Project : QIP-Reduction of Radial side wall rejections
Pain Area :
Location :
Plan Actual
QIP Start Date
QIP End Date
1
QIP Registration No:
26th May 2017
QIP Presentation Must-Haves
26th May 2017 2
Sr No. Particular Final Must-have
Title Slide QIP Name Reg ID (from online QIP registration)
QIP Charter
All Info, including planned and actual
dates
Step 1 RFI
Pain Area, Measure, Valid
Requirements
Step 2 Current Situation Specific Problem Statement
Step 3 Analysis Validated Root Causes
Step 4 Counter Measures Counter Measure Matrix
Step 5 Result Check
Before/After Pareto showing
reduction/elimination of specific
problem
Step 6 Standardisation
Snapshot of new/edited SOP or WI or
Standard review checklist
Step 7 Future Plan
Any scope for Horizontal Deployment
and Future QIPs for further reducing
the problem
Colour
code
Red Font Mandatory fields
Black Font Optional
PDCA
Plan
Do
Check
Act
QIP Project Charter
Project Title Justification
Brief sentence describing the problem you are trying to
attack
Why this problem needs to be resolved
Goal statement Project scope
Measure
(KPI)
Current
Level
Goal / target
Target
date
Define the scope by
Location/Section/Department/Level etc
(From P01) X Y 00/00/00
Project Plan Team Members
Phase Start Date End Date
Reason for
improvement
QIP Sponsor (M4 and above):
Current Situation QIP Facilitator (TQM background):
Analysis QIP Leader:
Counter-measures Members:
Result Check
Standardization
Future Plan
326th May 2017
Step I Reason For Improvement
• Pain Area
• Measures (KPI of Pain Area)
(from P01 or Role template)
• Valid Requirements
• Graphs
426th May 2017
Step II Current Situation
• Process Flow (as-is in reality) and Issues
– After Gemba (pain area) visit
526th May 2017
Step II Current Situation
Investigation of pain area from various view points by capturing various types of
process and support data
626th May 2017
MACHINE WISE BIAS CUTTING SCRAP DETAIL DATE:
BEAD WIRE
DEFECT
1st SHIFT
DEFECT
2nd SHIFT
DEFECT
3rd SHIFT
BIAS CUTTER NO. BIAS CUTTER NO. BIAS CUTTER NO.
BEAD FABRIC 1 2 3 4 5 6 7TOTAL 1 2 3 4 5 6 7TOTAL 1 2 3 4 5 6 7TOTAL
ANGLE ANGLE ANGLE
SLITTER M/C R.O.KNIFE R.O.KNIFE R.O.KNIFE
LUMPY LUMPY LUMPY
M.BAND BLD R.BORDER R.BORDER R.BORDER
BAGGY BAGGY BAGGY
LAB S.STICK S.STICK S.STICK
CRUSH CRUSH CRUSH
TTB BARE BARE BARE
SPLIT CORD SPLIT CORD SPLIT CORD
J59 WRINKLE WRINKLE WRINKLE
PEELING PEELING PEELING
SAMPLE SAMPLE SAMPLE
JOINT JOINT JOINT
ROLL MARK ROLL MARK ROLL MARK
NI/BO/BU NI/BO/BU NI/BO/BU
TOTAL TOTAL TOTAL
TEXTILE
BARE FABRIC
TEXTILE
BARE FABRIC
TEXTILE
BARE FABRIC
I RUBBER BORDER RUBBER BORDER RUBBER BORDER
SPLIT CORD SPLIT CORD SPLIT CORD
II SAMPLE SAMPLE SAMPLE
TABBEY TABBEY TABBEY
III JOINT JOINT JOINT
DARK FABRIC DARK FABRIC DARK FABRIC
TOTAL TOTAL TOTAL
TONNAGE TOTAL( BIAS+ TEXTILE) TOTAL( BIAS+ TEXTILE)
Step II Current Situation
• Data Analysis
– Stratification/Pareto/Histogram
726th May 2017
39%
63%
76%
87%
96%
100%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
5
10
15
20
25
30
35
40
45
Quality
Certificate
Error
Certificate
Missing
Invoice
Error
Packing
ListError
Wrong
Quantity
Other
Step II Current Situation
Adherence-To-Standard Check Table
Sl. No. Cause(s) of pain area
Are there
existing
standards
(SOP/WI etc)
[Yes/No]
If yes, what are the
standards?
[Name]
Are the
standards
currently
followed?
[Yes/No]
Reason, if not followed
Will the pain
area be
eliminated if
standards are
followed?
[Yes/No/Maybe]
Action
Planned on
Standard
[Create
/Follow/
Modify]
– If any Action item is ‘Follow Standard’, then first follow the
standard and validate whether the pain area still exists
– If all action items are either ‘Create’ or ‘Modify’, then continue
to forming the ‘Specific Problem Statement’
Validation of Pain Area
826th May 2017
Step II : Current Situation
(This is always the Last slide of Step 2)
• Specific Problem Statement
– Specific problem ( based on inference 20 % of pain
area having 80% impact on results)
– Statement should include
• What , When , where
• Existing level and Target with time.
• Impact on pain area.
• Example:
– Reduce defect in SKU X from Y% to Z% by October 30
– Reduce sales skew in SBU/div/location by improving area-under-
the curve from X to Y by September 15
– Increase DSS score in delivery/claims/etc by10% from 72 to 79
for SBU/div/location by December 15
926th May 2017
Step III Analysis - Fishbone Diagram
All potential Causes identified during Gemba/brainstorming
Typical for Manufacturing / Process type functions
– 4M + E (Man, Method, Materials, Machine, Environment)
Typical for Sales/Mkt/SCM
– 6P (product, place, promotion, price, people, process)
Fee Structure
Long Hold Times
LOW
CUSTOMER
SATISFACTION
POOR SUPPORT
LOW QUALITY PRODUCT HIGH PRICING
Cost of
Materials
Ineffective
Marketing
Incompetent
Employees
Bad Design
Poor
Materials
Wrong Answers
Long Hold Times
Fee Structure
POOR SUPPORT
Wrong Answers
1026th May 2017
Step III Analysis
• Probable causes validation
No Probable
Cause
Testing and Observations (any of below)
1.Gemba / Historical Observation
2. Hypothesis Testing
3. Technical Analysis / FTA
4. SPC / DOE /Scatter Plot / Regression
Conclusion
(Valid/Invalid)
1126th May 2017
Step III Analysis – Why –Why Example
This is used for the identification of Root cause of all validated causes
Validated Cause WHY WHY WHY
S/W stitching in
High pressure
No provision of
low pressure
stitching
No provision
on Dual
pressure
Design mis-
match with
application
need
Play in back stitcher
wheel
Play in bearing Contaminatio
n in bearing
There is no
seal on
bearing
Traverse screw
shifted
Circlip came out Circlip
damaged
Frequent
Wear and
tear, not
checked in
time
Poking not as per
spec
Lake of
knowledge
No training &
no visual
Display
Training need
and schedule
not identified
well
1226th May 2017
Step IV : Counter Measures: CM Matrix
This can be used to prioritize which CM to Implement for a given root cause
13
Action
Overall
(E x F)
Feasibility
(F)
Effective
Ness (E)
Practical
Method
Counter
Measure
Root
Cause
Problem
RATING (1 - 5)
COUNTERMEASURE IS “WHAT” TO DO
PRACTICAL METHOD IS “HOW” TO DO
26th May 2017
Step IV : Counter Measures
Validated
Root Causes
Action Plan
(action to be
taken)
Target
Completion
Date
Responsibility
(person)
Status
(Red/Yellow
/Green)
1426th May 2017
Step IV : Counter Measures
1526th May 2017
• Pictures / Data of Counter Measure implementation /
Kaizens
Step V Result Check
• Before & after Pareto / Trend line / Histogram
1626th May 2017
Step V : Result Check
• Tangible Benefits
• Intangible Benefits
1726th May 2017
Step VI : Standardisation
• Update existing SOP or Create new SOP
– Standards / Work Instructions / Manuals etc.
– Provide names/ snapshots of documents created or
updated
• CMS No. Internal Doc Number
• Pic of Document with Revision No highlighted
1826th May 2017
Step VII Future Plan
• Any Scope for Horizontal Deployment
– Within plant
– Across plant
AND / OR
• Taking the next QIP with redefined specific problem
statement
– Identification of new problem from the ‘After-Pareto’
1926th May 2017
Thank You
26th May 2017 20

More Related Content

Similar to Ceat qip report template

Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management Information
Ajay Kumar Uppal
 
HeartofAgile_Presentation_v3
HeartofAgile_Presentation_v3HeartofAgile_Presentation_v3
HeartofAgile_Presentation_v3
Armand Spoto
 
DMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxDMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptx
KristofMC
 

Similar to Ceat qip report template (20)

Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
Case study _cp foundry
Case study _cp foundryCase study _cp foundry
Case study _cp foundry
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Design and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing MachineDesign and Development of Dynamo Testing Machine
Design and Development of Dynamo Testing Machine
 
DFSS short
DFSS shortDFSS short
DFSS short
 
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVODo iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management Information
 
Problem Solving Frameworks
Problem Solving FrameworksProblem Solving Frameworks
Problem Solving Frameworks
 
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
 
PW Final Jun7 2012
PW Final Jun7 2012PW Final Jun7 2012
PW Final Jun7 2012
 
Managing Agile Software Development Quantitatively
Managing Agile Software Development QuantitativelyManaging Agile Software Development Quantitatively
Managing Agile Software Development Quantitatively
 
Yellow belt
Yellow beltYellow belt
Yellow belt
 
HeartofAgile_Presentation_v3
HeartofAgile_Presentation_v3HeartofAgile_Presentation_v3
HeartofAgile_Presentation_v3
 
DMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxDMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptx
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
A3 analisis
A3 analisisA3 analisis
A3 analisis
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 

Ceat qip report template

  • 1. Project : QIP-Reduction of Radial side wall rejections Pain Area : Location : Plan Actual QIP Start Date QIP End Date 1 QIP Registration No: 26th May 2017
  • 2. QIP Presentation Must-Haves 26th May 2017 2 Sr No. Particular Final Must-have Title Slide QIP Name Reg ID (from online QIP registration) QIP Charter All Info, including planned and actual dates Step 1 RFI Pain Area, Measure, Valid Requirements Step 2 Current Situation Specific Problem Statement Step 3 Analysis Validated Root Causes Step 4 Counter Measures Counter Measure Matrix Step 5 Result Check Before/After Pareto showing reduction/elimination of specific problem Step 6 Standardisation Snapshot of new/edited SOP or WI or Standard review checklist Step 7 Future Plan Any scope for Horizontal Deployment and Future QIPs for further reducing the problem Colour code Red Font Mandatory fields Black Font Optional PDCA Plan Do Check Act
  • 3. QIP Project Charter Project Title Justification Brief sentence describing the problem you are trying to attack Why this problem needs to be resolved Goal statement Project scope Measure (KPI) Current Level Goal / target Target date Define the scope by Location/Section/Department/Level etc (From P01) X Y 00/00/00 Project Plan Team Members Phase Start Date End Date Reason for improvement QIP Sponsor (M4 and above): Current Situation QIP Facilitator (TQM background): Analysis QIP Leader: Counter-measures Members: Result Check Standardization Future Plan 326th May 2017
  • 4. Step I Reason For Improvement • Pain Area • Measures (KPI of Pain Area) (from P01 or Role template) • Valid Requirements • Graphs 426th May 2017
  • 5. Step II Current Situation • Process Flow (as-is in reality) and Issues – After Gemba (pain area) visit 526th May 2017
  • 6. Step II Current Situation Investigation of pain area from various view points by capturing various types of process and support data 626th May 2017 MACHINE WISE BIAS CUTTING SCRAP DETAIL DATE: BEAD WIRE DEFECT 1st SHIFT DEFECT 2nd SHIFT DEFECT 3rd SHIFT BIAS CUTTER NO. BIAS CUTTER NO. BIAS CUTTER NO. BEAD FABRIC 1 2 3 4 5 6 7TOTAL 1 2 3 4 5 6 7TOTAL 1 2 3 4 5 6 7TOTAL ANGLE ANGLE ANGLE SLITTER M/C R.O.KNIFE R.O.KNIFE R.O.KNIFE LUMPY LUMPY LUMPY M.BAND BLD R.BORDER R.BORDER R.BORDER BAGGY BAGGY BAGGY LAB S.STICK S.STICK S.STICK CRUSH CRUSH CRUSH TTB BARE BARE BARE SPLIT CORD SPLIT CORD SPLIT CORD J59 WRINKLE WRINKLE WRINKLE PEELING PEELING PEELING SAMPLE SAMPLE SAMPLE JOINT JOINT JOINT ROLL MARK ROLL MARK ROLL MARK NI/BO/BU NI/BO/BU NI/BO/BU TOTAL TOTAL TOTAL TEXTILE BARE FABRIC TEXTILE BARE FABRIC TEXTILE BARE FABRIC I RUBBER BORDER RUBBER BORDER RUBBER BORDER SPLIT CORD SPLIT CORD SPLIT CORD II SAMPLE SAMPLE SAMPLE TABBEY TABBEY TABBEY III JOINT JOINT JOINT DARK FABRIC DARK FABRIC DARK FABRIC TOTAL TOTAL TOTAL TONNAGE TOTAL( BIAS+ TEXTILE) TOTAL( BIAS+ TEXTILE)
  • 7. Step II Current Situation • Data Analysis – Stratification/Pareto/Histogram 726th May 2017 39% 63% 76% 87% 96% 100% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 0 5 10 15 20 25 30 35 40 45 Quality Certificate Error Certificate Missing Invoice Error Packing ListError Wrong Quantity Other
  • 8. Step II Current Situation Adherence-To-Standard Check Table Sl. No. Cause(s) of pain area Are there existing standards (SOP/WI etc) [Yes/No] If yes, what are the standards? [Name] Are the standards currently followed? [Yes/No] Reason, if not followed Will the pain area be eliminated if standards are followed? [Yes/No/Maybe] Action Planned on Standard [Create /Follow/ Modify] – If any Action item is ‘Follow Standard’, then first follow the standard and validate whether the pain area still exists – If all action items are either ‘Create’ or ‘Modify’, then continue to forming the ‘Specific Problem Statement’ Validation of Pain Area 826th May 2017
  • 9. Step II : Current Situation (This is always the Last slide of Step 2) • Specific Problem Statement – Specific problem ( based on inference 20 % of pain area having 80% impact on results) – Statement should include • What , When , where • Existing level and Target with time. • Impact on pain area. • Example: – Reduce defect in SKU X from Y% to Z% by October 30 – Reduce sales skew in SBU/div/location by improving area-under- the curve from X to Y by September 15 – Increase DSS score in delivery/claims/etc by10% from 72 to 79 for SBU/div/location by December 15 926th May 2017
  • 10. Step III Analysis - Fishbone Diagram All potential Causes identified during Gemba/brainstorming Typical for Manufacturing / Process type functions – 4M + E (Man, Method, Materials, Machine, Environment) Typical for Sales/Mkt/SCM – 6P (product, place, promotion, price, people, process) Fee Structure Long Hold Times LOW CUSTOMER SATISFACTION POOR SUPPORT LOW QUALITY PRODUCT HIGH PRICING Cost of Materials Ineffective Marketing Incompetent Employees Bad Design Poor Materials Wrong Answers Long Hold Times Fee Structure POOR SUPPORT Wrong Answers 1026th May 2017
  • 11. Step III Analysis • Probable causes validation No Probable Cause Testing and Observations (any of below) 1.Gemba / Historical Observation 2. Hypothesis Testing 3. Technical Analysis / FTA 4. SPC / DOE /Scatter Plot / Regression Conclusion (Valid/Invalid) 1126th May 2017
  • 12. Step III Analysis – Why –Why Example This is used for the identification of Root cause of all validated causes Validated Cause WHY WHY WHY S/W stitching in High pressure No provision of low pressure stitching No provision on Dual pressure Design mis- match with application need Play in back stitcher wheel Play in bearing Contaminatio n in bearing There is no seal on bearing Traverse screw shifted Circlip came out Circlip damaged Frequent Wear and tear, not checked in time Poking not as per spec Lake of knowledge No training & no visual Display Training need and schedule not identified well 1226th May 2017
  • 13. Step IV : Counter Measures: CM Matrix This can be used to prioritize which CM to Implement for a given root cause 13 Action Overall (E x F) Feasibility (F) Effective Ness (E) Practical Method Counter Measure Root Cause Problem RATING (1 - 5) COUNTERMEASURE IS “WHAT” TO DO PRACTICAL METHOD IS “HOW” TO DO 26th May 2017
  • 14. Step IV : Counter Measures Validated Root Causes Action Plan (action to be taken) Target Completion Date Responsibility (person) Status (Red/Yellow /Green) 1426th May 2017
  • 15. Step IV : Counter Measures 1526th May 2017 • Pictures / Data of Counter Measure implementation / Kaizens
  • 16. Step V Result Check • Before & after Pareto / Trend line / Histogram 1626th May 2017
  • 17. Step V : Result Check • Tangible Benefits • Intangible Benefits 1726th May 2017
  • 18. Step VI : Standardisation • Update existing SOP or Create new SOP – Standards / Work Instructions / Manuals etc. – Provide names/ snapshots of documents created or updated • CMS No. Internal Doc Number • Pic of Document with Revision No highlighted 1826th May 2017
  • 19. Step VII Future Plan • Any Scope for Horizontal Deployment – Within plant – Across plant AND / OR • Taking the next QIP with redefined specific problem statement – Identification of new problem from the ‘After-Pareto’ 1926th May 2017