What We Will Discuss Today,
Introduction & Test Coverage
Test Development Strategies
Different Type of Tests
Functional Test Equipment
Thales Industrial Test Strategy
And What We Won’t !
X Detailed Test Development Steps
X Cost of Test Implementation/ROI
X RF Tests
X DFT Analysis
X Reliability, HALT/HASS, Compliance Tests
Table of Contents
▌Introduction – Why Testing is Required
▌ Test Coverage - PCBA & Product Level
▌ Different Test Strategies - Structural & Functional
▌ Test Benches - FATE
▌ Test Challenges in Transfer Programs
▌ Production Variation, even very small
Process Spec, M/C Parameters
▌ Internal Defect of PCB & Components
▌ Susceptibility & Tuning Requirement
Comp Tolerance, Overall Performance of comps + PCB.
Testing Required in Manufacturing? Why ?
Manufacturing Outsourced !
Test Data is the confidence
factor for customer !
Table of Contents
▌ Introduction – Why Testing Required
▌Test Coverage – PCBA & Product Level
▌ Different Test Strategies - Structural & Functional
▌ DFT Analysis
▌ Test Benches - FATE
▌ Test Challenges in Transfer Programs
Test Coverage
AOI ICT FCTType of
Test
Fault
Coverage
Missed
Coverage
Overlapped
Coverage
▌ Overall Fault Coverage
Optimum
Coverage
▌ Optimum Coverage
Introducing new test method
Fine-tuning of selected Test Methods
Test Covergae
▌ Fault Spectrum – Defect Universe
Venn Diagram
Test Coverage - Effectiveness of Test
▌ Modeling Standards for Test Coverage
PCOLA
•Presence
•Correctness
•Orientation
•Live
•Alignment
PPVS
•Presence
•Polarity
•Value
•Solder
DMPSF
•Design
•Material
•Placement
•Solder
•Function
MPS
•Material
•Placement
•Solder
Test Coverage
▌ Effectiveness of Test – Typical Case Study
No Choices
-Only at 1
Stage in
Process Flow
 AOI after Reflow catches more Defect. But better be before when Expensive
Comps on board !
Effectiveness of one Test is indicated
by another Test !
AOI – 35 %
AXI – 92 %
ICT – 25 %
Test Coverage - Product Level & Board Level
▌ Product Level Test
Coverage aspect is different at
product/sys level.
Focus on
- End to End Functionality
- Latent Defects due to Reliability
- Compliance !
• System Function
• ESS
• Reliability [Vibration, IP65]
• Certification [CE, EMI/EMC]
• AOI/AXI
• ICT/FPT
• Functional
• Functional
• AOI/AXI
• ICT/FPT
• AOI/AXI
• ICT/FPT
• BIT
• Continuity
• Functional
Board Level
Sub System Level
System Level
Product Level Coverage = Board Level Coverage + System Test Coverage !
Table of Contents
▌ Introduction – Why Testing Required
▌ Test Coverage – PCBA & Product Level
▌Test Strategies - Structural & Functional
Tests
▌ Test Benches - FATE
▌ Test Challenges in Transfer Programs
Test Strategy
 Test Strategy Finalized Before Manufacturing Starts.
 Test Strategy Influenced by
 Component Package – small joints/reduced access
 Product technology - Analog/ Dig/ RF
 Product criticality – Industrial/Mission critical ?
 Product complexity – H. Mix/L. Volume…
Assembly Process – Pb Free
There are many Dimensions to the Test Strategy Evaluation Matrix
▌ Right Test at Right Location – Later the Detection Tougher the Repair !
90% of the defects are Structural, only 10% is electrical
Traditional end of line testing (ICT+FCT) detects only electrical; at later stages of
assembly !
Imaging Tests (AOI/AXI), ICT & Boundary Scan are more Effective to capture Structural
Defects
Test Strategy – Influencing Factors
Test Strategy – Influencing Factors
▌ Test at Right Cost
Fault Spectrum is different for each product: Each line doesn’t require all Tests.
AOI + AXI can capture most of the visual & structural defects.
ICT can be made very simple of even eliminated.
Programming also can be a Test ! Eliminate the Test overlap !
▌ Test Throughput – Test Cycle Time !
▌ Time to Debug
▌ Test Development Time
Test Strategy – Influencing Factors
▌ Complementary Test Coverage
No single Test Technology can capture all defects
Optimum test coverage achieved by combination of most effective Test Methods
OVERALL
Focus on Component Packages, Assembly Process, Test Cost … (multiple dimensions)
Test Strategy
▌ Re-look from Test Effectiveness
Test Allocation in Electronic Manufacturing - Typical
Different Test Systems - AOI
▌ AOI
Visual check
No electrical Test
▌ X Ray – Manual & AXI
AXI – 3D X Ray
Imaging – through X Ray
No electrical Test
ICT - Most Effective Test Among Structural Tests
▌Test Fixture and Test SW development
using CAD file.
▌Bed of nails connects to each node
in the circuit.
TestSW
Complete PPVS Model
ICT
▌ ICT is most Effective test Strategy though very old ! No better Alternative !
▌ Integration with Boundary scan increased the coverage with reduced no of net
access
▌ Test Development cost justifies for high volume production
FPT
▌ No fixture - Highly sophisticated probe moves
around and test the component on the test via.
▌ Relatively more test cycle time, better for lower
volumes.
▌ Machine is programmed using CAD file
▌ Test Development fully in house
▌ Coverage can be lower than ICT in high mix
PCBAs.
Probe Movement can be obstructed by taller
component on the boards
Boundary Scan a.k.a JTAG
Nets in the circuit are accessed through JTAG port,
no physical access required at test via
Can Test only logic devices that are compatible with
BSDL
Compatible devices are connected in Daisy chain
and interconnecting passives also included in the
test.
Test Strategy developed based by Joint Test
Access Group (JTAG)
Specified in IEEE 1149.1
Programming Language - BSDL
JTAG – Not Only Testing, Programming as well !
▌ Powered Up Test
▌ In System Programming
▌ Boot loader loading and board bring up
▌ Integrated with ICT in modern systems to increase
the overall test coverage
Functional Test
▌ Simple/Manual Functional Test
Unit is powered up as in working configuration,
Electrical signal applied in the input port,
Output is connected and measured in
standard instruments.
Power
Supply
Data
Capture
Instrument
Signal
Source
Instrument
DUT
I/P O/P
FT is Power Up Test !
Functionality of the product is tested in the application point of view !
Functional Test
▌ Automated Functional Test
Plug & Play Setup
- Standard Bench-top Instruments
- Interfacing through protocol [GPIB]
- Test SW [Custom Developed on Licensed
platform (NI Lab View)]
- Test Fixture & Interfacing HW
Functional Test
Setup Validation
- Proto Batch Test & Test Report
score card
- Data Analysis & SPC
Table of Contents
▌ Introduction – Why Testing Required
▌ Test Coverage – PCBA & Product Level
▌ Different Test Strategies - Structural & Functional
▌Test Benches - FATE
▌ Test Challenges in Transfer Programs
Test Bench - FATE
▌ Functional ATE
Completely Automated Test System
Test Bench - FATE
Table of Contents
▌ Introduction – Why Testing Required
▌ Test Coverage – PCBA & Product Level
▌ Different Test Strategies - Structural & Functional
▌ Test Benches - FATE
▌Test Challenges in Transfer Programs
Test Challenges in Transfer Programs
▌ Old Designs – No coverage improvement possible.
▌ No DFT Tool and Test Coverage analysis in Manufacturing Interface Team
– Dependency on Design House
▌ Functional Test - False Fail
Tolerance Failure
Obsolete Test Procedure - Tuning Requirements are not detailed.
BOM and documents are not updated,
Non documented test methods - Changes implemented at supplier is not added
in the docs.
Only God We Trust,
Everything Else We Test !
▌Shiju JacobThank You
!

More Related Content

What's hot

Design for testability and automatic test pattern generation
Design for testability and automatic test pattern generationDesign for testability and automatic test pattern generation
Design for testability and automatic test pattern generationDilip Mathuria
 
Fpga Verification Methodology and case studies - Semisrael Expo2014
Fpga Verification Methodology and case studies - Semisrael Expo2014Fpga Verification Methodology and case studies - Semisrael Expo2014
Fpga Verification Methodology and case studies - Semisrael Expo2014Avi Caspi
 
Verification Engineer - Opportunities and Career Path
Verification Engineer - Opportunities and Career PathVerification Engineer - Opportunities and Career Path
Verification Engineer - Opportunities and Career PathRamdas Mozhikunnath
 
Asic design lect1 2 august 28 2012
Asic design lect1 2 august 28 2012Asic design lect1 2 august 28 2012
Asic design lect1 2 august 28 2012babak danyal
 
Combinational & Sequential ATPG.pdf
Combinational & Sequential ATPG.pdfCombinational & Sequential ATPG.pdf
Combinational & Sequential ATPG.pdfMoinPasha12
 
ASIC Design and Implementation
ASIC Design and ImplementationASIC Design and Implementation
ASIC Design and Implementationskerlj
 
Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)Usha Mehta
 
Verification flow and_planning_vlsi_design
Verification flow and_planning_vlsi_designVerification flow and_planning_vlsi_design
Verification flow and_planning_vlsi_designUsha Mehta
 
A comprehensive formal verification solution for ARM based SOC design
A comprehensive formal verification solution for ARM based SOC design A comprehensive formal verification solution for ARM based SOC design
A comprehensive formal verification solution for ARM based SOC design chiportal
 
VLSI Physical Design Flow(http://www.vlsisystemdesign.com)
VLSI Physical Design Flow(http://www.vlsisystemdesign.com)VLSI Physical Design Flow(http://www.vlsisystemdesign.com)
VLSI Physical Design Flow(http://www.vlsisystemdesign.com)VLSI SYSTEM Design
 
6 verification tools
6 verification tools6 verification tools
6 verification toolsUsha Mehta
 
Basics of Functional Verification - Arrow Devices
Basics of Functional Verification - Arrow DevicesBasics of Functional Verification - Arrow Devices
Basics of Functional Verification - Arrow DevicesArrow Devices
 
4. Formal Equivalence Checking (Formality).pptx
4. Formal Equivalence Checking (Formality).pptx4. Formal Equivalence Checking (Formality).pptx
4. Formal Equivalence Checking (Formality).pptxAhmed Abdelazeem
 
L12 programmable+logic+devices+(pld)
L12 programmable+logic+devices+(pld)L12 programmable+logic+devices+(pld)
L12 programmable+logic+devices+(pld)NAGASAI547
 
SOC Verification using SystemVerilog
SOC Verification using SystemVerilog SOC Verification using SystemVerilog
SOC Verification using SystemVerilog Ramdas Mozhikunnath
 

What's hot (20)

Design for testability and automatic test pattern generation
Design for testability and automatic test pattern generationDesign for testability and automatic test pattern generation
Design for testability and automatic test pattern generation
 
Fpga Verification Methodology and case studies - Semisrael Expo2014
Fpga Verification Methodology and case studies - Semisrael Expo2014Fpga Verification Methodology and case studies - Semisrael Expo2014
Fpga Verification Methodology and case studies - Semisrael Expo2014
 
OPEN STA
OPEN STAOPEN STA
OPEN STA
 
Code GPU with CUDA - SIMT
Code GPU with CUDA - SIMTCode GPU with CUDA - SIMT
Code GPU with CUDA - SIMT
 
Verification Engineer - Opportunities and Career Path
Verification Engineer - Opportunities and Career PathVerification Engineer - Opportunities and Career Path
Verification Engineer - Opportunities and Career Path
 
Asic design lect1 2 august 28 2012
Asic design lect1 2 august 28 2012Asic design lect1 2 august 28 2012
Asic design lect1 2 august 28 2012
 
Combinational & Sequential ATPG.pdf
Combinational & Sequential ATPG.pdfCombinational & Sequential ATPG.pdf
Combinational & Sequential ATPG.pdf
 
ASIC Design and Implementation
ASIC Design and ImplementationASIC Design and Implementation
ASIC Design and Implementation
 
Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)Automatic Test Pattern Generation (Testing of VLSI Design)
Automatic Test Pattern Generation (Testing of VLSI Design)
 
Verification flow and_planning_vlsi_design
Verification flow and_planning_vlsi_designVerification flow and_planning_vlsi_design
Verification flow and_planning_vlsi_design
 
A comprehensive formal verification solution for ARM based SOC design
A comprehensive formal verification solution for ARM based SOC design A comprehensive formal verification solution for ARM based SOC design
A comprehensive formal verification solution for ARM based SOC design
 
Verilog HDL
Verilog HDLVerilog HDL
Verilog HDL
 
VLSI Physical Design Flow(http://www.vlsisystemdesign.com)
VLSI Physical Design Flow(http://www.vlsisystemdesign.com)VLSI Physical Design Flow(http://www.vlsisystemdesign.com)
VLSI Physical Design Flow(http://www.vlsisystemdesign.com)
 
6 verification tools
6 verification tools6 verification tools
6 verification tools
 
Basics of Functional Verification - Arrow Devices
Basics of Functional Verification - Arrow DevicesBasics of Functional Verification - Arrow Devices
Basics of Functional Verification - Arrow Devices
 
4. Formal Equivalence Checking (Formality).pptx
4. Formal Equivalence Checking (Formality).pptx4. Formal Equivalence Checking (Formality).pptx
4. Formal Equivalence Checking (Formality).pptx
 
Scan chain operation
Scan chain operationScan chain operation
Scan chain operation
 
Profibus
ProfibusProfibus
Profibus
 
L12 programmable+logic+devices+(pld)
L12 programmable+logic+devices+(pld)L12 programmable+logic+devices+(pld)
L12 programmable+logic+devices+(pld)
 
SOC Verification using SystemVerilog
SOC Verification using SystemVerilog SOC Verification using SystemVerilog
SOC Verification using SystemVerilog
 

Similar to Board Test Coverage and Electronic Product Testing

Haiping(tom)he2016 update
Haiping(tom)he2016 updateHaiping(tom)he2016 update
Haiping(tom)he2016 updateThomas He
 
Extended QA testing to enhance productivity of a leading networking solution ...
Extended QA testing to enhance productivity of a leading networking solution ...Extended QA testing to enhance productivity of a leading networking solution ...
Extended QA testing to enhance productivity of a leading networking solution ...Veryx Technologies
 
Enhancing Quality and Test in Medical Device Design - Part 2.pdf
Enhancing Quality and Test in Medical Device Design - Part 2.pdfEnhancing Quality and Test in Medical Device Design - Part 2.pdf
Enhancing Quality and Test in Medical Device Design - Part 2.pdfICS
 
Benetel Overview 181209
Benetel Overview 181209Benetel Overview 181209
Benetel Overview 181209seawright777
 
아킬레스 테스트 플랫폼 | The Achilles® Test Platform
아킬레스 테스트 플랫폼 | The Achilles® Test Platform아킬레스 테스트 플랫폼 | The Achilles® Test Platform
아킬레스 테스트 플랫폼 | The Achilles® Test PlatformGE코리아
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsHTCS LLC
 
STS Characterization to Production Test
STS Characterization to Production TestSTS Characterization to Production Test
STS Characterization to Production TestHank Lydick
 
RA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxRA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxAjay Gangakhedkar
 
Cataloge RNS-USA 2011
Cataloge RNS-USA 2011Cataloge RNS-USA 2011
Cataloge RNS-USA 2011rns-usa
 
Arizona State University Test Lecture
Arizona State University Test LectureArizona State University Test Lecture
Arizona State University Test LecturePete Sarson, PH.D
 
Respond flow chart (rfc)
Respond flow chart (rfc)Respond flow chart (rfc)
Respond flow chart (rfc)Agus Triyanto
 

Similar to Board Test Coverage and Electronic Product Testing (20)

6TL NIdays 2010
6TL NIdays 2010 6TL NIdays 2010
6TL NIdays 2010
 
VLSI testing and analysis
VLSI testing and analysisVLSI testing and analysis
VLSI testing and analysis
 
Haiping(tom)he2016 update
Haiping(tom)he2016 updateHaiping(tom)he2016 update
Haiping(tom)he2016 update
 
Extended QA testing to enhance productivity of a leading networking solution ...
Extended QA testing to enhance productivity of a leading networking solution ...Extended QA testing to enhance productivity of a leading networking solution ...
Extended QA testing to enhance productivity of a leading networking solution ...
 
Enhancing Quality and Test in Medical Device Design - Part 2.pdf
Enhancing Quality and Test in Medical Device Design - Part 2.pdfEnhancing Quality and Test in Medical Device Design - Part 2.pdf
Enhancing Quality and Test in Medical Device Design - Part 2.pdf
 
BCO Inc
BCO IncBCO Inc
BCO Inc
 
Benetel Overview 181209
Benetel Overview 181209Benetel Overview 181209
Benetel Overview 181209
 
WCDMA_FAST_507-08
WCDMA_FAST_507-08WCDMA_FAST_507-08
WCDMA_FAST_507-08
 
Resume_Shakti Patra
Resume_Shakti PatraResume_Shakti Patra
Resume_Shakti Patra
 
Vlsi testing
Vlsi testingVlsi testing
Vlsi testing
 
아킬레스 테스트 플랫폼 | The Achilles® Test Platform
아킬레스 테스트 플랫폼 | The Achilles® Test Platform아킬레스 테스트 플랫폼 | The Achilles® Test Platform
아킬레스 테스트 플랫폼 | The Achilles® Test Platform
 
Vtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcsVtech cms divisonal presentation may 2014 represented by htcs
Vtech cms divisonal presentation may 2014 represented by htcs
 
STS Characterization to Production Test
STS Characterization to Production TestSTS Characterization to Production Test
STS Characterization to Production Test
 
P4Q services
P4Q servicesP4Q services
P4Q services
 
RA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxRA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptx
 
Cataloge RNS-USA 2011
Cataloge RNS-USA 2011Cataloge RNS-USA 2011
Cataloge RNS-USA 2011
 
Arizona State University Test Lecture
Arizona State University Test LectureArizona State University Test Lecture
Arizona State University Test Lecture
 
MaxEye Set Top Box Test Solution
MaxEye Set Top Box Test SolutionMaxEye Set Top Box Test Solution
MaxEye Set Top Box Test Solution
 
Respond flow chart (rfc)
Respond flow chart (rfc)Respond flow chart (rfc)
Respond flow chart (rfc)
 
Gandhi
GandhiGandhi
Gandhi
 

Recently uploaded

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 

Recently uploaded (20)

A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 

Board Test Coverage and Electronic Product Testing

  • 2. What We Will Discuss Today, Introduction & Test Coverage Test Development Strategies Different Type of Tests Functional Test Equipment Thales Industrial Test Strategy
  • 3. And What We Won’t ! X Detailed Test Development Steps X Cost of Test Implementation/ROI X RF Tests X DFT Analysis X Reliability, HALT/HASS, Compliance Tests
  • 4. Table of Contents ▌Introduction – Why Testing is Required ▌ Test Coverage - PCBA & Product Level ▌ Different Test Strategies - Structural & Functional ▌ Test Benches - FATE ▌ Test Challenges in Transfer Programs
  • 5. ▌ Production Variation, even very small Process Spec, M/C Parameters ▌ Internal Defect of PCB & Components ▌ Susceptibility & Tuning Requirement Comp Tolerance, Overall Performance of comps + PCB. Testing Required in Manufacturing? Why ? Manufacturing Outsourced ! Test Data is the confidence factor for customer !
  • 6. Table of Contents ▌ Introduction – Why Testing Required ▌Test Coverage – PCBA & Product Level ▌ Different Test Strategies - Structural & Functional ▌ DFT Analysis ▌ Test Benches - FATE ▌ Test Challenges in Transfer Programs
  • 7. Test Coverage AOI ICT FCTType of Test Fault Coverage Missed Coverage Overlapped Coverage ▌ Overall Fault Coverage Optimum Coverage ▌ Optimum Coverage Introducing new test method Fine-tuning of selected Test Methods
  • 8. Test Covergae ▌ Fault Spectrum – Defect Universe Venn Diagram
  • 9. Test Coverage - Effectiveness of Test ▌ Modeling Standards for Test Coverage PCOLA •Presence •Correctness •Orientation •Live •Alignment PPVS •Presence •Polarity •Value •Solder DMPSF •Design •Material •Placement •Solder •Function MPS •Material •Placement •Solder
  • 10. Test Coverage ▌ Effectiveness of Test – Typical Case Study No Choices -Only at 1 Stage in Process Flow  AOI after Reflow catches more Defect. But better be before when Expensive Comps on board ! Effectiveness of one Test is indicated by another Test ! AOI – 35 % AXI – 92 % ICT – 25 %
  • 11. Test Coverage - Product Level & Board Level ▌ Product Level Test Coverage aspect is different at product/sys level. Focus on - End to End Functionality - Latent Defects due to Reliability - Compliance ! • System Function • ESS • Reliability [Vibration, IP65] • Certification [CE, EMI/EMC] • AOI/AXI • ICT/FPT • Functional • Functional • AOI/AXI • ICT/FPT • AOI/AXI • ICT/FPT • BIT • Continuity • Functional Board Level Sub System Level System Level Product Level Coverage = Board Level Coverage + System Test Coverage !
  • 12. Table of Contents ▌ Introduction – Why Testing Required ▌ Test Coverage – PCBA & Product Level ▌Test Strategies - Structural & Functional Tests ▌ Test Benches - FATE ▌ Test Challenges in Transfer Programs
  • 13. Test Strategy  Test Strategy Finalized Before Manufacturing Starts.  Test Strategy Influenced by  Component Package – small joints/reduced access  Product technology - Analog/ Dig/ RF  Product criticality – Industrial/Mission critical ?  Product complexity – H. Mix/L. Volume… Assembly Process – Pb Free There are many Dimensions to the Test Strategy Evaluation Matrix
  • 14. ▌ Right Test at Right Location – Later the Detection Tougher the Repair ! 90% of the defects are Structural, only 10% is electrical Traditional end of line testing (ICT+FCT) detects only electrical; at later stages of assembly ! Imaging Tests (AOI/AXI), ICT & Boundary Scan are more Effective to capture Structural Defects Test Strategy – Influencing Factors
  • 15. Test Strategy – Influencing Factors ▌ Test at Right Cost Fault Spectrum is different for each product: Each line doesn’t require all Tests. AOI + AXI can capture most of the visual & structural defects. ICT can be made very simple of even eliminated. Programming also can be a Test ! Eliminate the Test overlap ! ▌ Test Throughput – Test Cycle Time ! ▌ Time to Debug ▌ Test Development Time
  • 16. Test Strategy – Influencing Factors ▌ Complementary Test Coverage No single Test Technology can capture all defects Optimum test coverage achieved by combination of most effective Test Methods OVERALL Focus on Component Packages, Assembly Process, Test Cost … (multiple dimensions)
  • 17. Test Strategy ▌ Re-look from Test Effectiveness
  • 18. Test Allocation in Electronic Manufacturing - Typical
  • 19. Different Test Systems - AOI ▌ AOI Visual check No electrical Test ▌ X Ray – Manual & AXI AXI – 3D X Ray Imaging – through X Ray No electrical Test
  • 20. ICT - Most Effective Test Among Structural Tests ▌Test Fixture and Test SW development using CAD file. ▌Bed of nails connects to each node in the circuit. TestSW Complete PPVS Model
  • 21. ICT ▌ ICT is most Effective test Strategy though very old ! No better Alternative ! ▌ Integration with Boundary scan increased the coverage with reduced no of net access ▌ Test Development cost justifies for high volume production
  • 22. FPT ▌ No fixture - Highly sophisticated probe moves around and test the component on the test via. ▌ Relatively more test cycle time, better for lower volumes. ▌ Machine is programmed using CAD file ▌ Test Development fully in house ▌ Coverage can be lower than ICT in high mix PCBAs. Probe Movement can be obstructed by taller component on the boards
  • 23. Boundary Scan a.k.a JTAG Nets in the circuit are accessed through JTAG port, no physical access required at test via Can Test only logic devices that are compatible with BSDL Compatible devices are connected in Daisy chain and interconnecting passives also included in the test. Test Strategy developed based by Joint Test Access Group (JTAG) Specified in IEEE 1149.1 Programming Language - BSDL
  • 24. JTAG – Not Only Testing, Programming as well ! ▌ Powered Up Test ▌ In System Programming ▌ Boot loader loading and board bring up ▌ Integrated with ICT in modern systems to increase the overall test coverage
  • 25. Functional Test ▌ Simple/Manual Functional Test Unit is powered up as in working configuration, Electrical signal applied in the input port, Output is connected and measured in standard instruments. Power Supply Data Capture Instrument Signal Source Instrument DUT I/P O/P FT is Power Up Test ! Functionality of the product is tested in the application point of view !
  • 26. Functional Test ▌ Automated Functional Test Plug & Play Setup - Standard Bench-top Instruments - Interfacing through protocol [GPIB] - Test SW [Custom Developed on Licensed platform (NI Lab View)] - Test Fixture & Interfacing HW
  • 27. Functional Test Setup Validation - Proto Batch Test & Test Report score card - Data Analysis & SPC
  • 28. Table of Contents ▌ Introduction – Why Testing Required ▌ Test Coverage – PCBA & Product Level ▌ Different Test Strategies - Structural & Functional ▌Test Benches - FATE ▌ Test Challenges in Transfer Programs
  • 29. Test Bench - FATE ▌ Functional ATE Completely Automated Test System
  • 30. Test Bench - FATE
  • 31. Table of Contents ▌ Introduction – Why Testing Required ▌ Test Coverage – PCBA & Product Level ▌ Different Test Strategies - Structural & Functional ▌ Test Benches - FATE ▌Test Challenges in Transfer Programs
  • 32. Test Challenges in Transfer Programs ▌ Old Designs – No coverage improvement possible. ▌ No DFT Tool and Test Coverage analysis in Manufacturing Interface Team – Dependency on Design House ▌ Functional Test - False Fail Tolerance Failure Obsolete Test Procedure - Tuning Requirements are not detailed. BOM and documents are not updated, Non documented test methods - Changes implemented at supplier is not added in the docs.
  • 33. Only God We Trust, Everything Else We Test ! ▌Shiju JacobThank You !