PRESENTATION
ON
MULTI-STOREY RESIDENTIAL BUILDING
UNDER
ARG GROUP
PRESENTED BY :-
IRSHAD ALI ANSARI
CONTENT
INTRODUCTION
PROJECT DETAILS
• Site Plan
MATERIALS USED
CONSTRUCTION WORK
• Brick Masonary
• Plastering
• Scaffolding
• Concreting
• Casting Of Beam, Column & Slab
SHEAR WALL
EXPANSION JOINT
EQUIPMENTS / MACHINERIES
FULLY FURNISHED SAMPLE FLAT
CONCLUSION
INTRODUCTION
A multi-storey building is a building that has multiple storeys, and typically contains vertical
circulation in the form of ramps, stairs and lifts.
ARG Group’s Residential projects are architecturally well-planned and structurally detailed to
perfection. Ananta is a group housing project with boundless opportunities and possibilities.
The apartments are smartly designed to offer a comfortable & joyful living. The project will
be fully equipped with all the modern amenities like club house, swimming pool, indoor &
outdoor games etc.
PROJECT DETAILS
Project name: Ananta – I Jagatpura, Sanganer, scheme launched by ARG Group pvt. Ltd.
Location: Sheopur Road ,Jagatpura, Jaipur
Architect : Gian P. Mathur & Associates (P) Ltd
Duration of Project: 36 Months
Cost of Project: RS 150Cr.
Total Area of Project: 2.7 Acre
Ananta Phase I offers 504 most spacious 1-BHK & 2-BHK apartments. The area of 1-BHK apartment
is 350 sq.ft. and 2-BHK has 2 variants – 2-BHK standard with an area of 640 sq.ft. and 2-BHK (LIG)
with an area 550 sq.ft.
Common Facilities
• Club House
• Swimming pool
• Children’s play area
• High tech security
• Common hall
• Reserved parking
• Visitor’s parking
• Earthquake resistance
• Common area power backup
1. EWS 1-BHK Flat Plan 2. LIG : 2-BHK Flat Plan 3. Standard : 2-BHK Flat Plan
SITE PLAN
(Total Built Up Area : 350 Sq.Ft) (Total Built Up Area : 550 Sq.Ft) (Total Built Up Area : 640 Sq.Ft.)
MATERIALS USED
Materials which are used at site in construction are as follows:-
1. Cement
2. Aggregate
3. Sand
4. Admixture
5. Steel Reinforcement
6. Gypsum
7. Tiles
8. Bricks
CONSTRUCTION WORKS
1. Brick – Masonry Work
Dimension of Brick: 230mm x 110mm x 70mm (Fly Ash Brick)
Mortar Ratio: 1: 4 ( Cement : Sand )
Type of Bond in Brick work: Stretcher Bond
Band are also Provided in Brick work.
2. Plastering
Plastering Material: Gypsum (P.O.P.) and cement
Layer of Plaster: 12 mm
3. Scaffolding
Scaffolding is a temporary structure to support the original structure as well as workmen used it as a
platform to carry on the construction works. Scaffolding is made up of timber or steel. It should be stable
and strong to support workmen and other construction material placed on it.
4. Concreting
During concreting following equipment’s are used
• Concrete mixer.
• Concrete vibrators (e.g. Needle vibrator, plate/ surface vibrator etc.).
5. Casting Of Beam
Beam is a structural member which is normally placed horizontally. It provides resistance to
bending when loads are applied on it. . Most commonly used material for beam is RCC (Reinforced
Cement Concrete).
6. Casting Of Column
Columns are basically rigid vertical structural members designed primarily to support axial
compressive loads coming from beams and slabs and then transfer it to ground through footing.
Column have different width and height according to the location and load on the column.
7. Casting Of Slab
A Reinforced Concrete Slab is the one of the most important component in a building. It is a
structural element of modern buildings. Slabs are supported on Columns and Beams.
Shear wall of reinforced concrete is a structural member used to resist lateral forces i.e.
parallel to the plane of the wall. It transmits the load/force exterior walls, floors, and roofs to
the ground foundation in a direction parallel to their planes.
Shear wall is made near the staircase and lift section.
SHEAR WALL
An expansion joint is an assembly designed to hold parts together while safely absorbing
temperature-induced expansion and contraction of building materials, and vibration, or to
allow movement due to ground settlement or seismic activity.
EXPANSION JOINT
EQUIPMENTS / MACHINERIES USED
Equipments which are used at site in construction are as follows:-
1. Concrete Batching Plant
2. Concrete Mixing Machine
3. Internal / Needle Vibrator
4. Compression Testing Machine
5. Slump Cone
1. Concrete Batching Plant
The concrete batch plants can be classified into 4 sections:
• Cement feeding
• Aggregate feeding
• Water
• Admixture for blending
the materials, transport,
and storage.
2. Concrete Mixing Machine
This machine is used for prepare a concrete mix. This machine has weighing buckets in
which sand, cement, aggregate, water and admixture are filled according to the grade of
concrete.
3. Internal / Needle Vibrator
They essentially consist of a power unit and a long flexible tube at the end of which
a vibrating head is attached.
4. Compression Testing Machine
Compressive strength of concrete cube test provides an idea about all the characteristics
of concrete.
FULLY FURNISHED SAMPLE FLAT
LIVING ROOM
KITCHEN
MASTER BEDROOM
COMMON LAT-BATH
I gained a lot of insight regarding almost every aspect of site. I was given
exposure in execution department at the ARG Ananta-I site. The friendly
welcome from all the employees is appreciating, sharing their
experience & giving their peace of wisdom which they have gained in
long journey of work.
During this training period I learn how to deal with Labours.
During this training period I learn how an Engineer deals with project.
How to check the Drawing sheet and implementation in reality.
I hope this experience will surely help me in my future & also in shaping
my career.
CONCLUSION
THANK YOU

More Related Content

What's hot

IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET Journal
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 
Slipform construction
Slipform constructionSlipform construction
Slipform constructiontivar rose
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 
Prefabrication
PrefabricationPrefabrication
PrefabricationABIRAMI G
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plantSagnik Datta
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road constructionSatish Kambaliya
 
Presentation1
Presentation1Presentation1
Presentation1mrstore01
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...nishant patyal
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 

What's hot (20)

IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing Technique
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
Site Report
Site ReportSite Report
Site Report
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Chimney one go
Chimney one goChimney one go
Chimney one go
 
Segmental bridge constructin techniques
Segmental bridge constructin techniquesSegmental bridge constructin techniques
Segmental bridge constructin techniques
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plant
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
 
Presentation1
Presentation1Presentation1
Presentation1
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...
 
Report
ReportReport
Report
 
Signature bridge ppt2
Signature bridge ppt2Signature bridge ppt2
Signature bridge ppt2
 
Viaduct
Viaduct Viaduct
Viaduct
 
Conventional support system
Conventional support systemConventional support system
Conventional support system
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Precast concrete 101
Precast concrete 101Precast concrete 101
Precast concrete 101
 

Similar to Multi storey residential building

foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated ColumnAnees Khan
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)AJAY SHAHU
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.Chiranjita Jibhkate
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesAr Jitendra
 
U-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYU-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYadityas07
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)Chong jiayi
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRSAbhishek Mewada
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 

Similar to Multi storey residential building (20)

Precast concrete
Precast concretePrecast concrete
Precast concrete
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Site report
Site reportSite report
Site report
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
BCON PJT 1
BCON PJT 1BCON PJT 1
BCON PJT 1
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)Industrial Training Report-(2012-13)
Industrial Training Report-(2012-13)
 
Construction site
Construction siteConstruction site
Construction site
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
Site report
Site reportSite report
Site report
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
 
Types of Foundation and Site Investigation.pdf
Types of Foundation and Site Investigation.pdfTypes of Foundation and Site Investigation.pdf
Types of Foundation and Site Investigation.pdf
 
U-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYU-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGY
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
 
Site report
Site reportSite report
Site report
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
Retaining wall (1)
Retaining wall (1)Retaining wall (1)
Retaining wall (1)
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 

More from Irshad Ansari

More from Irshad Ansari (8)

Self healing concrete
Self healing concreteSelf healing concrete
Self healing concrete
 
Multi-flow drainage system
Multi-flow drainage systemMulti-flow drainage system
Multi-flow drainage system
 
Multi-flow drainage System
Multi-flow drainage SystemMulti-flow drainage System
Multi-flow drainage System
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Cement & lime
Cement & limeCement & lime
Cement & lime
 
3 d modelling
3 d modelling3 d modelling
3 d modelling
 
Self healing concrete
Self healing concreteSelf healing concrete
Self healing concrete
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Multi storey residential building

  • 1. PRESENTATION ON MULTI-STOREY RESIDENTIAL BUILDING UNDER ARG GROUP PRESENTED BY :- IRSHAD ALI ANSARI
  • 2. CONTENT INTRODUCTION PROJECT DETAILS • Site Plan MATERIALS USED CONSTRUCTION WORK • Brick Masonary • Plastering • Scaffolding • Concreting • Casting Of Beam, Column & Slab SHEAR WALL EXPANSION JOINT EQUIPMENTS / MACHINERIES FULLY FURNISHED SAMPLE FLAT CONCLUSION
  • 3. INTRODUCTION A multi-storey building is a building that has multiple storeys, and typically contains vertical circulation in the form of ramps, stairs and lifts. ARG Group’s Residential projects are architecturally well-planned and structurally detailed to perfection. Ananta is a group housing project with boundless opportunities and possibilities. The apartments are smartly designed to offer a comfortable & joyful living. The project will be fully equipped with all the modern amenities like club house, swimming pool, indoor & outdoor games etc.
  • 4. PROJECT DETAILS Project name: Ananta – I Jagatpura, Sanganer, scheme launched by ARG Group pvt. Ltd. Location: Sheopur Road ,Jagatpura, Jaipur Architect : Gian P. Mathur & Associates (P) Ltd Duration of Project: 36 Months Cost of Project: RS 150Cr. Total Area of Project: 2.7 Acre Ananta Phase I offers 504 most spacious 1-BHK & 2-BHK apartments. The area of 1-BHK apartment is 350 sq.ft. and 2-BHK has 2 variants – 2-BHK standard with an area of 640 sq.ft. and 2-BHK (LIG) with an area 550 sq.ft.
  • 5. Common Facilities • Club House • Swimming pool • Children’s play area • High tech security • Common hall • Reserved parking • Visitor’s parking • Earthquake resistance • Common area power backup
  • 6. 1. EWS 1-BHK Flat Plan 2. LIG : 2-BHK Flat Plan 3. Standard : 2-BHK Flat Plan SITE PLAN (Total Built Up Area : 350 Sq.Ft) (Total Built Up Area : 550 Sq.Ft) (Total Built Up Area : 640 Sq.Ft.)
  • 7.
  • 8. MATERIALS USED Materials which are used at site in construction are as follows:- 1. Cement 2. Aggregate 3. Sand 4. Admixture 5. Steel Reinforcement 6. Gypsum 7. Tiles 8. Bricks
  • 9. CONSTRUCTION WORKS 1. Brick – Masonry Work Dimension of Brick: 230mm x 110mm x 70mm (Fly Ash Brick) Mortar Ratio: 1: 4 ( Cement : Sand ) Type of Bond in Brick work: Stretcher Bond Band are also Provided in Brick work.
  • 10. 2. Plastering Plastering Material: Gypsum (P.O.P.) and cement Layer of Plaster: 12 mm
  • 11. 3. Scaffolding Scaffolding is a temporary structure to support the original structure as well as workmen used it as a platform to carry on the construction works. Scaffolding is made up of timber or steel. It should be stable and strong to support workmen and other construction material placed on it.
  • 12. 4. Concreting During concreting following equipment’s are used • Concrete mixer. • Concrete vibrators (e.g. Needle vibrator, plate/ surface vibrator etc.).
  • 13. 5. Casting Of Beam Beam is a structural member which is normally placed horizontally. It provides resistance to bending when loads are applied on it. . Most commonly used material for beam is RCC (Reinforced Cement Concrete).
  • 14. 6. Casting Of Column Columns are basically rigid vertical structural members designed primarily to support axial compressive loads coming from beams and slabs and then transfer it to ground through footing. Column have different width and height according to the location and load on the column.
  • 15. 7. Casting Of Slab A Reinforced Concrete Slab is the one of the most important component in a building. It is a structural element of modern buildings. Slabs are supported on Columns and Beams.
  • 16. Shear wall of reinforced concrete is a structural member used to resist lateral forces i.e. parallel to the plane of the wall. It transmits the load/force exterior walls, floors, and roofs to the ground foundation in a direction parallel to their planes. Shear wall is made near the staircase and lift section. SHEAR WALL
  • 17. An expansion joint is an assembly designed to hold parts together while safely absorbing temperature-induced expansion and contraction of building materials, and vibration, or to allow movement due to ground settlement or seismic activity. EXPANSION JOINT
  • 18. EQUIPMENTS / MACHINERIES USED Equipments which are used at site in construction are as follows:- 1. Concrete Batching Plant 2. Concrete Mixing Machine 3. Internal / Needle Vibrator 4. Compression Testing Machine 5. Slump Cone
  • 19. 1. Concrete Batching Plant The concrete batch plants can be classified into 4 sections: • Cement feeding • Aggregate feeding • Water • Admixture for blending the materials, transport, and storage.
  • 20. 2. Concrete Mixing Machine This machine is used for prepare a concrete mix. This machine has weighing buckets in which sand, cement, aggregate, water and admixture are filled according to the grade of concrete.
  • 21. 3. Internal / Needle Vibrator They essentially consist of a power unit and a long flexible tube at the end of which a vibrating head is attached.
  • 22. 4. Compression Testing Machine Compressive strength of concrete cube test provides an idea about all the characteristics of concrete.
  • 23. FULLY FURNISHED SAMPLE FLAT LIVING ROOM KITCHEN
  • 25. I gained a lot of insight regarding almost every aspect of site. I was given exposure in execution department at the ARG Ananta-I site. The friendly welcome from all the employees is appreciating, sharing their experience & giving their peace of wisdom which they have gained in long journey of work. During this training period I learn how to deal with Labours. During this training period I learn how an Engineer deals with project. How to check the Drawing sheet and implementation in reality. I hope this experience will surely help me in my future & also in shaping my career. CONCLUSION