This document discusses the key steps and considerations for planning, designing, and implementing an information system project, including:
1) Creating a project plan that defines the tasks, team members, timeline, costs, and resources.
2) Addressing important social and ethical design issues like privacy, security, intellectual property, and equity.
3) Using prototypes to help understand requirements for complex problems through an iterative process.
4) Conducting feasibility studies and choosing appropriate solutions based on whether the problem can and should be solved.
This document discusses several topics related to management information systems:
1. It asks to list the major subsystems and typical reports generated within functional areas in an organization.
2. It asks how important the implementation phase is for MIS development and briefly discusses implementation strategies and when they are suitable.
3. It asks about expert systems, how they help with decision-making, and what kinds of decisions can be programmed into expert systems.
4. It outlines the basic steps for acquiring a database management system and why solely relying on benchmark tests for selection is risky.
5. It asks to differentiate among trojans, worms, and viruses, provide an example of each, and justify how computer viruses pose a major
CIS 558 Effective Communication - tutorialrank.comBartholomew22
For more course tutorials visit
www.tutorialrank.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
The document discusses various topics related to CIS 558, including COBIT planning, developing an ERM plan, mitigating wireless risk, obstacles to CMMI development, automated auditing, audit project control, identity and access management, effective disaster recovery plans, change and patch management, and quality assurance and auditing standards. It provides discussion questions for each topic and information on assignments related to developing an ERM roadmap, mitigating cloud computing risks, software engineering and CMMI, HIPAA and IT audits, and managing an IT infrastructure audit. The document provides resources for researching and completing the assignments.
CIS 558 RANK Lessons in Excellence--cis558rank.comRoelofMerwe143
Organizations establish the five COBIT IT governance focus areas through strategic planning and risk management. If tasked with planning a COBIT compliance project, key areas likely to be problematic are resource management and performance management. Two possible solutions are to obtain executive buy-in to dedicate resources, and to establish clear and measurable goals. The document then lists the discussion questions for CIS 558 weeks 1 through 11.
Organizations establish the five COBIT IT governance focus areas through strategic planning and risk management. If tasked with planning a COBIT compliance project, key areas likely to be problematic are resource management and performance management. Two possible solutions are to obtain additional funding and resources, and to set clear and measurable goals. The document then lists the discussion questions for CIS 558 weeks 1 through 11 and provides information on related tutorials and assignments.
Organizations establish the five COBIT IT governance focus areas through strategic planning and risk management. If tasked with planning a COBIT compliance project, key areas likely to be problematic are resource management and performance management. Two possible solutions are to obtain additional funding and resources, and to set clear and measurable goals. The document then lists the discussion questions for CIS 558 weeks 1 through 11 and provides information on related tutorials and assignments.
The document discusses several topics related to COBIT and enterprise risk management (ERM). It describes how organizations establish the five COBIT focus areas of strategic alignment, value delivery, risk management, resource management, and performance management. It then asks the reader to predict which key areas would be problematic to implement for a COBIT compliance project and suggest solutions. It provides discussion questions for 11 weeks of a course on topics like developing an ERM plan, mitigating wireless risks, obstacles to CMMI development, automated auditing, and more.
This document discusses the key steps and considerations for planning, designing, and implementing an information system project, including:
1) Creating a project plan that defines the tasks, team members, timeline, costs, and resources.
2) Addressing important social and ethical design issues like privacy, security, intellectual property, and equity.
3) Using prototypes to help understand requirements for complex problems through an iterative process.
4) Conducting feasibility studies and choosing appropriate solutions based on whether the problem can and should be solved.
This document discusses several topics related to management information systems:
1. It asks to list the major subsystems and typical reports generated within functional areas in an organization.
2. It asks how important the implementation phase is for MIS development and briefly discusses implementation strategies and when they are suitable.
3. It asks about expert systems, how they help with decision-making, and what kinds of decisions can be programmed into expert systems.
4. It outlines the basic steps for acquiring a database management system and why solely relying on benchmark tests for selection is risky.
5. It asks to differentiate among trojans, worms, and viruses, provide an example of each, and justify how computer viruses pose a major
CIS 558 Effective Communication - tutorialrank.comBartholomew22
For more course tutorials visit
www.tutorialrank.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
The document discusses various topics related to CIS 558, including COBIT planning, developing an ERM plan, mitigating wireless risk, obstacles to CMMI development, automated auditing, audit project control, identity and access management, effective disaster recovery plans, change and patch management, and quality assurance and auditing standards. It provides discussion questions for each topic and information on assignments related to developing an ERM roadmap, mitigating cloud computing risks, software engineering and CMMI, HIPAA and IT audits, and managing an IT infrastructure audit. The document provides resources for researching and completing the assignments.
CIS 558 RANK Lessons in Excellence--cis558rank.comRoelofMerwe143
Organizations establish the five COBIT IT governance focus areas through strategic planning and risk management. If tasked with planning a COBIT compliance project, key areas likely to be problematic are resource management and performance management. Two possible solutions are to obtain executive buy-in to dedicate resources, and to establish clear and measurable goals. The document then lists the discussion questions for CIS 558 weeks 1 through 11.
Organizations establish the five COBIT IT governance focus areas through strategic planning and risk management. If tasked with planning a COBIT compliance project, key areas likely to be problematic are resource management and performance management. Two possible solutions are to obtain additional funding and resources, and to set clear and measurable goals. The document then lists the discussion questions for CIS 558 weeks 1 through 11 and provides information on related tutorials and assignments.
Organizations establish the five COBIT IT governance focus areas through strategic planning and risk management. If tasked with planning a COBIT compliance project, key areas likely to be problematic are resource management and performance management. Two possible solutions are to obtain additional funding and resources, and to set clear and measurable goals. The document then lists the discussion questions for CIS 558 weeks 1 through 11 and provides information on related tutorials and assignments.
The document discusses several topics related to COBIT and enterprise risk management (ERM). It describes how organizations establish the five COBIT focus areas of strategic alignment, value delivery, risk management, resource management, and performance management. It then asks the reader to predict which key areas would be problematic to implement for a COBIT compliance project and suggest solutions. It provides discussion questions for 11 weeks of a course on topics like developing an ERM plan, mitigating wireless risks, obstacles to CMMI development, automated auditing, and more.
For more classes visit
www.snaptutorial.com
CIS 348 Week 1 Discussion
"Characteristics of Failing Projects" Please respond to the following:
Read the computer world article titled, “Detecting Disaster Projects”. Next, defend three (3) of the twelve (12) characteristics of disaster projects offered by
Strayer cis 348 week 3 assignment 2 business caseshyaminfo30
STRAYER CIS 348 Week 3 Assignment 2 Business Case (2 Papers) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-348-strayer/cis-348-week-3-assignment-2-business-case-new
For more classes visit
http://www.assignmentcloud.com/
This Tutorial contains 2 Papers
CIS 348 Week 3 Assignment 2: Business Case
Due Week 3 and worth 85 points
Imagine that you work as a project manager for a company that buys and sells used textbooks. The main sales channel is a Web application.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
CIS 498 Effective Communication - snaptutorial.comdonaldzs1
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary
For more course tutorials visit
www.newtonhelp.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Suppose senior management has tasked you with the planning of
For more classes visit
www.snaptutorial.com
CIS 348 Week 1 Discussion
"Characteristics of Failing Projects" Please respond to the following:
Read the computer world article titled, “Detecting Disaster Projects”. Next, defend three (3) of the twelve (12)
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to
FOR MORE CLASSES VISIT
www.cis558rank.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Suppose senior management has tasked you with the planning of the COBIT compliance project. In terms of the COBIT framework, predict which key areas are likely to be
This document contains summaries of assignments and discussions for CIS 348 Project Management course. It includes summaries of 12 weekly discussions and assignments on topics like characteristics of failing projects, project manager roles, agile vs waterfall methodologies, triple constraints, risk management, and a term paper on change management, communication and leadership. The assignments involve writing papers analyzing case studies and creating project schedules using tools like Work Breakdown Structure, Gantt charts, and PERT diagrams for a mobile app development project.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project
This document discusses planning for a COBIT compliance project and addresses various topics relating to IT governance, risk management, and auditing over multiple weeks. It describes establishing five focus areas for COBIT IT governance: strategic alignment, value delivery, risk management, resource management, and performance management. It also discusses developing an enterprise risk management plan, mitigating risks of wireless networks and cloud computing, overcoming obstacles to achieving higher CMMI levels, and establishing effective identity and access management, disaster recovery plans, and change/patch management. Finally, it covers quality assurance, auditing standards, and managing an IT infrastructure audit.
FOR MORE CLASSES VISIT
www.cis558rank.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Suppose senior management has tasked you with
For more classes visit
www.snaptutorial.com
CIS 348 Week 1 Discussion
"Characteristics of Failing Projects" Please respond to the following:
Read the computer world article titled, “Detecting Disaster Projects”. Next, defend three (3) of the twelve (12) characteristics of disaster projects offered by the author. Then, suggest at least one (1) additional characteristic that you have encountered in your experience that drives projects to failure.
For more course tutorials visit
www.newtonhelp.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
This presentation includes basic of PCOS their pathology and treatment and also Ayurveda correlation of PCOS and Ayurvedic line of treatment mentioned in classics.
For more classes visit
www.snaptutorial.com
CIS 348 Week 1 Discussion
"Characteristics of Failing Projects" Please respond to the following:
Read the computer world article titled, “Detecting Disaster Projects”. Next, defend three (3) of the twelve (12) characteristics of disaster projects offered by
Strayer cis 348 week 3 assignment 2 business caseshyaminfo30
STRAYER CIS 348 Week 3 Assignment 2 Business Case (2 Papers) NEW
Check this A+ tutorial guideline at
http://www.assignmentcloud.com/cis-348-strayer/cis-348-week-3-assignment-2-business-case-new
For more classes visit
http://www.assignmentcloud.com/
This Tutorial contains 2 Papers
CIS 348 Week 3 Assignment 2: Business Case
Due Week 3 and worth 85 points
Imagine that you work as a project manager for a company that buys and sells used textbooks. The main sales channel is a Web application.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
CIS 498 Effective Communication - snaptutorial.comdonaldzs1
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary
For more course tutorials visit
www.newtonhelp.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Suppose senior management has tasked you with the planning of
For more classes visit
www.snaptutorial.com
CIS 348 Week 1 Discussion
"Characteristics of Failing Projects" Please respond to the following:
Read the computer world article titled, “Detecting Disaster Projects”. Next, defend three (3) of the twelve (12)
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project introduction and a Gantt chart or project plan.You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
You have been made the Chief Information Officer and Chief Technology Officer (CIO / CTO) of an innovative e-Commerce start-up company that a venture capital group has funded. The CEO has given you sixty (60) days to
FOR MORE CLASSES VISIT
www.cis558rank.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Suppose senior management has tasked you with the planning of the COBIT compliance project. In terms of the COBIT framework, predict which key areas are likely to be
This document contains summaries of assignments and discussions for CIS 348 Project Management course. It includes summaries of 12 weekly discussions and assignments on topics like characteristics of failing projects, project manager roles, agile vs waterfall methodologies, triple constraints, risk management, and a term paper on change management, communication and leadership. The assignments involve writing papers analyzing case studies and creating project schedules using tools like Work Breakdown Structure, Gantt charts, and PERT diagrams for a mobile app development project.
For more classes visit
www.snaptutorial.com
Project Deliverable 1: Project Plan Inception
Due Week 2 and worth 50 points
This assignment consists of two (2) sections: a project
This document discusses planning for a COBIT compliance project and addresses various topics relating to IT governance, risk management, and auditing over multiple weeks. It describes establishing five focus areas for COBIT IT governance: strategic alignment, value delivery, risk management, resource management, and performance management. It also discusses developing an enterprise risk management plan, mitigating risks of wireless networks and cloud computing, overcoming obstacles to achieving higher CMMI levels, and establishing effective identity and access management, disaster recovery plans, and change/patch management. Finally, it covers quality assurance, auditing standards, and managing an IT infrastructure audit.
FOR MORE CLASSES VISIT
www.cis558rank.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Suppose senior management has tasked you with
For more classes visit
www.snaptutorial.com
CIS 348 Week 1 Discussion
"Characteristics of Failing Projects" Please respond to the following:
Read the computer world article titled, “Detecting Disaster Projects”. Next, defend three (3) of the twelve (12) characteristics of disaster projects offered by the author. Then, suggest at least one (1) additional characteristic that you have encountered in your experience that drives projects to failure.
For more course tutorials visit
www.newtonhelp.com
“COBIT Planning” Please respond to the following:
Describe how organizations establish the five (5) COBIT IT governance focus areas: strategic alignment, value delivery, risk management, resource management, and performance management
Similar to BUS 377 Massive Success / snaptutorial.com (20)
This presentation includes basic of PCOS their pathology and treatment and also Ayurveda correlation of PCOS and Ayurvedic line of treatment mentioned in classics.
LAND USE LAND COVER AND NDVI OF MIRZAPUR DISTRICT, UPRAHUL
This Dissertation explores the particular circumstances of Mirzapur, a region located in the
core of India. Mirzapur, with its varied terrains and abundant biodiversity, offers an optimal
environment for investigating the changes in vegetation cover dynamics. Our study utilizes
advanced technologies such as GIS (Geographic Information Systems) and Remote sensing to
analyze the transformations that have taken place over the course of a decade.
The complex relationship between human activities and the environment has been the focus
of extensive research and worry. As the global community grapples with swift urbanization,
population expansion, and economic progress, the effects on natural ecosystems are becoming
more evident. A crucial element of this impact is the alteration of vegetation cover, which plays a
significant role in maintaining the ecological equilibrium of our planet.Land serves as the foundation for all human activities and provides the necessary materials for
these activities. As the most crucial natural resource, its utilization by humans results in different
'Land uses,' which are determined by both human activities and the physical characteristics of the
land.
The utilization of land is impacted by human needs and environmental factors. In countries
like India, rapid population growth and the emphasis on extensive resource exploitation can lead
to significant land degradation, adversely affecting the region's land cover.
Therefore, human intervention has significantly influenced land use patterns over many
centuries, evolving its structure over time and space. In the present era, these changes have
accelerated due to factors such as agriculture and urbanization. Information regarding land use and
cover is essential for various planning and management tasks related to the Earth's surface,
providing crucial environmental data for scientific, resource management, policy purposes, and
diverse human activities.
Accurate understanding of land use and cover is imperative for the development planning
of any area. Consequently, a wide range of professionals, including earth system scientists, land
and water managers, and urban planners, are interested in obtaining data on land use and cover
changes, conversion trends, and other related patterns. The spatial dimensions of land use and
cover support policymakers and scientists in making well-informed decisions, as alterations in
these patterns indicate shifts in economic and social conditions. Monitoring such changes with the
help of Advanced technologies like Remote Sensing and Geographic Information Systems is
crucial for coordinated efforts across different administrative levels. Advanced technologies like
Remote Sensing and Geographic Information Systems
9
Changes in vegetation cover refer to variations in the distribution, composition, and overall
structure of plant communities across different temporal and spatial scales. These changes can
occur natural.
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Dr. Vinod Kumar Kanvaria
Exploiting Artificial Intelligence for Empowering Researchers and Faculty,
International FDP on Fundamentals of Research in Social Sciences
at Integral University, Lucknow, 06.06.2024
By Dr. Vinod Kumar Kanvaria
हिंदी वर्णमाला पीपीटी, hindi alphabet PPT presentation, hindi varnamala PPT, Hindi Varnamala pdf, हिंदी स्वर, हिंदी व्यंजन, sikhiye hindi varnmala, dr. mulla adam ali, hindi language and literature, hindi alphabet with drawing, hindi alphabet pdf, hindi varnamala for childrens, hindi language, hindi varnamala practice for kids, https://www.drmullaadamali.com
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...PECB
Denis is a dynamic and results-driven Chief Information Officer (CIO) with a distinguished career spanning information systems analysis and technical project management. With a proven track record of spearheading the design and delivery of cutting-edge Information Management solutions, he has consistently elevated business operations, streamlined reporting functions, and maximized process efficiency.
Certified as an ISO/IEC 27001: Information Security Management Systems (ISMS) Lead Implementer, Data Protection Officer, and Cyber Risks Analyst, Denis brings a heightened focus on data security, privacy, and cyber resilience to every endeavor.
His expertise extends across a diverse spectrum of reporting, database, and web development applications, underpinned by an exceptional grasp of data storage and virtualization technologies. His proficiency in application testing, database administration, and data cleansing ensures seamless execution of complex projects.
What sets Denis apart is his comprehensive understanding of Business and Systems Analysis technologies, honed through involvement in all phases of the Software Development Lifecycle (SDLC). From meticulous requirements gathering to precise analysis, innovative design, rigorous development, thorough testing, and successful implementation, he has consistently delivered exceptional results.
Throughout his career, he has taken on multifaceted roles, from leading technical project management teams to owning solutions that drive operational excellence. His conscientious and proactive approach is unwavering, whether he is working independently or collaboratively within a team. His ability to connect with colleagues on a personal level underscores his commitment to fostering a harmonious and productive workplace environment.
Date: May 29, 2024
Tags: Information Security, ISO/IEC 27001, ISO/IEC 42001, Artificial Intelligence, GDPR
-------------------------------------------------------------------------------
Find out more about ISO training and certification services
Training: ISO/IEC 27001 Information Security Management System - EN | PECB
ISO/IEC 42001 Artificial Intelligence Management System - EN | PECB
General Data Protection Regulation (GDPR) - Training Courses - EN | PECB
Webinars: https://pecb.com/webinars
Article: https://pecb.com/article
-------------------------------------------------------------------------------
For more information about PECB:
Website: https://pecb.com/
LinkedIn: https://www.linkedin.com/company/pecb/
Facebook: https://www.facebook.com/PECBInternational/
Slideshare: http://www.slideshare.net/PECBCERTIFICATION
Walmart Business+ and Spark Good for Nonprofits.pdfTechSoup
"Learn about all the ways Walmart supports nonprofit organizations.
You will hear from Liz Willett, the Head of Nonprofits, and hear about what Walmart is doing to help nonprofits, including Walmart Business and Spark Good. Walmart Business+ is a new offer for nonprofits that offers discounts and also streamlines nonprofits order and expense tracking, saving time and money.
The webinar may also give some examples on how nonprofits can best leverage Walmart Business+.
The event will cover the following::
Walmart Business + (https://business.walmart.com/plus) is a new shopping experience for nonprofits, schools, and local business customers that connects an exclusive online shopping experience to stores. Benefits include free delivery and shipping, a 'Spend Analytics” feature, special discounts, deals and tax-exempt shopping.
Special TechSoup offer for a free 180 days membership, and up to $150 in discounts on eligible orders.
Spark Good (walmart.com/sparkgood) is a charitable platform that enables nonprofits to receive donations directly from customers and associates.
Answers about how you can do more with Walmart!"
Executive Directors Chat Leveraging AI for Diversity, Equity, and InclusionTechSoup
Let’s explore the intersection of technology and equity in the final session of our DEI series. Discover how AI tools, like ChatGPT, can be used to support and enhance your nonprofit's DEI initiatives. Participants will gain insights into practical AI applications and get tips for leveraging technology to advance their DEI goals.
This presentation was provided by Steph Pollock of The American Psychological Association’s Journals Program, and Damita Snow, of The American Society of Civil Engineers (ASCE), for the initial session of NISO's 2024 Training Series "DEIA in the Scholarly Landscape." Session One: 'Setting Expectations: a DEIA Primer,' was held June 6, 2024.
1. BUS 377 Week 6 Assignment 3 Implementing
Risk Management
For more classes visit
www.snaptutorial.com
Assignment 3: Implementing Risk Management
Due Week 6 and worth 200 points
Choose a project from the following Website:
http://www.pmi.org/Business-Solutions/OPM3-Case-Study-Library.aspx
Your emphasis should relate to deploying network security appliances,
using biometric technologies for network and physical security,
managing organizational risk, or planning for disruptions.Note: You will
need to conduct further research on the above selected topic using the
Internet as a resource in order to address all of the questions /
statements.
Write a four to five (4-5) page paper in which you:
2. Summarize the selected project and describe the primary failures of
traditional project risk management.
Describe the levels of uncertainty and complexity for the project.
Determine what the project manager should communicate to the
customers about the project unknowns.
Relating to the selected project, identify and discuss the risk
identification for selectionism and learning.
Discuss the contingency planning approach and the management
challenges of informing stakeholders.
Use at least three (3) quality references. Note: Wikipedia and other
Websites do not qualify as academic resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
The specific course learning outcomes associated with this assignment
are:
Analyze the process for diagnosing uncertainty and complexity in
projects.
Examine the planning process for project contingencies.
Use technology and information resources to research issues in
managing project risk.
Write clearly and concisely about managing project risk using proper
writing mechanics
3. **********************************************************
BUS 377 Week 8 Assignment 4 Robust
Mindedness – Team Management
For more classes visit
www.snaptutorial.com
Assignment 4: Robust Mindedness – Team Management
Due Week 8 and worth 100 points
Refer to the project from your local community or state that you
described in Week 8, Discussion 1. You have learned that the unk-unk
mind-set necessitates team management and creates a culture of
encouraging problem reporting, valuing diversity, and utilizing social
cohesion.
Write a one to two (1-2) page paper in which you:
Describe to your project sponsor how you intend to develop and
implement an infrastructure of your project's management systems,
focusing on at least two (2) significant unk-unks.
4. Prepare a communication on how your project team uses social cohesion
as it implements an infrastructure of one (1) of the five (5) areas of
management systems.
Use at least two (2) quality resources in this assignment.Note: Wikipedia
and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow APA
or school-specific format. Check with your professor for any additional
instructions.
Include a cover page containing the title of the assignment, the student’s
name, the professor’s name, the course title, and the date. The cover
page and the reference page are not included in the required assignment
page length.
The specific course learning outcomes associated with this assignment
are:
Evaluate the organizational infrastructure for managing high-uncertainty
projects.
Use technology and information resources to research issues in
managing project risk.
Write clearly and concisely about managing project risk using proper
writing mechanics
**********************************************************