1. Name 1 project in Malaysia that has used Precast Concrete Piles as the
building component.
Petronas Twin Tower
• Distribute the weight of the finished structure safely, reducing
the risk of structural failure or collapse.
• Made to resist compression, tension, bending and torsion forces
during manufacturing, transportation, handling and installation
• Maintaining structural integrity and design
• Created off-site and then piledrived into place to allow for
greater control of the finished product.
Function of Component
Advantages
• Quality can be controlled and monitored much more easily
• Piles can be precast to the required specifications.
• The work is neat and clean, supervision of work is minimal. And
storage space required is very much less
• Driven piles are the most favoured for works over water.
• Bearing capacity of pile increased when driven into granular soil
compacts the adjacent soil mass
Disadvantages
• These piles are usually very heavy. So special equipments
are required for handling and transportation.
• Sufficient care must be taken at the time of transportation,
otherwise piles may break.
• For embedding these piles in field heavy pile driving
equipment is required.
• These piles are costly as extra reinforcement is required to
bear handling and driving stresses
• Once constructed, it is not possible to increase the length of
the pile (as per the site demand)
• If the pile is found to be too long, during driving, it is difficult
and uneconomical to cut.
• Driving these piles created a lot of noise pollution and
vibration. May cause settlements on neighbouring buildings.
• Can be damaged during driving. Replacement piles may be
required.
• Cannot be driven with very large diameters or in condition of
limited headroom.
Construction Process
Precast Concrete Pile
• The precast concrete pile is a prefabricated, high-strength
prestressed concrete column, impact driven into the soil by means
of an adjustable hydraulic or diesel hammer
Fields of application
● Ideal solution for cost-effective piling in homogeneous geotechnical conditions and for carrying low
to medium loads
● Extensive preliminary soil investigation is required in order to determine both the nature and the
behaviour of the layers of soil
● Wide range of applications
● Given the prefabrication and the delivery time of the precast piles, the pile must be dimensioned
depending on the definitive pile load and the soil conditions before execution
● Adequate solution for soil profiles with very weak resistances in the upper strata, where excess
use of concrete can be expected when installing cast-in-situ piles
If installation is to be carried out, then the
following factors should be taken in to
consideration:
● Size and the weight of the pile
● Driving resistance which has to be
overcome to achieve the design
penetration
● Available space and headroom on
the site
● Availability of cranes and
● Noise restrictions which may be in
force in the locality
Methods of pile driving can be
categorised as follows:
1. Dropping weight -
Compressed-air hammers
or double-acting pile
hammer
2. Vibration - Vibratory
hammers
3. Jacking - Hydraulic jack
4. Jetting - water jetting
Meet OSHA safety requirements
• A blocking device, capable of safely
supporting the weight of the hammer,
shall be provided for placement in the
leads under the hammer at all times
while employees are working under
the hammer.
• No employee shall be permitted under
precast concrete members being
lifted or tilted into position except
those employees required for the
erection of those member
Type 1:Cast Iron
Pointed Shoe
Type 2: Rock
Shoe/OSLO Point
Type 3: Standard X-
pile shoe
Type 4:
Plain Shoe
What is Pile Shoe ?
a point that fitted to a lower end of a wooden or concrete
pile to facilitate penetration of the ground
The pile shoe attachments to concrete piles are attached
during manufacturing process or in the factory.The chosen
type of pile shoe is depends on the soil condition.
Type 1 :Can be chiselled into any type of rock to ensure
proper seating
Type 2 :For hard driving & socketing into hard strata
Type 3 :For moderate to hard driving
Type 4:For easy to medium hard driving
Type of Pile Shoe Decided During Manufacturing Process
Quality Control
• Checks on finished piles
for straightness, cross-
section, alignment of
joint and fittings.
• Slump test on concrete
batches.
Before Installation
• Test on aggregate
samples for grading and
silt content.
1. Positioning of the prefabricated concrete pile
2. The pile is driven into the soil with an impact
pile driving hammer (diesel hammer or
hydraulic drop hammer).
3. Provides adequate protection to the pile head
during driving.
4. With control of driving achieved by measuring
the set, the pile is driven into the resistive soil
layer to a depth equal to one time the pile
diameter.
Fig.: Protecting pile head damage during driving
Special timber packing or a synthetic cushion
block
construction
sequence
Problems Occurred
Deformation of Piles
Pile Tilts Moves / Walks
High Water Table
Weather
Precast Concrete Piles for Petronas Twin Towers

More Related Content

What's hot

Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET Journal
 
Module 3 pile types and construction
Module 3   pile types and constructionModule 3   pile types and construction
Module 3 pile types and constructionAmelie P
 
Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Babu Arumugam
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...Bhaddin Al-Naqshabandi
 
PILE FOUNDATION-INDIA
PILE FOUNDATION-INDIAPILE FOUNDATION-INDIA
PILE FOUNDATION-INDIAaditya singh
 
Pile foundation design
Pile foundation designPile foundation design
Pile foundation designUTHM
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated ColumnAnees Khan
 
Types of isolated footing and design
Types of isolated footing and design Types of isolated footing and design
Types of isolated footing and design Sukhvinder Singh
 
Advance Construction Technology
Advance Construction Technology Advance Construction Technology
Advance Construction Technology GAURAV. H .TANDON
 
Presentation1
Presentation1Presentation1
Presentation1mrstore01
 

What's hot (20)

Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
DMC Piling
DMC PilingDMC Piling
DMC Piling
 
Pile Foundation
Pile FoundationPile Foundation
Pile Foundation
 
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing TechniqueIRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing Technique
 
Module 3 pile types and construction
Module 3   pile types and constructionModule 3   pile types and construction
Module 3 pile types and construction
 
Building Economics
Building EconomicsBuilding Economics
Building Economics
 
Piles
PilesPiles
Piles
 
Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
 
PILE FOUNDATION-INDIA
PILE FOUNDATION-INDIAPILE FOUNDATION-INDIA
PILE FOUNDATION-INDIA
 
Pile foundation design
Pile foundation designPile foundation design
Pile foundation design
 
Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)Piling of a flyover (AUST 2.2 A)
Piling of a flyover (AUST 2.2 A)
 
Various elements of building
Various elements of buildingVarious elements of building
Various elements of building
 
Problem in bored pile
Problem in bored pileProblem in bored pile
Problem in bored pile
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
Types of isolated footing and design
Types of isolated footing and design Types of isolated footing and design
Types of isolated footing and design
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Advance Construction Technology
Advance Construction Technology Advance Construction Technology
Advance Construction Technology
 
Presentation1
Presentation1Presentation1
Presentation1
 

Similar to Precast Concrete Piles for Petronas Twin Towers

Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimneyAxay Sharma
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsAkash Tilokani
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTUVATSAL PATEL
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction TechnologyDarshit
 
GT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxGT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxAPURWAYAWALE
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)Daphne Tan
 
Pile foundation
Pile foundationPile foundation
Pile foundationFatihoktr
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment'sMijanur Rahman
 
Soil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxSoil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxHariAinala
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptxHimanshumangal12
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 

Similar to Precast Concrete Piles for Petronas Twin Towers (20)

Pile
PilePile
Pile
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm Walls
 
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
11. to 14. CONSTRUCTION EQUIPMENTS (ACE) 2160601 GTU
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
Final_ppt_puneeth.pptx
Final_ppt_puneeth.pptxFinal_ppt_puneeth.pptx
Final_ppt_puneeth.pptx
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction Technology
 
GT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptxGT-II-Unit-III-PILE-PartA.pptx
GT-II-Unit-III-PILE-PartA.pptx
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)
 
Micropile
MicropileMicropile
Micropile
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
simplex infrastructure
simplex infrastructure simplex infrastructure
simplex infrastructure
 
Pile foundtion
Pile foundtionPile foundtion
Pile foundtion
 
Latest Construction Equipment's
Latest Construction Equipment'sLatest Construction Equipment's
Latest Construction Equipment's
 
Soil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptxSoil Nailing (1) [Autosaved] (1).pptx
Soil Nailing (1) [Autosaved] (1).pptx
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 

More from bee_by

Curtain wall system
Curtain wall systemCurtain wall system
Curtain wall systembee_by
 
Bs ii presentation slides
Bs ii presentation slidesBs ii presentation slides
Bs ii presentation slidesbee_by
 
M. science report
M. science report M. science report
M. science report bee_by
 
Building Services Presentation Slide
Building Services Presentation SlideBuilding Services Presentation Slide
Building Services Presentation Slidebee_by
 
Ct 2-Theory Presentation
Ct 2-Theory PresentationCt 2-Theory Presentation
Ct 2-Theory Presentationbee_by
 
Niro education trip
Niro education tripNiro education trip
Niro education tripbee_by
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Importance of carlill v carbolic smoke ball
Importance of carlill v carbolic smoke ballImportance of carlill v carbolic smoke ball
Importance of carlill v carbolic smoke ballbee_by
 
Ct formwork presentation
Ct formwork presentationCt formwork presentation
Ct formwork presentationbee_by
 
CTS booklet
CTS booklet CTS booklet
CTS booklet bee_by
 

More from bee_by (13)

Curtain wall system
Curtain wall systemCurtain wall system
Curtain wall system
 
Bs ii presentation slides
Bs ii presentation slidesBs ii presentation slides
Bs ii presentation slides
 
M. science report
M. science report M. science report
M. science report
 
Building Services Presentation Slide
Building Services Presentation SlideBuilding Services Presentation Slide
Building Services Presentation Slide
 
Ct 2-Theory Presentation
Ct 2-Theory PresentationCt 2-Theory Presentation
Ct 2-Theory Presentation
 
Niro education trip
Niro education tripNiro education trip
Niro education trip
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Importance of carlill v carbolic smoke ball
Importance of carlill v carbolic smoke ballImportance of carlill v carbolic smoke ball
Importance of carlill v carbolic smoke ball
 
Ct formwork presentation
Ct formwork presentationCt formwork presentation
Ct formwork presentation
 
CTS booklet
CTS booklet CTS booklet
CTS booklet
 
idj 3
idj 3idj 3
idj 3
 
idj 2
idj 2idj 2
idj 2
 
Idj1
Idj1 Idj1
Idj1
 

Recently uploaded

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 

Precast Concrete Piles for Petronas Twin Towers

  • 1. PRECAST CONCRETE PILESNg Bee Yee Chong Lih Yen Cheah Aun Ni Kuek Sze Ting Hoe Pooi Yee Khairi Fariz Chong Kian Loong
  • 2. 1. Name 1 project in Malaysia that has used Precast Concrete Piles as the building component. Petronas Twin Tower
  • 3. • Distribute the weight of the finished structure safely, reducing the risk of structural failure or collapse. • Made to resist compression, tension, bending and torsion forces during manufacturing, transportation, handling and installation • Maintaining structural integrity and design • Created off-site and then piledrived into place to allow for greater control of the finished product. Function of Component
  • 4. Advantages • Quality can be controlled and monitored much more easily • Piles can be precast to the required specifications. • The work is neat and clean, supervision of work is minimal. And storage space required is very much less • Driven piles are the most favoured for works over water. • Bearing capacity of pile increased when driven into granular soil compacts the adjacent soil mass
  • 5. Disadvantages • These piles are usually very heavy. So special equipments are required for handling and transportation. • Sufficient care must be taken at the time of transportation, otherwise piles may break. • For embedding these piles in field heavy pile driving equipment is required.
  • 6. • These piles are costly as extra reinforcement is required to bear handling and driving stresses • Once constructed, it is not possible to increase the length of the pile (as per the site demand) • If the pile is found to be too long, during driving, it is difficult and uneconomical to cut. • Driving these piles created a lot of noise pollution and vibration. May cause settlements on neighbouring buildings. • Can be damaged during driving. Replacement piles may be required. • Cannot be driven with very large diameters or in condition of limited headroom.
  • 7. Construction Process Precast Concrete Pile • The precast concrete pile is a prefabricated, high-strength prestressed concrete column, impact driven into the soil by means of an adjustable hydraulic or diesel hammer Fields of application ● Ideal solution for cost-effective piling in homogeneous geotechnical conditions and for carrying low to medium loads ● Extensive preliminary soil investigation is required in order to determine both the nature and the behaviour of the layers of soil ● Wide range of applications ● Given the prefabrication and the delivery time of the precast piles, the pile must be dimensioned depending on the definitive pile load and the soil conditions before execution ● Adequate solution for soil profiles with very weak resistances in the upper strata, where excess use of concrete can be expected when installing cast-in-situ piles
  • 8. If installation is to be carried out, then the following factors should be taken in to consideration: ● Size and the weight of the pile ● Driving resistance which has to be overcome to achieve the design penetration ● Available space and headroom on the site ● Availability of cranes and ● Noise restrictions which may be in force in the locality Methods of pile driving can be categorised as follows: 1. Dropping weight - Compressed-air hammers or double-acting pile hammer 2. Vibration - Vibratory hammers 3. Jacking - Hydraulic jack 4. Jetting - water jetting
  • 9. Meet OSHA safety requirements • A blocking device, capable of safely supporting the weight of the hammer, shall be provided for placement in the leads under the hammer at all times while employees are working under the hammer. • No employee shall be permitted under precast concrete members being lifted or tilted into position except those employees required for the erection of those member Type 1:Cast Iron Pointed Shoe Type 2: Rock Shoe/OSLO Point Type 3: Standard X- pile shoe Type 4: Plain Shoe What is Pile Shoe ? a point that fitted to a lower end of a wooden or concrete pile to facilitate penetration of the ground The pile shoe attachments to concrete piles are attached during manufacturing process or in the factory.The chosen type of pile shoe is depends on the soil condition. Type 1 :Can be chiselled into any type of rock to ensure proper seating Type 2 :For hard driving & socketing into hard strata Type 3 :For moderate to hard driving Type 4:For easy to medium hard driving Type of Pile Shoe Decided During Manufacturing Process Quality Control • Checks on finished piles for straightness, cross- section, alignment of joint and fittings. • Slump test on concrete batches. Before Installation • Test on aggregate samples for grading and silt content.
  • 10. 1. Positioning of the prefabricated concrete pile 2. The pile is driven into the soil with an impact pile driving hammer (diesel hammer or hydraulic drop hammer). 3. Provides adequate protection to the pile head during driving. 4. With control of driving achieved by measuring the set, the pile is driven into the resistive soil layer to a depth equal to one time the pile diameter. Fig.: Protecting pile head damage during driving Special timber packing or a synthetic cushion block construction sequence
  • 13. Pile Tilts Moves / Walks

Editor's Notes

  1. Special equipments like trailers. Heavy pile driving equipment vibratory pile driver