CFBC Vs AFBC
HEAT TRANSFER IN CFBC WATER
WALL
o Case Study On Husk Firing In CFBC
o Importance of loop seal air nozzle arrangement.
o Panel super heater failure in CFBC.
CASE STUDIES
The CFBC boiler was supplied by a Chinese company has been
operated for a year. Boiler was designed for 80% Rice husk + 20
% Indian coal / 100% Indian coal. Boiler parameters are 75 TPH,
90 Kg/cm2, 515 Deg C with the feed water temperature of 190
Deg C.
CASE STUDY ON HUSK FIRING IN CFBC
Cracks developed in cyclone outlet cone
CASE STUDY ON HUSK FIRING IN CFBC
CASE STUDY ON HUSK FIRING IN CFBC
CASE STUDY ON HUSK FIRING IN CFBC
IMPORTANCE OF LOOP SEAL AIR NOZZLE
ARRANGEMENT
Loop is mechanical device which transfers the un-combusted
(coarser) particles to the furnace, which was collected by cyclone.
It transfers the ash particles from low pressure cyclone to the high
pressure combustor. It protects the direct flow of flue gas from
furnace to cyclone.
There are two types of air nozzles were provided in loop seal. The
purpose of nozzle types is to shift the collected ash back to
furnace and also to control the gas bye-passing from furnace to
cyclone. Down leg side nozzles were provided for aeration
purpose only and in the riser leg side nozzles were provided for
fluidization purpose.
If loopseal air nozzles were erected in wrong manner then this
cause in boiler loading because ash will not transferred from
cyclone to furnace.
IMPORTANCE OF LOOP SEAL AIR NOZZLE
ARRANGEMENT
IMPORTANCE OF LOOP SEAL AIR NOZZLE
ARRANGEMENT
The is the philosophy of loop seal design by Foster wheeler.
IMPORTANCE OF LOOP SEAL AIR NOZZLE
ARRANGEMENT
The CFBC boiler was supplied by a Chinese company has been
operated for 3 years. Boiler was designed for 100%
Imported/Indian coal. Boiler parameters are 130 TPH, 100
Kg/cm2, 540 Deg C & feed water temperature is 180 Deg C. The
arrangement is shown in below
One and half year after commissioning they were faced frequent
failure in panel super heater tubes. Due to the frequent failure in
panel super heater tubes they can’t able to run the boiler more
than a month continuously. Especially failure was occurred in
bottom of super heater. Arrangement of panel super heater was
shown in photo-02. At the time of visit boiler was in operating
condition. However failed tubes were available for inspection. In
my presence boiler was stopped due to panel super heater failure,
boiler was inspected from inside.
PANEL SUPERHEATER FAILURE IN CFBC
PANEL SUPERHEATER FAILURE IN CFBC
Reason for Failure,
1. From the available failed tube, it
was understood that the anchoring
arrangement was not proper to hold
the refractory. They do not have the
anchors at bottom and at front.
2. Tubes are provided with 6mm dia x
30mm long studs.
3. Due to that insufficient anchoring,
refractory may fail from the first
firing itself. After refractory
falling, tubes were start eroding
from bottom.
PANEL SUPERHEATER FAILURE IN CFBC
Failed tubes, shows no anchors in
bend
New studs added with modified
arrangement.
PANEL SUPERHEATER FAILURE IN CFBC
Thickness measured in the outer coil during the shutdown time. Tube
thickness was observed 2.83mm against the original thickness of 5mm.
Recommendation,
1. For the proper holding of refractory, more studs were added
additionally with the existing stud arrangement.
2. New studs also with the same dimension.
3. Phosphate bonded high alumina castable was applied over a
coil up to the tip only. Phoscast will give better life in the high
velocity & high erosive zone also. This was practically
experienced in AFBC boilers.
PANEL SUPERHEATER FAILURE IN CFBC
SEE YOU WITH NEW
CASE STUDIES
THANK YOU !!!

More Related Content

What's hot

Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Ashvani Shukla
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoringManohar Tatwawadi
 
WUXI MAKE CFBC BOILER COLD CYCLONE
WUXI MAKE CFBC BOILER COLD CYCLONEWUXI MAKE CFBC BOILER COLD CYCLONE
WUXI MAKE CFBC BOILER COLD CYCLONEAshish Kumar Jain
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPEAshish Kumar Jain
 
basics_of_boiler_design__1674282406.pdf
basics_of_boiler_design__1674282406.pdfbasics_of_boiler_design__1674282406.pdf
basics_of_boiler_design__1674282406.pdfDhavalpatel219430
 
Principle of CFB Boiler , 30 April 2012, Presented at SCGBKK ,TH
Principle of CFB Boiler , 30 April 2012, Presented at SCGBKK ,THPrinciple of CFB Boiler , 30 April 2012, Presented at SCGBKK ,TH
Principle of CFB Boiler , 30 April 2012, Presented at SCGBKK ,THPichai Chaibamrung
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
Fireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerFireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerZalak Shah
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Improving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemImproving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemKamlesh Hariyani
 
AFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENTAFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENTManohar Tatwawadi
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequenceAshvani Shukla
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations Ashish Kumar Jain
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSharshavardhan sivadi
 

What's hot (20)

Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1Furnace safegaurd supervisory system logic-1
Furnace safegaurd supervisory system logic-1
 
Presentation on CFBC Boilers
Presentation on CFBC BoilersPresentation on CFBC Boilers
Presentation on CFBC Boilers
 
The Coal mill performance monitoring
The Coal mill performance monitoringThe Coal mill performance monitoring
The Coal mill performance monitoring
 
WUXI MAKE CFBC BOILER COLD CYCLONE
WUXI MAKE CFBC BOILER COLD CYCLONEWUXI MAKE CFBC BOILER COLD CYCLONE
WUXI MAKE CFBC BOILER COLD CYCLONE
 
Thermax IR CFBC BOILER U BEAM TYPE
Thermax IR CFBC BOILER                U BEAM TYPEThermax IR CFBC BOILER                U BEAM TYPE
Thermax IR CFBC BOILER U BEAM TYPE
 
basics_of_boiler_design__1674282406.pdf
basics_of_boiler_design__1674282406.pdfbasics_of_boiler_design__1674282406.pdf
basics_of_boiler_design__1674282406.pdf
 
Principle of CFB Boiler , 30 April 2012, Presented at SCGBKK ,TH
Principle of CFB Boiler , 30 April 2012, Presented at SCGBKK ,THPrinciple of CFB Boiler , 30 April 2012, Presented at SCGBKK ,TH
Principle of CFB Boiler , 30 April 2012, Presented at SCGBKK ,TH
 
Boiler Operation
Boiler OperationBoiler Operation
Boiler Operation
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Fireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerFireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a Boiler
 
CFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired BoilerCFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired Boiler
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Improving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam SystemImproving Efficiency for Boiler and Steam System
Improving Efficiency for Boiler and Steam System
 
AFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENTAFBC BOILERS PERFORMANCE IMPROVEMENT
AFBC BOILERS PERFORMANCE IMPROVEMENT
 
Cfbc burner startup sequence
Cfbc burner startup sequenceCfbc burner startup sequence
Cfbc burner startup sequence
 
MILL performance.ppt
MILL performance.pptMILL performance.ppt
MILL performance.ppt
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTSOVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
OVERVIEW OF SUPERCRITICAL THERMAL POWERPLANT , DPSTS
 

Viewers also liked

Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principlePichai Chaibamrung
 
Non mechanical valves
Non mechanical valvesNon mechanical valves
Non mechanical valvesRaju Gupta
 
The technological properties of refractory
The technological properties of refractory The technological properties of refractory
The technological properties of refractory Ahmed Abd Elmegeed
 

Viewers also liked (20)

Boiler Maintenance & Safety
Boiler Maintenance & SafetyBoiler Maintenance & Safety
Boiler Maintenance & Safety
 
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principleCirculating fluidized bed boiler (cfb boiler) how does it work and its principle
Circulating fluidized bed boiler (cfb boiler) how does it work and its principle
 
Minimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in IndiaMinimum Energy Performance Standards for Boilers in India
Minimum Energy Performance Standards for Boilers in India
 
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired BoilerOnline Efficiency Monitoring and Diagnostics in Coal Fired Boiler
Online Efficiency Monitoring and Diagnostics in Coal Fired Boiler
 
New Technologies in Process Heating
New Technologies in Process HeatingNew Technologies in Process Heating
New Technologies in Process Heating
 
Developments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power BoilersDevelopments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power Boilers
 
Boiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP BoilerBoiler Water Treatment for LP,MP and HP Boiler
Boiler Water Treatment for LP,MP and HP Boiler
 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
 
Efficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHREfficient steam systems - Generation to WHR
Efficient steam systems - Generation to WHR
 
Efficient Steam Systems -
Efficient Steam Systems -Efficient Steam Systems -
Efficient Steam Systems -
 
Boiler Water Treatment -
Boiler Water Treatment - Boiler Water Treatment -
Boiler Water Treatment -
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Safe Operation and Explosions in Boilers
Safe Operation and Explosions in BoilersSafe Operation and Explosions in Boilers
Safe Operation and Explosions in Boilers
 
Boiler Performance Monitoring
Boiler Performance MonitoringBoiler Performance Monitoring
Boiler Performance Monitoring
 
Non mechanical valves
Non mechanical valvesNon mechanical valves
Non mechanical valves
 
Pengolahan keramik 1
Pengolahan keramik 1Pengolahan keramik 1
Pengolahan keramik 1
 
Optimizing Combustion using a Flue Gas Analyser
Optimizing Combustion using a Flue Gas AnalyserOptimizing Combustion using a Flue Gas Analyser
Optimizing Combustion using a Flue Gas Analyser
 
The technological properties of refractory
The technological properties of refractory The technological properties of refractory
The technological properties of refractory
 
Javanotes
JavanotesJavanotes
Javanotes
 
System design
System designSystem design
System design
 

Similar to Case Studies on CFBC Boilers

Surging & blow out of loop seals in a CFBC boiler
Surging & blow out of loop seals in a CFBC boilerSurging & blow out of loop seals in a CFBC boiler
Surging & blow out of loop seals in a CFBC boilerVENUS ENERGY AUDIT SYSTEM
 
Case studies in boiler vibration and BFP cavitation by k.k.parthiban
Case studies in boiler vibration and BFP cavitation by k.k.parthibanCase studies in boiler vibration and BFP cavitation by k.k.parthiban
Case studies in boiler vibration and BFP cavitation by k.k.parthibanVENUS ENERGY AUDIT SYSTEM
 
Aiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agriumAiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agriumSatria Sakata
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptxrajneeshjauhari2
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to BoilersSATYAKAM MOHAPATRA
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converterPrem Baboo
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersRai University
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersRai University
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperiencePooja Agarwal
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfPrasadKandukuri4
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetdrazil
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetRohit Meena
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetRohit Meena
 
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018parthi2006
 

Similar to Case Studies on CFBC Boilers (20)

Surging & blow out of loop seals in a CFBC boiler
Surging & blow out of loop seals in a CFBC boilerSurging & blow out of loop seals in a CFBC boiler
Surging & blow out of loop seals in a CFBC boiler
 
Thermal fatigue failure in a FBC boiler
Thermal fatigue failure in a FBC boilerThermal fatigue failure in a FBC boiler
Thermal fatigue failure in a FBC boiler
 
Case studies in boiler vibration and BFP cavitation by k.k.parthiban
Case studies in boiler vibration and BFP cavitation by k.k.parthibanCase studies in boiler vibration and BFP cavitation by k.k.parthiban
Case studies in boiler vibration and BFP cavitation by k.k.parthiban
 
Aiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agriumAiche 42-024-primary reformer failure- agrium
Aiche 42-024-primary reformer failure- agrium
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
ppt. clg
ppt. clgppt. clg
ppt. clg
 
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
 
A Brief Introduction to Boilers
A Brief Introduction to BoilersA Brief Introduction to Boilers
A Brief Introduction to Boilers
 
Steam boilers
Steam boilersSteam boilers
Steam boilers
 
Failure in synthesis converter
Failure in synthesis converterFailure in synthesis converter
Failure in synthesis converter
 
boilers
boilersboilers
boilers
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilers
 
B.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilersB.tech i eme u 2 steam boilers
B.tech i eme u 2 steam boilers
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field Experience
 
Cochran Boiler
Cochran Boiler Cochran Boiler
Cochran Boiler
 
BOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdfBOILER PRESENTATION ON 21.10.14 1.pdf
BOILER PRESENTATION ON 21.10.14 1.pdf
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
 
Boiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yetBoiler & co generation presentation finished not yet
Boiler & co generation presentation finished not yet
 
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
Wingwall sh distortion in cfbc boilers by k.k.parthiban jan 2018
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Case Studies on CFBC Boilers

  • 1. By R.NAGARAJAPRASATH, B.E(Mech), BOE SHANTI GD ISPAT & POWER PVT LTD, CHATTISGARH
  • 3. HEAT TRANSFER IN CFBC WATER WALL
  • 4. o Case Study On Husk Firing In CFBC o Importance of loop seal air nozzle arrangement. o Panel super heater failure in CFBC. CASE STUDIES
  • 5. The CFBC boiler was supplied by a Chinese company has been operated for a year. Boiler was designed for 80% Rice husk + 20 % Indian coal / 100% Indian coal. Boiler parameters are 75 TPH, 90 Kg/cm2, 515 Deg C with the feed water temperature of 190 Deg C. CASE STUDY ON HUSK FIRING IN CFBC Cracks developed in cyclone outlet cone
  • 6. CASE STUDY ON HUSK FIRING IN CFBC
  • 7. CASE STUDY ON HUSK FIRING IN CFBC
  • 8. CASE STUDY ON HUSK FIRING IN CFBC
  • 9. IMPORTANCE OF LOOP SEAL AIR NOZZLE ARRANGEMENT
  • 10. Loop is mechanical device which transfers the un-combusted (coarser) particles to the furnace, which was collected by cyclone. It transfers the ash particles from low pressure cyclone to the high pressure combustor. It protects the direct flow of flue gas from furnace to cyclone. There are two types of air nozzles were provided in loop seal. The purpose of nozzle types is to shift the collected ash back to furnace and also to control the gas bye-passing from furnace to cyclone. Down leg side nozzles were provided for aeration purpose only and in the riser leg side nozzles were provided for fluidization purpose. If loopseal air nozzles were erected in wrong manner then this cause in boiler loading because ash will not transferred from cyclone to furnace. IMPORTANCE OF LOOP SEAL AIR NOZZLE ARRANGEMENT
  • 11. IMPORTANCE OF LOOP SEAL AIR NOZZLE ARRANGEMENT The is the philosophy of loop seal design by Foster wheeler.
  • 12. IMPORTANCE OF LOOP SEAL AIR NOZZLE ARRANGEMENT
  • 13. The CFBC boiler was supplied by a Chinese company has been operated for 3 years. Boiler was designed for 100% Imported/Indian coal. Boiler parameters are 130 TPH, 100 Kg/cm2, 540 Deg C & feed water temperature is 180 Deg C. The arrangement is shown in below One and half year after commissioning they were faced frequent failure in panel super heater tubes. Due to the frequent failure in panel super heater tubes they can’t able to run the boiler more than a month continuously. Especially failure was occurred in bottom of super heater. Arrangement of panel super heater was shown in photo-02. At the time of visit boiler was in operating condition. However failed tubes were available for inspection. In my presence boiler was stopped due to panel super heater failure, boiler was inspected from inside. PANEL SUPERHEATER FAILURE IN CFBC
  • 14. PANEL SUPERHEATER FAILURE IN CFBC Reason for Failure, 1. From the available failed tube, it was understood that the anchoring arrangement was not proper to hold the refractory. They do not have the anchors at bottom and at front. 2. Tubes are provided with 6mm dia x 30mm long studs. 3. Due to that insufficient anchoring, refractory may fail from the first firing itself. After refractory falling, tubes were start eroding from bottom.
  • 15. PANEL SUPERHEATER FAILURE IN CFBC Failed tubes, shows no anchors in bend New studs added with modified arrangement.
  • 16. PANEL SUPERHEATER FAILURE IN CFBC Thickness measured in the outer coil during the shutdown time. Tube thickness was observed 2.83mm against the original thickness of 5mm.
  • 17. Recommendation, 1. For the proper holding of refractory, more studs were added additionally with the existing stud arrangement. 2. New studs also with the same dimension. 3. Phosphate bonded high alumina castable was applied over a coil up to the tip only. Phoscast will give better life in the high velocity & high erosive zone also. This was practically experienced in AFBC boilers. PANEL SUPERHEATER FAILURE IN CFBC