CHANGES IN CONSTRUCTION PROJECTS
Managerial
Technologic
al
Social
CHANGES IN CONSTRUCTION PROJECTS
1
• The re-work problem is often
caused by poor project
change management.
2
• During construction projects,
many decisions have to be
made under uncertain
conditions.
CHANGES IN CONSTRUCTION PROJECTS
3
• Designers, engineers and other
professionals have to make
assumptions based on existing
available information and their
experience.
4
• If any assumption is proven wrong,
some decisions have to be revised.
• changes are often inevitable.
CHANGES IN CONSTRUCTION PROJECTS
5
• The key-how to avoid or
reduce the negative impact of
changes.
6
• The need for effective change
management is essential for
productivity improvement.
CHANGES IN CONSTRUCTION PROJECTS
It can be caused by either internal or external
Factors (ARE THEY AVOIDABLE?).
Different changes may have different
effects or consequences.
A change refers to an alteration or a
modification to pre-existing
conditions, assumptions or
requirements.
CHANGES IN CONSTRUCTION PROJECTS
Plan preventive impacts & coordinate changes across
the entire project.
Identify changes that have already occurred.
The objective of change management is to forecast
possible changes.
TYPES OF CHANGE
A gradual change, also known as
incremental change, happens slowly
over a prolonged period and its intensity
is low.
A change that occurs can be a
“gradual change” or a “radical
change”.
CHANGES IN CONSTRUCTION PROJECTS
• A radical change is sudden, dramatic
and has a marked effect.
• Gradual Changes often occur during
the design development stage, where
many decisions are fine Tuned and
refined progressively.
CHANGES IN CONSTRUCTION PROJECTS
• Radical changes occur during construction
phases.
• Project changes can also be classified as
“anticipated changes” and “emergent changes”.
• Anticipated changes are planned in advance
and occur as intended.
• On the other hand, emergent changes arise
spontaneously and are not originally anticipated
or intended.
CHANGES IN CONSTRUCTION PROJECTS
• Another way to view project change is
through its necessity.
• In this way, project changes can be
classified as “elective changes” and
“required changes”.
• An elective change is where one may
choose whether or not to implement; and a
required change is where there is no option
but to make the change.
CAUSES OF CHANGE
External causes may be due to
technological change (AVOIDABLE?).
The causes of project change may
originate from either external or internal
pressures that are being applied to the
project (AVOIDABLE?).
CHANGES IN CONSTRUCTION PROJECTS
Changes in the economy and
finally demographic changes in
the society
Changes in the customer expectations
and tastes
changes in competitor’s
activities
changes in government
and policies
CHANGES IN CONSTRUCTION PROJECTS
Or changes in organisational objectives
and changes in the long-term survival
strategy of the organisations involved.
Internal causes may result from
changes in management policy
CHANGES
External causes:
■ Economic issues
■ Environmental issues
■ Technological issues
■ Regulatory issues
CHANGES
Internal causes:
■ Organisational level
• Organisational culture
• Ineffective decision-making
■ Project level
• Design Improvements
CHANGES
• Inadequate skills and knowledge
amongst the team
• Inclement weather
• Late change of client brief
• Designer change of mind
• Design errors
• Inadequate knowledge of the site
conditions
CHANGES IN CONSTRUCTION PROJECTS
• Revised design parameters
• Minor field-originated changes
• Contract disputes
• Ambiguity in project goal, scope, and
resources
CHANGES IN CONSTRUCTION PROJECTS
Direct effects
■ Addition of work
■ Deletion of work
■ Demolition of work already done
■ Rework
■ Specification change
■ Time lost in stopping and
CHANGES IN CONSTRUCTION PROJECTS
restarting current tasks in order to make the
variation
■ Revisions to project reports and documents
■ Reorganise schedule and work methods to
make up lost time
Indirect effects
■ Need for communicating change to all
project members
CHANGES IN CONSTRUCTION PROJECTS
■ Dispute and blaming amongst project
partners
■ Loss of productivity due to reprogramming;
loss of rhythm, unbalanced gangs and
acceleration
CHANGES IN CONSTRUCTION PROJECTS
■ Change in cash flow, financial costs,
loss of earnings
■ Increased risk of co-ordination failures
and errors
■ Lower morale of work force
■ Loss of float, therefore increased
sensitivity to further delays
Resources
Scope
Goals
Removeany Ambiguity
Leadership
Co-ordination
communication
Team work

More Related Content

What's hot

Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
henry KKK
 
Management control of project
Management control of projectManagement control of project
Management control of project
Sai Mahesh
 
04.integration management updated
04.integration management updated04.integration management updated
04.integration management updated
Shraddha PMP
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
eklaksh
 

What's hot (14)

How to close a project
How to close a projectHow to close a project
How to close a project
 
Project implimentation
Project implimentationProject implimentation
Project implimentation
 
Project implementation
Project implementationProject implementation
Project implementation
 
Develop project management plan
Develop project management planDevelop project management plan
Develop project management plan
 
Week02 slides spring_2013
Week02 slides spring_2013Week02 slides spring_2013
Week02 slides spring_2013
 
Project cycle
Project cycleProject cycle
Project cycle
 
Management control of project
Management control of projectManagement control of project
Management control of project
 
Projrct Monitoring & Controling
Projrct   Monitoring  & ControlingProjrct   Monitoring  & Controling
Projrct Monitoring & Controling
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
 
04.integration management updated
04.integration management updated04.integration management updated
04.integration management updated
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Monitoring and evaluation of Projects
Monitoring and evaluation of ProjectsMonitoring and evaluation of Projects
Monitoring and evaluation of Projects
 
Project Implementation Process
Project Implementation ProcessProject Implementation Process
Project Implementation Process
 

Similar to 013 changes in construction projects

Similar to 013 changes in construction projects (20)

1.1 skill pi introduction
1.1 skill pi introduction1.1 skill pi introduction
1.1 skill pi introduction
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptx
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...#Perform Integrated Change Control (PICC)  Process for PMP Exam - By SN Panig...
#Perform Integrated Change Control (PICC) Process for PMP Exam - By SN Panig...
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
WHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptxWHAT MAKES A SUCCESSFUL PROJECT.pptx
WHAT MAKES A SUCCESSFUL PROJECT.pptx
 
Building An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLMBuilding An ROI for 3DEXPERIENCE PLM
Building An ROI for 3DEXPERIENCE PLM
 
BASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENTBASICS OF PROJECT MANAGEMENT
BASICS OF PROJECT MANAGEMENT
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 
Building castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environmentBuilding castles on sand - Project Management in distributed project environment
Building castles on sand - Project Management in distributed project environment
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Project Managemet Basics
Project Managemet BasicsProject Managemet Basics
Project Managemet Basics
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
Changes in construction
Changes in constructionChanges in construction
Changes in construction
 
Changes in construction projects
Changes in construction projectsChanges in construction projects
Changes in construction projects
 
lean construction and integrated project delivery
lean construction and integrated project delivery lean construction and integrated project delivery
lean construction and integrated project delivery
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 

More from drdej19

More from drdej19 (20)

069 managing people
069 managing people069 managing people
069 managing people
 
070 material management
070 material management070 material management
070 material management
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
 
067 management
067 management067 management
067 management
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
 
065 management information system
065 management information system065 management information system
065 management information system
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
 
063 management theory
063 management theory063 management theory
063 management theory
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivity
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

013 changes in construction projects

  • 1.
  • 2. CHANGES IN CONSTRUCTION PROJECTS Managerial Technologic al Social
  • 3. CHANGES IN CONSTRUCTION PROJECTS 1 • The re-work problem is often caused by poor project change management. 2 • During construction projects, many decisions have to be made under uncertain conditions.
  • 4. CHANGES IN CONSTRUCTION PROJECTS 3 • Designers, engineers and other professionals have to make assumptions based on existing available information and their experience. 4 • If any assumption is proven wrong, some decisions have to be revised. • changes are often inevitable.
  • 5. CHANGES IN CONSTRUCTION PROJECTS 5 • The key-how to avoid or reduce the negative impact of changes. 6 • The need for effective change management is essential for productivity improvement.
  • 6. CHANGES IN CONSTRUCTION PROJECTS It can be caused by either internal or external Factors (ARE THEY AVOIDABLE?). Different changes may have different effects or consequences. A change refers to an alteration or a modification to pre-existing conditions, assumptions or requirements.
  • 7. CHANGES IN CONSTRUCTION PROJECTS Plan preventive impacts & coordinate changes across the entire project. Identify changes that have already occurred. The objective of change management is to forecast possible changes.
  • 8. TYPES OF CHANGE A gradual change, also known as incremental change, happens slowly over a prolonged period and its intensity is low. A change that occurs can be a “gradual change” or a “radical change”.
  • 9. CHANGES IN CONSTRUCTION PROJECTS • A radical change is sudden, dramatic and has a marked effect. • Gradual Changes often occur during the design development stage, where many decisions are fine Tuned and refined progressively.
  • 10. CHANGES IN CONSTRUCTION PROJECTS • Radical changes occur during construction phases. • Project changes can also be classified as “anticipated changes” and “emergent changes”. • Anticipated changes are planned in advance and occur as intended. • On the other hand, emergent changes arise spontaneously and are not originally anticipated or intended.
  • 11. CHANGES IN CONSTRUCTION PROJECTS • Another way to view project change is through its necessity. • In this way, project changes can be classified as “elective changes” and “required changes”. • An elective change is where one may choose whether or not to implement; and a required change is where there is no option but to make the change.
  • 12. CAUSES OF CHANGE External causes may be due to technological change (AVOIDABLE?). The causes of project change may originate from either external or internal pressures that are being applied to the project (AVOIDABLE?).
  • 13. CHANGES IN CONSTRUCTION PROJECTS Changes in the economy and finally demographic changes in the society Changes in the customer expectations and tastes changes in competitor’s activities changes in government and policies
  • 14. CHANGES IN CONSTRUCTION PROJECTS Or changes in organisational objectives and changes in the long-term survival strategy of the organisations involved. Internal causes may result from changes in management policy
  • 15. CHANGES External causes: ■ Economic issues ■ Environmental issues ■ Technological issues ■ Regulatory issues
  • 16. CHANGES Internal causes: ■ Organisational level • Organisational culture • Ineffective decision-making ■ Project level • Design Improvements
  • 17. CHANGES • Inadequate skills and knowledge amongst the team • Inclement weather • Late change of client brief • Designer change of mind • Design errors • Inadequate knowledge of the site conditions
  • 18. CHANGES IN CONSTRUCTION PROJECTS • Revised design parameters • Minor field-originated changes • Contract disputes • Ambiguity in project goal, scope, and resources
  • 19. CHANGES IN CONSTRUCTION PROJECTS Direct effects ■ Addition of work ■ Deletion of work ■ Demolition of work already done ■ Rework ■ Specification change ■ Time lost in stopping and
  • 20. CHANGES IN CONSTRUCTION PROJECTS restarting current tasks in order to make the variation ■ Revisions to project reports and documents ■ Reorganise schedule and work methods to make up lost time Indirect effects ■ Need for communicating change to all project members
  • 21. CHANGES IN CONSTRUCTION PROJECTS ■ Dispute and blaming amongst project partners ■ Loss of productivity due to reprogramming; loss of rhythm, unbalanced gangs and acceleration
  • 22. CHANGES IN CONSTRUCTION PROJECTS ■ Change in cash flow, financial costs, loss of earnings ■ Increased risk of co-ordination failures and errors ■ Lower morale of work force ■ Loss of float, therefore increased sensitivity to further delays