SlideShare a Scribd company logo
PowerPoint Resume
Kevin Curtis
Systems Engineer
My Schooling
 Edmonds Community College
 CIW Foundations, Inter-networking & Server
Administration 2001
 CompTIA Network + 2002
My Schooling Cont...
 ITT Technical Institute
Associates of Applied Science Degree
Computer Network Systems 2007-2009
Coursework includes
 Windows Server 2003
 Windows XP
 Linux installation & administration
 Cable management & standards
 Cisco routing & switching
My Schooling Cont...
 ITT Technical Institute
Bachelor of Science Degree
Data Communication Systems Technology
2007-2009
Coursework includes
 Network Security
 Voice, Wireless & Web Technologies
 Advanced Routing & Switching
 Cisco routing
 Business Database Admin
● Certifications
 CompTIA
 A+ 2007
 Network + 2008
 Microsoft
 MCP XP installation
and
maintenance 12/2008
 CIW
 Associate 2002
 Professional 2003
 Dell 2012
 Certified Technician
Projects
 Farmers Insurance
 Migrated 500 users from one
site to another and upgrade
Dell OptiPlex 280’s to 755
systems
 Imaged and installed new
systems at new office Wiped
(Government standard)end of
lease PC's
 Coordinated the PC’s from
Migration to installation of the
new systems at the clients
new desks
Hilton Garden Inn
 Installed Workstations
 Printers, Credit card
readers
 Installed MS Outlook
2003 & Hotel software
 Verified Network
connectivity
 Pack & label for shipping
Contract - Projects
Projects
Merrill Lynch
 Installed new systems
 Configured dual monitor
step up
 Troubleshot installation
problems
 Verified system
performance
Projects
Best Buy
 Multiple stores
 Installed Wireless
hand scanners
 Test scanners
 Installed Star printers
Projects
 Installed AD
(commercials)
SpotboxHD server for
the TV station
 Migrated data to new
server
 Downloaded new
spots from satellite
feed.
Dell PowerEdge
2950
Projects
 Installed AD
(commercials)
SpotboxHD server for
the TV station
 Migrated data to new
server
 Downloaded new
spots from satellite
feedDell PowerEdge
2950
Projects
Cell phone center
 Removed old setup
 Drill mounting holes
 Secured Monitor to work
area
 Mounted PC under
shelve
 Troubleshot installation
problems
 Verified functionality
Old system
Optiplex GX755
Ultra Slim
Projects
Providence
Medical
 Installed 7 IBM
X3550 Servers & 7
EXP3000 disk
expansion units
 Followed strict
labeling and cable
management
guidelines
Actual equipment that I installed
Back side view
Projects
 Replaced motherboards
on 12 OptiPlex GX270
systems
 Upgraded system BIOS
 Troubleshot installation
problems
 Verified functionality
Oregon
Projects
WAMU/Chase
Training room move
 Disconnected 40+ computer
systems and 4 multifunction
printers
 Reconnected at new site
 Verified network connectivity
Projects
WAMU/Chase
Hardware conversion 3
branches
 Replaced computer systems
 Re-imaged new systems
 Verified network connectivity
 Installed multifunction printers
 Wiped old systems
 Prepped old systems for pickup
 1 day at each branch
Projects
WAMU/Chase Software
conversion
 Lead Technician Supervised 4
Techs
 Worked with branch manager to
ensured limited impact to
business
 Prepared site for conversion,
pulled cables, tested equipment
 Worked with support desk on
issues
 Verified techs work, corrected
problems
 Installed 120+ PC's on 3
floors
 Imaged and Joined to
domain
 Install 20 laptops on
W.O.W carts
 Troubleshot a laptop prob
no one else could
Projects
The Gap
 Disconnected computer,
receipt printers, customer
card readers
 reconnected at new
location 7 hour time-
frame
 Verified system
performance and network
connectivity
Projects
 Disconnected and
Reconnected 100+ PCs,
 Printers and fax
machines.
 Verified system
performance and network
connectivity
Projects
Projects
Best Buy
 8 stores
 Memory Upgrades
 Moved systems to
new VLAN
 Test systems
 Installed Netfinity 3000
server at an Unfinished
location
 Connected Cisco (3550)
Router to Cisco switch
(2610)
 Switch to server
 Connect to APC UPS
 Verified System and
Network Performance
Projects
Projects
Providence Medical
 Installed 5 IBM
X3550 Servers & 5
EXP3000 disk
expansion units
Actual equipment that I installed.
Back side view
Dominos
 Install Pulse Evolution
server
 Configure Workstations
 Configure touch screens
 Configure printers, credit
card reader
 Replace Netgear hub
 Test connectivity
Projects
 Installed 1 server
 Installed 1 storage array
 Hookup to KVM
 Name in KVM system
 Verified System and
Network Performance
Projects
 InPlace OS upgrade
 Replace old PC's
 Migrated Users data
 Ghost imaging
 Join PC's to domain
 troubleshot, fixed and/or
notified supervisors of
problems
 Removed old systems
Projects
DoubleTree Inn
 Remove PC's from
domain
 Install new PC's
 Installed Office 2007
 Outlook 2007
 Join to domain
 Connect printers
 Wiped data
 Pack old PC's for return
Projects
Morgan Stanley
 Relocate 4 PC's
 Disconnected computer,
printers
 Reconnected at new
location
 Verified System and
Network Performance
Projects
Standard Insurance
 Disconnect 75+ servers
 Labeled for shipping
 Connected servers to
new Data center racks
 Done in a 19 hour shift
Projects
Daimler Trucks N.
America
 Monitored Unix
Mainframes
 Edited scripts to rerun
jobs
 Notified Job Owners of
failures
 Pull backup tapes of off-
site storage
Projects
Wells Fargo
 Lead technician
 Windows 7 Upgrades
 Machine replacements
 User data migrations
 Work w/Tech support to
fix issues
 Multiple locations
 Multiple floors
 4 to 9 users per day
Projects
Kevin Curtis
System Administrator
kevinjcurtis@live.com
Thank you for watching
Visit www.kevinjcurtis.com
for more info

More Related Content

What's hot

Dell Networking Wired, Wireless and Security Solutions Lab
Dell Networking Wired, Wireless and Security Solutions LabDell Networking Wired, Wireless and Security Solutions Lab
Dell Networking Wired, Wireless and Security Solutions Lab
Dell World
 
Media and entertainment workload comparison: HP Z8 vs. Apple Mac Pro
Media and entertainment workload comparison: HP Z8 vs. Apple Mac ProMedia and entertainment workload comparison: HP Z8 vs. Apple Mac Pro
Media and entertainment workload comparison: HP Z8 vs. Apple Mac Pro
Principled Technologies
 
Get On The Bus David Overton Sbs 2008 Presentation
Get On The Bus   David Overton   Sbs 2008 PresentationGet On The Bus   David Overton   Sbs 2008 Presentation
Get On The Bus David Overton Sbs 2008 Presentation
IT Masterclasses
 
Mris network architecture proposal r1
Mris network architecture proposal r1Mris network architecture proposal r1
Mris network architecture proposal r1
Craig Burma
 
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESAProposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESAFederico Schiavio
 
Intel® Xeon® Processor E5-2600 v4 Core Business Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Core Business Applications ShowcaseIntel® Xeon® Processor E5-2600 v4 Core Business Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Core Business Applications Showcase
Intel IT Center
 
Hydra connect2015 security-accessibility-changemanagement-final
Hydra connect2015 security-accessibility-changemanagement-finalHydra connect2015 security-accessibility-changemanagement-final
Hydra connect2015 security-accessibility-changemanagement-final
newmanld
 
Intel® Xeon® Processor E5-2600 v4 Enterprise Database Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Enterprise Database Applications ShowcaseIntel® Xeon® Processor E5-2600 v4 Enterprise Database Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Enterprise Database Applications Showcase
Intel IT Center
 
Focus on business, not backups
Focus on business, not backupsFocus on business, not backups
Focus on business, not backups
Dell World
 
Cisco UCS - CA World 2013
Cisco UCS - CA World 2013 Cisco UCS - CA World 2013
Cisco UCS - CA World 2013
Ranjit Nayak
 
Financialservicessolutions
FinancialservicessolutionsFinancialservicessolutions
Financialservicessolutionsirvin1969
 
CV
CVCV
Effective Patch and Software Update Management
Effective Patch and Software Update ManagementEffective Patch and Software Update Management
Effective Patch and Software Update Management
Quest
 
Dell Seminar Euroborg Groningen
Dell Seminar Euroborg GroningenDell Seminar Euroborg Groningen
Dell Seminar Euroborg Groningen
Zernike College
 
Energy Efficient Power Management in Virtualized Data Center
Energy Efficient Power Management in Virtualized Data CenterEnergy Efficient Power Management in Virtualized Data Center
Energy Efficient Power Management in Virtualized Data Center
IRJET Journal
 

What's hot (16)

Dell Networking Wired, Wireless and Security Solutions Lab
Dell Networking Wired, Wireless and Security Solutions LabDell Networking Wired, Wireless and Security Solutions Lab
Dell Networking Wired, Wireless and Security Solutions Lab
 
Media and entertainment workload comparison: HP Z8 vs. Apple Mac Pro
Media and entertainment workload comparison: HP Z8 vs. Apple Mac ProMedia and entertainment workload comparison: HP Z8 vs. Apple Mac Pro
Media and entertainment workload comparison: HP Z8 vs. Apple Mac Pro
 
Get On The Bus David Overton Sbs 2008 Presentation
Get On The Bus   David Overton   Sbs 2008 PresentationGet On The Bus   David Overton   Sbs 2008 Presentation
Get On The Bus David Overton Sbs 2008 Presentation
 
Mris network architecture proposal r1
Mris network architecture proposal r1Mris network architecture proposal r1
Mris network architecture proposal r1
 
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESAProposal to Manage the Upgrade of the IT Infrastructure for PPESA
Proposal to Manage the Upgrade of the IT Infrastructure for PPESA
 
Intel® Xeon® Processor E5-2600 v4 Core Business Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Core Business Applications ShowcaseIntel® Xeon® Processor E5-2600 v4 Core Business Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Core Business Applications Showcase
 
Hydra connect2015 security-accessibility-changemanagement-final
Hydra connect2015 security-accessibility-changemanagement-finalHydra connect2015 security-accessibility-changemanagement-final
Hydra connect2015 security-accessibility-changemanagement-final
 
Intel® Xeon® Processor E5-2600 v4 Enterprise Database Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Enterprise Database Applications ShowcaseIntel® Xeon® Processor E5-2600 v4 Enterprise Database Applications Showcase
Intel® Xeon® Processor E5-2600 v4 Enterprise Database Applications Showcase
 
Focus on business, not backups
Focus on business, not backupsFocus on business, not backups
Focus on business, not backups
 
Cisco UCS - CA World 2013
Cisco UCS - CA World 2013 Cisco UCS - CA World 2013
Cisco UCS - CA World 2013
 
9. intel prez sesiune hw
9. intel prez sesiune hw9. intel prez sesiune hw
9. intel prez sesiune hw
 
Financialservicessolutions
FinancialservicessolutionsFinancialservicessolutions
Financialservicessolutions
 
CV
CVCV
CV
 
Effective Patch and Software Update Management
Effective Patch and Software Update ManagementEffective Patch and Software Update Management
Effective Patch and Software Update Management
 
Dell Seminar Euroborg Groningen
Dell Seminar Euroborg GroningenDell Seminar Euroborg Groningen
Dell Seminar Euroborg Groningen
 
Energy Efficient Power Management in Virtualized Data Center
Energy Efficient Power Management in Virtualized Data CenterEnergy Efficient Power Management in Virtualized Data Center
Energy Efficient Power Management in Virtualized Data Center
 

Similar to Slideshowresume 124802403676-phpapp01

Rob resume 6-23-15
Rob resume 6-23-15Rob resume 6-23-15
Rob resume 6-23-15Rob Levos
 
Allow me to show you what I have done over the last 25 years.
Allow me to show you what I have done over the last 25 years.Allow me to show you what I have done over the last 25 years.
Allow me to show you what I have done over the last 25 years.
dthornton4
 
Curriculum vitae updated
Curriculum vitae updatedCurriculum vitae updated
Curriculum vitae updated
JIJO JAMES
 
Over the last 25 years what have I done with my life.
Over the last 25 years what have I done with my life.Over the last 25 years what have I done with my life.
Over the last 25 years what have I done with my life.
dthornton4
 
Steve Smail Tech Resume
Steve Smail Tech ResumeSteve Smail Tech Resume
Steve Smail Tech ResumeSteven Smail
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and ProjectsCory Larsen
 
Todd Mullins Resume
Todd Mullins ResumeTodd Mullins Resume
Todd Mullins ResumeTodd Mullins
 
Leuze Web Design Project
Leuze Web Design ProjectLeuze Web Design Project
Leuze Web Design Project
WILKSS
 
Leuze Web Design
Leuze Web DesignLeuze Web Design
Leuze Web Design
thomasj12
 
Cyberdyne systems (2)
Cyberdyne systems (2)Cyberdyne systems (2)
Cyberdyne systems (2)
Bryan Moss
 
Resume of md. abu jafar
Resume of md. abu jafarResume of md. abu jafar
Resume of md. abu jafar
Abu Jafar
 
Stephen Duncan resume 2017
Stephen Duncan resume 2017Stephen Duncan resume 2017
Stephen Duncan resume 2017Stephen Duncan
 

Similar to Slideshowresume 124802403676-phpapp01 (20)

TechComp_overview_brief
TechComp_overview_briefTechComp_overview_brief
TechComp_overview_brief
 
Rob resume 6-23-15
Rob resume 6-23-15Rob resume 6-23-15
Rob resume 6-23-15
 
Allow me to show you what I have done over the last 25 years.
Allow me to show you what I have done over the last 25 years.Allow me to show you what I have done over the last 25 years.
Allow me to show you what I have done over the last 25 years.
 
Aaron_W
Aaron_WAaron_W
Aaron_W
 
Curriculum vitae updated
Curriculum vitae updatedCurriculum vitae updated
Curriculum vitae updated
 
Over the last 25 years what have I done with my life.
Over the last 25 years what have I done with my life.Over the last 25 years what have I done with my life.
Over the last 25 years what have I done with my life.
 
Steve Smail Tech Resume
Steve Smail Tech ResumeSteve Smail Tech Resume
Steve Smail Tech Resume
 
Summary of Skills and Projects
Summary of Skills and ProjectsSummary of Skills and Projects
Summary of Skills and Projects
 
Todd Mullins Resume
Todd Mullins ResumeTodd Mullins Resume
Todd Mullins Resume
 
Leuze Web Design Project
Leuze Web Design ProjectLeuze Web Design Project
Leuze Web Design Project
 
Leuze Web Design
Leuze Web DesignLeuze Web Design
Leuze Web Design
 
AaronW1
AaronW1AaronW1
AaronW1
 
Cyberdyne systems (2)
Cyberdyne systems (2)Cyberdyne systems (2)
Cyberdyne systems (2)
 
Peter_Erskine
Peter_ErskinePeter_Erskine
Peter_Erskine
 
Resume of md. abu jafar
Resume of md. abu jafarResume of md. abu jafar
Resume of md. abu jafar
 
Craig Pickering Resume
Craig Pickering ResumeCraig Pickering Resume
Craig Pickering Resume
 
Hassan Abdou Cv
Hassan Abdou CvHassan Abdou Cv
Hassan Abdou Cv
 
Stephen Duncan resume 2017
Stephen Duncan resume 2017Stephen Duncan resume 2017
Stephen Duncan resume 2017
 
Murari kumar
Murari kumarMurari kumar
Murari kumar
 
GEOREGWHITE1
GEOREGWHITE1GEOREGWHITE1
GEOREGWHITE1
 

Recently uploaded

PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
UiPathCommunity
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
Elena Simperl
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 

Recently uploaded (20)

PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...When stars align: studies in data quality, knowledge graphs, and machine lear...
When stars align: studies in data quality, knowledge graphs, and machine lear...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 

Slideshowresume 124802403676-phpapp01

  • 2. My Schooling  Edmonds Community College  CIW Foundations, Inter-networking & Server Administration 2001  CompTIA Network + 2002
  • 3. My Schooling Cont...  ITT Technical Institute Associates of Applied Science Degree Computer Network Systems 2007-2009 Coursework includes  Windows Server 2003  Windows XP  Linux installation & administration  Cable management & standards  Cisco routing & switching
  • 4. My Schooling Cont...  ITT Technical Institute Bachelor of Science Degree Data Communication Systems Technology 2007-2009 Coursework includes  Network Security  Voice, Wireless & Web Technologies  Advanced Routing & Switching  Cisco routing  Business Database Admin
  • 5. ● Certifications  CompTIA  A+ 2007  Network + 2008  Microsoft  MCP XP installation and maintenance 12/2008  CIW  Associate 2002  Professional 2003  Dell 2012  Certified Technician
  • 6. Projects  Farmers Insurance  Migrated 500 users from one site to another and upgrade Dell OptiPlex 280’s to 755 systems  Imaged and installed new systems at new office Wiped (Government standard)end of lease PC's  Coordinated the PC’s from Migration to installation of the new systems at the clients new desks
  • 7. Hilton Garden Inn  Installed Workstations  Printers, Credit card readers  Installed MS Outlook 2003 & Hotel software  Verified Network connectivity  Pack & label for shipping Contract - Projects
  • 8. Projects Merrill Lynch  Installed new systems  Configured dual monitor step up  Troubleshot installation problems  Verified system performance
  • 9. Projects Best Buy  Multiple stores  Installed Wireless hand scanners  Test scanners  Installed Star printers
  • 10. Projects  Installed AD (commercials) SpotboxHD server for the TV station  Migrated data to new server  Downloaded new spots from satellite feed. Dell PowerEdge 2950
  • 11. Projects  Installed AD (commercials) SpotboxHD server for the TV station  Migrated data to new server  Downloaded new spots from satellite feedDell PowerEdge 2950
  • 12. Projects Cell phone center  Removed old setup  Drill mounting holes  Secured Monitor to work area  Mounted PC under shelve  Troubleshot installation problems  Verified functionality Old system Optiplex GX755 Ultra Slim
  • 13. Projects Providence Medical  Installed 7 IBM X3550 Servers & 7 EXP3000 disk expansion units  Followed strict labeling and cable management guidelines Actual equipment that I installed Back side view
  • 14. Projects  Replaced motherboards on 12 OptiPlex GX270 systems  Upgraded system BIOS  Troubleshot installation problems  Verified functionality Oregon
  • 15. Projects WAMU/Chase Training room move  Disconnected 40+ computer systems and 4 multifunction printers  Reconnected at new site  Verified network connectivity
  • 16. Projects WAMU/Chase Hardware conversion 3 branches  Replaced computer systems  Re-imaged new systems  Verified network connectivity  Installed multifunction printers  Wiped old systems  Prepped old systems for pickup  1 day at each branch
  • 17. Projects WAMU/Chase Software conversion  Lead Technician Supervised 4 Techs  Worked with branch manager to ensured limited impact to business  Prepared site for conversion, pulled cables, tested equipment  Worked with support desk on issues  Verified techs work, corrected problems
  • 18.  Installed 120+ PC's on 3 floors  Imaged and Joined to domain  Install 20 laptops on W.O.W carts  Troubleshot a laptop prob no one else could Projects
  • 19. The Gap  Disconnected computer, receipt printers, customer card readers  reconnected at new location 7 hour time- frame  Verified system performance and network connectivity Projects
  • 20.  Disconnected and Reconnected 100+ PCs,  Printers and fax machines.  Verified system performance and network connectivity Projects
  • 21. Projects Best Buy  8 stores  Memory Upgrades  Moved systems to new VLAN  Test systems
  • 22.  Installed Netfinity 3000 server at an Unfinished location  Connected Cisco (3550) Router to Cisco switch (2610)  Switch to server  Connect to APC UPS  Verified System and Network Performance Projects
  • 23. Projects Providence Medical  Installed 5 IBM X3550 Servers & 5 EXP3000 disk expansion units Actual equipment that I installed. Back side view
  • 24. Dominos  Install Pulse Evolution server  Configure Workstations  Configure touch screens  Configure printers, credit card reader  Replace Netgear hub  Test connectivity Projects
  • 25.  Installed 1 server  Installed 1 storage array  Hookup to KVM  Name in KVM system  Verified System and Network Performance Projects
  • 26.  InPlace OS upgrade  Replace old PC's  Migrated Users data  Ghost imaging  Join PC's to domain  troubleshot, fixed and/or notified supervisors of problems  Removed old systems Projects
  • 27. DoubleTree Inn  Remove PC's from domain  Install new PC's  Installed Office 2007  Outlook 2007  Join to domain  Connect printers  Wiped data  Pack old PC's for return Projects
  • 28. Morgan Stanley  Relocate 4 PC's  Disconnected computer, printers  Reconnected at new location  Verified System and Network Performance Projects
  • 29. Standard Insurance  Disconnect 75+ servers  Labeled for shipping  Connected servers to new Data center racks  Done in a 19 hour shift Projects
  • 30. Daimler Trucks N. America  Monitored Unix Mainframes  Edited scripts to rerun jobs  Notified Job Owners of failures  Pull backup tapes of off- site storage Projects
  • 31. Wells Fargo  Lead technician  Windows 7 Upgrades  Machine replacements  User data migrations  Work w/Tech support to fix issues  Multiple locations  Multiple floors  4 to 9 users per day Projects
  • 32. Kevin Curtis System Administrator kevinjcurtis@live.com Thank you for watching Visit www.kevinjcurtis.com for more info