1. MUHAMMAD AKRAM MIAN
Nationality :Pakistan
Year of Birth :1973
Position :QC Supervisor Mechanical Welding
Address: Islamabad, Pakistan Shaheen Town
, Plot NO.10,Jhang Syeddan, Lehtrar Road
Marital Status: Marri e d
Contact No:+923328014483. e mail id.mohdakrammain@gmail.com
KEY QUALIFICATIONS
Quality Control Inspections on Piping & Equipment.
Welding Inspection & NDE.
Efficient control over QA/QC System Implementation
Leadership strength Proactive people management and team building
Effective conflict and negotiation management with strong decision making
Flexible of working with peoples from different ethnic background and organisational level
Excellent management skills and target oriented approach Quality consciousness
Analytical thinking and ability to work under pressure and to tight schedules, while appreciating time
constraints in the work environment.
Ability to work independently without supervision, with a flexible approach to handle a changing
environment.
Efficient control over documentation & NDT activities
Efficient analytical, written and verbal communication skills.
EDUCATION AND PROFESSIONAL STATUS
Diploma of Associate Engineer Mechanical Technology, Sindh Technical Board–S.I.T.E Karachi
Miler, Pakistan - 1994
Professional Certifications:
− CSWIP 3.1 Certified Welding Inspector .Certificate No.53385 .
− Radiographic Testing Level II (ASNT)
− Magnetic Particle Testing Level II (ASNT)
− Penetrate Testing Level II (ASNT)
− Ultra sonic testing Level II ASNT
− Total Quality Management Course from Yanbu Industrial Colleges’.
− Internal auditor Course from Sanjary Academy Quality Education From K.S.A
− Certified Pipeline Supervisor from GAZPROM NEFT Badra Iraq
− Certified QA/QC inspector Mechanical from OMV Pakistan
− Certified Mechanical inspector from PETRONAS Carigali Pakistan.
− Saudi Aramco Certified QC Supervisor Mechanical Welding
− Saudi Aramco Certified QC Welding/Piping Inspector SAP NO.70008110)
2. − Approved Welding Inspector From Flour Arabia/Sabic Yansab Project (K.S.A)
− Approved Mechanical Inspector from SEC-WR
− Approved Welding inspector from ADCO Abu Dhabi
− 12 Years’ Experience QA/QC in (Gulf)
− Saudi Driving License(LTV)
− ADCO Safety course
− ADCO Desert driving license.
EXPERIENCE RECORD
09/2014 – PRESENT ICI PAKISTAN LIMITED
LEAD QC ENGINEER MECHANICAL
Supervision, monitoring & inspection of contractors sub contractors .
Surveillance inspection visit on daily basis of fabrication and site welding NDT activity.
Review of welding procedures specifications and approval.
Witness Welders Qualification test as per relevant codes & standards i.e., ASME SEC-1, ASME B31.1
& ASME Sec IX.
Review of project specifications and comments.
Review of method statements and comments.
Review of project quality procedures and comments.
Review ITP and implement , perform inspection.
Review of NDT procedures specifications and comments.
Review material recept MTC and inspection.
Review of Pipe book.
Review of Hydro testing packages.
Perform, cross checking of NDT Performance.
Review of radiographs .
Witness of Hydro testing of BOP piping and Boiler tubes.
Review of project drawings.
Issued NCR againt standard violation and verification.
Review QA/QC construction contractor/Subcontractor documents.
Attended Site Weekly QA/QC meeting.
Preparing daily Site Surveillance inspection report to line Manager.
04/2013 – 02/2014 NAMA MOTT MACDONALD
Export Pipeline Supervisor (PMC) Oil, Gas and Petrochemicals Unit,
Abu Dhabi
Supervision ,Monitoring ,inspection of Pipelines in field,Export Pipelien EPC Main contractor
CPP
Review of welding procedures specifications and approval
Witness Welders Qualification as per Relevant Codes & standard.API 1104.
Review of project specifications and comments.
Review of method statements and comments
Review of project quality procedures and comments.
ROW Preparation inspection,monitoring.
Trunch excevation back filling dressing monitoring inspection etc.
Earth work inspection.
Roads , rail ,river crossing monitoring inspection .
Review of NDT procedures specifications and comments.
3. Monitoring ,inspection of pipeline welding as per API 1104 Standard and project
specifications.
Tie Ins crossing welding inspection.
Review of Pipe book,
Review of Hydro testing packages.
NDT films Review ,verification,and clearance.
Witness of cold bending .
Witness of cleaning,gauging,Hydro testing of oil export pipeline and In field gathering
pipeline system.
Review of project drawings
Issued NCR againt standard and specification violation and verification corrective action.
Review QA/QC Documents.
04/2012 – 01/2013 ADCO/ VELOSI, Abu Dhabi
QC Welding Inspector
ADCO - Qusahwira Full Field Development Project Phase-1)
Responsibilities include:
Supervision ,Monitoring ,inspection of main contractor NPCC/CCC
Review of welding procedures specifications and approval
Witness Welders Qualification as per Relevant Codes standard.
Review of MTC etc.
Fit up inspection as per approved drawing/ WPS.
Visual welding inspection of Main oil pipeline, flow and transfer pipeline dia 14.20,8,6,4.3, as
per API 1104 Standard and project specification
Daily welding inspection report reviewed and approved
Tie INS crossing welding inspection.
Review of Pipe book and approved
Review of project drawings
Issued NCR against standard violation.
Review of RT Films..
Review of NDT Reports
Cleaning, Gauging, hydro testing of pipeline witness.
Review QA/QC Documents and verification.
12/2011 – 03/2012 Velosi Certification Services, Abu Dhabi
Resident Inspector/Expeditor
Brouge/Tecnimont Project as Client Inspector
For project supervision, monitoring, inspection ongoing activities of pressure vessels manufacturing
as per ASME VIII.D.1 USTAMP
Responsibilities include:
Review of welding procedures specifications
Witness Welders Qualification as per Relevant Codes.
Review of MTC etc.
Fit up inspection as per approved drawing/ WPS.
Visual welding inspection
Review weld mapping.
Review Inspection of complete component fabrication report.
Preparing NCR against standard violation.
4. Review of RT Films..
Review of NDT Reports
Review QA/QC Documents and verification.
06/2011 – 09/2011 M.S. Al Suwaidi Industrial Services (SIS), Saudi Arabia
QC Supervisor Mechanical Welding
Project involved with:
Saudi Aramco Rabigh Bulk Plant Additional Capacity Phase II
Responsibilities include:
Assist/prepare project quality plan, inspection & test plan and inspection schedule.
Assist/prepare project specific quality procedures,
Assist in co-ordination with construction group clients representative and or thirld-party
inspection
Agency to perform stage inspection in line with the requirements of approved inspection and
test plan inspection check list etc.
Assist in preparing QA/QC Manpower Mobilization/Demobilization Programe.
Prepare and maintain QC reports and documents.
Assist in preparation of weekly QC reports for client and management.
Ensure the use of calibration inspection measuring &testing instruments.
Prepare and maintain QC reports and documents.
Co-ordinate with construction and participate in resolving non –conformance and monitor the
corrective and preventative action/measures.
Implement and control identification and traceability procedure.
Control and monitor QC activites of sub-contractors.
Identify the training requirement of QC Inspectors as and when required.
Used applicable company, procedures, work instruction and client/project specification(if any )
to perform the job and maintained effective implementation of ISO 9001-2000 Quality system
Control of Non- Conformance and corrective as well as preventive action and also focus
assessment for problem quality losses.
Identify the activates where improvement can be done
03/2011 – 06/2011 QC Welding Inspector (for replacement)
Saudi Aramco Al Jouf Bulk Plant NW Additional Capacity Phase II
Inspection and monitoring all the process of welding as per Saudi Aramco Engineering standard SAES
W.11/ASME Sec IX, ASME B.31.3,(SATIP, SATR, SAIC) and related International Code and project
specification.
Perform daily inspection of welding consumables handling storage issuance, inspection before, during & after
welding. preparing NDT request as per standard and approved inspection test plan requirements follow
approved project quality plan inspection test plan & proper selection of electrodes as per approved WPS-
coordination With client/Third Party Inspection agencies Qualification of Welding Procedure & Welders as per
ASME SEC IX & Aramco Standards Specifications, Updating the QC Documents & Preparing The Final Dossier
For The client, coordinating with NDT crew to meet the requirements per the contract conditions. Weekly weld
repair rate and welder’s performance reports.
01/2011 – 03/2011 QC Supervisor Mechanical Welding (for replacement)
5. Saudi Aramco Suliyal Bulk Plant ER/CR Additional Capacity Phase II
Responsibilities include:
Assist/prepare project quality plan, inspection & test plan and inspection schedule.
Assist/prepare project specific quality procedures,
Assist in co-ordination with construction group clients representative and or thirld-party
inspection
Agency to perform stage inspection in line with the requirements of approved inspection and
test plan inspection check list etc.
Assist in preparing QA/QC Manpower Mobilization/Demobilization Programe.
Prepare and maintain QC reports and documents.
Assist in preparation of weekly QC reports for client and management.
Ensure the use of calibration inspection measuring &testing instruments.
Prepare and maintain QC reports and documents.
Co-ordinate with construction and participate in resolving non –conformance and monitor the
corrective and preventatine action/measures.
Implement and control identification and traceability procedure.
Control and monitor QC activites of sub-contractors.
Identify the traning requirement of QC Inspectors as and when required.
Used applicable company ,procedures,work instruction and client/project specification(if any )
to perform the job and maintained effective implementation of ISO 9001-2000 Quality system
Control of Non- Conformance and corrective as well as preventive action and also focus
assessment for problem quality losses.
Identify the activites where improvement can be done
02/2010 – 01/2011 QC Supervisor Mechanical Welding
Saudi Aramco NAWW Upgrade Project Safaniyah/Abu Ali
BI.10-00207
Responsibilities include:
Assist/prepare project quality plan, inspection & test plan and inspection schedule.
Assist/prepare project specific quality procedures,
Assist in co-ordination with construction group client’s representative and or third-party
inspection
Agency to perform stage inspection in line with the requirements of approved inspection and
test plan inspection check list etc.
Assist in preparing QA/QC Manpower Mobilization/Demobilization Programe.
Prepare and maintain QC reports and documents.
Assist in preparation of weekly QC reports for client and management.
Ensure the use of calibration inspection measuring &testing instruments.
Prepare and maintain QC reports and documents.
Co-ordinate with construction and participate in resolving non –conformance and monitor the
corrective and preventatine action/measures.
Implement and control identification and traceability procedure.
Control and monitor QC activites of sub-contractors.
Identify the training requirement of QC Inspectors as and when required.
Used applicable company , procedures, work instruction and client/project specification(if any )
to perform the job and maintained effective implementation of ISO 9001-2000 Quality system
Control of Non- Conformance and corrective as well as preventive action and also focus
assessment for problem quality losses.
Identify the activates where improvement can be done
6. 04/2009 – 11/2009 QC Engineer Welding
SD8503 Sadaf Petrochemical Project, Jubail
Scope of Work for ASME Certified Vessels ‘U’ Stamp Recycle Benzene Pre-treatment Project.
Monitoring inspection all the process of welding fabrication NDT as per standard ASME VIII D.I
requirements & other related specification ITP etc.
Qualifying Welding Procedure
Daily inspection of consumables handling & storage
Conducting Welders Qualification as per Relevant Codes.
Inspection Identification of materials as available marking with MTC etc.
Fit up inspection as per approved WPS.
Visual welding inspection
Preparing log book of qualified welders
Preparing weld mapping.
Inspection component fabrication report.
Preparing welder testing report.
Preparing welder id card with identification and range of qualification.
Liaison with Third Party Inspection Agencies & clients.
Preparing monitoring & control welding repair rate.
Monitoring of equipment’s & Calibration as per procedure.
Conducting Surveillance Inspection of Welding Parameters
Reviewing NDT Report
11/2008 – 03/2009 QC Engineer Welding
Project involved with:
Sulfur Recovery Unit at Hawiyah Gas Plant Expansion for Tecnicas Reunidas Gulf (TRG)
Scope of Work for ASME Certified Welds ‘R’ Stamp at Sulphur Recovery Unit Consists of:
Review of welding procedure specification.
Witness of welder qualification test.
Material receiving inspection.
Fit up inspection, Welding consumables inspection.
Visual welding inspection.
Arrange NDT inspection as per approved ITP.
Preparing QA/QC documents.
Arrange NDT inspection as per approved ITP, Witness NDT activities, Witness of hydro
testing.
Preparing, review weld mapping.
11/2006 – 11/2007 QC Inspector Welding
NGL, YPL Project, Yanbu for Saudi Aramco Petro, Rabigh
Responsibilities include:
Inspection and monitoring all the process of welding as per Saudi Aramco engineering
standard SAES W.11/ASME Sec IX, ASME B.31.3,(SATIP, SATR, SAIC) and related
International Code.
Perform daily inspection of welding consumables handling & storage issuance, inspection
before, during & after welding.
Preparing NDT request as per standard and approved inspection test plan requirements follow
7. approved project quality plan inspection test plan & proper selection of electrodes as per
approved WPS-coordination with client/Third Party Inspection agencies
Qualification of Welding Procedure & Welders as per ASME SEC IX & Aramco Standards
Specifications, Updating the QC Documents & Preparing the Final Dossier for the client,
coordinating with NDT crew to meet the requirements per the contract conditions.
Weekly weld repair rate and welder’s performance reports
02/2008 – 09/2008 QC supervisor Welding
YANSAB, HDPE, BBTX for Show Stone Webster Arabia
Responsibilities include:
Review of drawings, codes & specifications
Assists & Preparing of Project Quality plan, ITP, Specific Quality Control Procedures.
Review of Welding Procedure Specification (WPS) & PQR (Procedure Qualification Record)
as per standard & Specification Requirements. Conducting Surveillance Inspection of Welding
Parameters
Coordinate with Welding Piping and Material Inspectors to maintain calibration records &
status of all measuring and test equipments used in project
Conducting welders performance qualification (WQT)
Fit-up & Dimensional Inspection, Material Verification
Verifying welding consumable storage, handling, issuance & its control
Weld Visual Inspection.
Coordinate with NDT contractors.
03/2006 – 07/2006 QC Inspectors Welding
Project involved with:
Saudi Aramco – DHT Complex Project Yanbu Refinery (TRG)
Responsibilities include:
Inspection and monitoring all the process of welding as per Saudi Aramco Engineering
Standard SAES W.11/ASME Sec IX, ASME B.31.3,(SATIP, SATR, SAIC) and related
International
Code. Perform Inspection measurement and dimensional checking Before ,during & after
welding. Follow approved project Quality plan inspection test plan& Proper Selection Of
Electrodes-Co-Ordination With Client/Third Party Inspection Personnel For Qualification Of
Welding Procedure Specifications, Updating The Qc Documents & Client, Co-Coordinating
With NDT Crew To Meet The Requirements Per The Contract conditions. Weekly Weld Repair
Rate and Welder’s Performance Report
Preparing The Final Dossier for the Client review.
11/2005 – 02/2006 Nimir Chemical, Pakistan
QC Supervisor Welding Piping (Client)
Project involved with:
Nimir Chemical Extension for Nimir Chemical Sheikhupura, Pakistan
Responsibilities include:
Monitoring &inspection all the process of piping welding as per approved(WPS)ASME Code
B31.3
Checking the drawings revisions IFC stamp & issued number marked.
Review of PQP, ITP, QCPS.
Review of WPS & supporting PQR.
8. Implementation of QC procedures as per quality plan
Monitoring day to day QC activates in live with approved quality plan
To maintain Calibration records of Instrument, measuring and test equipments.
Coordinate With Welding Inspectors Piping and Material Inspectors.
Conducting Surveillance Inspection of Welding Parameters
Fit-up and Dimensional Inspection.
Randomly inspection of welding consumables storage & handling issuance.
Visual inspection of welding.
Monitoring of NDT.
Verification of materials and welding consumables against mill test certificate
Review of Hydro test packages
Witnessing Hydro testing
04/2005 – 09/2005 OMV Pakistan/Moody International
Welding NDT Inspector (Client)
Development of Miano – 8 A Well Head And Flow Line Project for Client OMV Pakistan (Miano
– Kadanwari Gas Field)
Responsibilities include:
Supervision of main contractor/Sub contractor Pipelink construction PVT Ltd.
Responsible for construction supervision monitoring inspection of plant piping welding related
activities as per ASME B-31.3 and Project specification.
Material receiving inspection as per PO order/with MTC.
Review of Welding Procedures specification.
Witnessing of welder performance qualification tests.
Inspection of piping fabrication.
Fit up inspection.
Daily inspection of welding consumables handling storage issuance.
Visual inspection of welding.
Witnessing of MT, PT test.
Review of RT films.
Sand blasting and painting inspection.
Witness of Holiday Testing.
Construction supervision of oil storage tank.
Review of Test packages and verification at site.
Witnessing of Hydrostatic testing and commissioning.
Witnessing of leak test. Witnessing of Reinstatement.
12/2004 – 04/2005 PETRONAS Carigali Pakistan/Moody International
Mechanical Piping Inspector (Client)
Rehmat Gas Field Development Project
Responsibilities include:
Supervision of main contractor Person Descon.
Responsible for construction supervision of plant piping related activities as per ASME B-31.3
and Project specification.
Material Storage and handling inspection, Monitoring
Inspection of piping fabrication as per drawing P&ID
Dimension, orientation, traceability of piping fabrication.
Piping Spools marking on drawing verification
As built checking with red marking
Review of quality control documents.
9. Witnessing of Hydrostatic testing and commissioning of plant piping.
Witnessing of leak test in oil storage tanks.
Punch list clearance items.
Final verification of test pack.
Witnessing of Reinstatement.
07/2004 – 10/2004 OMV Pakistan/Moody international
Mechanical Inspector (Client)
Kadanwari Enhancement Project
Responsibilities include:
Supervision of main contractor Siemens Pakistan.
Responsible for construction supervision of plant piping related activities as per ASME B-31.3
and Project specification.
Study of construction drawing using P & ID and Isometric Drawing
Review of Welding Procedures specification.
Witnessing of welder performance qualification tests.
Material Receiving and handling inspection, monitoring.
Inspection of welding consumables handling storage issuance monitoring.
Inspection of piping fabrication.
Fit up inspection.
Visual inspection of welding.
Witnessing of MT. PT test.
Review of RT films.
Sand blasting and painting inspection.
Witness of Holiday Testing.
Construction supervision of oil storage tank.
Review of Test packages and verification at site.
Witnessing of Hydrostatic testing and commissioning of plant piping.
Witnessing of leak test.
Witnessing of Reinstatement.
03/2002 – 07/2003 MERZ & MCLELLAN – SAUDCONSULT (SEC/WR, Jeddah)
Mechanical Inspector (Client)
5 X 350MW Combined Cycle Power Plant at Shoaiba, K.S.A.
Responsibilities include:
Supervision of Main contractor Alstom Power Atalia S.P.A.
Responsible for construction supervision of piping related activities as per ASME Boiler and
pressure vessel Code and Boiler outside piping as Per ASME B 31.1 Code for 5 X 350MW
Combined Cycle Power Plant at Shoaiba, K.S.A., the activities included:
Witness of welder qualification test.
− Review of welding procedures specification.
Inspection of Piping Fabrication.
Randomly Inspection of consumables handling storage and issuance
Witnessing of welder’s performance qualification Test and approval.
Inspection of welding.
Review of daily Welding inspection reports& approval.
Review of NDT Reports.
Sandblasting & Painting inspection.
Construction supervision of oil storage Tanks. High Fuel oil storage.
Preparing punch list items.
Confirmations punch list items clearance.
10. Review of QA/QC Documents and approval.
05/2001 – 03/2002 NGDC/SAUD CONSULT, Riyadh, K.S.A.
Mechanical Inspector (Client)
Natural Gas, Distribution Pipelines Network Riyadh
Responsibilities include:
Supervision of main contractor M.D.S.A. (Australia) N.G.D.C. Project.
Responsible for construction supervision of Fuel Gas pipeline Distribution Network (30 km)
long 2” to 16” dia pipelines as per API-1104 & SAES.W12 Saudi Aramco standard specification
Tie-in at 36” dia main line
Review of Welding Procedure Specification.
Witnessing of Welders Performance Qualification Test
Inspection of pipeline stringing.
Randomly Inspection of consumables handling storage and issuance
Inspection of Main Line Welding.
Review of Radiographic films
Sand blasting, painting inspection
Field Joint Coating & Heat Shrink Slaving inspection
Witness of FBE Holiday Testing.
Inspection of trenching excavation sand padding back filling dressing etc.
Earth work inspection.
Road , rail ,river crossing monitoring inspection.
Witness of Hydrostatic testing and commissioning of the gas pipelines.
Witness of Lowering in the trench. Sand padding.
Backfilling.
Review of Quality control documents and verification.
08/2000 – 05/2001 SUI Northern Gas Pipeline Limited/JIACCO PAK
Inspection In charge (Lahore Region Distribution)
S.N.G.P.L Project - Lahore, Pakistan
Responsibilities include:
Responsible for construction supervision of Fuel Gas Distribution pipelines Project dia ranging 6” -12”
50kms long as per API-1104 standards & specification.
Witness of Welder Qualification test.
Control & Co-ordinate with welding Inspector.
Inspection of pipeline stringing.
Inspection of Main Line Welding
Tie- ins Crossing.
Review of Radiographic films.
Field Joint Coating & Heat Shrink Slaving inspection.
Preparation of Radiographic films result.
03/2000 – 08/2000 Inspection In-charge (Multan Region Distribution)
S.N.G.P.L Project - Multan, Pakistan
11. Responsibilities include:
Construction supervision of Fuel Gas pipelines Project 8x 40km long as per API-1104
standards & specification
Supervise welder training program.
Witness of Welder Qualification test.
Control & Co-ordinate with welding Inspectors.
Inspection of pipeline stringing.. Inspection of Main Line Welding.
Tie- Ins Crossing.
Review of Radiographic films.
Sand blasting, painting inspection.
Field Joint Coating & Heat Shrink Slaving inspection.
12/1999 – 08/2000 Inspection In-charge Faisal Abad Region
S.N.G.P.L Project - Faisal Abad, Pakistan
Responsibilities include:
Responsible for construction supervision of pipeline operation and maintenance of 12 inch and
16 inch dia pipelines.
High-pressure transmission pipelines.
Welders training program for hot welding.
Control & co-ordinate with welding inspectors.
Preparing the Review RT Result according to API 1104, valve assembly’s for different dia
piping on Gas Station Projects.
09/1999 – 11/1999 Pakistan Petroleum Limited/JIACCO PAK
Senior Inspector
PPL SUI Gas Field Pipelines Project/ADHI Oil Field
Responsibilities include:
Responsible for construction supervision inspection , monitoring of plant Expansion project
(Refrigeration unit) Plant piping, pipelines of well SUI .91 and ADHI well No.5 pipeline
construction.
Study of construction drawing using P & ID and Isometric Drawings.
Witness of Welder Qualifications, fabrication, main line welding visual inspection.
Maintaining Daily Welding Progress report.
Review of RT Films. tie-ins as per API 1104/ASME B.31.3 Standards Specification.
06/1997 – 12/1997 Engro Chemical Pakistan/JIACCO PAK
QC Inspector
Engro Chemical Project - Dharki, Pakistan
Responsibilities include:
Responsible for construction supervision inspection, monitoring of 850 Ton Expansion Project
as per ASME Code B 31.3.
Involving review of construction drawings and review of welding procedures qualifications,
visual inspection before welding, during welding after welding of high pressure piping welding..
QA/QC Documents verification, sand blasting and painting.
01/1997 – 05/1997 Pipelink Construction Pvt Limited/JIACCO PAK
Radiographic Inspector Level II Interpreter
Bukhari Upgrading Gas Plant Project
12. Responsibilities include:
Work Through Jiacco Pakistan Pvt Limited during installation of Bukhari Upgrading Project of
Union Texas Petroleum Badin and Turk Gas Field Compressor Job , As per ASME Code B
31.3
Various dia piping ranging from 2 inch to 16 inch.
Interpretation of RT films.& supervise to RT Crew.
01/1996 – 12/1996 SUI Northern Gas Pipeline Limited/JIACCO PAK
Inspection In-Charge
S.N.G.P.L. Project – Bhulwa, Chakwal, Pakistan
Responsibilities include:
Construction supervision inspection, monitoring of 16X150km long Pipeline Project as per API
1104 Standard &specification.
Witness of Welder qualification test
Monitoring all welding related activities.
Co-ordinate With Welding Inspectors
Visual inspection of main line welding
Tie-In & Crossing.
Review RT Result
Daily welding inspection and RT Inspection Report submitted to Engineering in charge Quality
control
Witness of Hydrostatic Testing and Commissioning.
08/1995 – 12/1995 Inspection In-Charge
S.N.G.P.L Project –Gujranwala, Hafiz Abad, Pakistan
Responsibilities include:
Construction supervision monitoring inspection as per API 1104 standard specification of 8 X
57KM Pipeline / Supervision of Main Contractor MNJ Foundation Iran.
Review of welding procedure specification.
Co-ordinate & supervised welding inspectors & RT team.
Witness of Welder Qualification Test.
Inspection of main line welding
Review of RT films.
Tie-ins Crossing.
Daily welding inspection Report and RT Inspection Report to submitted Engineering in charge
Quality Control. Witness of Hydrostatic Testing and Commissioning.
04/1995 – 07/1995 Oil & Gas Development Company Pakistan/JIACCO PAK
Inspection In-charge
O.G.D.C. Project - Qadir-Pur, Pakistán
Responsibilities include:
Supervision of main contractor Descon Engineering during the installation of Qadir Pur Gas
Plant
Responsible for construction supervision of plant piping related activities as per ASME B-31.3
13. and Project specification.
Material Receiving inspection AS Per ASME Sec.11 as attached MR.PO.MTC & Available
Marking
Inspection of piping fabrication.
Line checking with P &ID and IFC Drawing.
Review of quality control documents.
Witnessing of leak test.
Construction of oil storage tank.
Preparing Punch list items.
Punch list clearance items.
Final verification of test packages’
Witness of hydro testing commissioning of plant piping.
Witnessing of Reinstatement.
01/1995 – 03/1995 SUI Northern Gas Pipeline Limited/JIACCO PAK
Welding Inspector
S.N.G.P.L. Mian Chunnu to Sahiwal Pipeline Project, Pakistan
Responsibilities include:
Worked as Pipeline Inspector of dia. 24x100km Gas Pipeline/valve assemblies from Mian-
Chunnu to Sahi wall.
Witness of Welder Qualification Test
Visual Inspection of Pipeline welding.
Preparing daily Welding inspection Progress Report.
Preparing and review RT film result.
Tie-Ins Crossings
Hydrostatic Testing and Commissioning.
01/1995 – 03/1995 Welding Inspector
S.NG.P.L Gujarat Jehlum Fuel Gas Pipeline project
Worked as Pipeline Inspector for dia 6,8,10,14, Gas Pipeline/valve assemblies fabrication
welding.
Witness of Welder Qualification Test
Visual Inspection of Pipeline welding.
Maintain Daily Welding inspection Report.
Preparing NDT Request.
Tie-Ins Crossings welding NDT inspection
Hydrostatic Testing and Commissioning
LANGUAGE CAPABILITY
Urdu : National tongue
English : Spoken – fluent; written – fluent; reading – fluent
Arabic : Spoken – Medium – fluent; reading –
Punjabi : Mother tongue Spoken – fluent; written – fluent; reading – fluent