1. SURVEYOR
Land Surveyor, Civil surveyor, Highway Surveyor (Survey Engineer)
To,
Human Resources Manager,
Respected Sir,
The purpose of this communication is to introduce myself for considering my application for the post
of Surveyor in your esteemed Organization.
I Babar Sohail Khan would like to submit my Curriculum vitae for your kind perusal as Land
Surveyor, Civil surveyor, Highway Surveyor (Survey Engineer) in Highways, Building Facilities,
Bridges, Culverts, Irrigation, Sewerage, Water supply, Underground Utilities, Landscaping, Blasting
Work, Marine Earthworks and Other Civil / Infrastructure works over the past 11 years in which 6
years working in Qatar, 2 Years in Dubai now in Saudi Arabia for last 2 years. Aside from having
good exposure on various projects, I also have the ability to work in a team for the company. I
assure you, I will discharge my legislative duties to the entire satisfaction, and May I request you to
kindly gives me opportunity to serve my post in your esteemed organization.
Thanking you,
Yours faithfully,
Babar Sohail Khan
Mobile No. +966-581150877
E-mail:khanbabari@yahoo.com
http://www.omrania.com/
Omrania Associate Engineering Consultant
2. 1 | P a g e
Babar Sohail Khan
+966-581150877 khanbabari@yahoo.com khanbabari
Current Position: Sr. Land Surveyor (Survey Engineer).
Desired Position: Civil Surveyor/ Land Surveyor / Survey Engineer.
Objective:
To secure a position in the organization that offers challenge and opportunity for my career
development and at the same time serve the organization to the best of my capabilities. I would like
to gain new skills while utilizing my current area of expertise of procurement and employee
satisfaction services within a positive team environment.
Profile:
A Highly motivated individual and a team player, having 10+ years’ experience as a Survey Engineer
in the civil construction and architecture filed with various organizations in Pakistan as well as GCC.
Previously I was a professional Hockey Player played at National level in Pakistan as well as Qatar.
Right now work as a Survey Engineer for Omrania and Associates on different sites for Ministry of
Housing in western region, Kingdom of Saudi Arabia.
Work Experience:
Sr. Land Surveyor (Survey Engineer) October, 2014 - Present
Omrania & Associates Architecture & Engineering Consultants (KSA)
Project Description Housing Program Western Region Rabigh.
Infrastructure Work) HPWR Project consist of 488 Housing Program Western Region
(Road Work Pipelines Water Supply Sewerage, Manholes UG Water Tank O.H Water Tank,
Project Area: 563794m2
Consultant: Omrania & Associates
Client: Ministry of Housing
Project cost: 188 Million
Responsibilities:
To verify horizontal and vertical control points with reference of permanent control points.
Witness and verify of setting out of road center line and property line.
Record result of inspection work executed all check shop drawings with contract documents.
To check and verify Setting out for road center line and curvets, drainages, kerb stone road
crass duct manhole invert level.
Check the site before the start of work and record quantity of existing services
Record cut and fills level and crass section.
To follow up in coordination with ARE the protection of existing services.
To prepare daily report and forward to ARE
To check all contractors and sub-contractor work according to the drawings as drainages
level, invert level, manholes, sewerage, crass sleeve, and curvet.
To attend the weekly and monthly meeting.
Lay out of structure, formwork and reinforcement
3. 2 | P a g e
Sr. Land Surveyor (Survey Engineer) Nov ’2009 – Oct 2014
Redco International W.L.L (Qatar) Projects:
New Doha Port Project Qatar
excavation of New Doha port project through blasting method & jack hammer including
layout for erection of concrete blocks and maintain of slops,
Blasting Work, Marine Earth Work & Infrastructure Works Critical excavation,
Covered Area: 4265368.47Sqm
Consultant: AECOM
Client: State of Qatar
Responsibilities:
Topographic Survey.
Project setting out.
OGL recording for existing roads.
Pipe line works (Storm water, sewer, Irrigation, Potable Water and Fire Fighting).
Street light Work marking and Aligning.
Kerb stone setting out and aligning.
Asphalt works.
Sign Board marking.
Road marking.
As-built preparation for all the services and roads
Street light Work marking and Aligning.
Kerb stone setting out and aligning.
Asphalt works.
Sign Board marking.
Road marking.
As-built preparation for all the services and roads.
LRT (Infrastructure Tunnel work) Lusail Rail Transit Project, Qatar.
Mega excavation project of Lusail Railway Transit, excavation work of underground grid
stations, slop work and of railway tracks. A vast work of backfilling acting upon the strict
specifications of Client and consultant
Project Cost: 220 Million
Consultants: Halcrow /Cowi
Client: QDVC
Responsibilities:
Control points, Benchmark establishing.
Making setout drawing and convert to site coordinate.
Prepare Site Demarcations.
Convert Design level to datum level.
All type of underground utility work.
Project setting out.
OGL recording for existing details for various parking.
Preparing design proposal for various parking.
Street light pole verticality aligning.
Road marking.
Sign Board fixing.
Matching with structural drawing and architectural drawing and
Finalize the construction drawing.
Correspondence with consultant, arrange site inspection and get
Approval for survey work execution.
Co-ordinate with design peoples and executes the modification in The Site.
4. 3 | P a g e
Qatar Airways Crew Accommodation
(10 Multi Stories Building) Building Work ,Precast Aeration Work, MEP Work, Piling Work,
Excavation Work,
Project Cost: 450 Million
Consultants: AEB
Client: Qatar Airways
Responsibilities:
Site Inspection of all type of survey works.
Joint Survey for OGL recorded on site with contractor.
Calculating the area and volume of soil required for cutting and filling in the project.
Joint Survey for establishing temporary bench mark on site with Contractor.
Checking of all the shop drawings related to all the services.
Checking profiles for roads and services including irrigation, district
Checking, potable Water and firefighting.
Checking for all the clashes with the other services
Burj Al Marina Qatar
(36Multi Stories Building) Building Work, Precast Aeration Work ,MEP Work)
Excavation main building raft & services then blinding work and raft then structure work
precast aeration Water Supply Sewerage, Manholes work.
Cover Area: 115000Sqm
Project Cost: 520Million
Consultants: KEO International
Client: QNB
Responsibilities:
Implementation of work according to drawing & project specification.
Preparation of RFI and data entry coordinates level. etc.
Keep proper records of inspections and work check all shop drawings with IFC documents.
To check all our sub-contractors survey work and solve the drawings issues
Prepare as built drawings and forward to consultant.
To check and verify the all bench marker and traverse monthly basis.
Supervised the sub-contractor survey work like cladding, steel structure, MEP work and
Landscaping.
Responsibility the raft level settlement survey monitoring.
Responsibility the core wall verticality alignment survey monitoring on weekly basis.
Topographical survey and traversing.
Setting out of main sewerage pipe line and water supply pipe line.
Making the as built of slabs edge, column, and landscaping
Making the as built after pouring the element then tie with the original design drawings.
Joint survey with consultant for the formwork and joint survey for as built.
Verify the accuracy of survey data including measurements and calculations conducted at
survey sites.
Inspection of final handing over work, preparation of snag list and checking as built drawings
for final approval and handing over
Coordination with management and consultant regarding of the drawings issue.
Supervised the survey team and making daily work schedule are per site requirement.
Supervised the survey team worker,
Supervised the all elements for example setting out, demarcation, formwork of concrete
elements,
Calculation of coordinate, and horizontal and vertical traverse adjustment.
Supervised the marine earth work excavation and embankment and setting out in the mashed
water.
Control safety procedure for surveying and construction operations.
5. 4 | P a g e
Supervised the survey team and making daily work schedule are per site requirement.
Supervised the survey team worker,
Supervised the all elements for example setting out, demarcation, formwork of concrete
elements,
Calculation of coordinate, and horizontal and vertical traverse adjustment.
Control safety procedure for surveying and construction operations.
Preparation the measurement sheets
Co-ordination between the construction technical department and consultant.
Preparation the measurement sheets
North Doha Sewerage Treatment-PS70& Pumping Mains-CP682/2.
Excavation of Screen Chamber Lifting Pumping Station
Forwarding Pumping Station, HV & General Building, MCC1, Administration
Consultants: Stanley & QDVC
Client: Asghal
Responsibilities:
Topographic Survey.
Project setting out.
OGL recording for existing roads.
Topographical survey and traversing.
Setting out of main sewerage pipe line and water supply pipe line.
Making the as built of slabs edge, column, and landscaping
Calculation of coordinate, and horizontal and vertical traverse adjustment.
Joint Survey for establishing temporary bench mark on site with Contractor.
Senior Surveyor Nov 2007 - Oct 2009
Divers Marine contracting Projects: (Dubai)
Abu Dubai to Ghazlan Island under Water pipe line 26 km)
Consultant: Jacobs
Client: Abu Dubai Municipality
Sweet water pipe line Sharjah to Ajman 20 km ,( Air Valve Chamber Work, Excavation , Pipe
laying & Pipe Alignment )
Consultants: Al Turath Engraining Consultant
Client: Ajman Municipality
Responsibilities:
Topographical survey and traversing.
Preparation of RFI and data entry coordinates level. etc.
Pipe line works Storm water, sewer, Irrigation.
Checking, potable Water and firefighting.
Checking for all the clashes with the other services
6. 5 | P a g e
Surveyor April 2005 – Nov 2007
IJM Gulf (Pvt) Limited (Malaysian Company)
World Trade Center DHA, Islambad (35MultiStories)
Piles Work , Excavation Work ,Pipelines Water Supply Sewerage, Manholes
Work ,Structure Work, MEP Work, Retaining Wall etc)
Consultant: A.R.A & Hajjas Kasturi Associates (Malaysian)
Client: Al Ghurair Giga (Pvt) Limited
Responsibilities:
Layout of the Project as per Drawings.
Maintain Levels Record. Piles Work, Excavation Work.
Maintain Profiles at Graph for calculating Quantities.
Recording and Reporting of progress among different players.
Layout of different Structures (Manholes, UG Water Tanks, Water Treatment Structures,
Water reservoir Bodies, O.H Water Tanks, Retaining Walls etc) as per Drawings.
Data collecting from field for as built Drawings
All type of level instrument works.
Project setting out.
Worked for roads in super elevation and transition.
Academic Qualification:
BISE Gujranwala Intermediate in 2003.
BISE Gujranwala Secondary School Education Certificate
Professional Qualification (Diploma):
2 Year Diploma of Civil Engineering Construction from (Skill Development Council Lahore,
Pakistan).
1 Year Diploma of Surveyor from (Technical Board Lahore, Pakistan).
Trimble Training Course from Geoscope Qatar in April2013.
Certificate of Training Leica Viva GS12 GPS.
Certificate of Training Leica Flex Line Total Station.
Certificate of participation GPS Surveying and Post Processing Gyroscope.
Certificate of participation Practical &Theory on spna Epoch 50 connecting to VRS.
6 Months Computer Learning Course for Microsoft Office, InPage2000,,AutoCAD from
Islamabad
It Skills:
Installation of Windows 98, Window XP, Vista and Window 7,
Auto CAD 2D & 3D
Auto CAD Civil 3D
LISP CAD
EZY Surf
Tool Pack
Installation of software
Familiar Instruments:
Leica-Viva-GS12
LeicaVivaGNSSGS15
Sokkia Total station
Leica Total station
Trimble Total station
Theodo lites and all level instruments
7. 6 | P a g e
Key Skills:
Detailed Drawing study for avoiding mistakes in setting out
Establishing control points for setting out
Calculating Co-ordinates for this control points
Giving Catch points for excavation work
Setting out center line for road
Giving levels for vertical curves.
Controlling levels for asphalt work, setting for interchange etc. Taking X-Section with Total
station (x, y, z) Plotting of NSLs & Calculation of Quantities Traversing.
Layout of centerline & Fixing preservation of all control points of the whole project fixing of toe
points
Perpetration of constriction drawings and relevant detail.
Calculation Co-ordinates for different work like pile, pillar, column and Slab location etc.
Setting out Pile Location, Center line. Making as Built surveyor for different structures
columns shortening etc.
Calculation of volumes for earth work with Civil 3d 2013,Autocad 2007 To 2013,MS Excel,
EZY Surf, Tool Pack
Preparation of topographic survey drawings
Preparation of surface grading, contour, comparison of different surface (earthwork) by using
Civil 3D
Preparation of plot level plan, combined utility layout plan, utility duct layout plan, storm water
drainage
layout plan, irrigation distribution layout plan and potable water layout plan
Personal Details:
Father’s Name: Mohammad Hussain Khan
Date of Birth: 01stJune1985
Nationality: Pakistani
Driving License: KSA/Pakistan
Languages: English, Arabic, Urdu, Hindi
Permanent Address: Kotly Afghanan District & Tehsil, Mandi Baha-ud-Din, Pakistan.