- 1. LEGEND
Existing Pipe
Dish Drain
Catch Pit (Type 1)
Catch Pit (Type 2)
Telecom Network
Plot Connection
Underground realignment of existing
overhead 22 kV CEB Network.
22 kV Cable.
LV DP4
LV Feeder Cable from CEB Plantroom
Sleeves
Service Cable to each Plot
Distribution Pillar
Street Lighting Pole
Refer to Road crossing schedule
for Electrical Infrastructure
LV DP2
LVDP2
LVDP4.1
LVDP4.1
LVDP4.1
LVDP4.1
LVDP4.1
Road 1
CP1-8a
CP3-1
CP1-1
CP1-2
CP1-3
CP1-4
CP1-5
CP1-6
CP1-7
CP1-8
CP1-9
PLOT 22
PLOT 36
PLOT 24
PLOT 34
PLOT 19
PLOT 20
PLOT 35
PLOT 21
PLOT 23
Air Valve
in chamber
Air Valve
in chamber
Drain Valve
in chamber
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
0.0020.00
0.00
20.00
40.00
60.00
80.00
100.00
Road 3
20.00
40.00
60.00
80.00
100.00120.000
140.00
0.00
L3T
No.4
L3T
No.4
Telecom
Distribution
Cubicle
N
U/G 22kV Cable
to connect to existing
Pole O/H network
SDP
MV18
SDP
MV19
ADP
MV8
SDP
MV20
L3T
No.4
DP 4.1
Draw Pit
SC 7 (LV)
Draw Pit
SC 8 (LV)
E=996687.293
N=997478.659
E=996674.003
N=997485.394
E=996664.255
N=997485.365
E=996650.990
N=997479.287
E=996644.842
N=997465.829
E=996639.227
N=997448.780
E=996641.533
N=997434.294
E=996634.761
N=997428.485
E=996625.037
N=997433.339
E=996626.519
N=997422.011
E=996630.952
N=997413.340
ADP
MV7
ADP
MV6
SDP
LV5
SDP
MV17a
Draw Pit
SC 4 (LV)
Draw Pit
SC 5 (LV)
Draw Pit
SC 6 (LV)
Round About 1
RC 26
RC 31
RC 32
RC 33
Note :
Refer to drawing 2878-CU-301 for position
of sleeves entering draw pit in order to
have a proper bending radius
Air Valve
in chamber
SDP
MV
Tee 160x160x160
+ Reducer 160/110 (2 Nos.)
Job No
Drawing Status
Discipline
Scale at A1
Drawing No Rev
Drawing Title
Job Title
Client
Date By Chkd Appd
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Rev
CC-001 C22878
1:750
FOR CONSTRUCTION
Civil
COORDINATED SERVICES
LAYOUT
Sheet 1 of 8
/ /C1 15 03 13 Reza B. P.G P.G
ISSUED FOR CONSTRUCTION
N
KEY PLAN
KP 1
KEY PLAN 1
/ /C2 22 04 13 Reza B. P.G P.G
UPLIGHTER AT PLOT SERVICE HUB
MODIFIED