Key benefits are fuel flexibility, reduced emission and
lower bed temperature.
Different Versions
๏‚— Industrial boilers ore developing with gradual change in their design of different
parts and to optimize the thermal efficiency, fuel multiplicity and to sustain with
environmental norms, with cost effectiveness for installation operation and
maintenance.
๏‚— In our country early fifties and sixties small multi fuel boilers were used for process
industries and high pressure coal based boilers were used for power generation.
๏‚— With decreasing trend of coal heat value boiler was constantly modified to reach the
present status of CFBC boiler from previous version of stationary furnaces type
chain grate type, spreader stoker type, PF type, AFBC type and CFBC type. CFBC
is a new generation coal fired fluidized bed boiler developed since 1950 has the
advantage of high efficiency low Sox and Nox. emission and higher turn down ratio.
CFBC BOILER
๏‚— Assume a container with an air supply plenum at the bottom , A distributer plate
that promotes even air flow through the bed and an upper chamber filled with
sand. If a small quantity of air flow through the distributer plate in to the bed , If
it will pass through the voids of an immobile mass of sand. For low velocity the
air does not exert much force on sand and they remain in place. This condition
is called fixed bed or static bed. By increasing a flow rate ,the air exert greater
force on the sand and thereby reduces the contact force between the sand
particle caused by gravity. By increasing the air flow further ,a point is reached
where the drag force on particle counter balance the gravity force and sand
particle become suspended in up flowing air steam. The point where the bed
start to behave as a fluid is called the minimum fluidization condition.
CFBC BOILER
As the air increased further , the bed become less uniform bubbles of air start
to form and the bed becomes violent . At this condition bed is in expanded
condition, This is called bubbling fluidized bed and this occurs at
atmospheric condition. Hence, It is called as Atmospheric Fluidized Bed. As
the velocity of air further increased (around 10 m/sec.) a condition is
reached where in whole of bed material is in circulation from furnace to a
collection chamber (U beam hopper) and back to furnace. Thus resulting in
uniform temperature profile throughout the furnace. Because the whole bed
is in continuous circulation internally, This type of boiler is called IR-
CFBC. (Internal Re-circulating fluidized bed combustion).
CFBC BOILER TECHNOLOGY OFFERS
๏‚— High combustion efficiency
๏‚— Compact and economical
design.
๏‚— Higher reliability and
availability.
๏‚— Lower maintenance cost.
๏‚— Reduced erosion.
๏‚— Fuel flexibility.
Gas Velocities
๏‚— CFBC - 4 - 6 m/sec.
๏‚— AFBC - 2 - 3 mtr./sec.
๏‚— PF - 8 - 10 mtr./sec.
IMPROVED PERFORMANCE AT
REDUCED COST
๏‚— CFBC boiler design as โ€“ Two stage particle separation
system.
๏‚— First - U beam impact separators.
๏‚— Second โ€“ Mechanical dust collector or multi-cyclone
dust collector.
DESCRIPTION OF CFBC BOILER
๏‚— CFBC boilers are compact natural circulation ,Top
supported ,Single drum unit. The primary and
secondary particle separator is an integral part of
boiler / furnace and connected to the particle return
system.
THE BOILER IS COMPRISED OF-
๏‚— CFB Furnace
๏‚— U-Beam (Particle separator)
๏‚— Particle Return System
๏‚— Convection pass and back end equipment.
Internal Recirculation - Circulating Fluidized
Bed Boilers
CFBC FURNACE
๏‚— The CFBC furnace construction is of all welded
membrane tube panels. Functionally the furnace is
divided into three distinct zone .
A -Primary zones
B - Secondary zone
C - Free board zone
PRIMARY ZONE
๏‚— In the primary zone the fuel,sand,recycled material
and 50% to 60% of the air for combustion are
introduced.
๏‚— SECONDARY AND FREE BOARD ZONE
๏‚— In secondary zone the balance of combustion air is
introduced.
๏‚— Combustion is completed in free board zone
CFBC BOILER
โ€ข The combustion air split correspond to the furnace zones . i.e. Primary , lower secondary
and upper secondary air flow zone.
lower secondary zone โ€“ Burner
upper secondary zone โ€“ OF (Over Fired)
โ€ข Primary air effects the actual fluidization of bed material and is supplied through a
distributor plate at the bottom of the furnace. lower secondary and upper secondary air are
supplied through nozzle located on both the front or rear furnace walls at two separate
elevations.
โ€ข The air distribution patterns in the furnace can be adjusted to provide for the best control
of Nox (Nitrous Oxide) formation.
โ€ข In addition to the enclosure walls , water cooled division walls for the entire height of the
furnace provides additional heating surface.
U-BEAM
๏‚— Flue gas and solids leaving the furnace passes through a high temperature
primary particle collector where nearly all of the solids are separated from
the flue gas. A unique feature of boiler is a particle separator made of
labyrinth type array of beam having a shape similar to the letter โ€œUโ€. The U-
beam made from stainless steel alloy. Or fiber material for less weight &
cost and less erosion. The collector is designed to remove solids from dense
gasโ€“solids mixture .the solids impacting the first two rows of beams fall by
gravity back down the rear of the furnace .Solids impacting the remaining
beams fall by gravity in two particle collector hopper located directly
beneath the array of beams and enters the rear furnace through particle
return system especially designed for this application.
Hot Cyclone CFBC
BOILER CONVECTION PASS
๏‚— The flue gas leaving the particle separator flows in to the
boiler convection pass which includes the superheated and
economizer banks . The gas velocity in these tube banks is
designed specifically to minimize the erosion . Gases
enters the air pre heater and then to the secondary particle
separator . Gas leaving air heater enters the ESP and then
to the stack through ID Fans.
U-Beam separators
ยฉ 2003 The Babcock & Wilcox Company, all rights reserved
U-Beam separators
41
2
3Flue
Gas
&
Solid
Flow
Flue
Gas
1. Sidewall
membrane panel
2. U-beam - SS309H/
SS310H/RA253MA
3. Seal baffle
4. Refractory
U-Beams
Internal Recirculation - Circulating
Fluidized Bed Boilers
Internal Recirculation Circulating
Fluidized Bed Boilers
๏‚— A simplified approach to improved flexibility and reliability
๏‚— Design Features
๏‚— High combustion efficiency
๏‚— Compact, economical design
๏‚— Higher reliability and availability
๏‚— Lower maintenance costs
๏‚— Reduced erosion
๏‚— Fuel flexibility
๏‚— Low emissions
Why CFBC Boiler ?
๏‚— CFBC is a Fuel Flexible Technology
๏‚— Accepts wide range of fuels
๏‚— Volatile matter - >15 %
๏‚— Ash - UP TO 60%
๏‚— Heating value - > 2150 Kcal/kg
๏‚— Moisture - < 10%
๏‚— Use of lower rank fuels reduces fuel costs
๏‚— Fuel flexibility - minimizes fuel supply uncertainties
๏‚— Ability to burn low cost and waste fuels
Steam Flow Circuit
๏‚— Riser tubes are used to direct the steam water mixture from the outlet headers of each
water circuit to the steam drum.
๏‚— The water steam mixture in drum is separated by cyclone separators and the primary and
secondary scrubber arrangement.
๏‚— The saturated steam leaves the steam drum and enters primary super heater in let header
through supply pipes.Steam passes through the primary super heater coils and exits the
outlet header.Then steam enters the attemperator header for desuperheating.
๏‚— The attemperator uses water from the high pressure feed water heater discharge to
control the secondary super heater outlet temperature.
๏‚— From the attemperator the steam flow to the secondary super heater inlet header and to
the counter flow secondary super heater bank. Steam leaves the coils and exits from the
secondary super heater outlet header. Steam enters the turbine through main steam stop
valve and NRV.
Flue Gas Path
๏‚— CFBC boilers are balanced draft combustors. The pressure balance point is at the top
of the furnace, ahead of the front row of U beams, The flue gas flow path through is
as follows :
๏‚— Gas carrying with large quantity of bed solids, flow into the in bed U beams, above
hopper U beams hot particle collector. The U beams removes most of the solids
entrained in gas. The flue gas leaves the U beams and flows through the secondary
super heater zone, primary super heater zone, Economizer, primary & secondary air
heaters. At the bottom of the air heaters gas enters secondary particle U beams
separators which collects the majorities of the remaining solids entrained in gas.
๏‚— The cleaned gas then passes through ESP for final gas cleaning and stack through ID
fans. One stands by ID fanes is provided. Dampers are provided before and after the
ID fans for maintenance of fans. With the exception of the U beam and secondary
particle collection system below APH, The flue path is identical to what is found
conventional Unit.
CFBC BOILER
1st Pass
Fuel
2nd Pass
SH - 1
U Beam Section
SH - 2
Bed Ash
3rd Pass
Economizer
APH
ESP
Fans
Ash
Recycle
Particle Transfer Hopper
PA air
IR-CFBC Boiler Reheat
IR-CFBC Advantages
๏‚— High Upper Furnace Heat Transfer Rate and Precise
furnace temperature control Result of high efficiency
solids collection and solids recycle control from the MDC
(Mechanical Dust Collection)
๏‚— Extended turndown ratio (no oil/gas)
100% to 20% MCR (Maximum Continuous Rating)
๏‚— Low auxiliary power requirements
Due to Low Flue Gas ฮ”P and no fluidizing blower
IR-CFBC Advantages
๏‚— Fast shut down / cool down
80%+ of Bed material is drained during cooldown. Can
shutdown / cool / enter / re-start within a 24 hour period
compared to 2 to 3 times longer for competitor CFB designs.
๏‚— Low Maintenance Costs
Less refractory or hot expansion joints, โ€˜RDZโ€™ at lower furnace
refractory interface, no fluidized sealing system, low furnace exit
velocity, low gas velocity in convective heating surfaces,...
The B&W IR-CFBC Two-Staged Solids Separation
System
๏‚— Benefits
๏‚— High overall solid collection efficiency ~ More than
99.7%
๏‚— Precise furnace temperature control ~ By controlling
solid recycle rate from the secondary collector
๏‚— Extended turndown ratio without use of auxiliary fuel
(oil/gas) ~ 100% to 20% MCR
๏‚— Low auxiliary power requirements compared to
competitor cyclone-based CFB technologies ~ 50-100
mm w.c.
Thin Cooled Refractory
75% less refractory in IR-
CFB compared to hot
cyclone CFB
Difference Between CFBC &
AFBC
๏‚— CFBC boiler
๏‚— Flue gas velocity-3.7 to 4.3 m/sec
๏‚— Over bed feeding
๏‚— U beam Technology
๏‚— No bed coil
๏‚— UBC-Less than 2%
๏‚— Efficiency high (88%)
๏‚— Clinker formation chances low
๏‚— Tube erosion high as compared
to AFBC
๏‚— Ash recycle (unburned heavy
particle) system.
๏‚— Fuel consumption is less as
compared to AFBC
๏‚— AFBC boiler
๏‚— Flue gas velocity-1.5 to 2.0 m/sec
๏‚— Under bed feeding
๏‚— No U beam
๏‚— bed coil
๏‚— UBC-Less than 3 to 4%
๏‚— Efficiency low (84%)
๏‚— Clinker formation chances high
๏‚— Tube erosion low as compared to
CFBC
๏‚— No Ash recycle (unburned heavy
particle) system.
๏‚— Fuel consumption is more as
compared to CFBC
Conclusion
๏‚— With the changing environmental condition of Raw material
availability cost and sustainability of boilers are still under
modification stage with the effort of optimizing their efficiency and
reducing troubles.
๏‚— Presently different versions of boiler are being installed by various
venders like IJT Foster Wheeler (USA) design with compact separator
model, Thyssen Krupp AG Germany Design for cold cyclone model.
CVL with water cooled โ€œhot loopโ€ cyclone. Songhai electric Alstom
design for cyclone & V type seal, Greensol Hungzhon, Wuxi etc with
steam cooled cyclone. In view of operation troubles all boiler designersโ€™
are on the way to compete each other, with best possible designs and
constant innovation to become the leader of the market.
Presentation on CFBC Boilers

More Related Content

What's hot

Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
ABVSAI
ย 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plants
SHIVAJI CHOUDHURY
ย 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine Efficiency
Jahanzeb Khan
ย 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
SHIVAJI CHOUDHURY
ย 

What's hot (20)

CFBC boiler operation
CFBC boiler operationCFBC boiler operation
CFBC boiler operation
ย 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPE
ย 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
ย 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
ย 
Performance evaluation and optimization of air preheater in thermal power plant
Performance evaluation and optimization of air preheater in thermal power plantPerformance evaluation and optimization of air preheater in thermal power plant
Performance evaluation and optimization of air preheater in thermal power plant
ย 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plants
ย 
Calculation of Turbine Efficiency
Calculation of Turbine EfficiencyCalculation of Turbine Efficiency
Calculation of Turbine Efficiency
ย 
Boiler circulation theory
Boiler circulation theoryBoiler circulation theory
Boiler circulation theory
ย 
Circulating Fluidized Bed Boiler (cfb) training module
Circulating Fluidized Bed Boiler (cfb) training module Circulating Fluidized Bed Boiler (cfb) training module
Circulating Fluidized Bed Boiler (cfb) training module
ย 
Boiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & WorkingBoiler Purging-Logic, Importance & Working
Boiler Purging-Logic, Importance & Working
ย 
Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plant
ย 
coal pulveriser
coal pulveriser coal pulveriser
coal pulveriser
ย 
CFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired BoilerCFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired Boiler
ย 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
ย 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
ย 
Air heater
Air heaterAir heater
Air heater
ย 
Boiler Introduction
Boiler IntroductionBoiler Introduction
Boiler Introduction
ย 
Air Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance IndicesAir Heater and PF Boiler Performance Indices
Air Heater and PF Boiler Performance Indices
ย 
Case Studies on CFBC Boilers
Case Studies on CFBC BoilersCase Studies on CFBC Boilers
Case Studies on CFBC Boilers
ย 
Cfbc boiler drive interlock
Cfbc boiler drive interlockCfbc boiler drive interlock
Cfbc boiler drive interlock
ย 

Viewers also liked

Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Pichai Chaibamrung
ย 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
Bunk Bonk
ย 

Viewers also liked (19)

Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
ย 
Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Maintenance & Safety
ย 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
ย 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
ย 
Boiler operation
Boiler operationBoiler operation
Boiler operation
ย 
Safe Operation and Explosions in Boilers
Safe Operation and Explosions in BoilersSafe Operation and Explosions in Boilers
Safe Operation and Explosions in Boilers
ย 
Minimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in IndiaMinimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in India
ย 
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired BoilerOnline Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
ย 
New Technologies in Process Heating
New Technologies in Process HeatingNew Technologies in Process Heating
New Technologies in Process Heating
ย 
Developments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power BoilersDevelopments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power Boilers
ย 
Boiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP BoilerBoiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP Boiler
ย 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
ย 
Efficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHREfficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHR
ย 
Efficient Steam Systems -
Efficient Steam Systems -Efficient Steam Systems -
Efficient Steam Systems -
ย 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
ย 
Water and fire tube boilers
Water and fire tube boilersWater and fire tube boilers
Water and fire tube boilers
ย 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
ย 
Foreign part separator-FPS
Foreign part separator-FPSForeign part separator-FPS
Foreign part separator-FPS
ย 
Effect of Geometric Configuration on Performance of Uniflow Cyclone
Effect of Geometric Configuration on Performance of Uniflow CycloneEffect of Geometric Configuration on Performance of Uniflow Cyclone
Effect of Geometric Configuration on Performance of Uniflow Cyclone
ย 

Similar to Presentation on CFBC Boilers

Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
arvind singh rathore
ย 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23
Munna Sagar
ย 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
Rohit Meena
ย 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
drazil
ย 
THERMAL
THERMALTHERMAL
THERMAL
PANKAJ DHIR
ย 

Similar to Presentation on CFBC Boilers (20)

Boilers ps mrng sessn
Boilers ps mrng sessnBoilers ps mrng sessn
Boilers ps mrng sessn
ย 
Boilers ps mrng sessn
Boilers ps mrng sessnBoilers ps mrng sessn
Boilers ps mrng sessn
ย 
Costumer focus12 06-2010
Costumer focus12 06-2010Costumer focus12 06-2010
Costumer focus12 06-2010
ย 
Steam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxSteam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptx
ย 
Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01Coalfiredelectricpowerplants23 131208122612-phpapp01
Coalfiredelectricpowerplants23 131208122612-phpapp01
ย 
Fbc boilers
Fbc boilersFbc boilers
Fbc boilers
ย 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdf
ย 
Coal fired electric power plants23
Coal fired electric power plants23Coal fired electric power plants23
Coal fired electric power plants23
ย 
Power plant engineering micro project
Power plant engineering micro projectPower plant engineering micro project
Power plant engineering micro project
ย 
Combustion chambers-and-performance
Combustion chambers-and-performanceCombustion chambers-and-performance
Combustion chambers-and-performance
ย 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
ย 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
ย 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
ย 
Cfbc
CfbcCfbc
Cfbc
ย 
fbc boilers
 fbc boilers fbc boilers
fbc boilers
ย 
boilers
boilersboilers
boilers
ย 
Combustion chamber
Combustion chamberCombustion chamber
Combustion chamber
ย 
Steam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvementSteam turbine deaerating condenser perforamace improvement
Steam turbine deaerating condenser perforamace improvement
ย 
Studies on boiler
Studies on boilerStudies on boiler
Studies on boiler
ย 
THERMAL
THERMALTHERMAL
THERMAL
ย 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 

Recently uploaded (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 

Presentation on CFBC Boilers

  • 1.
  • 2. Key benefits are fuel flexibility, reduced emission and lower bed temperature.
  • 3. Different Versions ๏‚— Industrial boilers ore developing with gradual change in their design of different parts and to optimize the thermal efficiency, fuel multiplicity and to sustain with environmental norms, with cost effectiveness for installation operation and maintenance. ๏‚— In our country early fifties and sixties small multi fuel boilers were used for process industries and high pressure coal based boilers were used for power generation. ๏‚— With decreasing trend of coal heat value boiler was constantly modified to reach the present status of CFBC boiler from previous version of stationary furnaces type chain grate type, spreader stoker type, PF type, AFBC type and CFBC type. CFBC is a new generation coal fired fluidized bed boiler developed since 1950 has the advantage of high efficiency low Sox and Nox. emission and higher turn down ratio.
  • 4. CFBC BOILER ๏‚— Assume a container with an air supply plenum at the bottom , A distributer plate that promotes even air flow through the bed and an upper chamber filled with sand. If a small quantity of air flow through the distributer plate in to the bed , If it will pass through the voids of an immobile mass of sand. For low velocity the air does not exert much force on sand and they remain in place. This condition is called fixed bed or static bed. By increasing a flow rate ,the air exert greater force on the sand and thereby reduces the contact force between the sand particle caused by gravity. By increasing the air flow further ,a point is reached where the drag force on particle counter balance the gravity force and sand particle become suspended in up flowing air steam. The point where the bed start to behave as a fluid is called the minimum fluidization condition.
  • 5. CFBC BOILER As the air increased further , the bed become less uniform bubbles of air start to form and the bed becomes violent . At this condition bed is in expanded condition, This is called bubbling fluidized bed and this occurs at atmospheric condition. Hence, It is called as Atmospheric Fluidized Bed. As the velocity of air further increased (around 10 m/sec.) a condition is reached where in whole of bed material is in circulation from furnace to a collection chamber (U beam hopper) and back to furnace. Thus resulting in uniform temperature profile throughout the furnace. Because the whole bed is in continuous circulation internally, This type of boiler is called IR- CFBC. (Internal Re-circulating fluidized bed combustion).
  • 6. CFBC BOILER TECHNOLOGY OFFERS ๏‚— High combustion efficiency ๏‚— Compact and economical design. ๏‚— Higher reliability and availability. ๏‚— Lower maintenance cost. ๏‚— Reduced erosion. ๏‚— Fuel flexibility. Gas Velocities ๏‚— CFBC - 4 - 6 m/sec. ๏‚— AFBC - 2 - 3 mtr./sec. ๏‚— PF - 8 - 10 mtr./sec.
  • 7. IMPROVED PERFORMANCE AT REDUCED COST ๏‚— CFBC boiler design as โ€“ Two stage particle separation system. ๏‚— First - U beam impact separators. ๏‚— Second โ€“ Mechanical dust collector or multi-cyclone dust collector.
  • 8. DESCRIPTION OF CFBC BOILER ๏‚— CFBC boilers are compact natural circulation ,Top supported ,Single drum unit. The primary and secondary particle separator is an integral part of boiler / furnace and connected to the particle return system.
  • 9. THE BOILER IS COMPRISED OF- ๏‚— CFB Furnace ๏‚— U-Beam (Particle separator) ๏‚— Particle Return System ๏‚— Convection pass and back end equipment.
  • 10. Internal Recirculation - Circulating Fluidized Bed Boilers
  • 11. CFBC FURNACE ๏‚— The CFBC furnace construction is of all welded membrane tube panels. Functionally the furnace is divided into three distinct zone . A -Primary zones B - Secondary zone C - Free board zone
  • 12. PRIMARY ZONE ๏‚— In the primary zone the fuel,sand,recycled material and 50% to 60% of the air for combustion are introduced. ๏‚— SECONDARY AND FREE BOARD ZONE ๏‚— In secondary zone the balance of combustion air is introduced. ๏‚— Combustion is completed in free board zone
  • 13. CFBC BOILER โ€ข The combustion air split correspond to the furnace zones . i.e. Primary , lower secondary and upper secondary air flow zone. lower secondary zone โ€“ Burner upper secondary zone โ€“ OF (Over Fired) โ€ข Primary air effects the actual fluidization of bed material and is supplied through a distributor plate at the bottom of the furnace. lower secondary and upper secondary air are supplied through nozzle located on both the front or rear furnace walls at two separate elevations. โ€ข The air distribution patterns in the furnace can be adjusted to provide for the best control of Nox (Nitrous Oxide) formation. โ€ข In addition to the enclosure walls , water cooled division walls for the entire height of the furnace provides additional heating surface.
  • 14. U-BEAM ๏‚— Flue gas and solids leaving the furnace passes through a high temperature primary particle collector where nearly all of the solids are separated from the flue gas. A unique feature of boiler is a particle separator made of labyrinth type array of beam having a shape similar to the letter โ€œUโ€. The U- beam made from stainless steel alloy. Or fiber material for less weight & cost and less erosion. The collector is designed to remove solids from dense gasโ€“solids mixture .the solids impacting the first two rows of beams fall by gravity back down the rear of the furnace .Solids impacting the remaining beams fall by gravity in two particle collector hopper located directly beneath the array of beams and enters the rear furnace through particle return system especially designed for this application.
  • 16. BOILER CONVECTION PASS ๏‚— The flue gas leaving the particle separator flows in to the boiler convection pass which includes the superheated and economizer banks . The gas velocity in these tube banks is designed specifically to minimize the erosion . Gases enters the air pre heater and then to the secondary particle separator . Gas leaving air heater enters the ESP and then to the stack through ID Fans.
  • 17. U-Beam separators ยฉ 2003 The Babcock & Wilcox Company, all rights reserved U-Beam separators 41 2 3Flue Gas & Solid Flow Flue Gas 1. Sidewall membrane panel 2. U-beam - SS309H/ SS310H/RA253MA 3. Seal baffle 4. Refractory
  • 19. Internal Recirculation - Circulating Fluidized Bed Boilers
  • 20. Internal Recirculation Circulating Fluidized Bed Boilers ๏‚— A simplified approach to improved flexibility and reliability ๏‚— Design Features ๏‚— High combustion efficiency ๏‚— Compact, economical design ๏‚— Higher reliability and availability ๏‚— Lower maintenance costs ๏‚— Reduced erosion ๏‚— Fuel flexibility ๏‚— Low emissions
  • 21. Why CFBC Boiler ? ๏‚— CFBC is a Fuel Flexible Technology ๏‚— Accepts wide range of fuels ๏‚— Volatile matter - >15 % ๏‚— Ash - UP TO 60% ๏‚— Heating value - > 2150 Kcal/kg ๏‚— Moisture - < 10% ๏‚— Use of lower rank fuels reduces fuel costs ๏‚— Fuel flexibility - minimizes fuel supply uncertainties ๏‚— Ability to burn low cost and waste fuels
  • 22. Steam Flow Circuit ๏‚— Riser tubes are used to direct the steam water mixture from the outlet headers of each water circuit to the steam drum. ๏‚— The water steam mixture in drum is separated by cyclone separators and the primary and secondary scrubber arrangement. ๏‚— The saturated steam leaves the steam drum and enters primary super heater in let header through supply pipes.Steam passes through the primary super heater coils and exits the outlet header.Then steam enters the attemperator header for desuperheating. ๏‚— The attemperator uses water from the high pressure feed water heater discharge to control the secondary super heater outlet temperature. ๏‚— From the attemperator the steam flow to the secondary super heater inlet header and to the counter flow secondary super heater bank. Steam leaves the coils and exits from the secondary super heater outlet header. Steam enters the turbine through main steam stop valve and NRV.
  • 23. Flue Gas Path ๏‚— CFBC boilers are balanced draft combustors. The pressure balance point is at the top of the furnace, ahead of the front row of U beams, The flue gas flow path through is as follows : ๏‚— Gas carrying with large quantity of bed solids, flow into the in bed U beams, above hopper U beams hot particle collector. The U beams removes most of the solids entrained in gas. The flue gas leaves the U beams and flows through the secondary super heater zone, primary super heater zone, Economizer, primary & secondary air heaters. At the bottom of the air heaters gas enters secondary particle U beams separators which collects the majorities of the remaining solids entrained in gas. ๏‚— The cleaned gas then passes through ESP for final gas cleaning and stack through ID fans. One stands by ID fanes is provided. Dampers are provided before and after the ID fans for maintenance of fans. With the exception of the U beam and secondary particle collection system below APH, The flue path is identical to what is found conventional Unit.
  • 24. CFBC BOILER 1st Pass Fuel 2nd Pass SH - 1 U Beam Section SH - 2 Bed Ash 3rd Pass Economizer APH ESP Fans Ash Recycle Particle Transfer Hopper PA air
  • 26. IR-CFBC Advantages ๏‚— High Upper Furnace Heat Transfer Rate and Precise furnace temperature control Result of high efficiency solids collection and solids recycle control from the MDC (Mechanical Dust Collection) ๏‚— Extended turndown ratio (no oil/gas) 100% to 20% MCR (Maximum Continuous Rating) ๏‚— Low auxiliary power requirements Due to Low Flue Gas ฮ”P and no fluidizing blower
  • 27. IR-CFBC Advantages ๏‚— Fast shut down / cool down 80%+ of Bed material is drained during cooldown. Can shutdown / cool / enter / re-start within a 24 hour period compared to 2 to 3 times longer for competitor CFB designs. ๏‚— Low Maintenance Costs Less refractory or hot expansion joints, โ€˜RDZโ€™ at lower furnace refractory interface, no fluidized sealing system, low furnace exit velocity, low gas velocity in convective heating surfaces,...
  • 28. The B&W IR-CFBC Two-Staged Solids Separation System ๏‚— Benefits ๏‚— High overall solid collection efficiency ~ More than 99.7% ๏‚— Precise furnace temperature control ~ By controlling solid recycle rate from the secondary collector ๏‚— Extended turndown ratio without use of auxiliary fuel (oil/gas) ~ 100% to 20% MCR ๏‚— Low auxiliary power requirements compared to competitor cyclone-based CFB technologies ~ 50-100 mm w.c.
  • 29. Thin Cooled Refractory 75% less refractory in IR- CFB compared to hot cyclone CFB
  • 30. Difference Between CFBC & AFBC ๏‚— CFBC boiler ๏‚— Flue gas velocity-3.7 to 4.3 m/sec ๏‚— Over bed feeding ๏‚— U beam Technology ๏‚— No bed coil ๏‚— UBC-Less than 2% ๏‚— Efficiency high (88%) ๏‚— Clinker formation chances low ๏‚— Tube erosion high as compared to AFBC ๏‚— Ash recycle (unburned heavy particle) system. ๏‚— Fuel consumption is less as compared to AFBC ๏‚— AFBC boiler ๏‚— Flue gas velocity-1.5 to 2.0 m/sec ๏‚— Under bed feeding ๏‚— No U beam ๏‚— bed coil ๏‚— UBC-Less than 3 to 4% ๏‚— Efficiency low (84%) ๏‚— Clinker formation chances high ๏‚— Tube erosion low as compared to CFBC ๏‚— No Ash recycle (unburned heavy particle) system. ๏‚— Fuel consumption is more as compared to CFBC
  • 31. Conclusion ๏‚— With the changing environmental condition of Raw material availability cost and sustainability of boilers are still under modification stage with the effort of optimizing their efficiency and reducing troubles. ๏‚— Presently different versions of boiler are being installed by various venders like IJT Foster Wheeler (USA) design with compact separator model, Thyssen Krupp AG Germany Design for cold cyclone model. CVL with water cooled โ€œhot loopโ€ cyclone. Songhai electric Alstom design for cyclone & V type seal, Greensol Hungzhon, Wuxi etc with steam cooled cyclone. In view of operation troubles all boiler designersโ€™ are on the way to compete each other, with best possible designs and constant innovation to become the leader of the market.