Just-In-Time and Lean   Manufacturing by Sashi Prabhu
Definition of JIT: ,[object Object]
Definition of JIT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
JIT Synonyms ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Definition of Lean Manufacturing ,[object Object],[object Object],[object Object],[object Object]
Time-Based Competition ,[object Object],[object Object],[object Object],[object Object]
Order-to-Delivery Cycle Distri- bution and Customer Service Custo- mer Places Order Order Entry Engi- neering Design If reqd. Sched- uling Manufacturing Lead Times Purchasing Lead Times Manufacturing Cumulative Lead Time Order-to-Delivery Cycle
Traditional View of Manufacturing ,[object Object],[object Object],[object Object],[object Object]
JIT Manufacturing Philosophy ,[object Object],[object Object],[object Object],[object Object]
Capacity Utilization 10  20  30  40  50  60  70  80  90  100   5 1 3 % Capacity Utilization 11 Production Lead Times (days) 7 9 Traditional Manufacturing JIT Manufacturing
Increasing Production Capacity Reduces Manufacturing Lead Times  ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],Necessary Production Capacity
Work-in-Process Inventory ,[object Object]
Example:  Necessary Production Capacity ,[object Object],[object Object],[object Object]
Example:  Necessary Production Capacity ,[object Object],[object Object],[object Object],[object Object]
Example:  Reduction in WIP ,[object Object],[object Object]
Example:  Reduction in WIP ,[object Object],[object Object],[object Object],[object Object]
Successful JIT Applications ,[object Object],[object Object],[object Object]
Changes Required for JIT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Elements of JIT Manufacturing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eliminating Waste in Manufacturing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Problem Solving and Continuous Improvement ,[object Object],[object Object],[object Object],[object Object],[object Object]
Uncovering Production Problems Water level must be lowered! Quality Problems Material Shortages Machine Breakdowns Workload Imbalances Worker Absenteeism Out-of-Spec Materials Quality Problems In-Process Inventory Production Problems
People Make JIT Work ,[object Object],[object Object],[object Object],[object Object]
TQM and JIT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Parallel Processing ,[object Object],Op 1 Op 2 Op 3 Op 4 Op 5 Op 6 Op 7 Op 8 ,[object Object],Cycle Time for Each Operation = 1 Hour Total Product Cycle Time = 1 x 5 = 5 Hours ,[object Object],[object Object],Cycle Time for Each Operation = 1 Hour Total Product Cycle Time = 1 x 8 = 8 Hours Op 1 Op 2 Op 3 Op 4 Op 5 Op 6 Op 7 Op 8
JIT:  A Pull System ,[object Object],[object Object],[object Object]
Kanban Production Control ,[object Object],[object Object],[object Object]
Kanbans and Other Signals ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Kanban Cards Conveyance Kanban Card Part number to produce:  M471-36   Part description:  Valve Housing Lot size needed:  40   Container type:  RED Crate Card number:  2 of 5   Retrieval storage location:  NW53D From work center:  22   To work center:  35
Kanban Cards Production Kanban Card Part number to produce:  M471-36   Part description:  Valve Housing Lot size needed:  40   Container type:  RED crate Card number:  4 of 5   Completed storage location:  NW53D From work center:  22   To work center:  35 Materials required: Material no.  744B Storage location:  NW48C Part no.  B238-5 Storage location:  NW47B
How Kanban Operates ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Flow of Kanban Cards and Containers Upstream Work Center #1 Downstream Work Center #2 In-process storage Parts Flow P-Kanban and empty container Full container and P-Kanban C-Kanban and empty container Full container and C-Kanban
Containers in a Kanban System ,[object Object],[object Object],[object Object],[object Object]
Calculating the No of Containers   between Work Centers N = Total number of containers between 2 stations U = Usage rate of downstream operation T = Average elapsed time for container to make entire cycle P = Policy variable indicating efficiency... 0 - 1 C = Capacity (number of parts) of standard container
Example:  Number of Containers ,[object Object],[object Object],[object Object]
Example:Number of Containers ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Essential Elements of JIT Purchasing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
E-Commerce and JIT Purchasing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Reducing Inventories through Setup Time Reduction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Setup Time Required for an EOQ
[object Object],[object Object],Setup Time Required for an EOQ
Example:  Setup Time Required ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Example:  Setup Time Required ,[object Object]
Example:  Setup Time Required ,[object Object],[object Object]
Working Toward Repetitive Manufacturing ,[object Object],[object Object],[object Object],[object Object],[object Object]
Working Toward Repetitive Manufacturing ,[object Object],[object Object],[object Object],[object Object],[object Object]
Benefits of JIT ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Wrap-Up ,[object Object],[object Object],[object Object],[object Object],[object Object]

More Related Content

What's hot

Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jitsree19881988
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &ganessh04
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time Analysis
Ashim Roy
 
Just in time
Just in timeJust in time
Just in time
Manoj Lawate
 
Just In Time Technique
Just In Time TechniqueJust In Time Technique
Just In Time Techniquepawansher2002
 
just in time management
just in time managementjust in time management
just in time managementumesh yadav
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
Arunnima B S
 
Just in time
Just in timeJust in time
Just in time
Avish Shah
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
Raj Shravanthi
 
just in time
just in timejust in time
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
ALIGARH MUSLIM UNIVERSITY
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
rushin202003
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
Just in time
Just in timeJust in time
Just in time
Navdeep Asteya
 
Ppt jit
Ppt jitPpt jit
Ppt jit
Vibha Nayak
 

What's hot (20)

Just in time concept
Just in time conceptJust in time concept
Just in time concept
 
Slide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 JitSlide Show Week #9 Chapter 11 Jit
Slide Show Week #9 Chapter 11 Jit
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
 
Just In Time Analysis
Just In Time AnalysisJust In Time Analysis
Just In Time Analysis
 
Just in time
Just in timeJust in time
Just in time
 
Just In Time Technique
Just In Time TechniqueJust In Time Technique
Just In Time Technique
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
just in time management
just in time managementjust in time management
just in time management
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Just in time
Just in timeJust in time
Just in time
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
just in time
just in timejust in time
just in time
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
Just in time
Just in timeJust in time
Just in time
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 

Viewers also liked

19
1919
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
Joanmaines
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
Swati Luthra
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jitKusum Parmar
 
Pull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the SupplyPull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the Supplyarsin1975
 
Airtel Lean six sigma conclave
Airtel Lean six sigma conclaveAirtel Lean six sigma conclave
Airtel Lean six sigma conclave
Abayomi Adelowotan(CEMBB)
 
My mba project_iocl
My mba project_ioclMy mba project_iocl
My mba project_iocl
buddhadev karmakar
 
ITFT--JIT
ITFT--JITITFT--JIT
ITFT--JIT
Ravi Kaushal
 
Vodafone
VodafoneVodafone
Vodafone
Supriya Sahoo
 
IOCL PERFORMANCE ANALYSIS
IOCL PERFORMANCE ANALYSISIOCL PERFORMANCE ANALYSIS
IOCL PERFORMANCE ANALYSISKangan Deka
 
Ravi rupani.
Ravi rupani.Ravi rupani.
Ravi rupani.
Vinay Jeengar
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
ADD VALUE CONSULTING Inc
 
vodafone , vodafone report, project on vodafone, service operation management
vodafone , vodafone report, project on vodafone, service operation managementvodafone , vodafone report, project on vodafone, service operation management
vodafone , vodafone report, project on vodafone, service operation management
Micky Lyf
 
Vodafone report final
Vodafone report finalVodafone report final
Vodafone report final
Shri Theja
 

Viewers also liked (20)

19
1919
19
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Just in time
Just in timeJust in time
Just in time
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
0821001020Tarit Kumar Kundu
0821001020Tarit Kumar Kundu0821001020Tarit Kumar Kundu
0821001020Tarit Kumar Kundu
 
Pull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the SupplyPull Production & Kanban Implementation Throughout the Supply
Pull Production & Kanban Implementation Throughout the Supply
 
Airtel Lean six sigma conclave
Airtel Lean six sigma conclaveAirtel Lean six sigma conclave
Airtel Lean six sigma conclave
 
My mba project_iocl
My mba project_ioclMy mba project_iocl
My mba project_iocl
 
ITFT--JIT
ITFT--JITITFT--JIT
ITFT--JIT
 
Just in time
Just in timeJust in time
Just in time
 
Airtel Bitm
Airtel BitmAirtel Bitm
Airtel Bitm
 
Vodafone
VodafoneVodafone
Vodafone
 
IOCL PERFORMANCE ANALYSIS
IOCL PERFORMANCE ANALYSISIOCL PERFORMANCE ANALYSIS
IOCL PERFORMANCE ANALYSIS
 
Heizer 16
Heizer 16Heizer 16
Heizer 16
 
Ravi rupani.
Ravi rupani.Ravi rupani.
Ravi rupani.
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
vodafone , vodafone report, project on vodafone, service operation management
vodafone , vodafone report, project on vodafone, service operation managementvodafone , vodafone report, project on vodafone, service operation management
vodafone , vodafone report, project on vodafone, service operation management
 
Vodafone report final
Vodafone report finalVodafone report final
Vodafone report final
 

Similar to 37020766 jit-and-lean-manufacturing-by-sashi-prabhu

Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
Ayman Aljahdali
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
jasonhian
 
Chapter.1 just in time
Chapter.1 just in timeChapter.1 just in time
Chapter.1 just in time
Prof.Mayur Modi
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
Jitesh Gaurav
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
venky venkatesh
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
Blankdevil
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
Ashima Kandari
 
Just In Time
Just In TimeJust In Time
Just In Time
dvyvjy
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
Momin Uddin
 
Productivity for BMS student
Productivity for BMS studentProductivity for BMS student
Productivity for BMS student
Study Guide Pro
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
Kushal Shah
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its Implementation
Laukik Raut
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
MohammedRizwanSharif1
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 

Similar to 37020766 jit-and-lean-manufacturing-by-sashi-prabhu (20)

Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Chapter.1 just in time
Chapter.1 just in timeChapter.1 just in time
Chapter.1 just in time
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
LEAN MANUFACTURING USES
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
Productivity for BMS student
Productivity for BMS studentProductivity for BMS student
Productivity for BMS student
 
Jit report
Jit reportJit report
Jit report
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
 
jit
jitjit
jit
 
Overview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its ImplementationOverview on Kanban Methodology and its Implementation
Overview on Kanban Methodology and its Implementation
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 

Recently uploaded

Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 

Recently uploaded (20)

Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 

37020766 jit-and-lean-manufacturing-by-sashi-prabhu

  • 1. Just-In-Time and Lean Manufacturing by Sashi Prabhu
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. Order-to-Delivery Cycle Distri- bution and Customer Service Custo- mer Places Order Order Entry Engi- neering Design If reqd. Sched- uling Manufacturing Lead Times Purchasing Lead Times Manufacturing Cumulative Lead Time Order-to-Delivery Cycle
  • 8.
  • 9.
  • 10. Capacity Utilization 10 20 30 40 50 60 70 80 90 100 5 1 3 % Capacity Utilization 11 Production Lead Times (days) 7 9 Traditional Manufacturing JIT Manufacturing
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. Uncovering Production Problems Water level must be lowered! Quality Problems Material Shortages Machine Breakdowns Workload Imbalances Worker Absenteeism Out-of-Spec Materials Quality Problems In-Process Inventory Production Problems
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Kanban Cards Conveyance Kanban Card Part number to produce: M471-36 Part description: Valve Housing Lot size needed: 40 Container type: RED Crate Card number: 2 of 5 Retrieval storage location: NW53D From work center: 22 To work center: 35
  • 31. Kanban Cards Production Kanban Card Part number to produce: M471-36 Part description: Valve Housing Lot size needed: 40 Container type: RED crate Card number: 4 of 5 Completed storage location: NW53D From work center: 22 To work center: 35 Materials required: Material no. 744B Storage location: NW48C Part no. B238-5 Storage location: NW47B
  • 32.
  • 33. Flow of Kanban Cards and Containers Upstream Work Center #1 Downstream Work Center #2 In-process storage Parts Flow P-Kanban and empty container Full container and P-Kanban C-Kanban and empty container Full container and C-Kanban
  • 34.
  • 35. Calculating the No of Containers between Work Centers N = Total number of containers between 2 stations U = Usage rate of downstream operation T = Average elapsed time for container to make entire cycle P = Policy variable indicating efficiency... 0 - 1 C = Capacity (number of parts) of standard container
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.