G H Patel College of Engineering & Technology, V. V. Nagar,
Academic Year: 2016-17 (Even Sem.)
2160601 – Advanced Construction & Equipment
“Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel
Boring Machines”
Prepared By;
Prerak KachhiyaPatel 150113106008
Kishan Meghani 150113106009
Harsh Oza 150113106010
Hiten Patel 150113106011
TOPIC:-
Guided by;
Prof. Ratan Panchal
Prof. Ridhhi vasi
BRANCH: CIVIL ENGINEERING
CONSTRUCTION METHODS
 Displacement Piles
• It causes the soil to be displaced radially as well as vertically as the
pile shaft is driven or jacked into the ground.
 Replacement Piles
• It cause the soil to be removed and the resulting hole filled with
concrete or a pre cast concrete pile is dropped into the hole and
grouted in.
Displacement Pile Replacement pile
 Compaction Grouting
• This method is being used to improve the shear resistance
characteristics of soft and very soft layers of soil and results
in the formation of a compaction grout columns. It’s a cost-
effective method.
Hammers:
Dropping Weight or Drop Hammers
Steam Hammer: single-acting, double-acting
Air Hammer: single-acting, double-acting,
Diesel hammer: single-acting (open end) or double-acting
(closed end)
Hydraulic Hammer
Vibratory Hammer
• Water Jets (Wash Boring )
• Boring (Auger Boring)
Drop Hammer
 Hammer is raised by a rope or a steel cable
 Then it is allowed to drop on pile cap
 The weight of drop varies from 230-1800 kg
 Weight depends on the shape and length of pile and
the nature of the ground
 Takes a lot of time
Steam Hammer
 Hammer is automatically raised and dropped.
 A steam cylinder and piston is used.
 Steam pressure and the rate of hammer blow are
kept uniform.
 Steam Hammers are of two types
 Single Acting Type
 Double Acting Type
Hydraulic Hammer
Vibratory hammer
Jacking Method Of Insertion
Jacked Piles are most commonly used in underpinning
structures.
By excavating underneath a structure, short lengths of
pile can be inserted and jacked into the ground using
the underside of the existing structure as a reaction.
Wash boring
 Wash boring is a fast and simple method for
advancing holes in soft to stiff cohesive soils and fine
sand. This method is not suitable for boulders soil and
rock.
 The method consists of first driving a hollow steel pipe
known as casing pipe/drive pipe in to the ground.
 Through this casing pipe, a hollow drilled rod with a
sharp chisel or chopping bit at the lower end, known
as water jet pipe or wash pipe, is inserted.
 Upper end of wash pipe is connected to water pump
and lower end is contracted to produce jet action.
Auger boring
• Start with augur/rotary drilling;
• Boring is continued down to
planned depth (using a
guiding tube/rod)
• Using bentonite mud (slurry)
at the bottom as caisson
• Placing of reinforcement
• Placing of the concrete and
removing off the guiding tube
• (last two steps might be
swapped)
CONCRETE BATCHING PLANT
 A concrete plant, also known as a BATCH
PLANT OR BATCHING PLANT, is a device that
combines various ingredients to form concrete.
 Some of these inputs include
• Sand
• Water
• Aggregate (rocks, gravel, etc.),
• Fly ash
• Admixtures (sica , etc)
• Cement
 It’s easy to disassemble, transport and assemble
again. In 15 – 20 days we assemble your plant in a
new site producing concrete, saving you time and
money.
 READY MIX PLANT (READY MIX CONCRETE /
RMC)
 A ready mix plant combines all ingredients except
for water at the concrete plant. This mixture is then
discharged into a ready mix truck (also known as
a concrete transport truck).
 Water is then added to the mix in the truck and
mixed during transport to the job site.
• CENTRAL MIX PLANT
 Central mix plant combines all of the above ingredients
+ water at a central location.
 The final product is then transported to the job site.
 Central mix plants differ from ready mix plants in that
they offer the end user a much more consistent product,
since all the ingredient mixing is done in a central
location and is computer-assisted to ensure uniformity of
product.
 A temporary batch plant can be constructed on a large
job site. A concrete plant becomes central mix with the
addition of a concrete mixer.
• Features
 More precise and efficient weighing
 High efficiency
 Mixing blades made of wear resistant high hard alloys
have durable and reliable performance
 Storage capacities of cement silo can be customized
according to your demands
 There are three types of mixer:
 P a n m i x e r
 Tw i n s h a f t m i x e r
The twin shaft mixer can ensure an even mixture of concrete
and large output with high quality. It consist of mixer, with
Counter rotating shafts, delivers fast mixing action and rapid
discharge.
They are fast and efficient, but can be maintenance-intensive since they include several
Moving parts that are subjected to a heavy load.
 Ti l t i n g d r u m m i x e r
Pan mixers are generally lower capacity mixers at about 4 to 5 yd3 and are used at precast
concrete plants.
• AGGREGATE BATCHERS :-
The aggregate batching system includes aggregate supply
system, weighing system and electrical control system. The
feeding device is driven by conveyor belt.
• CONVEYORS :-
• CONTROL SYSTEM :-
The programmable controller can control
the production process with high reliability
and stability. It can control the unloading
ingredients, mixing and automatic control of
the whole process of the concrete.
•SILOS :-
 Provides bolted type and welded type storage silo in
various capacities and dimensions.
Bolted cement silo with special design can minimize
the transport cost.
 nominal capacity of cement = 10 to 75 tons and are
also available till 120 tons
nominal capacity of fly ash = 40 to 60 tons
 DUST COLLECTORS
Used to minimize environmental pollution
TUNNEL BORING MACHINE
INTRODUCTION
A tunnel is an underground passageway, completely
enclosed except for openings for egress, commonly at each
end.
A tunnel may be for road traffic, ,canal , hydroelectric station,
Sewer etc.
TUNNEL BORING MACHINE
• tunnel boring machine (TBM) is a machine
used to excavate tunnels with a circular
cross section through a variety of soil and
rock strata
• They can bore through anything from hard
rock to sand
• Tunnel diameters can range from a metre
to 19.25metre
DRILL AND BLAST
• 1.Before the advent of tunnel boring machines, drilling
and blasting was the only economical way of
excavating long tunnels through hard rock, where
digging is not possible.
• 2.Even today, the method is still used in the
construction of tunnels
• But the disadvantage is it disturbance the
surroundings
MAIN PARTS OF TBM
WORKING OF TBM
• A TBM is shaped like a tube. At the front is a
rotating disk with cutting teeth that can shear
through rock
• The pulverized rock falls to a conveyor belt that
carries it to the back of the TBM
• Hydraulic feet grip the sides of the tunnel and
push the machine forward
• There is also the ability to insert plates to line the
interior of the tunnel
ADVANTAGE
• Higher advance rates
• Continuous operations
• Less rock damage
• Less support requirements
• Uniform muck characteristics
• Greater worker safety
• Potential for remote, automated operation.
DISADVANTAGE
• The major disadvantage is the upfront cost
• TBMs are expensive to construct, and can be difficult to
transport.
• TBM can not move in backward direction
• TBMs are expensive to construct, and can be difficult to
transport.
APPLICATION
1. In Road Traffic
2. In Sewer
3. IN Mining
4. In Rail Traffics
5. In hydroelectric Stations
The main purpose for any organisation is that provide safe
environment for worker and TBM is more control and safe
than drilling and blasting
CONCLUSION
Thank You….

More Related Content

What's hot

Pile Foundation presentation
Pile Foundation presentationPile Foundation presentation
Pile Foundation presentationSevar Dilkhaz
 
3414 code of practice for joints in buildings
3414 code of practice for joints in buildings3414 code of practice for joints in buildings
3414 code of practice for joints in buildingssatejkeche
 
Cracks in Concrete Structure RRS
Cracks in Concrete Structure RRSCracks in Concrete Structure RRS
Cracks in Concrete Structure RRSRamanuj Jaldhari
 
Piledrivingequipment
PiledrivingequipmentPiledrivingequipment
PiledrivingequipmentDurgesh Patil
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignUmer Farooq
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTUVATSAL PATEL
 
Bored piles production method
Bored piles   production methodBored piles   production method
Bored piles production methodNguyen Bao
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-pptDYPCET
 
Factors to consider in foundation design
Factors to consider in foundation designFactors to consider in foundation design
Factors to consider in foundation designMushtaq Zaib
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSShivananda Roy
 
2)indirect methods
2)indirect methods2)indirect methods
2)indirect methodsjagadish108
 

What's hot (20)

Pile Foundation presentation
Pile Foundation presentationPile Foundation presentation
Pile Foundation presentation
 
3414 code of practice for joints in buildings
3414 code of practice for joints in buildings3414 code of practice for joints in buildings
3414 code of practice for joints in buildings
 
Cracks in Concrete Structure RRS
Cracks in Concrete Structure RRSCracks in Concrete Structure RRS
Cracks in Concrete Structure RRS
 
Piledrivingequipment
PiledrivingequipmentPiledrivingequipment
Piledrivingequipment
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Structural Strengthening
Structural StrengtheningStructural Strengthening
Structural Strengthening
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU1.PILE FOUNDATION (ACE) 2160601 GTU
1.PILE FOUNDATION (ACE) 2160601 GTU
 
Concrete admixtures
Concrete admixturesConcrete admixtures
Concrete admixtures
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Bored piles production method
Bored piles   production methodBored piles   production method
Bored piles production method
 
Piles, Piers and Caissons
Piles, Piers and CaissonsPiles, Piers and Caissons
Piles, Piers and Caissons
 
Pile and pile driving equipments
Pile and pile driving equipmentsPile and pile driving equipments
Pile and pile driving equipments
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Factors to consider in foundation design
Factors to consider in foundation designFactors to consider in foundation design
Factors to consider in foundation design
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
Deep foundation ppt my final tos work
Deep foundation ppt  my final tos workDeep foundation ppt  my final tos work
Deep foundation ppt my final tos work
 
2)indirect methods
2)indirect methods2)indirect methods
2)indirect methods
 
Anchors rock anchors
Anchors rock anchorsAnchors rock anchors
Anchors rock anchors
 

Similar to Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines

TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYTOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYVj NiroSh
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant pptdip17
 
Presentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptxPresentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptxAyushsharma131736
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) laxman singh
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques GAURAV. H .TANDON
 
Preperation of concrete
Preperation of concretePreperation of concrete
Preperation of concreteRajat Nainwal
 
3 hayzi.pptx
3 hayzi.pptx3 hayzi.pptx
3 hayzi.pptxsol zem
 
concreteequipmentsandspacialconcrete-180308051734.pdf
concreteequipmentsandspacialconcrete-180308051734.pdfconcreteequipmentsandspacialconcrete-180308051734.pdf
concreteequipmentsandspacialconcrete-180308051734.pdfKuberBhusal1
 
Concrete equipments and special concrete
Concrete equipments and special concreteConcrete equipments and special concrete
Concrete equipments and special concreteTushar Sonawane
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptVaibhavSoni742163
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptHarshKumarEname
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
CONCRETE EQUIPMENTS.pptx
CONCRETE EQUIPMENTS.pptxCONCRETE EQUIPMENTS.pptx
CONCRETE EQUIPMENTS.pptxJanmithRai
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesAr Jitendra
 
construction equipment and agreegate production equipment
construction equipment and agreegate production equipmentconstruction equipment and agreegate production equipment
construction equipment and agreegate production equipmentkonagallasrivardhan
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfAbishekKumar81
 

Similar to Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines (20)

TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYTOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant ppt
 
Presentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptxPresentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptx
 
Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering) Manufacturing process of concrete (for civil engineering)
Manufacturing process of concrete (for civil engineering)
 
Special Concreting Techniques
Special Concreting Techniques Special Concreting Techniques
Special Concreting Techniques
 
Preperation of concrete
Preperation of concretePreperation of concrete
Preperation of concrete
 
3 hayzi.pptx
3 hayzi.pptx3 hayzi.pptx
3 hayzi.pptx
 
concreteequipmentsandspacialconcrete-180308051734.pdf
concreteequipmentsandspacialconcrete-180308051734.pdfconcreteequipmentsandspacialconcrete-180308051734.pdf
concreteequipmentsandspacialconcrete-180308051734.pdf
 
Concrete equipments and special concrete
Concrete equipments and special concreteConcrete equipments and special concrete
Concrete equipments and special concrete
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
Cmwm ppt
Cmwm pptCmwm ppt
Cmwm ppt
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
 
CONCRETE EQUIPMENTS.pptx
CONCRETE EQUIPMENTS.pptxCONCRETE EQUIPMENTS.pptx
CONCRETE EQUIPMENTS.pptx
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
 
construction equipment and agreegate production equipment
construction equipment and agreegate production equipmentconstruction equipment and agreegate production equipment
construction equipment and agreegate production equipment
 
unit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdfunit - IV - Concrete methods.pdf
unit - IV - Concrete methods.pdf
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 

Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines

  • 1. G H Patel College of Engineering & Technology, V. V. Nagar, Academic Year: 2016-17 (Even Sem.) 2160601 – Advanced Construction & Equipment “Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines” Prepared By; Prerak KachhiyaPatel 150113106008 Kishan Meghani 150113106009 Harsh Oza 150113106010 Hiten Patel 150113106011 TOPIC:- Guided by; Prof. Ratan Panchal Prof. Ridhhi vasi BRANCH: CIVIL ENGINEERING
  • 2. CONSTRUCTION METHODS  Displacement Piles • It causes the soil to be displaced radially as well as vertically as the pile shaft is driven or jacked into the ground.  Replacement Piles • It cause the soil to be removed and the resulting hole filled with concrete or a pre cast concrete pile is dropped into the hole and grouted in. Displacement Pile Replacement pile
  • 3.  Compaction Grouting • This method is being used to improve the shear resistance characteristics of soft and very soft layers of soil and results in the formation of a compaction grout columns. It’s a cost- effective method.
  • 4. Hammers: Dropping Weight or Drop Hammers Steam Hammer: single-acting, double-acting Air Hammer: single-acting, double-acting, Diesel hammer: single-acting (open end) or double-acting (closed end) Hydraulic Hammer Vibratory Hammer • Water Jets (Wash Boring ) • Boring (Auger Boring)
  • 5.
  • 7.  Hammer is raised by a rope or a steel cable  Then it is allowed to drop on pile cap  The weight of drop varies from 230-1800 kg  Weight depends on the shape and length of pile and the nature of the ground  Takes a lot of time
  • 9.  Hammer is automatically raised and dropped.  A steam cylinder and piston is used.  Steam pressure and the rate of hammer blow are kept uniform.  Steam Hammers are of two types  Single Acting Type  Double Acting Type
  • 12. Jacking Method Of Insertion Jacked Piles are most commonly used in underpinning structures. By excavating underneath a structure, short lengths of pile can be inserted and jacked into the ground using the underside of the existing structure as a reaction.
  • 13. Wash boring  Wash boring is a fast and simple method for advancing holes in soft to stiff cohesive soils and fine sand. This method is not suitable for boulders soil and rock.  The method consists of first driving a hollow steel pipe known as casing pipe/drive pipe in to the ground.  Through this casing pipe, a hollow drilled rod with a sharp chisel or chopping bit at the lower end, known as water jet pipe or wash pipe, is inserted.  Upper end of wash pipe is connected to water pump and lower end is contracted to produce jet action.
  • 14.
  • 15. Auger boring • Start with augur/rotary drilling; • Boring is continued down to planned depth (using a guiding tube/rod) • Using bentonite mud (slurry) at the bottom as caisson • Placing of reinforcement • Placing of the concrete and removing off the guiding tube • (last two steps might be swapped)
  • 16.
  • 17. CONCRETE BATCHING PLANT  A concrete plant, also known as a BATCH PLANT OR BATCHING PLANT, is a device that combines various ingredients to form concrete.  Some of these inputs include • Sand • Water • Aggregate (rocks, gravel, etc.), • Fly ash • Admixtures (sica , etc) • Cement
  • 18.  It’s easy to disassemble, transport and assemble again. In 15 – 20 days we assemble your plant in a new site producing concrete, saving you time and money.  READY MIX PLANT (READY MIX CONCRETE / RMC)  A ready mix plant combines all ingredients except for water at the concrete plant. This mixture is then discharged into a ready mix truck (also known as a concrete transport truck).  Water is then added to the mix in the truck and mixed during transport to the job site.
  • 19. • CENTRAL MIX PLANT  Central mix plant combines all of the above ingredients + water at a central location.  The final product is then transported to the job site.  Central mix plants differ from ready mix plants in that they offer the end user a much more consistent product, since all the ingredient mixing is done in a central location and is computer-assisted to ensure uniformity of product.  A temporary batch plant can be constructed on a large job site. A concrete plant becomes central mix with the addition of a concrete mixer.
  • 20. • Features  More precise and efficient weighing  High efficiency  Mixing blades made of wear resistant high hard alloys have durable and reliable performance  Storage capacities of cement silo can be customized according to your demands
  • 21.  There are three types of mixer:  P a n m i x e r  Tw i n s h a f t m i x e r The twin shaft mixer can ensure an even mixture of concrete and large output with high quality. It consist of mixer, with Counter rotating shafts, delivers fast mixing action and rapid discharge. They are fast and efficient, but can be maintenance-intensive since they include several Moving parts that are subjected to a heavy load.  Ti l t i n g d r u m m i x e r Pan mixers are generally lower capacity mixers at about 4 to 5 yd3 and are used at precast concrete plants. • AGGREGATE BATCHERS :- The aggregate batching system includes aggregate supply system, weighing system and electrical control system. The feeding device is driven by conveyor belt. • CONVEYORS :-
  • 22. • CONTROL SYSTEM :- The programmable controller can control the production process with high reliability and stability. It can control the unloading ingredients, mixing and automatic control of the whole process of the concrete. •SILOS :-  Provides bolted type and welded type storage silo in various capacities and dimensions. Bolted cement silo with special design can minimize the transport cost.  nominal capacity of cement = 10 to 75 tons and are also available till 120 tons nominal capacity of fly ash = 40 to 60 tons  DUST COLLECTORS Used to minimize environmental pollution
  • 23.
  • 25. INTRODUCTION A tunnel is an underground passageway, completely enclosed except for openings for egress, commonly at each end. A tunnel may be for road traffic, ,canal , hydroelectric station, Sewer etc.
  • 26. TUNNEL BORING MACHINE • tunnel boring machine (TBM) is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata • They can bore through anything from hard rock to sand • Tunnel diameters can range from a metre to 19.25metre
  • 27.
  • 28. DRILL AND BLAST • 1.Before the advent of tunnel boring machines, drilling and blasting was the only economical way of excavating long tunnels through hard rock, where digging is not possible. • 2.Even today, the method is still used in the construction of tunnels • But the disadvantage is it disturbance the surroundings
  • 30. WORKING OF TBM • A TBM is shaped like a tube. At the front is a rotating disk with cutting teeth that can shear through rock • The pulverized rock falls to a conveyor belt that carries it to the back of the TBM • Hydraulic feet grip the sides of the tunnel and push the machine forward • There is also the ability to insert plates to line the interior of the tunnel
  • 31. ADVANTAGE • Higher advance rates • Continuous operations • Less rock damage • Less support requirements • Uniform muck characteristics • Greater worker safety • Potential for remote, automated operation.
  • 32. DISADVANTAGE • The major disadvantage is the upfront cost • TBMs are expensive to construct, and can be difficult to transport. • TBM can not move in backward direction • TBMs are expensive to construct, and can be difficult to transport.
  • 33. APPLICATION 1. In Road Traffic 2. In Sewer 3. IN Mining 4. In Rail Traffics 5. In hydroelectric Stations The main purpose for any organisation is that provide safe environment for worker and TBM is more control and safe than drilling and blasting CONCLUSION