learning Outcomes  BBA 4226, Risk Management 1 Course Learning Outcomes
BBA 4226, Risk Management 1 Course Learning Outcomes
MargaritoWhitt221
 
Emergency Plan, Monitoring and Evaluation.pptx
Emergency Plan, Monitoring and Evaluation.pptxEmergency Plan, Monitoring and Evaluation.pptx
Emergency Plan, Monitoring and Evaluation.pptx
PaulAnicete2
 
Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...
Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...
Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...
GianRelator1
 
Gcse geography revision checklist
Gcse geography revision checklistGcse geography revision checklist
Gcse geography revision checklist
Mrs Coles
 
GCSE geography revision checklist
GCSE geography revision checklistGCSE geography revision checklist
GCSE geography revision checklist
Mrs Coles
 
Adm module grade 11_quarter1(s1112_es-if-30,31,33)
Adm module grade 11_quarter1(s1112_es-if-30,31,33)Adm module grade 11_quarter1(s1112_es-if-30,31,33)
Adm module grade 11_quarter1(s1112_es-if-30,31,33)
MarenPendon1
 
Destination branding 28.02.2011
Destination branding 28.02.2011Destination branding 28.02.2011
Destination branding 28.02.2011
Chryssa Skodra
 
Core(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdf
Core(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdfCore(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdf
Core(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdf
GianRelator1
 

Similar to 7. Risk management (20)

1 beacon international college major incident an
1 beacon international college major incident an1 beacon international college major incident an
1 beacon international college major incident an
 
Resilience Systems Analysis Workshop presentation 9th of July.pptx
Resilience Systems Analysis Workshop presentation 9th of July.pptxResilience Systems Analysis Workshop presentation 9th of July.pptx
Resilience Systems Analysis Workshop presentation 9th of July.pptx
 
Lesson Plan and TIP Model Integration
Lesson Plan and TIP Model IntegrationLesson Plan and TIP Model Integration
Lesson Plan and TIP Model Integration
 
Project Risk Management Handbook
Project Risk Management HandbookProject Risk Management Handbook
Project Risk Management Handbook
 
Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...
Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...
Core(STEM)-DRRR-Q1-Module-11_Earthquake-Hazards-and-Risk-Reduction-Methods-co...
 
DRRR-MODULE8-FINAL.pdf
DRRR-MODULE8-FINAL.pdfDRRR-MODULE8-FINAL.pdf
DRRR-MODULE8-FINAL.pdf
 
BBA 4226, Risk Management 1 Course Learning Outcomes .docx
 BBA 4226, Risk Management 1 Course Learning Outcomes .docx BBA 4226, Risk Management 1 Course Learning Outcomes .docx
BBA 4226, Risk Management 1 Course Learning Outcomes .docx
 
HM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizing
HM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizingHM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizing
HM510Unit6 Assignment 2Hazard Mitigation AnalysisUtilizing
 
BBA 4226, Risk Management 1 Course Learning Outcomes
 BBA 4226, Risk Management 1 Course Learning Outcomes  BBA 4226, Risk Management 1 Course Learning Outcomes
BBA 4226, Risk Management 1 Course Learning Outcomes
 
Emergency Plan, Monitoring and Evaluation.pptx
Emergency Plan, Monitoring and Evaluation.pptxEmergency Plan, Monitoring and Evaluation.pptx
Emergency Plan, Monitoring and Evaluation.pptx
 
Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...
Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...
Core(STEM)-DRRR-Q1-Module-14_Interpret-Earthquake-Hazard-Map-commented-080820...
 
David Hancock - Risk Leadership in a world of Uncertainty and Ambiguity
David Hancock - Risk Leadership in a world of Uncertainty and AmbiguityDavid Hancock - Risk Leadership in a world of Uncertainty and Ambiguity
David Hancock - Risk Leadership in a world of Uncertainty and Ambiguity
 
DRRR WEEK 7 DLL.docx
DRRR WEEK 7 DLL.docxDRRR WEEK 7 DLL.docx
DRRR WEEK 7 DLL.docx
 
Gcse geography revision checklist
Gcse geography revision checklistGcse geography revision checklist
Gcse geography revision checklist
 
GCSE geography revision checklist
GCSE geography revision checklistGCSE geography revision checklist
GCSE geography revision checklist
 
Gcse geography revision checklist
Gcse geography revision checklistGcse geography revision checklist
Gcse geography revision checklist
 
Adm module grade 11_quarter1(s1112_es-if-30,31,33)
Adm module grade 11_quarter1(s1112_es-if-30,31,33)Adm module grade 11_quarter1(s1112_es-if-30,31,33)
Adm module grade 11_quarter1(s1112_es-if-30,31,33)
 
Destination branding 28.02.2011
Destination branding 28.02.2011Destination branding 28.02.2011
Destination branding 28.02.2011
 
Zero lecture 2024 GEO801.pptx
Zero lecture 2024 GEO801.pptxZero lecture 2024 GEO801.pptx
Zero lecture 2024 GEO801.pptx
 
Core(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdf
Core(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdfCore(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdf
Core(STEM)-DRRR-Q1-Module-16_Signs-of-Impending-Volcanic-Eruption-08082020.pdf
 

More from Mr Blackwell

More from Mr Blackwell (20)

Chronology skills lesson
Chronology skills lessonChronology skills lesson
Chronology skills lesson
 
Historical sources intro lesson
Historical sources intro lessonHistorical sources intro lesson
Historical sources intro lesson
 
Spanish armada
Spanish armada Spanish armada
Spanish armada
 
3. Environmental impacts of industry
3. Environmental impacts of industry3. Environmental impacts of industry
3. Environmental impacts of industry
 
Tudor torture
Tudor tortureTudor torture
Tudor torture
 
2. A Post-industrial economy
2. A Post-industrial economy2. A Post-industrial economy
2. A Post-industrial economy
 
3. why did henry viii have so many wives
3. why did henry viii have so many wives3. why did henry viii have so many wives
3. why did henry viii have so many wives
 
2. a post industrial economy
2. a post industrial economy2. a post industrial economy
2. a post industrial economy
 
1. the changing uk economy
1. the changing uk economy1. the changing uk economy
1. the changing uk economy
 
2. Protestant or Catholic
2. Protestant or Catholic2. Protestant or Catholic
2. Protestant or Catholic
 
Should charles have been executed
Should charles have been executedShould charles have been executed
Should charles have been executed
 
12 managed retreat
12 managed retreat12 managed retreat
12 managed retreat
 
1. introduction to the tudors
1. introduction to the tudors1. introduction to the tudors
1. introduction to the tudors
 
11. soft engineering
11. soft engineering11. soft engineering
11. soft engineering
 
Events of the English Civil War
Events of the English Civil WarEvents of the English Civil War
Events of the English Civil War
 
10. hard engineering
10. hard engineering10. hard engineering
10. hard engineering
 
Intro to Tudor life
Intro to Tudor lifeIntro to Tudor life
Intro to Tudor life
 
Causes of the english civil war
Causes of the english civil war Causes of the english civil war
Causes of the english civil war
 
10. Hard Engineering
10. Hard Engineering10. Hard Engineering
10. Hard Engineering
 
9. Coastal features Swanage
9. Coastal features Swanage9. Coastal features Swanage
9. Coastal features Swanage
 

Recently uploaded

Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Po-Chuan Chen
 

Recently uploaded (20)

Advances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdfAdvances in production technology of Grapes.pdf
Advances in production technology of Grapes.pdf
 
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptxStudents, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
Students, digital devices and success - Andreas Schleicher - 27 May 2024..pptx
 
Benefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational ResourcesBenefits and Challenges of Using Open Educational Resources
Benefits and Challenges of Using Open Educational Resources
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptxslides CapTechTalks Webinar May 2024 Alexander Perry.pptx
slides CapTechTalks Webinar May 2024 Alexander Perry.pptx
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
Mattingly "AI & Prompt Design: Limitations and Solutions with LLMs"
 
Gyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptxGyanartha SciBizTech Quiz slideshare.pptx
Gyanartha SciBizTech Quiz slideshare.pptx
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdfAdversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
Adversarial Attention Modeling for Multi-dimensional Emotion Regression.pdf
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Application of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matricesApplication of Matrices in real life. Presentation on application of matrices
Application of Matrices in real life. Presentation on application of matrices
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 

7. Risk management

  • 1.
  • 2. Big Picture Tungurahua  DVD on monitoring and the 3P’s Risk management Volcanoes Earthquakes Exam style questions How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard. Management strategies  Techniques of controlling, responding to, or dealing with an event. Key Vocabulary All key words MUST be highlighted or underlined. Page 20 - 21 a
  • 3.  You can describe how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.  You use a limited range of specialist terms  You have a reasonable accuracy in the use of spelling, punctuation and grammar.  You can explain how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.  You use a good range of specialist terms  You have a considerable accuracy in spelling, punctuation and grammar.  You can evaluate how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.  You use a wide range of specialist terms where appropriate.  Accurate use of spelling, punctuation and grammar. L3 - Detailed Answer L2 - Clear Answer L1 - Basic Answer Learning Outcomes – Success Criteria How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 4. Page 20 - 21 Risk management – Volcanoes & Earthquakes Create a revision resource identifying how volcano and earthquake risks can be managed. Use your sheet, the internet and the resources on page 20-21 to complete this. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 5. Page 20 - 21 Risk management – Volcanoes & Earthquakes Use the next slide to fill in the rows for your definitions of the 4 management strategies. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 6. Monitoring  Using scientific equipment to detect warning signs of events such as a volcanic eruption. Prediction  Using historical evidence and monitoring, scientists can make predictions about when and where a tectonic hazard may happen. Protection  Designing buildings that will withstand tectonic hazards. Planning  Identifying and avoiding places most at risk. Key Vocabulary How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 7. Page 20 - 21 Risk management – Earthquakes Use the next slide, the following video and pages 20-21 in the textbook to fill in the rows for Earthquakes. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 8. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 9. Risk management - Earthquakes Page 20 - 21 Extension: Use all of the resources to create an annotated sketch of an earthquake proof building in your book. Earthquake proof building How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 10. Page 20 - 21 Risk management – Volcanoes Use the next slide, the following video and pages 20-21 in the textbook to fill in the rows for Volcanoes. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 11. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 12. Risk management - Volcanoes Warning signs of a volcanic eruption Monitoring and protection Extension: Include this annotated sketch in your book
  • 13. Exam tip Mitigate is another word for ‘reducing the impacts’. Using it in an exam is quicker! The decision to mitigate against a hazard will be based on an analysis of the risks, the costs, and the benefits. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 14. Explain how buildings and other structures shown in Figure 1 might have been designed to reduce the effects of earthquakes or volcanic eruptions. [4] 4 marks Exam Style Question Figure 1. Yokohama, a city in Japan. Yokohama is close to Mount Fuji, an active volcano. The area is also prone to earthquakes. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 15. Explain how buildings and other structures shown in Figure 1 might have been designed to reduce the effects of earthquakes or volcanic eruptions. [4]
  • 16. Explain how buildings and other structures shown in Figure 1 might have been designed to reduce the effects of earthquakes or volcanic eruptions. [4] Level 1 Basic (1 – 2 marks)  There is basic description of one or two building features.  Simple statements that are descriptive.  Statements are general and separate in a random order. Level 2 Clear (3– 4 marks)  There is a clear description of specific building features and an explanation of how they might help reduce the effects of tectonic hazards. Statements are developed.  Linked statements with some explanation.  Shows a sound understanding. L2 - Clear Answer L1 - Basic Answer Exam Style Question 4 marks How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 17. How Can We Manage the Risk? LO: To know how monitoring, prediction, protection and planning can reduce the risks from a tectonic hazard.
  • 18. Positive– Write down areas of the lesson you have been successful in, name the key terms or named examples you are now confident in using. What areas have you worked hard on improving? Named examples, geographical terms, facts, statistics, explanations, comparison? Error – Write down areas you are less confident with, certain case studies or examples you may need to go over again to fully understand. Do you use enough explanation using named examples and facts in all your answers? Do you push yourself or are you reliant on the teacher for guidance or pressure to progress? Next – Where can you move yourself forward over the next lesson, week or month. What are you going to start including which will improve your detail and work? Making the Grade: How am I doing in this lesson?
  • 19. The buildings in the picture are built on a destructive plate boundary. One way the buildings may have been specially adapted is___ __________________________________________________ __________________________________________________ This design feature will reduce the effects of an earthquake by __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ Another way the buildings may have been specially adapted is __________________________________________________ __________________________________________________ This design feature will reduce the effects of an earthquake by __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ Additional features that they may have include____________ __________________________________________________ __________________________________________________ _ The buildings in the picture are built on a destructive plate boundary. One way the buildings may have been specially adapted is___ __________________________________________________ __________________________________________________ This design feature will reduce the effects of an earthquake by __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ Another way the buildings may have been specially adapted is __________________________________________________ __________________________________________________ This design feature will reduce the effects of an earthquake by __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ Additional features that they may have include____________ __________________________________________________ __________________________________________________ _