Introduction to risk assessment
Unit 126: Preparing tiles for fixing to wall and floor
installations
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 2 of 14
Origins of risk assessment
• The law says that every employer who has more than five employees
must have a written risk assessment.
• A risk assessment should identify all the hazards associated with a
task and evaluate the risks.
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 3 of 14
The basic principles for a risk assessment are:
• A risk assessment should identify all the significant hazards
associated with a task and evaluate the risks.
• A risk assessment should be:
– Suitable and sufficient
– Not one event but an ongoing cycle of activity
– It must include monitoring and review
– It must be planned and thorough
– It must be competently executed
– It must be a matter of detailed record
– It must record all significant findings
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 4 of 14
Who should carry out risk assessments?
• Your works manager, or health and safety officer, would normally
carry this out. But anyone can providing they are:
– Trained
– Experienced
– Knowledgeable
– Capable
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 5 of 14
The key stages of a risk assessment
• Identification of hazards
• Identification of people at risk
• Evaluation of the risk
• Selection of additional control measures
• Information and training
• Records
• Monitoring and review
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 6 of 14
The difference between a hazard and a risk?
• Hazard – is the potential to cause harm, by injury or ill health.
• Risk – is the likelihood of a hazard doing harm.
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 7 of 14
Evaluate the risks
• Evaluate the likelihood of the hazard resulting in actual harm or loss.
• This is governed by the frequency of the activity concerned, the
number of people affected, and the extent of their exposure to the
hazard.
• Evaluate the severity of a hazard and the consequences if the hazard
were to result in harm or loss.
• Finally, assess the adequacy of current control measures.
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 8 of 14
Hierarchy of control
• Elimination
• Substitution
• Controlling risk at source: separation and isolation
• Safe working procedures
• Training, instruction and supervision
• Personal protective equipment and clothing
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 9 of 14
Hierarchy of control
When it is not reasonably possible to eliminate the
risk, preference should be given to controls in
descending order. Personal protective equipment
and clothing should be considered a last resort.
Source: Wickes.co.uk
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 10 of 14
Information and training
Relevant information and training is needed.
• You need an understanding of the risks involved in any activity.
• You should understand the correct use of any control measures that
are in place.
• You need to know what the risk assessment says before you carry
out the task.
• You need to be trained for the task.
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 11 of 14
Filling in a risk assessment (1)
1) Identify a risk – this could be any task you are going to be carrying
out, any tools you may be using, or anything else that could be
considered a risk, such as working below or above ground level,
in low light or in an area of high noise.
2) Identify what the worst-case outcome could be:
1 No injury, 3 Minor injury, 5 Lost time / injury, 8 Severe injury, 10 Fatality
3) What is the likelihood of the incident happening?
1 Remote, 3 Unlikely, 5 Likely, 8 Very likely, 10 Certain / imminent
Multiply the numbers in 1 and 3 together. This will give you a risk rating.
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 12 of 14
Filling in a risk assessment (2)
Risk rating table
High Medium Low
50–100 20–49 1–19
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 13 of 14
Filling in a risk assessment (3)
Look at the current control measures to help minimise the risk.
Look at whether the rating can be lowered or eliminated.
If not, what other safety measures can you put in place to lessen the
risk?
Is there a better way or different way of doing the job to lessen the risk
of injury?
If none of these can be applied is the risk acceptable?
Level 1 Diploma in Wall and Floor Tiling
© 2013 City and Guilds of London Institute. All rights reserved. 14 of 14
Risk assessment overview
• The aim is to identify the significant risks.
• The risks from the identified hazard must be assessed.
• What actually happens in the workplace or during the work activity
must be addressed.
• The recording of the assessment must be a formal written record.
• The assessment should be reviewed periodically and revised if
necessary.

More Related Content

Viewers also liked

6710 130 ppt3
6710 130 ppt36710 130 ppt3
6710 130 ppt3
Gordon Turner
 
6710 128 power_point 1_
6710 128 power_point 1_6710 128 power_point 1_
6710 128 power_point 1_
Gordon Turner
 
Window task
Window taskWindow task
Window task
Gordon Turner
 
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
gsr101
 
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
gsr101
 
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
gsr101
 
Unit 101: Principles of building construction, information and communication
Unit 101: Principles of building construction, information and communicationUnit 101: Principles of building construction, information and communication
Unit 101: Principles of building construction, information and communication
DjCurrie
 

Viewers also liked (7)

6710 130 ppt3
6710 130 ppt36710 130 ppt3
6710 130 ppt3
 
6710 128 power_point 1_
6710 128 power_point 1_6710 128 power_point 1_
6710 128 power_point 1_
 
Window task
Window taskWindow task
Window task
 
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
 
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
 
101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication101 Level 1 Principles of building construction, information and communication
101 Level 1 Principles of building construction, information and communication
 
Unit 101: Principles of building construction, information and communication
Unit 101: Principles of building construction, information and communicationUnit 101: Principles of building construction, information and communication
Unit 101: Principles of building construction, information and communication
 

Similar to 6710 126 powerpoint_1

unit 211 PPT 5
unit 211 PPT 5unit 211 PPT 5
unit 211 PPT 5
kevin porter
 
Risk assessments 1
Risk assessments 1Risk assessments 1
Risk assessments 1
michael mcewan
 
Power point 1
Power point 1Power point 1
Power point 1
iancollins666
 
Unit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in constructionUnit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in construction
gsr101
 
Accidents and emergency reporting, procedures and documentation, and hazards ...
Accidents and emergency reporting, procedures and documentation, and hazards ...Accidents and emergency reporting, procedures and documentation, and hazards ...
Accidents and emergency reporting, procedures and documentation, and hazards ...
michael mcewan
 
Risk.pdf
Risk.pdfRisk.pdf
Risk.pdf
hasan752746
 
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Tim Christ Executive Leadership
 
Risk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in MyanmarRisk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in Myanmar
ijtsrd
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
olusholaJoseph
 
6710 127 l1_powerpoint_4
6710 127 l1_powerpoint_46710 127 l1_powerpoint_4
6710 127 l1_powerpoint_4
Gordon Turner
 
3_orm.ppt
3_orm.ppt3_orm.ppt
3_orm.ppt
dantx32914
 
1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx
1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx
1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx
vickeryr87
 
practical-approach-to-strategic-risk-management-220318051837.pdf
practical-approach-to-strategic-risk-management-220318051837.pdfpractical-approach-to-strategic-risk-management-220318051837.pdf
practical-approach-to-strategic-risk-management-220318051837.pdf
Hany Farouk
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
AnkitSharma13479
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
Kameswara Rao Poranki
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
new617824
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
Quỳnh Nhi
 
strategic-risk-management
strategic-risk-management strategic-risk-management
strategic-risk-management
dollumehta1
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
aminrahman34
 
Topic 04 risk mangement
Topic 04 risk mangementTopic 04 risk mangement
Topic 04 risk mangement
Basitali Nevarekar
 

Similar to 6710 126 powerpoint_1 (20)

unit 211 PPT 5
unit 211 PPT 5unit 211 PPT 5
unit 211 PPT 5
 
Risk assessments 1
Risk assessments 1Risk assessments 1
Risk assessments 1
 
Power point 1
Power point 1Power point 1
Power point 1
 
Unit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in constructionUnit 201: Health safety and welfare in construction
Unit 201: Health safety and welfare in construction
 
Accidents and emergency reporting, procedures and documentation, and hazards ...
Accidents and emergency reporting, procedures and documentation, and hazards ...Accidents and emergency reporting, procedures and documentation, and hazards ...
Accidents and emergency reporting, procedures and documentation, and hazards ...
 
Risk.pdf
Risk.pdfRisk.pdf
Risk.pdf
 
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
 
Risk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in MyanmarRisk Assessment for Building Construction Sites in Myanmar
Risk Assessment for Building Construction Sites in Myanmar
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
 
6710 127 l1_powerpoint_4
6710 127 l1_powerpoint_46710 127 l1_powerpoint_4
6710 127 l1_powerpoint_4
 
3_orm.ppt
3_orm.ppt3_orm.ppt
3_orm.ppt
 
1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx
1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx
1Running Head RISK MANAGEMENT PLAN FOR BUILDING A BRIDGE16R.docx
 
practical-approach-to-strategic-risk-management-220318051837.pdf
practical-approach-to-strategic-risk-management-220318051837.pdfpractical-approach-to-strategic-risk-management-220318051837.pdf
practical-approach-to-strategic-risk-management-220318051837.pdf
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
 
strategic-risk-management
strategic-risk-management strategic-risk-management
strategic-risk-management
 
practical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.pptpractical-approach-to-strategic-risk-management.ppt
practical-approach-to-strategic-risk-management.ppt
 
Topic 04 risk mangement
Topic 04 risk mangementTopic 04 risk mangement
Topic 04 risk mangement
 

More from Gordon Turner

yujskooookkth
yujskooookkthyujskooookkth
yujskooookkth
Gordon Turner
 
Fundamentals walls
Fundamentals wallsFundamentals walls
Fundamentals walls
Gordon Turner
 
Adhesives and grouts km 1
Adhesives and grouts km 1Adhesives and grouts km 1
Adhesives and grouts km 1
Gordon Turner
 
6710 126 powerpoint_4
6710 126 powerpoint_46710 126 powerpoint_4
6710 126 powerpoint_4
Gordon Turner
 
6710 126 powerpoint_3
6710 126 powerpoint_36710 126 powerpoint_3
6710 126 powerpoint_3
Gordon Turner
 
6710 126 powerpoint_2
6710 126 powerpoint_26710 126 powerpoint_2
6710 126 powerpoint_2
Gordon Turner
 
6710 128 power_point 2_
6710 128 power_point 2_6710 128 power_point 2_
6710 128 power_point 2_
Gordon Turner
 
6710 128 power_point 1_
6710 128 power_point 1_6710 128 power_point 1_
6710 128 power_point 1_
Gordon Turner
 
6710 127 l1_powerpoint_3
6710 127 l1_powerpoint_36710 127 l1_powerpoint_3
6710 127 l1_powerpoint_3
Gordon Turner
 
6710 127 l1_powerpoint_1
6710 127 l1_powerpoint_16710 127 l1_powerpoint_1
6710 127 l1_powerpoint_1
Gordon Turner
 
6710 129 ppt2_tools and equipment
6710 129 ppt2_tools and equipment6710 129 ppt2_tools and equipment
6710 129 ppt2_tools and equipment
Gordon Turner
 
6710 129
6710 129 6710 129
6710 129
Gordon Turner
 
3etry
3etry3etry
sour
soursour
Preparing
Preparing Preparing
Preparing
Gordon Turner
 
Basic
Basic Basic
Disposal
Disposal Disposal
Disposal
Gordon Turner
 
Tools
Tools Tools
Measuring
MeasuringMeasuring
Measuring
Gordon Turner
 
Your First Job
Your First JobYour First Job
Your First Job
Gordon Turner
 

More from Gordon Turner (20)

yujskooookkth
yujskooookkthyujskooookkth
yujskooookkth
 
Fundamentals walls
Fundamentals wallsFundamentals walls
Fundamentals walls
 
Adhesives and grouts km 1
Adhesives and grouts km 1Adhesives and grouts km 1
Adhesives and grouts km 1
 
6710 126 powerpoint_4
6710 126 powerpoint_46710 126 powerpoint_4
6710 126 powerpoint_4
 
6710 126 powerpoint_3
6710 126 powerpoint_36710 126 powerpoint_3
6710 126 powerpoint_3
 
6710 126 powerpoint_2
6710 126 powerpoint_26710 126 powerpoint_2
6710 126 powerpoint_2
 
6710 128 power_point 2_
6710 128 power_point 2_6710 128 power_point 2_
6710 128 power_point 2_
 
6710 128 power_point 1_
6710 128 power_point 1_6710 128 power_point 1_
6710 128 power_point 1_
 
6710 127 l1_powerpoint_3
6710 127 l1_powerpoint_36710 127 l1_powerpoint_3
6710 127 l1_powerpoint_3
 
6710 127 l1_powerpoint_1
6710 127 l1_powerpoint_16710 127 l1_powerpoint_1
6710 127 l1_powerpoint_1
 
6710 129 ppt2_tools and equipment
6710 129 ppt2_tools and equipment6710 129 ppt2_tools and equipment
6710 129 ppt2_tools and equipment
 
6710 129
6710 129 6710 129
6710 129
 
3etry
3etry3etry
3etry
 
sour
soursour
sour
 
Preparing
Preparing Preparing
Preparing
 
Basic
Basic Basic
Basic
 
Disposal
Disposal Disposal
Disposal
 
Tools
Tools Tools
Tools
 
Measuring
MeasuringMeasuring
Measuring
 
Your First Job
Your First JobYour First Job
Your First Job
 

Recently uploaded

A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
RitikBhardwaj56
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
Colégio Santa Teresinha
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 

Recently uploaded (20)

A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...The simplified electron and muon model, Oscillating Spacetime: The Foundation...
The simplified electron and muon model, Oscillating Spacetime: The Foundation...
 
The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
MARY JANE WILSON, A “BOA MÃE” .
MARY JANE WILSON, A “BOA MÃE”           .MARY JANE WILSON, A “BOA MÃE”           .
MARY JANE WILSON, A “BOA MÃE” .
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 

6710 126 powerpoint_1

  • 1. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 1 of 14 PowerPointpresentation Introduction to risk assessment Unit 126: Preparing tiles for fixing to wall and floor installations
  • 2. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 2 of 14 Origins of risk assessment • The law says that every employer who has more than five employees must have a written risk assessment. • A risk assessment should identify all the hazards associated with a task and evaluate the risks.
  • 3. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 3 of 14 The basic principles for a risk assessment are: • A risk assessment should identify all the significant hazards associated with a task and evaluate the risks. • A risk assessment should be: – Suitable and sufficient – Not one event but an ongoing cycle of activity – It must include monitoring and review – It must be planned and thorough – It must be competently executed – It must be a matter of detailed record – It must record all significant findings
  • 4. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 4 of 14 Who should carry out risk assessments? • Your works manager, or health and safety officer, would normally carry this out. But anyone can providing they are: – Trained – Experienced – Knowledgeable – Capable
  • 5. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 5 of 14 The key stages of a risk assessment • Identification of hazards • Identification of people at risk • Evaluation of the risk • Selection of additional control measures • Information and training • Records • Monitoring and review
  • 6. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 6 of 14 The difference between a hazard and a risk? • Hazard – is the potential to cause harm, by injury or ill health. • Risk – is the likelihood of a hazard doing harm.
  • 7. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 7 of 14 Evaluate the risks • Evaluate the likelihood of the hazard resulting in actual harm or loss. • This is governed by the frequency of the activity concerned, the number of people affected, and the extent of their exposure to the hazard. • Evaluate the severity of a hazard and the consequences if the hazard were to result in harm or loss. • Finally, assess the adequacy of current control measures.
  • 8. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 8 of 14 Hierarchy of control • Elimination • Substitution • Controlling risk at source: separation and isolation • Safe working procedures • Training, instruction and supervision • Personal protective equipment and clothing
  • 9. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 9 of 14 Hierarchy of control When it is not reasonably possible to eliminate the risk, preference should be given to controls in descending order. Personal protective equipment and clothing should be considered a last resort. Source: Wickes.co.uk
  • 10. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 10 of 14 Information and training Relevant information and training is needed. • You need an understanding of the risks involved in any activity. • You should understand the correct use of any control measures that are in place. • You need to know what the risk assessment says before you carry out the task. • You need to be trained for the task.
  • 11. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 11 of 14 Filling in a risk assessment (1) 1) Identify a risk – this could be any task you are going to be carrying out, any tools you may be using, or anything else that could be considered a risk, such as working below or above ground level, in low light or in an area of high noise. 2) Identify what the worst-case outcome could be: 1 No injury, 3 Minor injury, 5 Lost time / injury, 8 Severe injury, 10 Fatality 3) What is the likelihood of the incident happening? 1 Remote, 3 Unlikely, 5 Likely, 8 Very likely, 10 Certain / imminent Multiply the numbers in 1 and 3 together. This will give you a risk rating.
  • 12. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 12 of 14 Filling in a risk assessment (2) Risk rating table High Medium Low 50–100 20–49 1–19
  • 13. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 13 of 14 Filling in a risk assessment (3) Look at the current control measures to help minimise the risk. Look at whether the rating can be lowered or eliminated. If not, what other safety measures can you put in place to lessen the risk? Is there a better way or different way of doing the job to lessen the risk of injury? If none of these can be applied is the risk acceptable?
  • 14. Level 1 Diploma in Wall and Floor Tiling © 2013 City and Guilds of London Institute. All rights reserved. 14 of 14 Risk assessment overview • The aim is to identify the significant risks. • The risks from the identified hazard must be assessed. • What actually happens in the workplace or during the work activity must be addressed. • The recording of the assessment must be a formal written record. • The assessment should be reviewed periodically and revised if necessary.