PRECAST
CONCRETE
PILESNg Bee Yee
Chong Lih Yen
Cheah Aun Ni
Kuek Sze Ting
Hoe Pooi Yee
Khairi Fariz
Chong Kian Loong
1. Name 1 project in Malaysia that has used Precast Concrete Piles as the
building component.
Petronas Twin Tower
• Distribute the weight of the finished structure safely, reducing
the risk of structural failure or collapse.
• Made to resist compression, tension, bending and torsion forces
during manufacturing, transportation, handling and installation
• Maintaining structural integrity and design
• Created off-site and then piledrived into place to allow for
greater control of the finished product.
Function of Component
Advantages
• Quality can be controlled and monitored much more easily
• Piles can be precast to the required specifications.
• The work is neat and clean, supervision of work is minimal. And
storage space required is very much less
• Driven piles are the most favoured for works over water.
• Bearing capacity of pile increased when driven into granular soil
compacts the adjacent soil mass
Disadvantages
• These piles are usually very heavy. So special equipments
are required for handling and transportation.
• Sufficient care must be taken at the time of transportation,
otherwise piles may break.
• For embedding these piles in field heavy pile driving
equipment is required.
• These piles are costly as extra reinforcement is required to
bear handling and driving stresses
• Once constructed, it is not possible to increase the length of
the pile (as per the site demand)
• If the pile is found to be too long, during driving, it is difficult
and uneconomical to cut.
• Driving these piles created a lot of noise pollution and
vibration. May cause settlements on neighbouring buildings.
• Can be damaged during driving. Replacement piles may be
required.
• Cannot be driven with very large diameters or in condition of
limited headroom.
Construction Process
Precast Concrete Pile
• The precast concrete pile is a prefabricated, high-strength
prestressed concrete column, impact driven into the soil by means
of an adjustable hydraulic or diesel hammer
Fields of application
● Ideal solution for cost-effective piling in homogeneous geotechnical conditions and for carrying low
to medium loads
● Extensive preliminary soil investigation is required in order to determine both the nature and the
behaviour of the layers of soil
● Wide range of applications
● Given the prefabrication and the delivery time of the precast piles, the pile must be dimensioned
depending on the definitive pile load and the soil conditions before execution
● Adequate solution for soil profiles with very weak resistances in the upper strata, where excess
use of concrete can be expected when installing cast-in-situ piles
If installation is to be carried out, then the
following factors should be taken in to
consideration:
● Size and the weight of the pile
● Driving resistance which has to be
overcome to achieve the design
penetration
● Available space and headroom on
the site
● Availability of cranes and
● Noise restrictions which may be in
force in the locality
Methods of pile driving can be
categorised as follows:
1. Dropping weight -
Compressed-air hammers
or double-acting pile
hammer
2. Vibration - Vibratory
hammers
3. Jacking - Hydraulic jack
4. Jetting - water jetting
Meet OSHA safety requirements
• A blocking device, capable of safely
supporting the weight of the hammer,
shall be provided for placement in the
leads under the hammer at all times
while employees are working under
the hammer.
• No employee shall be permitted under
precast concrete members being
lifted or tilted into position except
those employees required for the
erection of those member
Type 1:Cast Iron
Pointed Shoe
Type 2: Rock
Shoe/OSLO Point
Type 3: Standard X-
pile shoe
Type 4:
Plain Shoe
What is Pile Shoe ?
a point that fitted to a lower end of a wooden or concrete
pile to facilitate penetration of the ground
The pile shoe attachments to concrete piles are attached
during manufacturing process or in the factory.The chosen
type of pile shoe is depends on the soil condition.
Type 1 :Can be chiselled into any type of rock to ensure
proper seating
Type 2 :For hard driving & socketing into hard strata
Type 3 :For moderate to hard driving
Type 4:For easy to medium hard driving
Type of Pile Shoe Decided During Manufacturing Process
Quality Control
• Checks on finished piles
for straightness, cross-
section, alignment of
joint and fittings.
• Slump test on concrete
batches.
Before Installation
• Test on aggregate
samples for grading and
silt content.
1. Positioning of the prefabricated concrete pile
2. The pile is driven into the soil with an impact
pile driving hammer (diesel hammer or
hydraulic drop hammer).
3. Provides adequate protection to the pile head
during driving.
4. With control of driving achieved by measuring
the set, the pile is driven into the resistive soil
layer to a depth equal to one time the pile
diameter.
Fig.: Protecting pile head damage during driving
Special timber packing or a synthetic cushion
block
construction
sequence
Problems Occurred
Deformation of Piles
Pile Tilts Moves / Walks
High Water Table
Weather
Ct2 Precast concrete piles

More Related Content

What's hot (20)

Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
Foundations
FoundationsFoundations
Foundations
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall construction
 
Staircase design
Staircase designStaircase design
Staircase design
 
Introduction to prestressed concrete structures
Introduction to prestressed concrete structuresIntroduction to prestressed concrete structures
Introduction to prestressed concrete structures
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
TYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONSTYPES OF PILE FOUNDATION & APPLICATIONS
TYPES OF PILE FOUNDATION & APPLICATIONS
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concrete
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
REPAIRING WORKS FOR CRACKS ...
																		     REPAIRING WORKS FOR CRACKS 				 				                  ...																		     REPAIRING WORKS FOR CRACKS 				 				                  ...
REPAIRING WORKS FOR CRACKS ...
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
Shoring
ShoringShoring
Shoring
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
BCT MODULE 2 - Caisson
BCT MODULE 2 - CaissonBCT MODULE 2 - Caisson
BCT MODULE 2 - Caisson
 
Composite slab
Composite slabComposite slab
Composite slab
 

Similar to Ct2 Precast concrete piles

Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimneyAxay Sharma
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsAkash Tilokani
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTUVATSAL PATEL
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction TechnologyDarshit
 
GT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxGT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxAPURWAYAWALE
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)Daphne Tan
 
Pile foundation
Pile foundationPile foundation
Pile foundationFatihoktr
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPrerak Ka.Patel
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment'sMijanur Rahman
 
Soil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxSoil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxHariAinala
 

Similar to Ct2 Precast concrete piles (20)

Pile
PilePile
Pile
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm Walls
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
Final_ppt_puneeth.pptx
Final_ppt_puneeth.pptxFinal_ppt_puneeth.pptx
Final_ppt_puneeth.pptx
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction Technology
 
GT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxGT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptx
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)
 
Micropile
MicropileMicropile
Micropile
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
 
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring MachinesPile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
Pile boring/ Driving Equipment, Concrete Batching plant, Tunnel Boring Machines
 
Pile foundtion
Pile foundtionPile foundtion
Pile foundtion
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
 
Soil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxSoil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptx
 

More from Sze Ting Kuek

Assignment for niro visit mar 2018
Assignment for niro visit mar 2018Assignment for niro visit mar 2018
Assignment for niro visit mar 2018Sze Ting Kuek
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
 
Sustainable wastewater treatment report
Sustainable wastewater treatment reportSustainable wastewater treatment report
Sustainable wastewater treatment reportSze Ting Kuek
 
Building Material - wastewater treatment
Building Material - wastewater treatmentBuilding Material - wastewater treatment
Building Material - wastewater treatmentSze Ting Kuek
 
Site report assignment
Site report assignmentSite report assignment
Site report assignmentSze Ting Kuek
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentationSze Ting Kuek
 
Final project - video
Final project - videoFinal project - video
Final project - videoSze Ting Kuek
 
Scrapebook Taman Negara
Scrapebook Taman NegaraScrapebook Taman Negara
Scrapebook Taman NegaraSze Ting Kuek
 
Enbe final project brief
Enbe final project briefEnbe final project brief
Enbe final project briefSze Ting Kuek
 
Enbe.project one july 2016 (1)
Enbe.project one july 2016 (1)Enbe.project one july 2016 (1)
Enbe.project one july 2016 (1)Sze Ting Kuek
 
Cts assignment 3 brief
Cts assignment 3 briefCts assignment 3 brief
Cts assignment 3 briefSze Ting Kuek
 
Assignment 01 cts august2016
Assignment 01 cts august2016Assignment 01 cts august2016
Assignment 01 cts august2016Sze Ting Kuek
 

More from Sze Ting Kuek (20)

Assignment for niro visit mar 2018
Assignment for niro visit mar 2018Assignment for niro visit mar 2018
Assignment for niro visit mar 2018
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
Sustainable wastewater treatment report
Sustainable wastewater treatment reportSustainable wastewater treatment report
Sustainable wastewater treatment report
 
Building Material - wastewater treatment
Building Material - wastewater treatmentBuilding Material - wastewater treatment
Building Material - wastewater treatment
 
Site report assignment
Site report assignmentSite report assignment
Site report assignment
 
Law presentation
Law presentationLaw presentation
Law presentation
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
MJ 2
MJ 2MJ 2
MJ 2
 
PASAR SENI BOOKLET
PASAR SENI BOOKLETPASAR SENI BOOKLET
PASAR SENI BOOKLET
 
idj 2
idj 2 idj 2
idj 2
 
idj 2
idj 2 idj 2
idj 2
 
Final project - video
Final project - videoFinal project - video
Final project - video
 
Scrapebook Taman Negara
Scrapebook Taman NegaraScrapebook Taman Negara
Scrapebook Taman Negara
 
MINI JOURNAL 1
MINI JOURNAL 1MINI JOURNAL 1
MINI JOURNAL 1
 
IDJ 1
IDJ 1IDJ 1
IDJ 1
 
Enbe final project brief
Enbe final project briefEnbe final project brief
Enbe final project brief
 
Enbe.project one july 2016 (1)
Enbe.project one july 2016 (1)Enbe.project one july 2016 (1)
Enbe.project one july 2016 (1)
 
Cts assignment 3 brief
Cts assignment 3 briefCts assignment 3 brief
Cts assignment 3 brief
 
Cts Ass 2
Cts Ass 2Cts Ass 2
Cts Ass 2
 
Assignment 01 cts august2016
Assignment 01 cts august2016Assignment 01 cts august2016
Assignment 01 cts august2016
 

Recently uploaded

EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Recently uploaded (20)

EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

Ct2 Precast concrete piles

  • 1. PRECAST CONCRETE PILESNg Bee Yee Chong Lih Yen Cheah Aun Ni Kuek Sze Ting Hoe Pooi Yee Khairi Fariz Chong Kian Loong
  • 2. 1. Name 1 project in Malaysia that has used Precast Concrete Piles as the building component. Petronas Twin Tower
  • 3. • Distribute the weight of the finished structure safely, reducing the risk of structural failure or collapse. • Made to resist compression, tension, bending and torsion forces during manufacturing, transportation, handling and installation • Maintaining structural integrity and design • Created off-site and then piledrived into place to allow for greater control of the finished product. Function of Component
  • 4. Advantages • Quality can be controlled and monitored much more easily • Piles can be precast to the required specifications. • The work is neat and clean, supervision of work is minimal. And storage space required is very much less • Driven piles are the most favoured for works over water. • Bearing capacity of pile increased when driven into granular soil compacts the adjacent soil mass
  • 5. Disadvantages • These piles are usually very heavy. So special equipments are required for handling and transportation. • Sufficient care must be taken at the time of transportation, otherwise piles may break. • For embedding these piles in field heavy pile driving equipment is required.
  • 6. • These piles are costly as extra reinforcement is required to bear handling and driving stresses • Once constructed, it is not possible to increase the length of the pile (as per the site demand) • If the pile is found to be too long, during driving, it is difficult and uneconomical to cut. • Driving these piles created a lot of noise pollution and vibration. May cause settlements on neighbouring buildings. • Can be damaged during driving. Replacement piles may be required. • Cannot be driven with very large diameters or in condition of limited headroom.
  • 7. Construction Process Precast Concrete Pile • The precast concrete pile is a prefabricated, high-strength prestressed concrete column, impact driven into the soil by means of an adjustable hydraulic or diesel hammer Fields of application ● Ideal solution for cost-effective piling in homogeneous geotechnical conditions and for carrying low to medium loads ● Extensive preliminary soil investigation is required in order to determine both the nature and the behaviour of the layers of soil ● Wide range of applications ● Given the prefabrication and the delivery time of the precast piles, the pile must be dimensioned depending on the definitive pile load and the soil conditions before execution ● Adequate solution for soil profiles with very weak resistances in the upper strata, where excess use of concrete can be expected when installing cast-in-situ piles
  • 8. If installation is to be carried out, then the following factors should be taken in to consideration: ● Size and the weight of the pile ● Driving resistance which has to be overcome to achieve the design penetration ● Available space and headroom on the site ● Availability of cranes and ● Noise restrictions which may be in force in the locality Methods of pile driving can be categorised as follows: 1. Dropping weight - Compressed-air hammers or double-acting pile hammer 2. Vibration - Vibratory hammers 3. Jacking - Hydraulic jack 4. Jetting - water jetting
  • 9. Meet OSHA safety requirements • A blocking device, capable of safely supporting the weight of the hammer, shall be provided for placement in the leads under the hammer at all times while employees are working under the hammer. • No employee shall be permitted under precast concrete members being lifted or tilted into position except those employees required for the erection of those member Type 1:Cast Iron Pointed Shoe Type 2: Rock Shoe/OSLO Point Type 3: Standard X- pile shoe Type 4: Plain Shoe What is Pile Shoe ? a point that fitted to a lower end of a wooden or concrete pile to facilitate penetration of the ground The pile shoe attachments to concrete piles are attached during manufacturing process or in the factory.The chosen type of pile shoe is depends on the soil condition. Type 1 :Can be chiselled into any type of rock to ensure proper seating Type 2 :For hard driving & socketing into hard strata Type 3 :For moderate to hard driving Type 4:For easy to medium hard driving Type of Pile Shoe Decided During Manufacturing Process Quality Control • Checks on finished piles for straightness, cross- section, alignment of joint and fittings. • Slump test on concrete batches. Before Installation • Test on aggregate samples for grading and silt content.
  • 10. 1. Positioning of the prefabricated concrete pile 2. The pile is driven into the soil with an impact pile driving hammer (diesel hammer or hydraulic drop hammer). 3. Provides adequate protection to the pile head during driving. 4. With control of driving achieved by measuring the set, the pile is driven into the resistive soil layer to a depth equal to one time the pile diameter. Fig.: Protecting pile head damage during driving Special timber packing or a synthetic cushion block construction sequence
  • 13. Pile Tilts Moves / Walks

Editor's Notes

  1. Special equipments like trailers. Heavy pile driving equipment vibratory pile driver
  2. Also cutting of extra length results in the wastage of material. (not environmental friendly) Drivng…. It is not suitable to use if there are neighbouring foundations.