The document contains load calculations for several columns. It summarizes the dead loads, live loads, and total loads on the roof, first floor, and ground floor of each column. The loads include slab weight, wall weight, beam weight and live loads. It calculates ultimate loads by multiplying the total loads by 1.4 and live loads by 1.6. The total ultimate loads on Column 1 is 284.5 kN and Column 4 is 635.65 kN.
Schema on read is obsolete. Welcome metaprogramming..pdf
Column
1. Column W, C (Teo Vi Vien)
Roof Plan
Dead Load
Slab [ (1.89m x 4.84m) + (0.73m x 3.93m) ] x 1.0 kN/m² = 12.02 kN
Beam (1.59m + 1.97m + 2.73m + 0.72m ) x 1.62 kN/m = 11.36 kN
Total Dead load = 12.02 + 11.36
= 23.38 kN
Live Load
(9.15m² + 2.87m²) x 0.5kN/m² = 6 kN
First Floor Plan
Dead Load
Wall (1.45m + 0.6m + 0.875m + 2.35m) x 8.55kN/m = 45.1 kN
Slab [ (1.45m + 0.875m) x (2.25m + 2.35m) ] x 3.6 kN/m² = 38.5 kN
Beam (1.45m + 0.875m + 2.25m + 2.35m) x 1.62 kN/m = 11.22 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load = 45.1kN + 38.5kN + 11.22kN + 3.24kN
= 98.06 kN
Live Load
(2.325m x 4.6m) x 1.5 kN/m² = 16.04 kN
Ultimate Dead Load
(98.06 kN + 23.38 kN) x 1.4 = 170.02 kN
Ultimate Live Load
(16.04kN + 6 kN) x 1.6 = 35.26 kN
Total Ultimate Load
170.02 kN + 35.26 kN = 205.28 kN
2. Column 4, E (Teo Vi Vien)
Roof Plan
Dead Load
Slab (4.26m x 3.04m) x 1.0 kN/m² = 12.95 kN
Beam (4.26m + 2.89m ) x 1.62 kN/m = 11.36 kN
Total Dead load = 12.95 kN + 11.58 kN
= 24.53 kN
Live Load
(4.26m² + 3.04m²) x 0.5kN/m² = 6.475 kN
First Floor Plan
Dead Load
Wall (3.87m + 1.35m) x 8.55kN/m = 44.63 kN
Slab [ (2.91m + 3.87m) x (1.35m + 2.97m) ] x 3.6 kN/m² = 54.98 kN
Beam (2.91m + 2.91m + 1.8m + 2.97m + 1.35m) x 1.62 kN/m = 19.34 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load = 44.63 kN + 54.98 kN + 19.34 kN + 3.24 kN
= 122.19 kN
Live Load
[(2.91m x 3.87m) + (1.35m x 2.97m) ] x 1.5 kN/m² = 22.91 kN
Ground Floor Plan
Dead Load
Wall (2.91m + 1.35m + 2.97m) x 8.55kN/m = 61.82 kN
Slab (4.26m x 2.97m) x 3.6 kN/m² = 45.55 kN
Beam (2.91m + 2.97m + 1.35m) x 1.62 kN/m = 11.71 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load = 61.82 kN + 45.55 kN + 11.71 kN + 3.24 kN
= 122.32 kN
Live Load
(4.26m x 2.97m) x 1.5 kN/m² = 18.98 kN
Ultimate Dead Load
(122.19 kN + 122.32 kN + 24.53 kN) x 1.4 = 376.66 kN
Ultimate Live Load
(22.91 kN + 18.98 kN + 6.475 kN) x 1.6 = 77.38 kN
Total Ultimate Load
376.66 kN + 77.38 kN = 454.04 kN
3. Column 1, E (Teo Chong Yih)
Roof Plan
Dead Load
Slab (1.93m x 3.4m) x 1.0 kN/m² = 6.56 kN
Beam (1.78m + 3.4m ) x 1.62 kN/m = 8.39 kN
Total Dead load = 6.56 kN + 8.39 kN
= 14.95 kN
Live Load
(1.93m x 3.4m) x 0.5kN/m² = 3.28 kN
First Floor Plan
Dead Load
Wall (3.1m + 1.9m) x 8.55kN/m = 42.75 kN
Slab (3.1m x 1.9m) x 3.6 kN/m² = 21.2 kN
Beam (3.1m + 1.9m) x 1.62 kN/m = 8.1 kN
Column 0.3m x 0.15m x 3m x 24 kN/m³ = 3.24 kN
Total Dead Load = 42.75 kN + 21.2 kN + 8.1 kN + 3.24 kN
= 75.29 kN
Live Load
(3.1m x 1.9m) x 1.5 kN/m² =8.84 kN
Ground Floor Plan
Dead Load
Wall (3.1m + 1.9m + 1.35m) x 8.55kN/m = 54.29 kN
Slab (3.1m x 1.9m) x 3.6 kN/m² = 21.2 kN
Beam (3.1m + 1.9m + 1.35m) x 1.62 kN/m = 10.29 kN
Column 0.3m x 0.15m x 3m x 24 kN/m³ = 3.24 kN
Total Dead Load = 54.29 kN +21.2 kN + 10.29 kN + 3.24 kN
= 89.02 kN
Live Load
(3.1m x 1.9m) x 1.5 kN/m² =8.84 kN
Ultimate Dead Load
(75.29 kN + 89.02 kN + 14.95 kN) x 1.4 = 250.96 kN
Ultimate Live Load
(8.84 kN + 8.84 kN +3.28 kN) x 1.6 = 33.54 kN
Total Ultimate Load
250.96 kN + 33.54 kN = 284.5 kN
4. Column X, C ( Teo Chong Yih)
Roof Plan
Dead Load
Slab (4.85m x 2.23m) ] x 1.0 kN/m² = 10.82 kN
Beam (0.8m + 4.85m + 1.13m) x 1.62 kN/m = 10.98 kN
Total Dead load = 10.82 kN + 10.98 kN
= 21.8 kN
Live Load
(4.85m x 2.23m) x 0.5kN/m² = 5.41 kN
First Floor Plan
Dead Load
Wall (2.23m + 0.85m + 0.6m) x 8.55kN/m = 31.46kN
Slab [ (1.05m + 0.6m) x (2.23m + 2.4m) ] x 3.6 kN/m² = 27.5 kN
Beam (2.3m + 2.4m + 1.3m + 0.9m + 0.9m) x 1.62 kN/m = 12.64 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load =31.46kN + 27.5kN + 12.64kN + 3.24kN
= 74.84 kN
Live Load
(1.65m x 4.63m) x 1.5 kN/m² = 11.46 kN
Ultimate Dead Load
(74.84kN + 21.8 kN) x 1.4 = 135.3 kN
Ultimate Live Load
(11.46kN + 5.41 kN) x 1.6 = 26.99 kN
Total Ultimate Load
135.3 kN + 26.99 kN = 162.29 kN
5. Column 4,D (Lim Zanyu)
Roof plan
Dead load
Slab [(1.43m x 2.38m) + (2.69m x 1.8m)] x 1.0kN/m² = 8.25kN
Beam (1.13m + 2.21m + 2.69m + 1.65m) x 1.62kN/m = 12.44kN
Total dead load
8.25kN + 12.44kN = 20.69kN
Live load
[(2.2m x 1.35m) + (2.45m x 2.55m)] x 0.5kN/m²= 4.12kN
First floor plan
Dead load
Wall (1.35m + 2.6m + 2.55m) x 8.55kN/m = 72.68kN
Slab [(2.2m x 1.35m) x (2.45m x 2.55m)] x 3.6kN/m² = 23.51kN
Beams (1.35m + 2.6M + 2.55m + 2.55m) x 1.62kN/m = 17.9kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
72.68kN + 23.52kN + 17.9kN + 3.24kN = 117.33kN
Live load
[(2.2m x 1.35m) + (2.45m x 2.55m)] x 1.5kN/m² = 13.83kN
Ground floor plan
Dead load
Wall (1.3m + 2.85m + 3.1m) x 8.55kN/m = 61.99kN
Slab [(2.85m x 1.3m) + (2.3m x 3.1m) + (0.25m x 2.3m)] x 3.6kN/m² = 41.11kN
Beams (1.3m + 2.85m + 3.1m + 2.55m) x 1.62kN/m = 15.88kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
61.99kN + 41.11kN + 15.88kN + 3.24kN = 122.22kN
Live load
[(2.85m x 1.3m) + (2.3m x 3.1m) + (0.25m x 2.3m)] x1.5kN/m² = 17.13kN
Ultimate dead load
(20.69kN + 117.33kN + 122.22kN) x 1.4 = 364.34kN
Ultimate live load
(4.12kN + 13.83kN + 17.13kN) x 1.6 = 56.13kN
Total ultimate load
364.34kN + 56.13kN = 420.47kN
6. Column 4,F (Lim Zanyu)
Roof plan
Dead load
Slab [(2.99m x 3.04m)] x 1.0kN/m² = 9.09kN
Beam (2.79m + 2.89m + 2.89m) x 1.62kN/m = 13.84kN
Total dead load
9.09kN + 13.84kN = 22.93kN
Live load
(2.99m x 3.04m) x 0.5kN/m² = 4.55kN
First floor plan
Wall (2.7m + 3.95m + 3.7m) x 8.55kN/m = 88.49kN
Slabs [(1.1m x 3.95m) + (3.7m x 4.6m)] x 3.6kN/m² = 77.29kN
Beams (5.6m + 3.7m + 3.7m + 5.6m + 2.3m) x 1.62kN/m = 33.86kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
88.49kN + 77.29kN + 33.86kN + 3.24kN= 202.88kN
Live load
[(1.1m x 3.95m) + (3.7m + 4.6m)] x 1.5kN/m² = 32.21kN
Ground floor plan
Dead load
Wall (3.1m + 3.9m) x 8.55kN/m = 59.85kN
Slabs [(2.8m x 2.2m) + (3.9m x 3.4m)] x3.6kN/m² = 69.91kN
Beam (5.6m + 3.9m + 2.8m) x 1.62kN/m = 19.93kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
59.85kN + 69.91kN + 19.93kN + 3.24kN = 152.93kN
Live load
[(2.8m x 2.2m) + (3.9m x 3.4m)] x 1.5kN/m = 29.13kN
Ultimate dead load
(22.93kN + 202.88kN + 152.93kN) x 1.4 = 530.23kN
Ultimate live load
(4.55kN + 32.21kN + 29.13) x 1.6 = 105.42kN
Total ultimate load
530.23kN + 105.42kN = 635.65kN
7. Column 2,E (Teh Sin Ying)
Roof plan
Dead load
Slab [(4.81m x 3.4m)] x 1.0kN/m² = 16.35kN
Beam (2.89m + 1.28m + 1.9m + 1.78m) x 1.62kN/m = 12.72kN
Total dead load
16.35kN + 12.72kN = 29.07kN
Live load
(4.81m x 3.4m) x 0.5kN/m² = 8.175kN
First floor plan
Wall (2.97m + 1.89m + 1.75m) x 8.55kN/m = 56.52kN
Slabs (4.86m x 3.25m) x 3.6kN/m² = 56.86kN
Beams (2.97m + 1.89m + 1.9m + 1.35m) x 1.62kN/m = 13.14kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
56.52kN + 56.86kN + 13.14kN + 3.24kN = 129.77kN
Live load
(4.86m x 3.25m) x 1.5kN/m² = 23.69kN
Ground floor plan
Dead load
Wall (1.17m + 1.89m + 1.9m) x 8.55kN/m = 42.41kN
Slabs (4.86m + 3.25m) x3.6kN/m² = 56.86kN
Beam (2.97m + 1.89m + 1.9m + 1.35m + 1.35m) x 1.62kN/m = 15.33kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
42.41kN + 56.86kN + 15.33kN + 3.24kN = 117.84kN
Live load
(4.86m x 3.25m) x 1.5kN/m = 23.69kN
Ultimate dead load
(29.07kN + 129.77kN + 117.84kN) x 1.4 = 387.35kN
Ultimate live load
(8.175kN + 23.69kN + 23.69kN) x 1.6 = 88.86kN
Total ultimate load
387.35kN + 88.86kN = 476.2kN
8. Column 1,E’ (Teh Sin Ying)
Roof plan
Dead load
Slab [(1.93m x 1.975m) + (0.937m x 0.426m)] x 1.0kN/m² = 4.209kN
Beam (1.675m + 1.776m + 0.937m) x 1.62kN/m = 7.109kN
Total dead load
4.209kN + 7.109kN = 11.32kN
Live load
(3.81kN + 0.399kN) x 0.5kN/m² = 2.11kN
First floor plan
Wall (2m + 2m + 0.85m + 0.85m) x 8.55kN/m = 48.735kN
Slabs [(2m x 2m) + (0.5m x 0.85m)] x 3.6kN/m² = 15.93kN
Beams (2m + 2m + 0.85m) x 1.62kN/m = 7.857kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
48.735kN + 15.93kN + 7.857kN + 3.24kN = 75.762kN
Live load
[(2m x 2m) + (0.5m x 0.85m)] x 1.5kN/m² = 6.6375kN
Ground floor plan
Dead load
Wall (2m + 2m + 0.85m) x 8.55kN/m = 41.48kN
Slabs [(2m x 2m) + (0.5m x 0.85m) x 3.6kN/m² = 15.93kN
Beam (2m + 2m + 0.85m) x 1.62kN/m = 7.857kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
41.48kN + 15.93kN + 7.857kN + 3.24kN = 68.51kN
Live load
[(2m x 2m) + (0.5m x 0.85m)] x 1.5kN/m² = 6.6375kN
Ultimate dead load
(11.32kN + 75.762kN + 68.51kN) x 1.4 = 217.83kN
Ultimate live load
(2.11kN + 6.6375kN + 6.6375kN) x 1.6 = 24.62kN
Total ultimate load
217.83kN + 24.62kN = 242.45kN
9. Column 1,D (Yen Wei Zheng)
Roof plan
Dead load
Slab (2.56m x 4m) x 1.0kN/m² = 10.24kN
Beam (2.56m + 2.56m + 4m) x 1.62kN/m = 14.77kN
Total dead load
10.24kN + 14.77kN = 25kN
Live load
(2.56kN + 4kN) x 0.5kN/m² = 5.12kN
First floor plan
Wall (1.8m + 2.05m + 2.25m + 2.7m + 0.8m) x 8.55kN/m = 82.08kN
Slabs [(2.7m x 2.05m) + (2.25m x 1.8m)] x 3.6kN/m² = 20.115kN
Beams (1.8m + 2.05m + 2.25m + 2.7m + 0.8m) x 1.62kN/m = 15.552kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
20.115kN + 82.08kN + 15.552kN + 3.24kN = 120.987kN
Live load
[(2.7m x 2.05m) + (2.25m x 1.8m)] x 1.5kN/m² = 14.38kN
Ground floor plan
Dead load
Wall (4.3m + 1.2m + 1.7m + 1.7m + 0.2m) x 8.55kN/m = 77.805kN
Slabs (4.5m + 2m) x3.6kN/m² = 32.4kN
Beam (4.3m + 1.2m + 1.7m + 1.7m + 0.2m) x 1.62kN/m = 14.742kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
32.4kN + 77.805kN + 14.742kN + 3.24kN = 128.187kN
Live load
(4.5m x 2m) x 1.5kN/m = 13.5kN
Ultimate dead load
(120.987kN + 128.187kN + 25kN) x 1.4 = 383.84kN
Ultimate live load
(14.38kN + 13.5kN + 5.12kN) x 1.6 = 52.8kN
Total ultimate load
383.84kN + 52.8kN = 436.64kN
10. Column 2,D (Yen Wei Zheng)
Ground floor plan
Dead load
Wall (1.1m + 1.1m + 1.2m + 2.1m + 1.7m + 1.7m + 0.75m) x 8.55kN/m = 82.508kN
Slabs (4.6m + 2.1m) x3.6kN/m² = 34.776kN
Beam (4.1m + 2.1m + 1.2m + 2.1m + 0.75m) x 1.62kN/m = 16.605kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24kN
Total dead load
34.776kN +82.508kN + 16.605kN + 3.24kN = 137.13kN
Live load
(4.6m x 2.1m) x 1.5kN/m = 14.49kN
Ultimate dead load
137.13kN x 1.4 = 191.98kN
Ultimate live load
14.49kN x 1.6 = 23.18kN
Total ultimate load
191.98kN + 23.18kN = 215.16kN