UNDER REAMED PILES
By
J.C.WASON
COMPLETED PILE
SINGLE UNDER
REAMED PILE
D
DU
D
DU
1.5
DU
350
TO
400
2D
APPROX
350
TO
400
FOR
BRACKET
2D
2000
Mtn
350
TO
400
FOR
BRACKET
150
MIN
80
200
WIDTH OF WALL
A B
DOUBLE UNDER
REAMED PILE
A
B
UNDER REAMED PILES :
• Manually Bored Cast in Situ Shallow Depth Piles,
3m to 8m in length, 200mm to 500mm dia, with
Single or Double Under Reams.
• MERITS :
1. Easy to install, manual boring with simple
equipment, can be worked with semi skilled labour,
Hence economical.
• DEMERIS :
1. Limited depth (3 to 8m)
2. Limited load carrying capacity (15 to 30 Tonne
capacity), Hence can be adopted for small low rise
bldgs.
Applications of UR piles :
1. For foundations of bldgs in Black Cotton
Soils.
2. For foundations of bldgs in filled up soils.
3. As an alternate to ordinary Piles.
4. As Anchor (Tension) Piles.
UNDER REAMED PILES – APPLICATIONS :
1. IN BLACK COTTON SOILS :
Primarily developed by CBRI, Roorkee as
appropriate type of foundations for low rise
buildings in Black Cotton Soils. These help to
transfer loads to strata not affected by seasonal
volumeteric changes in such soils, ( normally 2 to
3 m below ground level).
2. IN FILLED UP SOILS :
Also adopted for building foundations in filled up
soils where good firm soils may lie at shallow
depths of 3 to 6 m below ground level, but top
soil, being filled up, is not suitable for placing
foundations.
UNDER REAMED PILES –
APPLICATIONS (CONTD.) :
3. AS AN ALTERNATIVE TO NORMAL PILES :
Recently, C.P. Kukreja & Associates have adopted
U.R. Piles Foundations as an alternative to
Normal Pile Foundations for some of their
projects in Gurgaon (Example : 13 storeyed
Resedential buildings for their Heritage City
Project in Gurgaon).
4. AS TENSION PILES :
under deep underground water tanks, under
deep basements with high water table, and
under Tall H.T. Electric Towers.
PROCEEDURE TO INSTALL UR PILES
:
1. Make a bore hole with a manual auger.
2. Enlarge bore holes at locations of under
ream bulb(s) with the help of
collapsible blades.
3. Place reinf cage in the bore hole.
4. Place concreting by Tremie Pipes.
SAFE LOAD FOR VERTICAL BORED CAST-INSITU UNDER REAMED
PILE IN SANDY AND CLAYEY SOILS INCLUDING BLACK COTTON
SOILS
Size
Ø of pile
(mm)
L (m) Capacity (KN) Increase in cap
per 30 cm
length
Decrease in
capacity/30cm
length
SUR DUR SUR DUR SUR DUR SUR DUR
200 3.5 3.5 80 120 9 9 7 7 Up lift
resistan
ce ~
50% of
comprn
. load
capacit
y
250 3.5 3.5 120 180 11.5 11.5 9 9
300 3.5 3.5 160 240 14 14 11 11
375 3.5 3.75 240 360 18 18 14 14
400 3.5 4.0 280 420 19 19 15 15
450 3.5 4.5 350 525 21.5 21.5 17 17
500 3.5 5.0 420 630 24 24 19 19
SUR = SINGLE UNDER – REAMED PILE
SUR = DOUBLE UNDER – REAMED PILE
COMPLETED PILE
SINGLE UNDER
REAMED PILE
D
DU
D
DU
1.5
DU
350
TO
400
2D
APPROX
350
TO
400
FOR
BRACKET
2D
2000
Mtn
350
TO
400
FOR
BRACKET
150
MIN
80
200
WIDTH OF WALL
A B
DOUBLE UNDER
REAMED PILE
A
B
BORING THE PILE SHAFT IN
GRANULAR SOIL USING
TEMPORARY CASING AND SHELL
STAGE – 1
REINFORCEMENT AND TREMIE
TUBE INSERTED IN PILE SHAFT
AT THE START OF THE
CONCRETING OPERATION
STAGE – 2
PLUG
TREMIE TUBE
REINFORCEMENT
TEMPORARY CASING
SLURRY
CONCRETING COMMENCED
WITH WATER AND SILTY SLURR
BEING DISPLACED
STAGE – 3
WATER AND SLURRY
DISCHARGING AS
CONCRETING PROCEEDS
STAGE – 4
NOTE :-
CONCRETING DEEP PILES MAY BE
FACILITATED BY EXTRACTING THE
TEMPORARY CASING IN STAGES
AND REMOVING THE TREMIE TUBE
IN CONCRETE
WITHDRAWING
TEMPORAY CASING
STAGE – 5
NOTE :-
CONCRETING DEEP PILES MAY BE
FACILITATED BY EXTRACTING THE
TEMPORARY CASING IN STAGES
AND REMOVING THE TREMIE TUBE
IN CONCRETE
COMPLETED PILE
STAGE – 6
NOTE :-
CONCRETING DEEP PILES MAY BE
FACILITATED BY EXTRACTING THE
TEMPORARY CASING IN STAGES
AND REMOVING THE TREMIE TUBE
IN CONCRETE
CASE STUDY OF A
BLDG WITH UNDER
REAMED PILE
FOUNDATIONS
Case Study : Staff Quarters for FSL , Rohini, New
Delhi – Under Reamed Pile Foundations
• DATA :
• No of Storeyes : 4
• Structural System : Load Bearing Brick Masonry Bldgs without Basement
(Wall Thickness : 230mm, Bricks Masonry in GF : 230 – 10 – H2 (Bricks
class : 10, Cement mortar : 1 : 4, Wall Tk : 230mm)
• Sesimic Zone : 4 (Delhi), Imporance Factor : 1 (Residences)
• (Bldg Strengthened for EQ Resistance as per IS: 4326 – 1976)
• Storey Ht : 3m
• Soil Strata at Site : Loose Filled up soil for top 2.5 to 3.5 m,
Firm soil below
• Foundations :Under Reamed Pile Foundations with RCC Pile caps,
• Size, Type,
• length and Capacity of Piles : 400 mm dia
Bored Cast in Situ Single Under Reamed Piles, 8m long
Capacity : 31 Tonnes (310KN)
• Conc Mix for Piles and Pile Caps : M 25, Steel Reinf Grade : Fe 415
Showing location of under reamed piles, pile caps and grade beams
DETAILS OF A TYPICAL
PILE CAP WITH
SINGLE (ONE) PILE
PILE CAP SIZE : 600mm x
600mm X 500 mm Thick
Conc Mix for Piles and Piles
Caps : M 25
Steel Reinf. Grade : Fe 415
Type of Piles : 400 mm dia
Single Under Reamed Bored
Cast in Situ Piles,
Friction cum Bearing Piles
Length of Piles : 8m
Capacity of Piles : 31 Tonnes
(310 KN)

More Related Content

What's hot

Earthen dam
Earthen damEarthen dam
Compaction tests
Compaction testsCompaction tests
Compaction tests
Ami jasani
 
GEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETEGEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETE
Chandra Vardhan
 
Gully Control Structures.pptx
Gully Control Structures.pptxGully Control Structures.pptx
Gully Control Structures.pptx
Ajay Singh Lodhi
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
Bilal Mirani
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
Mulugeta Abera
 
Irrigation
IrrigationIrrigation
Irrigation
Danish Mohd
 
Check dams
Check damsCheck dams
Check dams
ujjwalaupreti
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
Jimit Shah
 
Sub surface water
Sub surface waterSub surface water
Sub surface water
Tharun Reddy
 
Design of a channel Reach
Design of a channel ReachDesign of a channel Reach
Design of a channel Reach
Latif Hyder Wadho
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
Venkata Sai Kari
 
Canal of design
Canal of designCanal of design
Canal of design
PREMKUMAR
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
GAURAV. H .TANDON
 
Stability analysis of dam
Stability analysis of damStability analysis of dam
Stability analysis of dam
Sonam Pandey
 
Irrigation
IrrigationIrrigation
Engineering and Bio-engineering soil conservation measures
Engineering and Bio-engineering soil conservation measuresEngineering and Bio-engineering soil conservation measures
Engineering and Bio-engineering soil conservation measures
Anil Thapa Kazi
 
Index property of soil
Index property of soilIndex property of soil
Index property of soil
SARASWATI PATHARIYA
 
SOIL PERMEABILITY.pdf
SOIL PERMEABILITY.pdfSOIL PERMEABILITY.pdf
SOIL PERMEABILITY.pdf
GourhariBiswas1
 
Shotcrete
ShotcreteShotcrete
Shotcrete
MTarunkumarreddy
 

What's hot (20)

Earthen dam
Earthen damEarthen dam
Earthen dam
 
Compaction tests
Compaction testsCompaction tests
Compaction tests
 
GEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETEGEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETE
 
Gully Control Structures.pptx
Gully Control Structures.pptxGully Control Structures.pptx
Gully Control Structures.pptx
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
Irrigation
IrrigationIrrigation
Irrigation
 
Check dams
Check damsCheck dams
Check dams
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Sub surface water
Sub surface waterSub surface water
Sub surface water
 
Design of a channel Reach
Design of a channel ReachDesign of a channel Reach
Design of a channel Reach
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Canal of design
Canal of designCanal of design
Canal of design
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Stability analysis of dam
Stability analysis of damStability analysis of dam
Stability analysis of dam
 
Irrigation
IrrigationIrrigation
Irrigation
 
Engineering and Bio-engineering soil conservation measures
Engineering and Bio-engineering soil conservation measuresEngineering and Bio-engineering soil conservation measures
Engineering and Bio-engineering soil conservation measures
 
Index property of soil
Index property of soilIndex property of soil
Index property of soil
 
SOIL PERMEABILITY.pdf
SOIL PERMEABILITY.pdfSOIL PERMEABILITY.pdf
SOIL PERMEABILITY.pdf
 
Shotcrete
ShotcreteShotcrete
Shotcrete
 

Similar to 346260332-Under-Reamed-Piles-1-10-09.pptx

Well Foundation
Well FoundationWell Foundation
Well Foundation
Dave Chinmyee
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their composition
MdDiluarHossain1
 
Underpinning
UnderpinningUnderpinning
Underpinning
YingHongKang
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
akjain_mkt
 
Micropile
MicropileMicropile
Micropile
Sameer Thaiyam
 
2.pile foundation 2.ppt
2.pile foundation 2.ppt2.pile foundation 2.ppt
2.pile foundation 2.ppt
DAYANANDWANDRE
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
Er.Sunil Wasade
 
Power system earthing
Power system earthingPower system earthing
Power system earthing
Nisarg Amin
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
Kiran Hadiya
 
1115
11151115
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipments
Nagma Modi
 
Foam Concrete.ppt
Foam Concrete.pptFoam Concrete.ppt
Foam Concrete.ppt
Sri Kalyana Rama J
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
YingHongKang
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)
Daphne Tan
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
SUNILPRASAD68
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
Riya Trivedi
 
Soil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhurySoil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhury
Ankush Choudhury
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
KHUSHBU SHAH
 
Sub soil exploration
Sub soil explorationSub soil exploration
Sub soil exploration
Surpal Zala
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
Remya Rajeev
 

Similar to 346260332-Under-Reamed-Piles-1-10-09.pptx (20)

Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Types of pile according to their composition
Types of pile according to their compositionTypes of pile according to their composition
Types of pile according to their composition
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Well Foundation
Well FoundationWell Foundation
Well Foundation
 
Micropile
MicropileMicropile
Micropile
 
2.pile foundation 2.ppt
2.pile foundation 2.ppt2.pile foundation 2.ppt
2.pile foundation 2.ppt
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
Power system earthing
Power system earthingPower system earthing
Power system earthing
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
1115
11151115
1115
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipments
 
Foam Concrete.ppt
Foam Concrete.pptFoam Concrete.ppt
Foam Concrete.ppt
 
Soldier Bored and Diaphragm
Soldier Bored and DiaphragmSoldier Bored and Diaphragm
Soldier Bored and Diaphragm
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)
 
pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Soil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhurySoil nailing ppt by ankush choudhury
Soil nailing ppt by ankush choudhury
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Sub soil exploration
Sub soil explorationSub soil exploration
Sub soil exploration
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 

Recently uploaded

Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
bijceesjournal
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
21UME003TUSHARDEB
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 

Recently uploaded (20)

Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...Rainfall intensity duration frequency curve statistical analysis and modeling...
Rainfall intensity duration frequency curve statistical analysis and modeling...
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
Mechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdfMechanical Engineering on AAI Summer Training Report-003.pdf
Mechanical Engineering on AAI Summer Training Report-003.pdf
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 

346260332-Under-Reamed-Piles-1-10-09.pptx

  • 2. COMPLETED PILE SINGLE UNDER REAMED PILE D DU D DU 1.5 DU 350 TO 400 2D APPROX 350 TO 400 FOR BRACKET 2D 2000 Mtn 350 TO 400 FOR BRACKET 150 MIN 80 200 WIDTH OF WALL A B DOUBLE UNDER REAMED PILE A B
  • 3. UNDER REAMED PILES : • Manually Bored Cast in Situ Shallow Depth Piles, 3m to 8m in length, 200mm to 500mm dia, with Single or Double Under Reams. • MERITS : 1. Easy to install, manual boring with simple equipment, can be worked with semi skilled labour, Hence economical. • DEMERIS : 1. Limited depth (3 to 8m) 2. Limited load carrying capacity (15 to 30 Tonne capacity), Hence can be adopted for small low rise bldgs.
  • 4. Applications of UR piles : 1. For foundations of bldgs in Black Cotton Soils. 2. For foundations of bldgs in filled up soils. 3. As an alternate to ordinary Piles. 4. As Anchor (Tension) Piles.
  • 5. UNDER REAMED PILES – APPLICATIONS : 1. IN BLACK COTTON SOILS : Primarily developed by CBRI, Roorkee as appropriate type of foundations for low rise buildings in Black Cotton Soils. These help to transfer loads to strata not affected by seasonal volumeteric changes in such soils, ( normally 2 to 3 m below ground level). 2. IN FILLED UP SOILS : Also adopted for building foundations in filled up soils where good firm soils may lie at shallow depths of 3 to 6 m below ground level, but top soil, being filled up, is not suitable for placing foundations.
  • 6. UNDER REAMED PILES – APPLICATIONS (CONTD.) : 3. AS AN ALTERNATIVE TO NORMAL PILES : Recently, C.P. Kukreja & Associates have adopted U.R. Piles Foundations as an alternative to Normal Pile Foundations for some of their projects in Gurgaon (Example : 13 storeyed Resedential buildings for their Heritage City Project in Gurgaon). 4. AS TENSION PILES : under deep underground water tanks, under deep basements with high water table, and under Tall H.T. Electric Towers.
  • 7. PROCEEDURE TO INSTALL UR PILES : 1. Make a bore hole with a manual auger. 2. Enlarge bore holes at locations of under ream bulb(s) with the help of collapsible blades. 3. Place reinf cage in the bore hole. 4. Place concreting by Tremie Pipes.
  • 8. SAFE LOAD FOR VERTICAL BORED CAST-INSITU UNDER REAMED PILE IN SANDY AND CLAYEY SOILS INCLUDING BLACK COTTON SOILS Size Ø of pile (mm) L (m) Capacity (KN) Increase in cap per 30 cm length Decrease in capacity/30cm length SUR DUR SUR DUR SUR DUR SUR DUR 200 3.5 3.5 80 120 9 9 7 7 Up lift resistan ce ~ 50% of comprn . load capacit y 250 3.5 3.5 120 180 11.5 11.5 9 9 300 3.5 3.5 160 240 14 14 11 11 375 3.5 3.75 240 360 18 18 14 14 400 3.5 4.0 280 420 19 19 15 15 450 3.5 4.5 350 525 21.5 21.5 17 17 500 3.5 5.0 420 630 24 24 19 19 SUR = SINGLE UNDER – REAMED PILE SUR = DOUBLE UNDER – REAMED PILE
  • 9. COMPLETED PILE SINGLE UNDER REAMED PILE D DU D DU 1.5 DU 350 TO 400 2D APPROX 350 TO 400 FOR BRACKET 2D 2000 Mtn 350 TO 400 FOR BRACKET 150 MIN 80 200 WIDTH OF WALL A B DOUBLE UNDER REAMED PILE A B
  • 10. BORING THE PILE SHAFT IN GRANULAR SOIL USING TEMPORARY CASING AND SHELL STAGE – 1
  • 11. REINFORCEMENT AND TREMIE TUBE INSERTED IN PILE SHAFT AT THE START OF THE CONCRETING OPERATION STAGE – 2 PLUG TREMIE TUBE REINFORCEMENT TEMPORARY CASING SLURRY
  • 12. CONCRETING COMMENCED WITH WATER AND SILTY SLURR BEING DISPLACED STAGE – 3
  • 13. WATER AND SLURRY DISCHARGING AS CONCRETING PROCEEDS STAGE – 4 NOTE :- CONCRETING DEEP PILES MAY BE FACILITATED BY EXTRACTING THE TEMPORARY CASING IN STAGES AND REMOVING THE TREMIE TUBE IN CONCRETE
  • 14. WITHDRAWING TEMPORAY CASING STAGE – 5 NOTE :- CONCRETING DEEP PILES MAY BE FACILITATED BY EXTRACTING THE TEMPORARY CASING IN STAGES AND REMOVING THE TREMIE TUBE IN CONCRETE
  • 15. COMPLETED PILE STAGE – 6 NOTE :- CONCRETING DEEP PILES MAY BE FACILITATED BY EXTRACTING THE TEMPORARY CASING IN STAGES AND REMOVING THE TREMIE TUBE IN CONCRETE
  • 16. CASE STUDY OF A BLDG WITH UNDER REAMED PILE FOUNDATIONS
  • 17. Case Study : Staff Quarters for FSL , Rohini, New Delhi – Under Reamed Pile Foundations • DATA : • No of Storeyes : 4 • Structural System : Load Bearing Brick Masonry Bldgs without Basement (Wall Thickness : 230mm, Bricks Masonry in GF : 230 – 10 – H2 (Bricks class : 10, Cement mortar : 1 : 4, Wall Tk : 230mm) • Sesimic Zone : 4 (Delhi), Imporance Factor : 1 (Residences) • (Bldg Strengthened for EQ Resistance as per IS: 4326 – 1976) • Storey Ht : 3m • Soil Strata at Site : Loose Filled up soil for top 2.5 to 3.5 m, Firm soil below • Foundations :Under Reamed Pile Foundations with RCC Pile caps, • Size, Type, • length and Capacity of Piles : 400 mm dia Bored Cast in Situ Single Under Reamed Piles, 8m long Capacity : 31 Tonnes (310KN) • Conc Mix for Piles and Pile Caps : M 25, Steel Reinf Grade : Fe 415
  • 18.
  • 19. Showing location of under reamed piles, pile caps and grade beams
  • 20. DETAILS OF A TYPICAL PILE CAP WITH SINGLE (ONE) PILE PILE CAP SIZE : 600mm x 600mm X 500 mm Thick Conc Mix for Piles and Piles Caps : M 25 Steel Reinf. Grade : Fe 415 Type of Piles : 400 mm dia Single Under Reamed Bored Cast in Situ Piles, Friction cum Bearing Piles Length of Piles : 8m Capacity of Piles : 31 Tonnes (310 KN)