LEGEND
Existing Pipe
Dish Drain
Catch Pit (Type 1)
Catch Pit (Type 2)
Telecom Network
Plot Connection
Underground realignment of existing
overhead 22 kV CEB Network.
22 kV Cable.
LV DP4
LV Feeder Cable from CEB Plantroom
Sleeves
Service Cable to each Plot
Distribution Pillar
Street Lighting Pole
Refer to Road crossing schedule
for Electrical Infrastructure
LV DP2
LVDP2
LVDP4.1
LVDP4.1
LVDP4.1
LVDP4.1
LVDP4.1
Road 1
CP1-8a
CP3-1
CP1-1
CP1-2
CP1-3
CP1-4
CP1-5
CP1-6
CP1-7
CP1-8
CP1-9
PLOT 22
PLOT 36
PLOT 24
PLOT 34
PLOT 19
PLOT 20
PLOT 35
PLOT 21
PLOT 23
Air Valve
in chamber
Air Valve
in chamber
Drain Valve
in chamber
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
EXISTING HT
0.0020.00
0.00
20.00
40.00
60.00
80.00
100.00
Road 3
20.00
40.00
60.00
80.00
100.00120.000
140.00
0.00
L3T
No.4
L3T
No.4
Telecom
Distribution
Cubicle
N
U/G 22kV Cable
to connect to existing
Pole O/H network
SDP
MV18
SDP
MV19
ADP
MV8
SDP
MV20
L3T
No.4
DP 4.1
Draw Pit
SC 7 (LV)
Draw Pit
SC 8 (LV)
E=996687.293
N=997478.659
E=996674.003
N=997485.394
E=996664.255
N=997485.365
E=996650.990
N=997479.287
E=996644.842
N=997465.829
E=996639.227
N=997448.780
E=996641.533
N=997434.294
E=996634.761
N=997428.485
E=996625.037
N=997433.339
E=996626.519
N=997422.011
E=996630.952
N=997413.340
ADP
MV7
ADP
MV6
SDP
LV5
SDP
MV17a
Draw Pit
SC 4 (LV)
Draw Pit
SC 5 (LV)
Draw Pit
SC 6 (LV)
Round About 1
RC 26
RC 31
RC 32
RC 33
Note :
Refer to drawing 2878-CU-301 for position
of sleeves entering draw pit in order to
have a proper bending radius
Air Valve
in chamber
SDP
MV
Tee 160x160x160
+ Reducer 160/110 (2 Nos.)
Job No
Drawing Status
Discipline
Scale at A1
Drawing No Rev
Drawing Title
Job Title
Client
Date By Chkd Appd
A1
1
2
3
4
5
6
7
8
9
10
11
A B C D E F G H I J K L M N
Do not scale
Rev
CC-001 C22878
1:750
FOR CONSTRUCTION
Civil
COORDINATED SERVICES
LAYOUT
Sheet 1 of 8
/ /C1 15 03 13 Reza B. P.G P.G
ISSUED FOR CONSTRUCTION
N
KEY PLAN
KP 1
KEY PLAN 1
/ /C2 22 04 13 Reza B. P.G P.G
UPLIGHTER AT PLOT SERVICE HUB
MODIFIED

More Related Content

What's hot

555 IC working
555 IC working555 IC working
555 IC workingDhonu
 
555 Timer integrated circuit and its applications
555 Timer integrated circuit and its applications555 Timer integrated circuit and its applications
555 Timer integrated circuit and its applicationsMayank Raj Singh
 
Original NPN Transistor D468 2SD468 468 TO-92 New
Original NPN Transistor D468 2SD468 468 TO-92 NewOriginal NPN Transistor D468 2SD468 468 TO-92 New
Original NPN Transistor D468 2SD468 468 TO-92 NewAUTHELECTRONIC
 
(S.C.E.T) Appliction of pll fm demodulation fsk demodulation
(S.C.E.T) Appliction of pll fm demodulation fsk demodulation(S.C.E.T) Appliction of pll fm demodulation fsk demodulation
(S.C.E.T) Appliction of pll fm demodulation fsk demodulationChirag vasava
 
Bunker Level monitoring - Thermal power Plant
Bunker Level monitoring  - Thermal power PlantBunker Level monitoring  - Thermal power Plant
Bunker Level monitoring - Thermal power PlantRaja Kannan
 
Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...
Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...
Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...Bob Walter
 
Ic 555 timer as astable
Ic 555 timer as astableIc 555 timer as astable
Ic 555 timer as astableDominicHendry
 
Wan topologies awan lab
Wan topologies awan labWan topologies awan lab
Wan topologies awan labGaurav Juneja
 
Traxon Cove Light AC HO RGBW Wiring Diagram
Traxon Cove Light AC HO RGBW Wiring DiagramTraxon Cove Light AC HO RGBW Wiring Diagram
Traxon Cove Light AC HO RGBW Wiring Diagramvalorlighting
 
555 Timer (detailed presentation)
555 Timer (detailed presentation)555 Timer (detailed presentation)
555 Timer (detailed presentation)Tanish Gupta
 
555 astable powerpoint
555 astable powerpoint555 astable powerpoint
555 astable powerpointJAC1994
 

What's hot (20)

555 timer tutorial
555 timer tutorial555 timer tutorial
555 timer tutorial
 
555 IC working
555 IC working555 IC working
555 IC working
 
555 timer ppt by vishnu
555 timer ppt by vishnu555 timer ppt by vishnu
555 timer ppt by vishnu
 
555 Timer integrated circuit and its applications
555 Timer integrated circuit and its applications555 Timer integrated circuit and its applications
555 Timer integrated circuit and its applications
 
Original NPN Transistor D468 2SD468 468 TO-92 New
Original NPN Transistor D468 2SD468 468 TO-92 NewOriginal NPN Transistor D468 2SD468 468 TO-92 New
Original NPN Transistor D468 2SD468 468 TO-92 New
 
(S.C.E.T) Appliction of pll fm demodulation fsk demodulation
(S.C.E.T) Appliction of pll fm demodulation fsk demodulation(S.C.E.T) Appliction of pll fm demodulation fsk demodulation
(S.C.E.T) Appliction of pll fm demodulation fsk demodulation
 
Bunker Level monitoring - Thermal power Plant
Bunker Level monitoring  - Thermal power PlantBunker Level monitoring  - Thermal power Plant
Bunker Level monitoring - Thermal power Plant
 
Ic 555
Ic 555Ic 555
Ic 555
 
Lm2907 Tacometro
Lm2907 TacometroLm2907 Tacometro
Lm2907 Tacometro
 
Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...
Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...
Independant Assessment of APIC's MicroATX RFoF Link by Aselsan Electronic Ind...
 
Ic 555 timer as astable
Ic 555 timer as astableIc 555 timer as astable
Ic 555 timer as astable
 
Wan topologies awan lab
Wan topologies awan labWan topologies awan lab
Wan topologies awan lab
 
CSRF V1.0
CSRF V1.0CSRF V1.0
CSRF V1.0
 
555 Timer Ic
555 Timer Ic555 Timer Ic
555 Timer Ic
 
Spaun
SpaunSpaun
Spaun
 
Astable multivibrator
Astable multivibratorAstable multivibrator
Astable multivibrator
 
Traxon Cove Light AC HO RGBW Wiring Diagram
Traxon Cove Light AC HO RGBW Wiring DiagramTraxon Cove Light AC HO RGBW Wiring Diagram
Traxon Cove Light AC HO RGBW Wiring Diagram
 
555 Timer (detailed presentation)
555 Timer (detailed presentation)555 Timer (detailed presentation)
555 Timer (detailed presentation)
 
IC 555
IC 555IC 555
IC 555
 
555 astable powerpoint
555 astable powerpoint555 astable powerpoint
555 astable powerpoint
 

Similar to 2878-CC-001 COORDINATED SERVICES LAYOUT

L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdfL-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdfsatyam jha
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER EnergyRashmi Jeswani
 
Multi-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptxMulti-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptxRickMaity
 
Modelling of 25 kV Electric Railway System
Modelling of 25 kV Electric Railway SystemModelling of 25 kV Electric Railway System
Modelling of 25 kV Electric Railway SystemBérengère VIGNAUX
 
VLSI D PPT.pdf
VLSI D PPT.pdfVLSI D PPT.pdf
VLSI D PPT.pdfAMohan12
 
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATIONHIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATIONSenthilVenkat2
 
Ch5 lecture slides Chenming Hu Device for IC
Ch5 lecture slides Chenming Hu Device for ICCh5 lecture slides Chenming Hu Device for IC
Ch5 lecture slides Chenming Hu Device for ICChenming Hu
 
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATORUNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATORijiert bestjournal
 
Technical presentation on modern earthing
Technical presentation on modern earthingTechnical presentation on modern earthing
Technical presentation on modern earthingPankaj Chakraborty
 
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Mikolaj Kukawski
 
Datos_tecnicos_del_Circuito_integrado_TJA1050_3.pdf
Datos_tecnicos_del_Circuito_integrado_TJA1050_3.pdfDatos_tecnicos_del_Circuito_integrado_TJA1050_3.pdf
Datos_tecnicos_del_Circuito_integrado_TJA1050_3.pdfEradHernandez
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report imkanhaiyalal
 
A New Proposal for OFCC-based Instrumentation Amplifier
A New Proposal for OFCC-based Instrumentation AmplifierA New Proposal for OFCC-based Instrumentation Amplifier
A New Proposal for OFCC-based Instrumentation AmplifierYayah Zakaria
 

Similar to 2878-CC-001 COORDINATED SERVICES LAYOUT (20)

L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdfL-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
L-24(DK&SSG)(PE) ((EE)NPTEL) (4 files merged).pdf
 
Presenting AUGIER Energy
Presenting AUGIER EnergyPresenting AUGIER Energy
Presenting AUGIER Energy
 
Multi-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptxMulti-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptx
 
Modelling of 25 kV Electric Railway System
Modelling of 25 kV Electric Railway SystemModelling of 25 kV Electric Railway System
Modelling of 25 kV Electric Railway System
 
VLSI D PPT.pdf
VLSI D PPT.pdfVLSI D PPT.pdf
VLSI D PPT.pdf
 
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATIONHIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
HIGH VOLTAGE PANEL SWITCHGEAR PRESENTATION
 
Ch5 lecture slides Chenming Hu Device for IC
Ch5 lecture slides Chenming Hu Device for ICCh5 lecture slides Chenming Hu Device for IC
Ch5 lecture slides Chenming Hu Device for IC
 
220kv substation
220kv substation220kv substation
220kv substation
 
Lab sheet
Lab sheetLab sheet
Lab sheet
 
L3 f10 2
L3 f10 2L3 f10 2
L3 f10 2
 
unit 1.ppt
unit 1.pptunit 1.ppt
unit 1.ppt
 
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATORUNDERGROUND CABLE FAULT DISTANCE LOCATOR
UNDERGROUND CABLE FAULT DISTANCE LOCATOR
 
Technical presentation on modern earthing
Technical presentation on modern earthingTechnical presentation on modern earthing
Technical presentation on modern earthing
 
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
Partial discharge monitoring of High Voltage Assets - TATA Steel Scunthorpe
 
Datos_tecnicos_del_Circuito_integrado_TJA1050_3.pdf
Datos_tecnicos_del_Circuito_integrado_TJA1050_3.pdfDatos_tecnicos_del_Circuito_integrado_TJA1050_3.pdf
Datos_tecnicos_del_Circuito_integrado_TJA1050_3.pdf
 
Aec manual2017 imp
Aec manual2017 impAec manual2017 imp
Aec manual2017 imp
 
Differentiator
DifferentiatorDifferentiator
Differentiator
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
99992505.pdf
99992505.pdf99992505.pdf
99992505.pdf
 
A New Proposal for OFCC-based Instrumentation Amplifier
A New Proposal for OFCC-based Instrumentation AmplifierA New Proposal for OFCC-based Instrumentation Amplifier
A New Proposal for OFCC-based Instrumentation Amplifier
 

More from Reza Bassawon

2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKINGReza Bassawon
 
2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORKReza Bassawon
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELSReza Bassawon
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILSReza Bassawon
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTIONReza Bassawon
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTIONReza Bassawon
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROADReza Bassawon
 
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELSReza Bassawon
 
2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer Line2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer LineReza Bassawon
 

More from Reza Bassawon (11)

Bagatelle Earthwork
Bagatelle EarthworkBagatelle Earthwork
Bagatelle Earthwork
 
Choisy Platform
Choisy PlatformChoisy Platform
Choisy Platform
 
2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING
 
2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD
 
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
 
2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer Line2759-SW-101 LS Along Sewer Line
2759-SW-101 LS Along Sewer Line
 

2878-CC-001 COORDINATED SERVICES LAYOUT

  • 1. LEGEND Existing Pipe Dish Drain Catch Pit (Type 1) Catch Pit (Type 2) Telecom Network Plot Connection Underground realignment of existing overhead 22 kV CEB Network. 22 kV Cable. LV DP4 LV Feeder Cable from CEB Plantroom Sleeves Service Cable to each Plot Distribution Pillar Street Lighting Pole Refer to Road crossing schedule for Electrical Infrastructure LV DP2 LVDP2 LVDP4.1 LVDP4.1 LVDP4.1 LVDP4.1 LVDP4.1 Road 1 CP1-8a CP3-1 CP1-1 CP1-2 CP1-3 CP1-4 CP1-5 CP1-6 CP1-7 CP1-8 CP1-9 PLOT 22 PLOT 36 PLOT 24 PLOT 34 PLOT 19 PLOT 20 PLOT 35 PLOT 21 PLOT 23 Air Valve in chamber Air Valve in chamber Drain Valve in chamber EXISTING HT EXISTING HT EXISTING HT EXISTING HT EXISTING HT EXISTING HT EXISTING HT EXISTING HT EXISTING HT EXISTING HT 0.0020.00 0.00 20.00 40.00 60.00 80.00 100.00 Road 3 20.00 40.00 60.00 80.00 100.00120.000 140.00 0.00 L3T No.4 L3T No.4 Telecom Distribution Cubicle N U/G 22kV Cable to connect to existing Pole O/H network SDP MV18 SDP MV19 ADP MV8 SDP MV20 L3T No.4 DP 4.1 Draw Pit SC 7 (LV) Draw Pit SC 8 (LV) E=996687.293 N=997478.659 E=996674.003 N=997485.394 E=996664.255 N=997485.365 E=996650.990 N=997479.287 E=996644.842 N=997465.829 E=996639.227 N=997448.780 E=996641.533 N=997434.294 E=996634.761 N=997428.485 E=996625.037 N=997433.339 E=996626.519 N=997422.011 E=996630.952 N=997413.340 ADP MV7 ADP MV6 SDP LV5 SDP MV17a Draw Pit SC 4 (LV) Draw Pit SC 5 (LV) Draw Pit SC 6 (LV) Round About 1 RC 26 RC 31 RC 32 RC 33 Note : Refer to drawing 2878-CU-301 for position of sleeves entering draw pit in order to have a proper bending radius Air Valve in chamber SDP MV Tee 160x160x160 + Reducer 160/110 (2 Nos.) Job No Drawing Status Discipline Scale at A1 Drawing No Rev Drawing Title Job Title Client Date By Chkd Appd A1 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H I J K L M N Do not scale Rev CC-001 C22878 1:750 FOR CONSTRUCTION Civil COORDINATED SERVICES LAYOUT Sheet 1 of 8 / /C1 15 03 13 Reza B. P.G P.G ISSUED FOR CONSTRUCTION N KEY PLAN KP 1 KEY PLAN 1 / /C2 22 04 13 Reza B. P.G P.G UPLIGHTER AT PLOT SERVICE HUB MODIFIED