Introduction
Foundation constructed in site visit
Type: Concrete square pile( Precast
concrete pile)
They are square in sizes and reinforced by
rebar. The typical cross-sectional
dimensions range from 25 to 41 centimeters
and bearing capacities from 45 to 500 tons.
Type of machine used : Pile Drive
A pile driver hammers a precast concrete
pile into the ground. The pile is supported
by the vertical structure of the pile driver
and driven by heavy piston mechanism that
follows it down the leads as it penetrates
deeper into soil.
Precast details
Advantages:
• Cost saving compare to other types
of piling.
• High load capacity and corrosion
resistance
Disadvantages:
• High breakage rates
• Vulnerability to damage associated
with handling
Precast pilling process
Steps:
1. Excavation, to reduce level for the construction of
pile cap
2. Lifting, pile is tied on its lifting lug and ready to be
hammering.
3. Start hammering, the pile is driven into the
ground by hammering.
4. Construction of pile cap, after hammering process
and the formwork is build by using plywood
5. Cutting of the pile, this is
the last port of the pilling
process. The concrete is
crushed by Pneumatic
hammer. The cut pile is lifted
off and disposed.

More Related Content

What's hot

Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
SSudhaVelan
 

What's hot (20)

Industrial training seminar PPT
Industrial training seminar PPTIndustrial training seminar PPT
Industrial training seminar PPT
 
Cep construction of railway overbridge by abhisek panda
Cep construction of railway overbridge by abhisek pandaCep construction of railway overbridge by abhisek panda
Cep construction of railway overbridge by abhisek panda
 
Multi storey residential building
Multi storey residential buildingMulti storey residential building
Multi storey residential building
 
CLAM SHELL BUCKETS
CLAM SHELL BUCKETSCLAM SHELL BUCKETS
CLAM SHELL BUCKETS
 
Grinding table for vertical mill
Grinding table for vertical millGrinding table for vertical mill
Grinding table for vertical mill
 
Batching plant ppt
Batching plant pptBatching plant ppt
Batching plant ppt
 
How clamshell bucket works
How clamshell bucket worksHow clamshell bucket works
How clamshell bucket works
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
 
Central Mix Concrete Batching Plant
Central Mix Concrete Batching PlantCentral Mix Concrete Batching Plant
Central Mix Concrete Batching Plant
 
Construction equipment (earth work)
Construction equipment (earth work)Construction equipment (earth work)
Construction equipment (earth work)
 
Significance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needsSignificance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needs
 
Earth moving equipments
Earth moving equipmentsEarth moving equipments
Earth moving equipments
 
Tunnel boring machines_Advanced Construction Technology (Semester-6), Civil E...
Tunnel boring machines_Advanced Construction Technology (Semester-6), Civil E...Tunnel boring machines_Advanced Construction Technology (Semester-6), Civil E...
Tunnel boring machines_Advanced Construction Technology (Semester-6), Civil E...
 
Compacting equipments_Advanced Construction Technology (Semester-6), Civil En...
Compacting equipments_Advanced Construction Technology (Semester-6), Civil En...Compacting equipments_Advanced Construction Technology (Semester-6), Civil En...
Compacting equipments_Advanced Construction Technology (Semester-6), Civil En...
 
Machineries and equipments used for large concrete works_Advanced Constructio...
Machineries and equipments used for large concrete works_Advanced Constructio...Machineries and equipments used for large concrete works_Advanced Constructio...
Machineries and equipments used for large concrete works_Advanced Constructio...
 
Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...Equipments used for aggregate production_Advanced Construction Technology (Se...
Equipments used for aggregate production_Advanced Construction Technology (Se...
 
Hoisting equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Hoisting equipments_Advanced Construction Technology (Semester-6), Civil Engi...Hoisting equipments_Advanced Construction Technology (Semester-6), Civil Engi...
Hoisting equipments_Advanced Construction Technology (Semester-6), Civil Engi...
 
Isolated footing Site report
Isolated footing Site reportIsolated footing Site report
Isolated footing Site report
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Types Of Roller Used For Construction
Types Of Roller Used For Construction Types Of Roller Used For Construction
Types Of Roller Used For Construction
 

Viewers also liked

7th pre alg -l68--april 30
7th pre alg -l68--april 307th pre alg -l68--april 30
7th pre alg -l68--april 30
jdurst65
 
7th pre alg -l29
7th pre alg -l297th pre alg -l29
7th pre alg -l29
jdurst65
 

Viewers also liked (17)

Tarea no bor rar
Tarea no bor rarTarea no bor rar
Tarea no bor rar
 
Introducción a automatización de pruebas web
Introducción a automatización de pruebas webIntroducción a automatización de pruebas web
Introducción a automatización de pruebas web
 
7th pre alg -l68--april 30
7th pre alg -l68--april 307th pre alg -l68--april 30
7th pre alg -l68--april 30
 
Elmetodocientifico elementos
Elmetodocientifico elementosElmetodocientifico elementos
Elmetodocientifico elementos
 
Mekanik Melek Bölüm 2
Mekanik Melek Bölüm 2Mekanik Melek Bölüm 2
Mekanik Melek Bölüm 2
 
Investigación diaapsitivas
Investigación  diaapsitivasInvestigación  diaapsitivas
Investigación diaapsitivas
 
Trabajo moodle
Trabajo moodleTrabajo moodle
Trabajo moodle
 
Livrinho
LivrinhoLivrinho
Livrinho
 
Tadeo jeremias
Tadeo jeremiasTadeo jeremias
Tadeo jeremias
 
7th pre alg -l29
7th pre alg -l297th pre alg -l29
7th pre alg -l29
 
Método Científico
Método CientíficoMétodo Científico
Método Científico
 
από τα-μονοκλωνικά-αντισώματα-στα-βλαστοκύτταρα-(2)
από τα-μονοκλωνικά-αντισώματα-στα-βλαστοκύτταρα-(2)από τα-μονοκλωνικά-αντισώματα-στα-βλαστοκύτταρα-(2)
από τα-μονοκλωνικά-αντισώματα-στα-βλαστοκύτταρα-(2)
 
vondel_seti
vondel_setivondel_seti
vondel_seti
 
δοκιμασια επικοινωνιας-παις
δοκιμασια επικοινωνιας-παιςδοκιμασια επικοινωνιας-παις
δοκιμασια επικοινωνιας-παις
 
εγκεφαλικα λογω-μη-αθηρωσκληρωτικων-αγγειοπαθειων-και-συστηματικων-νοσων
εγκεφαλικα λογω-μη-αθηρωσκληρωτικων-αγγειοπαθειων-και-συστηματικων-νοσωνεγκεφαλικα λογω-μη-αθηρωσκληρωτικων-αγγειοπαθειων-και-συστηματικων-νοσων
εγκεφαλικα λογω-μη-αθηρωσκληρωτικων-αγγειοπαθειων-και-συστηματικων-νοσων
 
Fase de grupos de la champions
Fase de grupos de la championsFase de grupos de la champions
Fase de grupos de la champions
 
TIC
TIC TIC
TIC
 

Similar to Presentation1

Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Prerak Ka.Patel
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
BurkaDinka
 

Similar to Presentation1 (20)

CT2 Group Presentation
CT2 Group PresentationCT2 Group Presentation
CT2 Group Presentation
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 
DEEP FOUNDATION
DEEP FOUNDATIONDEEP FOUNDATION
DEEP FOUNDATION
 
Pile
PilePile
Pile
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Internship PPT 2022.pptx
Internship PPT 2022.pptxInternship PPT 2022.pptx
Internship PPT 2022.pptx
 
Micropile
MicropileMicropile
Micropile
 
Types of Concrete
Types of ConcreteTypes of Concrete
Types of Concrete
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
MODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptxMODULE 2 Construction Equipment.pptx
MODULE 2 Construction Equipment.pptx
 
Pile foundation by nadir khattak
Pile foundation by nadir khattakPile foundation by nadir khattak
Pile foundation by nadir khattak
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Presentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptxPresentation2 constructioin equipments.pptx
Presentation2 constructioin equipments.pptx
 
Compaction of concrete
Compaction of concreteCompaction of concrete
Compaction of concrete
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
 
Demolition Equipment/Technique Available
Demolition Equipment/Technique Available Demolition Equipment/Technique Available
Demolition Equipment/Technique Available
 

More from mrstore01

More from mrstore01 (20)

Sichu portfolio
Sichu portfolioSichu portfolio
Sichu portfolio
 
Site analysis
Site analysis Site analysis
Site analysis
 
Culture report project 2 final
Culture report project 2 finalCulture report project 2 final
Culture report project 2 final
 
Presentation1
Presentation1Presentation1
Presentation1
 
Foundation
Foundation Foundation
Foundation
 
Chu cover
Chu coverChu cover
Chu cover
 
Chu
ChuChu
Chu
 
Groupcompilation 150211212238-conversion-gate02
Groupcompilation 150211212238-conversion-gate02Groupcompilation 150211212238-conversion-gate02
Groupcompilation 150211212238-conversion-gate02
 
What stereotypes mean it
What stereotypes mean itWhat stereotypes mean it
What stereotypes mean it
 
Final (1)
Final (1)Final (1)
Final (1)
 
Business chairty-event-report-maniyo-150201113222-conversion-gate02
Business chairty-event-report-maniyo-150201113222-conversion-gate02Business chairty-event-report-maniyo-150201113222-conversion-gate02
Business chairty-event-report-maniyo-150201113222-conversion-gate02
 
Slides 150201032948-conversion-gate02
Slides 150201032948-conversion-gate02Slides 150201032948-conversion-gate02
Slides 150201032948-conversion-gate02
 
Comparative analysis-of-2-business-in-differen-geographical-locations
Comparative analysis-of-2-business-in-differen-geographical-locationsComparative analysis-of-2-business-in-differen-geographical-locations
Comparative analysis-of-2-business-in-differen-geographical-locations
 
English 2-2
English 2-2English 2-2
English 2-2
 
Masjid
MasjidMasjid
Masjid
 
Batu caves
Batu cavesBatu caves
Batu caves
 
Masjid
MasjidMasjid
Masjid
 
Church
ChurchChurch
Church
 
Temple
TempleTemple
Temple
 
Masjid
MasjidMasjid
Masjid
 

Recently uploaded

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Recently uploaded (20)

PITHAMPUR 💋 Call Girl 9827461493 Call Girls in Escort service book now
PITHAMPUR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPITHAMPUR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PITHAMPUR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book nowSRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in  Escort service book now
SRI GANGANAGAR 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTSJHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
JHARSUGUDA CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JHARSUGUDA ESCORTS
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
BADDI 💋 Call Girl 9827461493 Call Girls in Escort service book now
BADDI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowBADDI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
BADDI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 

Presentation1

  • 2. Foundation constructed in site visit Type: Concrete square pile( Precast concrete pile) They are square in sizes and reinforced by rebar. The typical cross-sectional dimensions range from 25 to 41 centimeters and bearing capacities from 45 to 500 tons. Type of machine used : Pile Drive A pile driver hammers a precast concrete pile into the ground. The pile is supported by the vertical structure of the pile driver and driven by heavy piston mechanism that follows it down the leads as it penetrates deeper into soil. Precast details Advantages: • Cost saving compare to other types of piling. • High load capacity and corrosion resistance Disadvantages: • High breakage rates • Vulnerability to damage associated with handling
  • 3. Precast pilling process Steps: 1. Excavation, to reduce level for the construction of pile cap 2. Lifting, pile is tied on its lifting lug and ready to be hammering. 3. Start hammering, the pile is driven into the ground by hammering. 4. Construction of pile cap, after hammering process and the formwork is build by using plywood 5. Cutting of the pile, this is the last port of the pilling process. The concrete is crushed by Pneumatic hammer. The cut pile is lifted off and disposed.