SlideShare a Scribd company logo
1 of 22
PROJECTMANAGEMENT FOR RENOVATING A HOSTEL
Department Of Business Administration
Turiba University
Professor
Ivars Linde
Prepared By: Abens Anna Jacob
Group: UMA1V22
CONTENT
1. ProjectSummary
1.1 ProjectScope
1.2 ProjectJustification and Main Problem
1.3 SWOT Analysis
2. Alternatives
2.1 Evaluation of Alternatives
2.2 Choosing the Best Alternatives
3. Developmentof Concept(WBS)
3.1 Workbreakdown Structure – Alternative A
3.2 Workbreakdown Structure – Alternative B
3.3 Schedule Planning
3.3.1 CPM for Alternative A
3.3.2 CPM for Alternative B
4.1 Cost Estimates for Alternative A (with Gantt chart)
4.1.1 CostEstimates for Alternative B (with Gantt chart)
5. Comparisonof Profitability
6. Strategic Analysis
7. Risk Analysis
7.1 Conclusion about selecting bestalternatives
8. ProjectDescription
9. Conclusion
1. PROJECTSUMMARY:
The basic idea is to initiate and develop this project is mainly based on the
merging needs of stay in Riga. It has been observed that now a day more and
more trend of hostelling has beenfound in twin cities. Hence, it’s creating a
business opportunity for many organizations in the near future it’s gone be a
profitable business field.
According to the data of the Central Statistical Bureau (CSB) in 2015, 2.1
million foreignvisitors stayed in Latvian accommodationestablishments,
which is 2.0 % more than in 2014.As compared with 2014,the number of
foreignvisitors grew by 3.1 %, reaching 1.5 million. The average length of a
stay of foreignvisitors in accommodationestablishments was 2 nights.
Of all foreignvisitors “79.1% stayed in Riga”, 8.2 % - in Jūrmala, 1.7 % - in
Sigulda county, 1.5% - in Ventspils,1.5% - in Liepāja.
Although the issue of safety and security remains the primary reason which
keeping people to avoid hostel. As the recent trend shows that people are
gaining more confidence about staying in hostel especiallysolo travelers.
From 2011 to 2014,for example, SITA World Tours’ solo traveler bookings
increased by nearly 64%, generating an increase of more than 90% in sales,
the company said. Although a good hostel should present the following
factors to the customers forbetter usability:
* 24 hour reception;
* Transfer from/to airport
* Laundry facilities
* Printing
* Two commonrooms;
* Party room;
* Fully equipped kitchen;
* City maps;
* Wi-Fi;
* TV & DVD;
* Personal Computer;
* Tourist Information;
* Hairdryers;
* Iron and ironing board;
* Hot beverages and milk;
* Board games;
* Parking place;
* Book exchange shelf;
* Lockers;
* Front door keys;
* Luggage storage;
* Bed linen;
* Towels;
* Slippers;
* Baby cot;
* Ear plugs;
* Bicycle rent (seasonal)
1.1 PROJECTSCOPE:
Since most people only rate a hostel by it look, facilities, amenities and its
location and etc… So it is important to selecta good site which is really close
to city and easy to connectwith other places. Therefore,we have selected a
place in Riga Town because it is really close to supermarkets, restaurants,
the train station, the bus station, airport etc….
Renovating a 2 story – building to hostel requires a considerable amount of
money. We need to make a good impressionby choosing an exterior
productand style that will give a good appeal to the hostel. So, it is very
important to designthe hostel in such a way that it can deliver all the needs
of our customers.Total area covered forthis projectis 35,000 sq.ft.It is very
important to decide how many rooms we want give for rent and how much
spacious we need the room to be. Considerhow much money you have in
the bank and how much you are willing to borrow when deciding which floor
plan to go for.
We can easily add more rooms in second floorby adding more room
partitions and same time we can reduce the number of rooms by removing
the partition. Which allow you to give more single occupancy rooms for solo
travelers who preferto stay alone.
1.2 ProjectJustification and Main Problem
One of the biggestproblemswhichare oftenfaced bythe travelers is feeling
lonely and getting lost in their way. Therefore it is important to offerthem help
in social and practical integration process by organizing cultural and social
events in order to ensure that the travelers learns to adopt the new local
necessities and becomes integrated into the new social network.
Anna Builders Pvt. LTD is a reliable construction company. Recently we have
signed a contract of renovating a 2 story - building to hostel with modern
facilities in Riga town with Mr. Frank Marc. Therefore Anna Builders (Pvt.)
Limited will completethe renovation of the hostel as per the requirements and
specifications provided by the client.
The duration decided forthis projectis 8 months with basement, first floorand
second floor.
1.3 SWOT analysis
STRENGTH:
 Location
 Reasonable and Flexible
pricing
 Heritage & Museums
 Night life
 Transportation
WEAKNESS:
 Famous and busy destination
 Rely heavily on tourism
 Diversity
 Things you need to improve
OPPORTUNITIES:
 Business Hub
 Surge in tourist arrivial
THREATS:
 Pandemic issues
 Strong competion
 Seasonality
SWOT
2. Alternatives
For the attainment of the whole development of the project is influenced by the selection of
the outstanding alternative which fits better into criteria such as budget, time management,
etc. In the course of our research three convenient alternatives emerged that may meet the
requirements of our client. In the process within the alternatives there is no distinction
between different locations or transport companies etc., but rather between the project team.
The three alternatives are described as follows:
 Alternative A: The whole renovation will be well planned, designed and organized within
the company with a project team. The team has to be determined.
 Alternative B: Each distribute task of the construction of hostel to different organization,
which has to be decided, made agreement and charged first. But the construction will be
monitored by us.
 Alternative c: The entire hostel will designed, planned and organized by ourselves
2.1 Evaluation of alternatives
BENEFITS LIMITATIONS COSTS RISKS
A Chance to
distribution
of task
within the
projectteam
Payment of
wages to project
team
Intermediate  Diversity of
project
team
 Difference
of opinion
within the
team
B Betterprices
& service for
the client.
 Takes time
to find an
agency
 Usually
high
commission
costs
High  If the
agency
does not
meet the
expectation
 Chance of
not finding
an
accurate
agency
C Give us
flexibility
during the
entire
procedure
Requires more
time
Low Overload of work
by over
estimating our
own capabilities
2.2 Choosingthe bestalternatives
We decided not consideralternative B because
 Time consuming
 High risk
 Close monitoring is needed
 Expensive
3. Developmentof concept
3.1 WORK BREAK DOWN STRUCTURE – ALTERNATIVE A.
3.2 WORK BREAK DOWN STRUCTURE – ALTERNATIVE B.
Hostel
1.1 Intiation
1.1.1
Contract
1.1.2 Project Planning
1.1.3
Requirement
Gathering
1.1.1.1 Selection
Of Team
1..1.1.2Hiring Of
Skilled Person
1.2 Project Plan
1.1.3
Allocating
a Project
team
1.1.4 Budgeting
1.1.5 Resource
Allocation
1.3 Design
1.2.1
Interior
Design
1.2.2
Exterior
Design
1.2.3Design
Approval
1.4 Construction
1.4.1
Electrical
1.4.2
Plumbing
1.4.3 Adding more
room in second flo
by using partitions
1.4.4 Install
Kitchen
1.4.5 Install
Sanitary facilities
1.4.6 Lay
floors
1.4.6 Put up Wall
paers
1.4.7 Exter
3.3 SCHEDULE PLANNING
3.3.1 CRITICAL PATH ANALYSIS ALTERNATIVE A:
Hostel
1.1
Intiation
1.1.1
Contract
1.1.2 Project
Planning
1.1.3
Requiremen
t Gathering
1.2 Strategy
1.1.3 Resource
planning
1.1.4 Budget
Planning
1.1.5
Resource
Allocation
1.3 Design
1.2.1
Interior
Design
1.2.2
Exterior
Design
1.2.3Design
Approval
1.4Construction
1.4.1 Electrical
1.4.2 Plumbing
1.4.4 Install
Kitchen
1.4.5 Install Sanitary
facilities
1.4.6 Lay floors
1.4.6 Put up Wall paers
1.4.7 Exterior Painting
1.5 Start -
Up
1.5.1 Test
Installion
1.5.2
Hire
Staff
1.5.3
Move in
3.3.2 CRITICAL PATH ANALYSIS ALTERNATIVE B:
START
A
B D E
F
G J
K
L N O P
MH
I
C
4.1 Cost Estimates for Alternative A:
START
A
B C D
E
F I
J
K M N O
LG
H
Project Team
Salary/mont
h Salary/Day
Working
days
Net
salary
for
Work
days
Social
Tax
Total
salary
with
Tax
ProjectManager 800,00 26,67 24 640,08 128.02 768.1
Assitant 400,00 13,33 25 333,25 66.65 399.9
Designer/architect 600,00 20,00 10 200,00 40 240
Total 1173,33 234,67 1408,00
Internal Cost/day
Working
days
Net
costs
Tax
VAT
Total
Cost
Electrical 250,00 10 2500,00 50,00 2550,00
Plumbing 300,00 13 3900,00 60,00 3960,00
Walls 112,00 8 896,00 22,40 918,40
Flooring 83,00 14 1162,00 232,40 1394,40
Install roofdrains 200,00 4 800,00 160,00 960,00
Install tile intoilet rooms 50,00 3 150,00 30,00 180,00
Paint walls 40,00 6 240,00 48,00 288,00
Ceiling tile 200,00 5 1000,00 200,00 1200,00
Carpet 85,00 14 1190,00 238,00 1428,00
Install electrical fixtures 150,00 3 450,00 90,00 540,00
Install kitchenfixtures 75,00 3 225,00 45,00 270,00
Install sanitaryfixture 60,00 3 180,00 36,00 216,00
Total 13904.8
Event costs/day tax VAT
total
costs
Transport 250,00 50,00 _
Decorations 40,00 8,00 _
Location 250,00 50,00 _
Pour 200,00 40,00 _
Steel columns 300,00 60,00 _
Beams 85,00 17,00 _
Total Net 1063,33 Gross 1310,29
Alternative A Start Date End Date
Duratio
n in
weeks
1.May.2016
24.July.201
6 12
Total Cost
16623.0
9
4.1.1 COST ESTIMATES FOR ALTERNATIVE B:
Project Team
Salary/mont
h Salary/Day
Working
days
Net
salary
for
Work
days
Social
Tax
Total
salary
with
Tax
ProjectManager 800,00 26,67 35 933,45 186,69 1120,14
Assitant 400,00 13,33 40 533,2 106,64 399,9
Designer/architect 600,00 20,00 10 200,00 40,00 240,0
Total 1666,65 333,33 1760,04
Internal Cost/day
Working
days
Net
costs
Tax
VAT
Total
Cost
Electrical 100,00 15 1500,00 300,00 1800,00
Plumbing 110,00 18 1980,00 396,00 2376,00
Walls 60,00 12 720,00 144,00 864,00
Flooring 83,00 14 1162,00 232,40 1394,40
Install roofdrains 200,00 4 800,00 160,00 960,00
Install tile intoilet rooms 50,00 3 150,00 30,00 180,00
Paint walls 20,00 10 200,00 40,00 240,00
Ceiling tile 200,00 5 1000,00 200,00 1200,00
Carpet 85,00 14 1190,00 238,00 1428,00
Install electrical fixtures 60,00 5 300,00 60,00 360,00
Install kitchenfixtures 30,00 7 210,00 42,00 252,00
Install sanitaryfixture 15,00 8 120,00 24,00 144,00
Total
11198,4
0
Event costs/day tax VAT
total
costs
Transport 250,00 50,00 _
Decorations 40,00 8,00 _
Location 250,00 50,00 _
Pour 200,00 40,00 _
Steel columns 300,00 60,00 _
Beams 85,00 17,00 _
Total Net 1063,33 Gross 1310,29
Alternative A Start Date End Date
Duratio
n in
weeks
1.May.2016
08.Oct.201
6 22 W 6D
Total Cost
14268,7
3
5. COMPARISON OF PROFITABILITY
Alternative - A 2017 2018 2019 2020
Income without tax
Project development cost excl
VAT
-
16623.1
Cash Flow
-
16623.1 60000 80000 70000 85000
Corporate Tax (15%) 9000 12000 10500 12750
Cash without tax 51 000 68000 59500 72250
Total cash flow 34376.9 51376.9 42876.9 55626.9
Discount Factor 10% 0.909 0.826 0.751 0.683
PV 31248.6 42437.3 32200.55 37993.17
NPV 14625.5 25814.2 15577.45 21370.07
Discount Factor 20% 0.83 0.694 0.579 0.482
PV 28532.83 35655.5 24825.72 26812.16
NPV 11909.73 19032.4 8202.6 10189.06
Discount Factor 30% 0.769 0.592 0.455 0.35
PV 26435.8 30415.1 19508.9 25287.5
NPV 9812.7 13792 2885.88 8664.4
IRR = r1 + NPVr1 (r2-r1)
NPVr1 – NPVr2
R1 = 0.1; R2 = 0.2
IRR = 63.8%
Alternative - B 2017 2018 2019 2020
Income without tax
Project development cost excl
VAT
-
14268.7
Cash Flow
-
14268.7 50000 75000 83000 85000
Corporate Tax (15%) 7500 11250 12450 12750
Cash without tax 42 500 63750 70550 72250
Total cash flow 28231.3 49481.3 56281.3 57981.3
Discount Factor 10% 0.909 0.826 0.751 0.683
PV 25662.25 40871.55 42267.25 39601.22
NPV 11393.55 26602.85 27998.5 25332.52
Discount Factor 20% 0.83 0.694 0.579 0.482
PV 23431.9 34340.02 32586.87 27946.98
NPV 9163.2 20071.32 18318.17 13678.28
Discount Factor 30% 0.769 0.592 0.455 0.35
PV 21709.8 29292.92 25607.9 20293.45
NPV 7441.16 15024.22 11339.29 6024.75
IRR = r1 + NPVr1 (r2-r1)
NPVr1 – NPVr2
R1 = 0.1; R2 = 0.2
IRR = 61.08%
4.1.2 TASK PLAN
6. Strategic analysis
CriteriaWeight Alternative A
Weighted
Score
Alternative B
Weighted
Score
1. Observance of time
schedule
20% 4 0,8 3 0,6
2. Simultaneous
processing of tasks
15% 4 0,6 2 0,3
3. Level of influence by
stakeholders
10% 2 0,2 4 0,4
4. Provides appropriate 30% 3 0,9 5 1,5
5. Sponsorships 25% 5 1,25 5 1,25
100% 3,75 4,05
7. Risk analysis
SCALE LOW
0-5
MODERATE
6-10
SIGNIFICANT
11-15
HIGH
16-20
Alternative A
Typesofrisks Risks Evaluation Activity
economic
1. Delay in funds
2. Wrong budget calculation
3. Underestimation in terms of
required time
4
1. Ongoing information
exchange with sponsors
2. Rechecking event budget
calculation
3. Observance of time
management plan
social
1.Decision-making without
informing Stakeholder
1.5 1. Arrange regular stakeholder
technical
1. Machinery does not work
properly
2
1. Purchase new machinery or
backup machinery
Alternative B
Types of
risks
Risks Evaluation Activity
Economic
1. Working overtime which
leads to increased salaries
2. Delay in funds
3. Wrong budget calculation
4.5
1. Monitoring the work progress
and observance of time
schedule
2. Time to time project progress
update with stakeholders
3. Rechecking budget calculation
Social
1. Internal diversity within
project team
2. Project Manager could
take autonomous
decisions
3
1. Conducting regular team
meetings
2. Manager update project
knowledge with other team
members
technical 1. Inflation 2
1. Reserve extra material to
handle this risk
7.1 Conclusion about selecting best alternative
Alternatives economic social Technical sum
A 4 1.5 2 7.5
В 4.5 3 2 9.5
ProjectDescription:
During the renovation of the building we can expect to accumulate many documents ranging
from floor plans to inspirational photographs, product catalogs and design ideas. The Home
Building Organizer is a flexible 3-ring binder that includes detailed budget worksheets,
product ideas and organizational tools to assist in managing your entire home building
process. This binder will prove to be invaluable in helping you stay organized. It also makes
a great scrapbook.
When deciding on the design of hostel, we need to take note of the rooms and features the
client included. Having all single occupancy rooms on the second floor also gives privacy
and all double occupancy rooms on first gives easy accessibility. Consider all single
occupancy rooms on first floor which gives more flexibility and greater view of the city from
balcony.
First Floor: 35000 Sq.Ft
No rooms: 6 double rooms
Second floor:
No rooms: 8 single rooms
The scope of this Project includes: • developing the construction plans, the grading plans and the
landscape plans acquiring all required permits and approvals installation of the water well and a
water system including a pump and all required piping installation of a properly designed and the
garage with a parking area adequate for at least 6 average sized vehicles the parking area.
Title
Construction of a Hostel
Alternative A
Main Problem:
There are numerous important challenges facing today's
construction industry. Some of the construction issues include
workforce considerations, safety, time constraints, and the changing
nature of the work. Non-construction challenges that construction
industry faces that are part of the business landscape include legal
issues, government regulations, environmental concerns, and socio-
political pressures. Also in addition to these challenges, the
construction industry is highly competitive, and firms must
continually improve their productivity to remain competitive. The
identification of material, identifying materials moving flow in
logistics and tracking materials location are needed for successful
project management in construction.
•A positive image of the construction industry as a career choice.
•The transfer of skills from other sectors, such as agriculture, fishing,
aquaculture and forestry, to the construction industry.
•Local employers able to effectively compete for the large scale
construction contracts.
Realization
In order to bring them together and to get to know each other it seems obvious to
organize a special event for it. The fact that will not have many contacts in the
beginning of construction will make it all the more important to get business use
social media and online sites for marketing the hostel. The successful completion
of this project depends upon the following external processes: The contracted
Home Builders must complete construction of the hostel no later than the date to
which they have agreed with the client.
Project duration(12 weeks, registration period excluded):
Starting:01.05.2016
Ending:24.07.2016
Project budget(€):
20000.00 €
Total Costs:
16623.09 €
Conclusion:
In the years ahead, the construction industry must has to overcome different
challenges with respect to building environment, transportation, power or
natural hazards. The Construction industry is comprised of clients,
designers and contractors. But in the modern industrialized world,
construction usually involves the translation of designs into reality. A formal
design team may be assembled to plan the physical proceedings, and to
integrate those proceedings with the other parts. The outstanding
performance underdemanding situations in the past will stand in good stead
and give confidence to the construction industry to bring about an overall
development in the infrastructure of the nation. The gains of large
investments in the mega-projects eventually will feedback to the
constructionindustry itself in the form of bettereconomy and improved work
conditions.
As efficiencycodes have come into effectin recent years, new construction
technologies and methods have emerged. New techniques of building
construction are being researched, made possible by advances in 3D
printing technology. In a form of additive building construction, similar to
the additive manufacturing techniques for manufactured parts, building
printing is making it possible to flexiblyconstructsmall commercialbuildings
and private habitations in around 20 hours, with built-in plumbing and
electrical facilities, in one continuous build, using large 3D printers.
In the current trend of sustainable construction, the recent movements
of New Urbanism and New Classical Architecture promote a sustainable
approach towards construction, that appreciates and develops smart
growth, architectural tradition and classical design.

More Related Content

What's hot

Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document xingxin_GOh
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.Abhishek kumar maurya
 
Residential Powerpoint Presentation
Residential Powerpoint PresentationResidential Powerpoint Presentation
Residential Powerpoint Presentationmdbp2009
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONSagar Kaptan
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Project management
Project managementProject management
Project managementBenjamin Tan
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentationArchDuty
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practiceAditya Sanyal
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Kai Yun Pang
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business planfarouq umar
 
Project report on construction of hotel/hostel
Project report on construction of hotel/hostelProject report on construction of hotel/hostel
Project report on construction of hotel/hostelmuhammed iqbal
 

What's hot (20)

Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Tender
TenderTender
Tender
 
Residential Powerpoint Presentation
Residential Powerpoint PresentationResidential Powerpoint Presentation
Residential Powerpoint Presentation
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATION
 
Construction contract
Construction contract Construction contract
Construction contract
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Project management
Project managementProject management
Project management
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Construction company business plan
Construction company business planConstruction company business plan
Construction company business plan
 
Project report on construction of hotel/hostel
Project report on construction of hotel/hostelProject report on construction of hotel/hostel
Project report on construction of hotel/hostel
 

Viewers also liked

project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house reportHagi Sahib
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Hohenadel House Renovation Project *Update*
Hohenadel House Renovation Project *Update*Hohenadel House Renovation Project *Update*
Hohenadel House Renovation Project *Update*Felicite Moorman
 
Riverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALL
Riverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALLRiverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALL
Riverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALLAki Ishida
 
Summary of Key Findings: APP Zero Energy Homes Workshop
Summary of Key Findings: APP Zero Energy Homes WorkshopSummary of Key Findings: APP Zero Energy Homes Workshop
Summary of Key Findings: APP Zero Energy Homes WorkshopAlliance To Save Energy
 
Lessons Learned - Passive House Construction
Lessons Learned - Passive House ConstructionLessons Learned - Passive House Construction
Lessons Learned - Passive House ConstructionEd O'Donoghue
 
Project Management Presentation
Project Management PresentationProject Management Presentation
Project Management Presentationblakefelson
 
G+20 Corporate House Construction & Project Management.
G+20 Corporate House Construction & Project Management.G+20 Corporate House Construction & Project Management.
G+20 Corporate House Construction & Project Management.Neelay Khese
 
Kitchen renovation project
Kitchen renovation projectKitchen renovation project
Kitchen renovation projectIvi Baykov
 
Project Plan for Construction of School in Africa (Congo)
Project Plan for Construction of School in Africa (Congo)Project Plan for Construction of School in Africa (Congo)
Project Plan for Construction of School in Africa (Congo)Alex Osborne
 
Example of ActiveDisclosure Linked Audit Committee Package
Example of ActiveDisclosure Linked Audit Committee PackageExample of ActiveDisclosure Linked Audit Committee Package
Example of ActiveDisclosure Linked Audit Committee PackageJarrod Job, CPA, MBA
 
WEBINAR_Hologram labeling
WEBINAR_Hologram labelingWEBINAR_Hologram labeling
WEBINAR_Hologram labelingGeorge Perkous
 
After B.Tech
After B.TechAfter B.Tech
After B.Techbalukits
 
Understanding Hologram
Understanding HologramUnderstanding Hologram
Understanding HologramGeorge Perkous
 
806210WP0P12680Box0379812B00PUBLIC0
806210WP0P12680Box0379812B00PUBLIC0806210WP0P12680Box0379812B00PUBLIC0
806210WP0P12680Box0379812B00PUBLIC0Domenico Bruzzone
 
Genera Blog Gratis Que incluye Wordpress
Genera Blog Gratis Que incluye Wordpress
Genera Blog Gratis Que incluye Wordpress
Genera Blog Gratis Que incluye Wordpress sordidthrill6405
 

Viewers also liked (20)

project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house report
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Project management-Report
Project management-ReportProject management-Report
Project management-Report
 
TUSCAN APT RENO
TUSCAN APT RENOTUSCAN APT RENO
TUSCAN APT RENO
 
Hohenadel House Renovation Project *Update*
Hohenadel House Renovation Project *Update*Hohenadel House Renovation Project *Update*
Hohenadel House Renovation Project *Update*
 
Riverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALL
Riverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALLRiverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALL
Riverside Drive Apartment Interior Renovation by Architects ISHIDA/CRANDALL
 
Summary of Key Findings: APP Zero Energy Homes Workshop
Summary of Key Findings: APP Zero Energy Homes WorkshopSummary of Key Findings: APP Zero Energy Homes Workshop
Summary of Key Findings: APP Zero Energy Homes Workshop
 
Lessons Learned - Passive House Construction
Lessons Learned - Passive House ConstructionLessons Learned - Passive House Construction
Lessons Learned - Passive House Construction
 
Examples Of Our Kitchen Remodeling Projects
Examples Of Our Kitchen Remodeling ProjectsExamples Of Our Kitchen Remodeling Projects
Examples Of Our Kitchen Remodeling Projects
 
Project Management Presentation
Project Management PresentationProject Management Presentation
Project Management Presentation
 
G+20 Corporate House Construction & Project Management.
G+20 Corporate House Construction & Project Management.G+20 Corporate House Construction & Project Management.
G+20 Corporate House Construction & Project Management.
 
Kitchen renovation project
Kitchen renovation projectKitchen renovation project
Kitchen renovation project
 
Project Plan for Construction of School in Africa (Congo)
Project Plan for Construction of School in Africa (Congo)Project Plan for Construction of School in Africa (Congo)
Project Plan for Construction of School in Africa (Congo)
 
Example of ActiveDisclosure Linked Audit Committee Package
Example of ActiveDisclosure Linked Audit Committee PackageExample of ActiveDisclosure Linked Audit Committee Package
Example of ActiveDisclosure Linked Audit Committee Package
 
WEBINAR_Hologram labeling
WEBINAR_Hologram labelingWEBINAR_Hologram labeling
WEBINAR_Hologram labeling
 
After B.Tech
After B.TechAfter B.Tech
After B.Tech
 
Understanding Hologram
Understanding HologramUnderstanding Hologram
Understanding Hologram
 
806210WP0P12680Box0379812B00PUBLIC0
806210WP0P12680Box0379812B00PUBLIC0806210WP0P12680Box0379812B00PUBLIC0
806210WP0P12680Box0379812B00PUBLIC0
 
Genera Blog Gratis Que incluye Wordpress
Genera Blog Gratis Que incluye Wordpress
Genera Blog Gratis Que incluye Wordpress
Genera Blog Gratis Que incluye Wordpress
 

Similar to Project report on construction of house/hotel/hostel

3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974Manideep Yellanki
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 CourAbramMartino96
 
PM3110 Project Part 1 Kapricia Morris
PM3110 Project Part 1 Kapricia MorrisPM3110 Project Part 1 Kapricia Morris
PM3110 Project Part 1 Kapricia MorrisKapricia Morris
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Project Blue Update 171108 v7
Project Blue Update 171108 v7Project Blue Update 171108 v7
Project Blue Update 171108 v7conradfsr
 
Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...
Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...
Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...Caroline Bilet
 
LECTURE 2 310723 (1)_organized (1).pptx
LECTURE 2 310723 (1)_organized (1).pptxLECTURE 2 310723 (1)_organized (1).pptx
LECTURE 2 310723 (1)_organized (1).pptxMhlonishwaKhumalo
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016subhash gupta
 
CV_Linked In_2015-03-10
CV_Linked In_2015-03-10CV_Linked In_2015-03-10
CV_Linked In_2015-03-10Stuart Redhead
 
Alpha Case Study - Project Management Plan Sample
Alpha Case Study - Project Management Plan SampleAlpha Case Study - Project Management Plan Sample
Alpha Case Study - Project Management Plan SampleAgatha Maia Duarte de Assis
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfMoncefMakni1
 
case study.pdf
case study.pdfcase study.pdf
case study.pdfHongLc19
 
Architectural Professional Practice - Fees
Architectural Professional Practice - FeesArchitectural Professional Practice - Fees
Architectural Professional Practice - FeesGalala University
 
Project Defense
Project DefenseProject Defense
Project DefenseAli Zannah
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxIRESH3
 

Similar to Project report on construction of house/hotel/hostel (20)

3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
 
Running head PMPM .docx
Running head PMPM                                          .docxRunning head PMPM                                          .docx
Running head PMPM .docx
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
 
PM3110 Project Part 1 Kapricia Morris
PM3110 Project Part 1 Kapricia MorrisPM3110 Project Part 1 Kapricia Morris
PM3110 Project Part 1 Kapricia Morris
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Project Blue Update 171108 v7
Project Blue Update 171108 v7Project Blue Update 171108 v7
Project Blue Update 171108 v7
 
Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...
Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...
Green Wulf - Sustainable Gym on Campus / Project Management at SKEMA Business...
 
LECTURE 2 310723 (1)_organized (1).pptx
LECTURE 2 310723 (1)_organized (1).pptxLECTURE 2 310723 (1)_organized (1).pptx
LECTURE 2 310723 (1)_organized (1).pptx
 
Rdpl bank specific profile 22062016
Rdpl  bank specific profile 22062016Rdpl  bank specific profile 22062016
Rdpl bank specific profile 22062016
 
CV_Linked In_2015-03-10
CV_Linked In_2015-03-10CV_Linked In_2015-03-10
CV_Linked In_2015-03-10
 
Project charter j
Project charter jProject charter j
Project charter j
 
Alpha Case Study - Project Management Plan Sample
Alpha Case Study - Project Management Plan SampleAlpha Case Study - Project Management Plan Sample
Alpha Case Study - Project Management Plan Sample
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
Project mangment
Project mangmentProject mangment
Project mangment
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
Architectural Professional Practice - Fees
Architectural Professional Practice - FeesArchitectural Professional Practice - Fees
Architectural Professional Practice - Fees
 
Project Defense
Project DefenseProject Defense
Project Defense
 
Warrington Western Link, Robert Holloway
Warrington Western Link, Robert HollowayWarrington Western Link, Robert Holloway
Warrington Western Link, Robert Holloway
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
 
Project background
Project backgroundProject background
Project background
 

Recently uploaded

Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...sanakhan51485
 
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...kajal
 
Webinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumWebinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumFinTech Belgium
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...jeffreytingson
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetSareena Khatun
 
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize ThemSignificant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them360factors
 
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...rightmanforbloodline
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...priyasharma62062
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfAdnet Communications
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsPriya Reddy
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsDeepika Singh
 
7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator OptionsVince Stanzione
 
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...priyasharma62062
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfJinJiang6
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Adnet Communications
 
logistics industry development power point ppt.pdf
logistics industry development power point ppt.pdflogistics industry development power point ppt.pdf
logistics industry development power point ppt.pdfSalimullah13
 
Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...RaniT11
 
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...priyasharma62062
 
falcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunitiesfalcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunitiesFalcon Invoice Discounting
 

Recently uploaded (20)

Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
Escorts Indore Call Girls-9155612368-Vijay Nagar Decent Fantastic Call Girls ...
 
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
Call Girls in Benson Town / 8250092165 Genuine Call girls with real Photos an...
 
Webinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumWebinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech Belgium
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
 
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize ThemSignificant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them
 
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
Solution Manual For Financial Statement Analysis, 13th Edition By Charles H. ...
 
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
2999,Vashi Fantastic Ellete Call Girls📞📞9833754194 CBD Belapur Genuine Call G...
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options7 tips trading Deriv Accumulator Options
7 tips trading Deriv Accumulator Options
 
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
Premium Call Girls Bangalore Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
Kopar Khairane Cheapest Call Girls✔✔✔9833754194 Nerul Premium Call Girls-Navi...
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
logistics industry development power point ppt.pdf
logistics industry development power point ppt.pdflogistics industry development power point ppt.pdf
logistics industry development power point ppt.pdf
 
Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...Collecting banker, Capacity of collecting Banker, conditions under section 13...
Collecting banker, Capacity of collecting Banker, conditions under section 13...
 
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
 
falcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunitiesfalcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunities
 

Project report on construction of house/hotel/hostel

  • 1. PROJECTMANAGEMENT FOR RENOVATING A HOSTEL Department Of Business Administration Turiba University Professor Ivars Linde Prepared By: Abens Anna Jacob Group: UMA1V22
  • 2. CONTENT 1. ProjectSummary 1.1 ProjectScope 1.2 ProjectJustification and Main Problem 1.3 SWOT Analysis 2. Alternatives 2.1 Evaluation of Alternatives 2.2 Choosing the Best Alternatives 3. Developmentof Concept(WBS) 3.1 Workbreakdown Structure – Alternative A 3.2 Workbreakdown Structure – Alternative B 3.3 Schedule Planning 3.3.1 CPM for Alternative A 3.3.2 CPM for Alternative B 4.1 Cost Estimates for Alternative A (with Gantt chart) 4.1.1 CostEstimates for Alternative B (with Gantt chart) 5. Comparisonof Profitability 6. Strategic Analysis 7. Risk Analysis 7.1 Conclusion about selecting bestalternatives 8. ProjectDescription 9. Conclusion
  • 3. 1. PROJECTSUMMARY: The basic idea is to initiate and develop this project is mainly based on the merging needs of stay in Riga. It has been observed that now a day more and more trend of hostelling has beenfound in twin cities. Hence, it’s creating a business opportunity for many organizations in the near future it’s gone be a profitable business field. According to the data of the Central Statistical Bureau (CSB) in 2015, 2.1 million foreignvisitors stayed in Latvian accommodationestablishments, which is 2.0 % more than in 2014.As compared with 2014,the number of foreignvisitors grew by 3.1 %, reaching 1.5 million. The average length of a stay of foreignvisitors in accommodationestablishments was 2 nights. Of all foreignvisitors “79.1% stayed in Riga”, 8.2 % - in Jūrmala, 1.7 % - in Sigulda county, 1.5% - in Ventspils,1.5% - in Liepāja. Although the issue of safety and security remains the primary reason which keeping people to avoid hostel. As the recent trend shows that people are gaining more confidence about staying in hostel especiallysolo travelers. From 2011 to 2014,for example, SITA World Tours’ solo traveler bookings increased by nearly 64%, generating an increase of more than 90% in sales, the company said. Although a good hostel should present the following factors to the customers forbetter usability: * 24 hour reception; * Transfer from/to airport * Laundry facilities * Printing * Two commonrooms; * Party room; * Fully equipped kitchen; * City maps;
  • 4. * Wi-Fi; * TV & DVD; * Personal Computer; * Tourist Information; * Hairdryers; * Iron and ironing board; * Hot beverages and milk; * Board games; * Parking place; * Book exchange shelf; * Lockers; * Front door keys; * Luggage storage; * Bed linen; * Towels; * Slippers; * Baby cot; * Ear plugs; * Bicycle rent (seasonal) 1.1 PROJECTSCOPE: Since most people only rate a hostel by it look, facilities, amenities and its location and etc… So it is important to selecta good site which is really close to city and easy to connectwith other places. Therefore,we have selected a place in Riga Town because it is really close to supermarkets, restaurants, the train station, the bus station, airport etc…. Renovating a 2 story – building to hostel requires a considerable amount of money. We need to make a good impressionby choosing an exterior productand style that will give a good appeal to the hostel. So, it is very important to designthe hostel in such a way that it can deliver all the needs of our customers.Total area covered forthis projectis 35,000 sq.ft.It is very important to decide how many rooms we want give for rent and how much spacious we need the room to be. Considerhow much money you have in the bank and how much you are willing to borrow when deciding which floor plan to go for. We can easily add more rooms in second floorby adding more room partitions and same time we can reduce the number of rooms by removing the partition. Which allow you to give more single occupancy rooms for solo travelers who preferto stay alone.
  • 5. 1.2 ProjectJustification and Main Problem One of the biggestproblemswhichare oftenfaced bythe travelers is feeling lonely and getting lost in their way. Therefore it is important to offerthem help in social and practical integration process by organizing cultural and social events in order to ensure that the travelers learns to adopt the new local necessities and becomes integrated into the new social network. Anna Builders Pvt. LTD is a reliable construction company. Recently we have signed a contract of renovating a 2 story - building to hostel with modern facilities in Riga town with Mr. Frank Marc. Therefore Anna Builders (Pvt.) Limited will completethe renovation of the hostel as per the requirements and specifications provided by the client. The duration decided forthis projectis 8 months with basement, first floorand second floor. 1.3 SWOT analysis STRENGTH:  Location  Reasonable and Flexible pricing  Heritage & Museums  Night life  Transportation WEAKNESS:  Famous and busy destination  Rely heavily on tourism  Diversity  Things you need to improve OPPORTUNITIES:  Business Hub  Surge in tourist arrivial THREATS:  Pandemic issues  Strong competion  Seasonality SWOT
  • 6. 2. Alternatives For the attainment of the whole development of the project is influenced by the selection of the outstanding alternative which fits better into criteria such as budget, time management, etc. In the course of our research three convenient alternatives emerged that may meet the requirements of our client. In the process within the alternatives there is no distinction between different locations or transport companies etc., but rather between the project team. The three alternatives are described as follows:  Alternative A: The whole renovation will be well planned, designed and organized within the company with a project team. The team has to be determined.  Alternative B: Each distribute task of the construction of hostel to different organization, which has to be decided, made agreement and charged first. But the construction will be monitored by us.  Alternative c: The entire hostel will designed, planned and organized by ourselves 2.1 Evaluation of alternatives BENEFITS LIMITATIONS COSTS RISKS A Chance to distribution of task within the projectteam Payment of wages to project team Intermediate  Diversity of project team  Difference of opinion within the team B Betterprices & service for the client.  Takes time to find an agency  Usually high commission costs High  If the agency does not meet the expectation  Chance of not finding an accurate agency
  • 7. C Give us flexibility during the entire procedure Requires more time Low Overload of work by over estimating our own capabilities 2.2 Choosingthe bestalternatives We decided not consideralternative B because  Time consuming  High risk  Close monitoring is needed  Expensive 3. Developmentof concept 3.1 WORK BREAK DOWN STRUCTURE – ALTERNATIVE A.
  • 8. 3.2 WORK BREAK DOWN STRUCTURE – ALTERNATIVE B. Hostel 1.1 Intiation 1.1.1 Contract 1.1.2 Project Planning 1.1.3 Requirement Gathering 1.1.1.1 Selection Of Team 1..1.1.2Hiring Of Skilled Person 1.2 Project Plan 1.1.3 Allocating a Project team 1.1.4 Budgeting 1.1.5 Resource Allocation 1.3 Design 1.2.1 Interior Design 1.2.2 Exterior Design 1.2.3Design Approval 1.4 Construction 1.4.1 Electrical 1.4.2 Plumbing 1.4.3 Adding more room in second flo by using partitions 1.4.4 Install Kitchen 1.4.5 Install Sanitary facilities 1.4.6 Lay floors 1.4.6 Put up Wall paers 1.4.7 Exter
  • 9. 3.3 SCHEDULE PLANNING 3.3.1 CRITICAL PATH ANALYSIS ALTERNATIVE A: Hostel 1.1 Intiation 1.1.1 Contract 1.1.2 Project Planning 1.1.3 Requiremen t Gathering 1.2 Strategy 1.1.3 Resource planning 1.1.4 Budget Planning 1.1.5 Resource Allocation 1.3 Design 1.2.1 Interior Design 1.2.2 Exterior Design 1.2.3Design Approval 1.4Construction 1.4.1 Electrical 1.4.2 Plumbing 1.4.4 Install Kitchen 1.4.5 Install Sanitary facilities 1.4.6 Lay floors 1.4.6 Put up Wall paers 1.4.7 Exterior Painting 1.5 Start - Up 1.5.1 Test Installion 1.5.2 Hire Staff 1.5.3 Move in
  • 10. 3.3.2 CRITICAL PATH ANALYSIS ALTERNATIVE B: START A B D E F G J K L N O P MH I C
  • 11. 4.1 Cost Estimates for Alternative A: START A B C D E F I J K M N O LG H
  • 12. Project Team Salary/mont h Salary/Day Working days Net salary for Work days Social Tax Total salary with Tax ProjectManager 800,00 26,67 24 640,08 128.02 768.1 Assitant 400,00 13,33 25 333,25 66.65 399.9 Designer/architect 600,00 20,00 10 200,00 40 240 Total 1173,33 234,67 1408,00 Internal Cost/day Working days Net costs Tax VAT Total Cost Electrical 250,00 10 2500,00 50,00 2550,00 Plumbing 300,00 13 3900,00 60,00 3960,00 Walls 112,00 8 896,00 22,40 918,40 Flooring 83,00 14 1162,00 232,40 1394,40
  • 13. Install roofdrains 200,00 4 800,00 160,00 960,00 Install tile intoilet rooms 50,00 3 150,00 30,00 180,00 Paint walls 40,00 6 240,00 48,00 288,00 Ceiling tile 200,00 5 1000,00 200,00 1200,00 Carpet 85,00 14 1190,00 238,00 1428,00 Install electrical fixtures 150,00 3 450,00 90,00 540,00 Install kitchenfixtures 75,00 3 225,00 45,00 270,00 Install sanitaryfixture 60,00 3 180,00 36,00 216,00 Total 13904.8 Event costs/day tax VAT total costs Transport 250,00 50,00 _ Decorations 40,00 8,00 _ Location 250,00 50,00 _ Pour 200,00 40,00 _ Steel columns 300,00 60,00 _ Beams 85,00 17,00 _ Total Net 1063,33 Gross 1310,29 Alternative A Start Date End Date Duratio n in weeks 1.May.2016 24.July.201 6 12 Total Cost 16623.0 9 4.1.1 COST ESTIMATES FOR ALTERNATIVE B:
  • 14. Project Team Salary/mont h Salary/Day Working days Net salary for Work days Social Tax Total salary with Tax ProjectManager 800,00 26,67 35 933,45 186,69 1120,14 Assitant 400,00 13,33 40 533,2 106,64 399,9 Designer/architect 600,00 20,00 10 200,00 40,00 240,0 Total 1666,65 333,33 1760,04 Internal Cost/day Working days Net costs Tax VAT Total Cost Electrical 100,00 15 1500,00 300,00 1800,00 Plumbing 110,00 18 1980,00 396,00 2376,00 Walls 60,00 12 720,00 144,00 864,00 Flooring 83,00 14 1162,00 232,40 1394,40 Install roofdrains 200,00 4 800,00 160,00 960,00
  • 15. Install tile intoilet rooms 50,00 3 150,00 30,00 180,00 Paint walls 20,00 10 200,00 40,00 240,00 Ceiling tile 200,00 5 1000,00 200,00 1200,00 Carpet 85,00 14 1190,00 238,00 1428,00 Install electrical fixtures 60,00 5 300,00 60,00 360,00 Install kitchenfixtures 30,00 7 210,00 42,00 252,00 Install sanitaryfixture 15,00 8 120,00 24,00 144,00 Total 11198,4 0 Event costs/day tax VAT total costs Transport 250,00 50,00 _ Decorations 40,00 8,00 _ Location 250,00 50,00 _ Pour 200,00 40,00 _ Steel columns 300,00 60,00 _ Beams 85,00 17,00 _ Total Net 1063,33 Gross 1310,29 Alternative A Start Date End Date Duratio n in weeks 1.May.2016 08.Oct.201 6 22 W 6D Total Cost 14268,7 3 5. COMPARISON OF PROFITABILITY Alternative - A 2017 2018 2019 2020 Income without tax Project development cost excl VAT - 16623.1 Cash Flow - 16623.1 60000 80000 70000 85000 Corporate Tax (15%) 9000 12000 10500 12750 Cash without tax 51 000 68000 59500 72250
  • 16. Total cash flow 34376.9 51376.9 42876.9 55626.9 Discount Factor 10% 0.909 0.826 0.751 0.683 PV 31248.6 42437.3 32200.55 37993.17 NPV 14625.5 25814.2 15577.45 21370.07 Discount Factor 20% 0.83 0.694 0.579 0.482 PV 28532.83 35655.5 24825.72 26812.16 NPV 11909.73 19032.4 8202.6 10189.06 Discount Factor 30% 0.769 0.592 0.455 0.35 PV 26435.8 30415.1 19508.9 25287.5 NPV 9812.7 13792 2885.88 8664.4 IRR = r1 + NPVr1 (r2-r1) NPVr1 – NPVr2 R1 = 0.1; R2 = 0.2 IRR = 63.8% Alternative - B 2017 2018 2019 2020 Income without tax Project development cost excl VAT - 14268.7 Cash Flow - 14268.7 50000 75000 83000 85000 Corporate Tax (15%) 7500 11250 12450 12750 Cash without tax 42 500 63750 70550 72250 Total cash flow 28231.3 49481.3 56281.3 57981.3 Discount Factor 10% 0.909 0.826 0.751 0.683 PV 25662.25 40871.55 42267.25 39601.22 NPV 11393.55 26602.85 27998.5 25332.52 Discount Factor 20% 0.83 0.694 0.579 0.482 PV 23431.9 34340.02 32586.87 27946.98 NPV 9163.2 20071.32 18318.17 13678.28
  • 17. Discount Factor 30% 0.769 0.592 0.455 0.35 PV 21709.8 29292.92 25607.9 20293.45 NPV 7441.16 15024.22 11339.29 6024.75 IRR = r1 + NPVr1 (r2-r1) NPVr1 – NPVr2 R1 = 0.1; R2 = 0.2 IRR = 61.08% 4.1.2 TASK PLAN 6. Strategic analysis CriteriaWeight Alternative A Weighted Score Alternative B Weighted Score
  • 18. 1. Observance of time schedule 20% 4 0,8 3 0,6 2. Simultaneous processing of tasks 15% 4 0,6 2 0,3 3. Level of influence by stakeholders 10% 2 0,2 4 0,4 4. Provides appropriate 30% 3 0,9 5 1,5 5. Sponsorships 25% 5 1,25 5 1,25 100% 3,75 4,05 7. Risk analysis SCALE LOW 0-5 MODERATE 6-10 SIGNIFICANT 11-15 HIGH 16-20 Alternative A Typesofrisks Risks Evaluation Activity
  • 19. economic 1. Delay in funds 2. Wrong budget calculation 3. Underestimation in terms of required time 4 1. Ongoing information exchange with sponsors 2. Rechecking event budget calculation 3. Observance of time management plan social 1.Decision-making without informing Stakeholder 1.5 1. Arrange regular stakeholder technical 1. Machinery does not work properly 2 1. Purchase new machinery or backup machinery Alternative B Types of risks Risks Evaluation Activity Economic 1. Working overtime which leads to increased salaries 2. Delay in funds 3. Wrong budget calculation 4.5 1. Monitoring the work progress and observance of time schedule 2. Time to time project progress update with stakeholders 3. Rechecking budget calculation Social 1. Internal diversity within project team 2. Project Manager could take autonomous decisions 3 1. Conducting regular team meetings 2. Manager update project knowledge with other team members technical 1. Inflation 2 1. Reserve extra material to handle this risk 7.1 Conclusion about selecting best alternative Alternatives economic social Technical sum A 4 1.5 2 7.5
  • 20. В 4.5 3 2 9.5 ProjectDescription: During the renovation of the building we can expect to accumulate many documents ranging from floor plans to inspirational photographs, product catalogs and design ideas. The Home Building Organizer is a flexible 3-ring binder that includes detailed budget worksheets, product ideas and organizational tools to assist in managing your entire home building process. This binder will prove to be invaluable in helping you stay organized. It also makes a great scrapbook. When deciding on the design of hostel, we need to take note of the rooms and features the client included. Having all single occupancy rooms on the second floor also gives privacy and all double occupancy rooms on first gives easy accessibility. Consider all single occupancy rooms on first floor which gives more flexibility and greater view of the city from balcony. First Floor: 35000 Sq.Ft No rooms: 6 double rooms Second floor: No rooms: 8 single rooms The scope of this Project includes: • developing the construction plans, the grading plans and the landscape plans acquiring all required permits and approvals installation of the water well and a water system including a pump and all required piping installation of a properly designed and the garage with a parking area adequate for at least 6 average sized vehicles the parking area. Title Construction of a Hostel Alternative A Main Problem: There are numerous important challenges facing today's construction industry. Some of the construction issues include workforce considerations, safety, time constraints, and the changing nature of the work. Non-construction challenges that construction industry faces that are part of the business landscape include legal issues, government regulations, environmental concerns, and socio- political pressures. Also in addition to these challenges, the construction industry is highly competitive, and firms must
  • 21. continually improve their productivity to remain competitive. The identification of material, identifying materials moving flow in logistics and tracking materials location are needed for successful project management in construction. •A positive image of the construction industry as a career choice. •The transfer of skills from other sectors, such as agriculture, fishing, aquaculture and forestry, to the construction industry. •Local employers able to effectively compete for the large scale construction contracts. Realization In order to bring them together and to get to know each other it seems obvious to organize a special event for it. The fact that will not have many contacts in the beginning of construction will make it all the more important to get business use social media and online sites for marketing the hostel. The successful completion of this project depends upon the following external processes: The contracted Home Builders must complete construction of the hostel no later than the date to which they have agreed with the client. Project duration(12 weeks, registration period excluded): Starting:01.05.2016 Ending:24.07.2016 Project budget(€): 20000.00 € Total Costs: 16623.09 € Conclusion: In the years ahead, the construction industry must has to overcome different challenges with respect to building environment, transportation, power or natural hazards. The Construction industry is comprised of clients, designers and contractors. But in the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The outstanding performance underdemanding situations in the past will stand in good stead and give confidence to the construction industry to bring about an overall development in the infrastructure of the nation. The gains of large investments in the mega-projects eventually will feedback to the
  • 22. constructionindustry itself in the form of bettereconomy and improved work conditions. As efficiencycodes have come into effectin recent years, new construction technologies and methods have emerged. New techniques of building construction are being researched, made possible by advances in 3D printing technology. In a form of additive building construction, similar to the additive manufacturing techniques for manufactured parts, building printing is making it possible to flexiblyconstructsmall commercialbuildings and private habitations in around 20 hours, with built-in plumbing and electrical facilities, in one continuous build, using large 3D printers. In the current trend of sustainable construction, the recent movements of New Urbanism and New Classical Architecture promote a sustainable approach towards construction, that appreciates and develops smart growth, architectural tradition and classical design.