SlideShare a Scribd company logo
1 of 7
PM 584 Week 1 Individual Assignment Project Baseline (2
Papers)
FOR MORE CLASSES VISIT
www.pm584study.com
This Tutorial contains 2 Papers
Resource: Risk Management Plan Outline
Select a scenario for your final project. Research and identify a
suitable project for risk management discussion and analysis. Several
examples are available in weekly readings. The following guidelines
apply:
The project must contain detailed information related to overall project
requirements and related risks.
The project must contain adequate substance to support discussing
risk identification, risk documentation, and contingency planning.
The project must be ongoing and approved by your facilitator.
The project may be documented through research or a personal
experience.
If you are unable to locate a suitable project in research, two scenarios
are available in the virtual organization.
Write a paper of no more than 1,050 words that describes the project’s
background and general requirements, which must include
prescheduled milestones, cost constraints, and quality requirements.
The paper must relay the theoretical and practical application of the
following:
The framework for risk identification in the project; for example:
WBS, brainstorming, and critical success factors
Fault tree and event tree techniques and how they could be used to
identify risks
Project risks in the selected scenario
Elements used in documenting project risks
Portion of assignment utilized in final project
-------------------------------------------------------------------------------
PM 584 Week 2 Learning Team Assignment Qualitative
Risk Assessment
FOR MORE CLASSES VISIT
www.pm584study.com
Resources: Risk Management Plan Outline, text readings
Make a presentation of 10-12 slides utilizing the scenario you selected
last week. Each team member researches two tools or methods for
qualitative risk analysis in the risk management industry.
· Description of tool or method
· One selected risk from your project
· How chosen risk could be qualitatively analyzed using tool or
method
· Assessment of efficiencies or deficiencies
· Evaluation of risk scope and severity using qualitative analysis
methods
· Narrative that asserts theoretical application of qualitative risk
analysis
· Summation of tools and methods with pros and cons of each,
preferably with a tabular format and a supporting narrative
· Top three qualitative tools or methodology assessment with
explanation
Complete individual and team elements to attain full points. A portion
of this assignment is utilized in your final project.
Format your paper consistent with APA guidelines.
-------------------------------------------------------------------------------
PM 584 Week 3 Individual Assignment Quantitative Risk
Assessment(2 Papers)
FOR MORE CLASSES VISIT
www.pm584study.com
This Tutorial contains 2 Papers
Resources: Risk Management Plan Outline, assigned readings
Write a paper of no more than 1,400 words, including tables and
matrix, that includes the following:
Revision of project background that clarifies project scope,
requirements, schedule, quality, and constraints
Updated risk identification framework
Qualified and quantified risk matrix with low, medium, and high
qualitative assessments linked to quantifiable measures and risk
factors, with performance of a risk assessment using a risk matrix,
including:
Calculation of project risk factors
Risk quantified in terms of cost, schedule, and performance
Prioritized risk register, including the following:
· Risk description
· Initial low, medium, or high risk assessment
· Risk priority in the overall risk management plan
Note. A portion of this assignment is utilized in the final project.
Format your paper consistent with APA guidelines
-------------------------------------------------------------------------------
PM 584 Week 4 Individual Assignment Risk Management
Planning
FOR MORE CLASSES VISIT
www.pm584study.com
Resources: Risk Management Plan Outline, assigned reading
Prepare a paper of no more than 1,050 words, including the following
elements:
• Determine project risk management procedures and relay forms of
risk management.
• Determine responses to potential risks. Relay initial risk response
measures for risks in earlier weeks.
• Create a risk action plan. Relay the components of a risk action plan
and provide one example of a risk in your project. A portion of this
assignment is utilized in your final project.
Format your paper consistent with APA guidelines.
-------------------------------------------------------------------------------
PM 584 Week 5 Learning Team Assignment Risk
Monitoring and Reporting Practices
FOR MORE CLASSES VISIT
www.pm584study.com
Resources: Risk Management Plan Outline, assigned reading
Write a paper of no more than 1,750 words.
Research, individually, one risk monitoring and one risk reporting
practice from your project’s industry. Each synopsis must be no more
than 150 words, including the following:
· One risk monitoring and one risk reporting practice
· A description of the risk monitoring and reporting practices
· An explanation of their links to other procedures
· The positive and negative aspects of risk monitoring and
reporting
· Lessons learned that could be applied to your project
Analyze, as a team, in approximately 1,400 words, the following
elements:
· Narrative that asserts theoretical application of risk monitoring
and reporting, including the analysis of project risk reporting
requirements
· A summation of risk monitoring and reporting methods with
pros and cons of each, preferably with tabular format and a
supporting narrative
· Top two risk monitoring and reporting formats with an
explanation of why these formats were chosen
Complete both elements to attain full points. A portion of this
assignment is utilized in your final project.
Format your paper consistent with APA guidelines.
-------------------------------------------------------------------------------
PM 584 Week 6 Individual Assignment Project Risk
Management Plan (2 Papers)
FOR MORE CLASSES VISIT
www.pm584study.com
This Tutorial contains 2 Papers
Resources: Risk Management Plan Outline, assigned reading
Write a paper of no more than 1,750 words following the outline of a
risk management plan. Refer to the Risk Management Plan Outline as
an example of what the outline must look like. The word count
includes tables
Incorporate all individual and team assessments.
Include a synopsis determining measures to mitigate project risks and
these elements:
· A minimum of two real-world risk management plans related to
your project
· The viability of the plans
· A comparison of your proposed risk management plan with real-
world standards
Format your paper consistent with APA guidelines.
-------------------------------------------------------------------------------

More Related Content

What's hot

PM 584 STUDY Education Your Life / pm584study.com
PM 584 STUDY Education Your Life / pm584study.comPM 584 STUDY Education Your Life / pm584study.com
PM 584 STUDY Education Your Life / pm584study.comkopiko19
 
PM 584 STUDY Redefined Education--pm584study.com
PM 584 STUDY Redefined Education--pm584study.comPM 584 STUDY Redefined Education--pm584study.com
PM 584 STUDY Redefined Education--pm584study.comkopiko185
 
Pm 584 studyPM 584 STUDY Education Counseling--pm584study.com
Pm 584 studyPM 584 STUDY Education Counseling--pm584study.comPm 584 studyPM 584 STUDY Education Counseling--pm584study.com
Pm 584 studyPM 584 STUDY Education Counseling--pm584study.comvenkat60043
 
Risk management overview
Risk management overviewRisk management overview
Risk management overviewHossam Maghrabi
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & SkillsPMC Mentor
 
11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk Analysis11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk AnalysisDavidMcLachlan1
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis Shereef Sabri
 
R I S K M A N A G E M E N T
R I S K  M A N A G E M E N TR I S K  M A N A G E M E N T
R I S K M A N A G E M E N Tmadhav shirur
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part twoHossam Maghrabi
 
Fundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & ControlFundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & ControlAssociation for Project Management
 
2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...
2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...
2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...Ashish Mishra
 
BUS 519 Education Organization -- snaptutorial.com
BUS 519   Education Organization -- snaptutorial.comBUS 519   Education Organization -- snaptutorial.com
BUS 519 Education Organization -- snaptutorial.comDavisMurphyB97
 
iSQI Certification Days Advanced Level Test Analyst Graham Bath
iSQI Certification Days Advanced Level Test Analyst Graham BathiSQI Certification Days Advanced Level Test Analyst Graham Bath
iSQI Certification Days Advanced Level Test Analyst Graham BathIevgenii Katsan
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupTùng Trần Thanh
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part threeHossam Maghrabi
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OneHossam Maghrabi
 
How to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysisHow to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysisiZenBridge Consultancy Pvt. Ltd.
 
12. Project Risk Management
12. Project Risk Management12. Project Risk Management
12. Project Risk ManagementBhuWan Khadka
 

What's hot (20)

PM 584 STUDY Education Your Life / pm584study.com
PM 584 STUDY Education Your Life / pm584study.comPM 584 STUDY Education Your Life / pm584study.com
PM 584 STUDY Education Your Life / pm584study.com
 
PM 584 STUDY Redefined Education--pm584study.com
PM 584 STUDY Redefined Education--pm584study.comPM 584 STUDY Redefined Education--pm584study.com
PM 584 STUDY Redefined Education--pm584study.com
 
Pm 584 studyPM 584 STUDY Education Counseling--pm584study.com
Pm 584 studyPM 584 STUDY Education Counseling--pm584study.comPm 584 studyPM 584 STUDY Education Counseling--pm584study.com
Pm 584 studyPM 584 STUDY Education Counseling--pm584study.com
 
Risk management overview
Risk management overviewRisk management overview
Risk management overview
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
 
11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk Analysis11.3 Perform Qualitative Risk Analysis
11.3 Perform Qualitative Risk Analysis
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
R I S K M A N A G E M E N T
R I S K  M A N A G E M E N TR I S K  M A N A G E M E N T
R I S K M A N A G E M E N T
 
Monitor and control process group part two
Monitor and control process group part twoMonitor and control process group part two
Monitor and control process group part two
 
Fundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & ControlFundamentals of Project Planning, Scheduling, Monitoring & Control
Fundamentals of Project Planning, Scheduling, Monitoring & Control
 
2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...
2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...
2 to 3 days End to End Test Management Test Strategy Estimation and Metrics W...
 
BUS 519 Education Organization -- snaptutorial.com
BUS 519   Education Organization -- snaptutorial.comBUS 519   Education Organization -- snaptutorial.com
BUS 519 Education Organization -- snaptutorial.com
 
iSQI Certification Days Advanced Level Test Analyst Graham Bath
iSQI Certification Days Advanced Level Test Analyst Graham BathiSQI Certification Days Advanced Level Test Analyst Graham Bath
iSQI Certification Days Advanced Level Test Analyst Graham Bath
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
 
Pmbok 5th planning process group part three
Pmbok 5th planning process group part threePmbok 5th planning process group part three
Pmbok 5th planning process group part three
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
How to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysisHow to Prioritize Risks with Qualitative and Quantitative Risk analysis
How to Prioritize Risks with Qualitative and Quantitative Risk analysis
 
Introduction to schedule management
Introduction to schedule managementIntroduction to schedule management
Introduction to schedule management
 
12. Project Risk Management
12. Project Risk Management12. Project Risk Management
12. Project Risk Management
 

Similar to PM 584 STUDY Become Exceptional--pm584study.com

Pm 584 Success Begins / snaptutorial.com
Pm 584  Success Begins / snaptutorial.comPm 584  Success Begins / snaptutorial.com
Pm 584 Success Begins / snaptutorial.comWilliamsTaylor88
 
Bus 519 Enhance teaching / snaptutorial.com
Bus 519  Enhance teaching / snaptutorial.comBus 519  Enhance teaching / snaptutorial.com
Bus 519 Enhance teaching / snaptutorial.comHarrisGeorg50
 
1 Assignment Objectives Introduction to Project Risk Managemen.docx
1 Assignment Objectives Introduction to Project Risk Managemen.docx1 Assignment Objectives Introduction to Project Risk Managemen.docx
1 Assignment Objectives Introduction to Project Risk Managemen.docxhoney725342
 
BUS 377 Massive Success / snaptutorial.com
BUS 377 Massive Success / snaptutorial.comBUS 377 Massive Success / snaptutorial.com
BUS 377 Massive Success / snaptutorial.comsantricksapiens46
 
Bus 377 Success Begins / snaptutorial.com
Bus 377 Success Begins / snaptutorial.comBus 377 Success Begins / snaptutorial.com
Bus 377 Success Begins / snaptutorial.comRobinson044
 
Project Report-All Chapters,Sections (1).pptx
Project Report-All Chapters,Sections (1).pptxProject Report-All Chapters,Sections (1).pptx
Project Report-All Chapters,Sections (1).pptxK214884SoorajKumar
 
CIS 525 Education guide/Tutorialrank.com
CIS 525 Education guide/Tutorialrank.comCIS 525 Education guide/Tutorialrank.com
CIS 525 Education guide/Tutorialrank.comnummaju
 
Amp 434 Exceptional Education / snaptutorial.com
Amp 434  Exceptional Education / snaptutorial.comAmp 434  Exceptional Education / snaptutorial.com
Amp 434 Exceptional Education / snaptutorial.comBaileya42
 
PROJ 587 Effective Communication - tutorialrank.com
PROJ 587 Effective Communication - tutorialrank.comPROJ 587 Effective Communication - tutorialrank.com
PROJ 587 Effective Communication - tutorialrank.comBartholomew60
 
BUSN 412 CART Possible Is Everything / busn412cart.com
BUSN 412 CART Possible Is Everything / busn412cart.comBUSN 412 CART Possible Is Everything / busn412cart.com
BUSN 412 CART Possible Is Everything / busn412cart.comalbert0131
 
BUSN 412 CART Education Counseling--busn412cart.com
 BUSN 412 CART Education Counseling--busn412cart.com BUSN 412 CART Education Counseling--busn412cart.com
BUSN 412 CART Education Counseling--busn412cart.comshanaabe12
 
Criteria for Research AssignmentPSCI 1010· The paper is due on.docx
Criteria for Research AssignmentPSCI 1010· The paper is due on.docxCriteria for Research AssignmentPSCI 1010· The paper is due on.docx
Criteria for Research AssignmentPSCI 1010· The paper is due on.docxwillcoxjanay
 
Amp 434 Education Specialist -snaptutorial.com
Amp 434   Education Specialist -snaptutorial.comAmp 434   Education Specialist -snaptutorial.com
Amp 434 Education Specialist -snaptutorial.comDavisMurphyC32
 
BUSN 412 Success Begins /newtonhelp.com 
BUSN 412 Success Begins /newtonhelp.com BUSN 412 Success Begins /newtonhelp.com 
BUSN 412 Success Begins /newtonhelp.com myblue130
 

Similar to PM 584 STUDY Become Exceptional--pm584study.com (16)

Pm 584 Success Begins / snaptutorial.com
Pm 584  Success Begins / snaptutorial.comPm 584  Success Begins / snaptutorial.com
Pm 584 Success Begins / snaptutorial.com
 
Bus 519 Enhance teaching / snaptutorial.com
Bus 519  Enhance teaching / snaptutorial.comBus 519  Enhance teaching / snaptutorial.com
Bus 519 Enhance teaching / snaptutorial.com
 
1 Assignment Objectives Introduction to Project Risk Managemen.docx
1 Assignment Objectives Introduction to Project Risk Managemen.docx1 Assignment Objectives Introduction to Project Risk Managemen.docx
1 Assignment Objectives Introduction to Project Risk Managemen.docx
 
BUS 377 Massive Success / snaptutorial.com
BUS 377 Massive Success / snaptutorial.comBUS 377 Massive Success / snaptutorial.com
BUS 377 Massive Success / snaptutorial.com
 
Bus 377 Success Begins / snaptutorial.com
Bus 377 Success Begins / snaptutorial.comBus 377 Success Begins / snaptutorial.com
Bus 377 Success Begins / snaptutorial.com
 
Project Report-All Chapters,Sections (1).pptx
Project Report-All Chapters,Sections (1).pptxProject Report-All Chapters,Sections (1).pptx
Project Report-All Chapters,Sections (1).pptx
 
CIS 525 Education guide/Tutorialrank.com
CIS 525 Education guide/Tutorialrank.comCIS 525 Education guide/Tutorialrank.com
CIS 525 Education guide/Tutorialrank.com
 
Amp 434 Exceptional Education / snaptutorial.com
Amp 434  Exceptional Education / snaptutorial.comAmp 434  Exceptional Education / snaptutorial.com
Amp 434 Exceptional Education / snaptutorial.com
 
PROJ 587 Effective Communication - tutorialrank.com
PROJ 587 Effective Communication - tutorialrank.comPROJ 587 Effective Communication - tutorialrank.com
PROJ 587 Effective Communication - tutorialrank.com
 
BUSN 412 CART Possible Is Everything / busn412cart.com
BUSN 412 CART Possible Is Everything / busn412cart.comBUSN 412 CART Possible Is Everything / busn412cart.com
BUSN 412 CART Possible Is Everything / busn412cart.com
 
Bsa 376 week 2 dq 2
Bsa 376 week 2 dq 2Bsa 376 week 2 dq 2
Bsa 376 week 2 dq 2
 
BUSN 412 CART Education Counseling--busn412cart.com
 BUSN 412 CART Education Counseling--busn412cart.com BUSN 412 CART Education Counseling--busn412cart.com
BUSN 412 CART Education Counseling--busn412cart.com
 
Criteria for Research AssignmentPSCI 1010· The paper is due on.docx
Criteria for Research AssignmentPSCI 1010· The paper is due on.docxCriteria for Research AssignmentPSCI 1010· The paper is due on.docx
Criteria for Research AssignmentPSCI 1010· The paper is due on.docx
 
Amp 434 Education Specialist -snaptutorial.com
Amp 434   Education Specialist -snaptutorial.comAmp 434   Education Specialist -snaptutorial.com
Amp 434 Education Specialist -snaptutorial.com
 
BUSN 412 Success Begins /newtonhelp.com 
BUSN 412 Success Begins /newtonhelp.com BUSN 412 Success Begins /newtonhelp.com 
BUSN 412 Success Begins /newtonhelp.com 
 
Bsa 376 week 1 dq 1
Bsa 376 week 1 dq 1Bsa 376 week 1 dq 1
Bsa 376 week 1 dq 1
 

Recently uploaded

Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...EduSkills OECD
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptxPoojaSen20
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxAdelaideRefugio
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxLimon Prince
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxneillewis46
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi RajagopalEADTU
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...Nguyen Thanh Tu Collection
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesAmanpreetKaur157993
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppCeline George
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxCeline George
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesPooky Knightsmith
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhleson0603
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....Ritu480198
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxMarlene Maheu
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjMohammed Sikander
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint23600690
 

Recently uploaded (20)

Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
e-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopale-Sealing at EADTU by Kamakshi Rajagopal
e-Sealing at EADTU by Kamakshi Rajagopal
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
How to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptxHow to Manage Website in Odoo 17 Studio App.pptx
How to Manage Website in Odoo 17 Studio App.pptx
 
Trauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical PrinciplesTrauma-Informed Leadership - Five Practical Principles
Trauma-Informed Leadership - Five Practical Principles
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
Book Review of Run For Your Life Powerpoint
Book Review of Run For Your Life PowerpointBook Review of Run For Your Life Powerpoint
Book Review of Run For Your Life Powerpoint
 

PM 584 STUDY Become Exceptional--pm584study.com

  • 1. PM 584 Week 1 Individual Assignment Project Baseline (2 Papers) FOR MORE CLASSES VISIT www.pm584study.com This Tutorial contains 2 Papers Resource: Risk Management Plan Outline Select a scenario for your final project. Research and identify a suitable project for risk management discussion and analysis. Several examples are available in weekly readings. The following guidelines apply: The project must contain detailed information related to overall project requirements and related risks. The project must contain adequate substance to support discussing risk identification, risk documentation, and contingency planning. The project must be ongoing and approved by your facilitator. The project may be documented through research or a personal experience. If you are unable to locate a suitable project in research, two scenarios are available in the virtual organization. Write a paper of no more than 1,050 words that describes the project’s background and general requirements, which must include prescheduled milestones, cost constraints, and quality requirements. The paper must relay the theoretical and practical application of the following:
  • 2. The framework for risk identification in the project; for example: WBS, brainstorming, and critical success factors Fault tree and event tree techniques and how they could be used to identify risks Project risks in the selected scenario Elements used in documenting project risks Portion of assignment utilized in final project ------------------------------------------------------------------------------- PM 584 Week 2 Learning Team Assignment Qualitative Risk Assessment FOR MORE CLASSES VISIT www.pm584study.com Resources: Risk Management Plan Outline, text readings Make a presentation of 10-12 slides utilizing the scenario you selected last week. Each team member researches two tools or methods for qualitative risk analysis in the risk management industry. · Description of tool or method · One selected risk from your project · How chosen risk could be qualitatively analyzed using tool or method · Assessment of efficiencies or deficiencies
  • 3. · Evaluation of risk scope and severity using qualitative analysis methods · Narrative that asserts theoretical application of qualitative risk analysis · Summation of tools and methods with pros and cons of each, preferably with a tabular format and a supporting narrative · Top three qualitative tools or methodology assessment with explanation Complete individual and team elements to attain full points. A portion of this assignment is utilized in your final project. Format your paper consistent with APA guidelines. ------------------------------------------------------------------------------- PM 584 Week 3 Individual Assignment Quantitative Risk Assessment(2 Papers) FOR MORE CLASSES VISIT www.pm584study.com This Tutorial contains 2 Papers Resources: Risk Management Plan Outline, assigned readings Write a paper of no more than 1,400 words, including tables and matrix, that includes the following: Revision of project background that clarifies project scope, requirements, schedule, quality, and constraints Updated risk identification framework
  • 4. Qualified and quantified risk matrix with low, medium, and high qualitative assessments linked to quantifiable measures and risk factors, with performance of a risk assessment using a risk matrix, including: Calculation of project risk factors Risk quantified in terms of cost, schedule, and performance Prioritized risk register, including the following: · Risk description · Initial low, medium, or high risk assessment · Risk priority in the overall risk management plan Note. A portion of this assignment is utilized in the final project. Format your paper consistent with APA guidelines ------------------------------------------------------------------------------- PM 584 Week 4 Individual Assignment Risk Management Planning FOR MORE CLASSES VISIT www.pm584study.com Resources: Risk Management Plan Outline, assigned reading Prepare a paper of no more than 1,050 words, including the following elements: • Determine project risk management procedures and relay forms of risk management.
  • 5. • Determine responses to potential risks. Relay initial risk response measures for risks in earlier weeks. • Create a risk action plan. Relay the components of a risk action plan and provide one example of a risk in your project. A portion of this assignment is utilized in your final project. Format your paper consistent with APA guidelines. ------------------------------------------------------------------------------- PM 584 Week 5 Learning Team Assignment Risk Monitoring and Reporting Practices FOR MORE CLASSES VISIT www.pm584study.com Resources: Risk Management Plan Outline, assigned reading Write a paper of no more than 1,750 words. Research, individually, one risk monitoring and one risk reporting practice from your project’s industry. Each synopsis must be no more than 150 words, including the following: · One risk monitoring and one risk reporting practice · A description of the risk monitoring and reporting practices · An explanation of their links to other procedures · The positive and negative aspects of risk monitoring and reporting · Lessons learned that could be applied to your project
  • 6. Analyze, as a team, in approximately 1,400 words, the following elements: · Narrative that asserts theoretical application of risk monitoring and reporting, including the analysis of project risk reporting requirements · A summation of risk monitoring and reporting methods with pros and cons of each, preferably with tabular format and a supporting narrative · Top two risk monitoring and reporting formats with an explanation of why these formats were chosen Complete both elements to attain full points. A portion of this assignment is utilized in your final project. Format your paper consistent with APA guidelines. ------------------------------------------------------------------------------- PM 584 Week 6 Individual Assignment Project Risk Management Plan (2 Papers) FOR MORE CLASSES VISIT www.pm584study.com This Tutorial contains 2 Papers Resources: Risk Management Plan Outline, assigned reading Write a paper of no more than 1,750 words following the outline of a risk management plan. Refer to the Risk Management Plan Outline as an example of what the outline must look like. The word count includes tables
  • 7. Incorporate all individual and team assessments. Include a synopsis determining measures to mitigate project risks and these elements: · A minimum of two real-world risk management plans related to your project · The viability of the plans · A comparison of your proposed risk management plan with real- world standards Format your paper consistent with APA guidelines. -------------------------------------------------------------------------------