Column W, C (Teo Vi Vien)
Roof Plan
Dead Load
Slab [ (1.89m x 4.84m) + (0.73m x 3.93m) ] x 1.0 kN/m² = 12.02 kN
Beam (1.59m + 1.97m + 2.73m + 0.72m ) x 1.62 kN/m = 11.36 kN
Total Dead load = 12.02 + 11.36
= 23.38 kN
Live Load
(9.15m² + 2.87m²) x 0.5kN/m² = 6 kN
First Floor Plan
Dead Load
Wall (1.45m + 0.6m + 0.875m + 2.35m) x 8.55kN/m = 45.1 kN
Slab [ (1.45m + 0.875m) x (2.25m + 2.35m) ] x 3.6 kN/m² = 38.5 kN
Beam (1.45m + 0.875m + 2.25m + 2.35m) x 1.62 kN/m = 11.22 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load = 45.1kN + 38.5kN + 11.22kN + 3.24kN
= 98.06 kN
Live Load
(2.325m x 4.6m) x 1.5 kN/m² = 16.04 kN
Ultimate Dead Load
(98.06 kN + 23.38 kN) x 1.4 = 170.02 kN
Ultimate Live Load
(16.04kN + 6 kN) x 1.6 = 35.26 kN
Total Ultimate Load
170.02 kN + 35.26 kN = 205.28 kN
Column 4, E (Teo Vi Vien)
Roof Plan
Dead Load
Slab (4.26m x 3.04m) x 1.0 kN/m² = 12.95 kN
Beam (4.26m + 2.89m ) x 1.62 kN/m = 11.36 kN
Total Dead load = 12.95 kN + 11.58 kN
= 24.53 kN
Live Load
(4.26m² + 3.04m²) x 0.5kN/m² = 6.475 kN
First Floor Plan
Dead Load
Wall (3.87m + 1.35m) x 8.55kN/m = 44.63 kN
Slab [ (2.91m + 3.87m) x (1.35m + 2.97m) ] x 3.6 kN/m² = 54.98 kN
Beam (2.91m + 2.91m + 1.8m + 2.97m + 1.35m) x 1.62 kN/m = 19.34 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load = 44.63 kN + 54.98 kN + 19.34 kN + 3.24 kN
= 122.19 kN
Live Load
[(2.91m x 3.87m) + (1.35m x 2.97m) ] x 1.5 kN/m² = 22.91 kN
Ground Floor Plan
Dead Load
Wall (2.91m + 1.35m + 2.97m) x 8.55kN/m = 61.82 kN
Slab (4.26m x 2.97m) x 3.6 kN/m² = 45.55 kN
Beam (2.91m + 2.97m + 1.35m) x 1.62 kN/m = 11.71 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load = 61.82 kN + 45.55 kN + 11.71 kN + 3.24 kN
= 122.32 kN
Live Load
(4.26m x 2.97m) x 1.5 kN/m² = 18.98 kN
Ultimate Dead Load
(122.19 kN + 122.32 kN + 24.53 kN) x 1.4 = 376.66 kN
Ultimate Live Load
(22.91 kN + 18.98 kN + 6.475 kN) x 1.6 = 77.38 kN
Total Ultimate Load
376.66 kN + 77.38 kN = 454.04 kN
Column 1, E (Teo Chong Yih)
Roof Plan
Dead Load
Slab (1.93m x 3.4m) x 1.0 kN/m² = 6.56 kN
Beam (1.78m + 3.4m ) x 1.62 kN/m = 8.39 kN
Total Dead load = 6.56 kN + 8.39 kN
= 14.95 kN
Live Load
(1.93m x 3.4m) x 0.5kN/m² = 3.28 kN
First Floor Plan
Dead Load
Wall (3.1m + 1.9m) x 8.55kN/m = 42.75 kN
Slab (3.1m x 1.9m) x 3.6 kN/m² = 21.2 kN
Beam (3.1m + 1.9m) x 1.62 kN/m = 8.1 kN
Column 0.3m x 0.15m x 3m x 24 kN/m³ = 3.24 kN
Total Dead Load = 42.75 kN + 21.2 kN + 8.1 kN + 3.24 kN
= 75.29 kN
Live Load
(3.1m x 1.9m) x 1.5 kN/m² =8.84 kN
Ground Floor Plan
Dead Load
Wall (3.1m + 1.9m + 1.35m) x 8.55kN/m = 54.29 kN
Slab (3.1m x 1.9m) x 3.6 kN/m² = 21.2 kN
Beam (3.1m + 1.9m + 1.35m) x 1.62 kN/m = 10.29 kN
Column 0.3m x 0.15m x 3m x 24 kN/m³ = 3.24 kN
Total Dead Load = 54.29 kN +21.2 kN + 10.29 kN + 3.24 kN
= 89.02 kN
Live Load
(3.1m x 1.9m) x 1.5 kN/m² =8.84 kN
Ultimate Dead Load
(75.29 kN + 89.02 kN + 14.95 kN) x 1.4 = 250.96 kN
Ultimate Live Load
(8.84 kN + 8.84 kN +3.28 kN) x 1.6 = 33.54 kN
Total Ultimate Load
250.96 kN + 33.54 kN = 284.5 kN
Column X, C ( Teo Chong Yih)
Roof Plan
Dead Load
Slab (4.85m x 2.23m) ] x 1.0 kN/m² = 10.82 kN
Beam (0.8m + 4.85m + 1.13m) x 1.62 kN/m = 10.98 kN
Total Dead load = 10.82 kN + 10.98 kN
= 21.8 kN
Live Load
(4.85m x 2.23m) x 0.5kN/m² = 5.41 kN
First Floor Plan
Dead Load
Wall (2.23m + 0.85m + 0.6m) x 8.55kN/m = 31.46kN
Slab [ (1.05m + 0.6m) x (2.23m + 2.4m) ] x 3.6 kN/m² = 27.5 kN
Beam (2.3m + 2.4m + 1.3m + 0.9m + 0.9m) x 1.62 kN/m = 12.64 kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN
Total Dead Load =31.46kN + 27.5kN + 12.64kN + 3.24kN
= 74.84 kN
Live Load
(1.65m x 4.63m) x 1.5 kN/m² = 11.46 kN
Ultimate Dead Load
(74.84kN + 21.8 kN) x 1.4 = 135.3 kN
Ultimate Live Load
(11.46kN + 5.41 kN) x 1.6 = 26.99 kN
Total Ultimate Load
135.3 kN + 26.99 kN = 162.29 kN
Column 4,D (Lim Zanyu)
Roof plan
Dead load
Slab [(1.43m x 2.38m) + (2.69m x 1.8m)] x 1.0kN/m² = 8.25kN
Beam (1.13m + 2.21m + 2.69m + 1.65m) x 1.62kN/m = 12.44kN
Total dead load
8.25kN + 12.44kN ​= 20.69kN
Live load
[(2.2m x 1.35m) + (2.45m x 2.55m)] x 0.5kN/m²= 4.12kN
First floor plan
Dead load
Wall (1.35m + 2.6m + 2.55m) x 8.55kN/m = ​72.68kN
Slab [(2.2m x 1.35m) x (2.45m x 2.55m)] x 3.6kN/m² = ​23.51kN
Beams (1.35m + 2.6M + 2.55m + 2.55m) x 1.62kN/m = ​17.9kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
72.68kN + 23.52kN + 17.9kN + 3.24kN ​= 117.33kN
Live load
[(2.2m x 1.35m) + (2.45m x 2.55m)] x 1.5kN/m² ​= 13.83kN
Ground floor plan
Dead load
Wall (1.3m + 2.85m + 3.1m) x 8.55kN/m = ​61.99kN
Slab [(2.85m x 1.3m) + (2.3m x 3.1m) + (0.25m x 2.3m)] x 3.6kN/m² = ​41.11kN
Beams (1.3m + 2.85m + 3.1m + 2.55m) x 1.62kN/m = ​15.88kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
61.99kN + 41.11kN + 15.88kN + 3.24kN ​= 122.22kN
Live load
[(2.85m x 1.3m) + (2.3m x 3.1m) + (0.25m x 2.3m)] x1.5kN/m² ​= 17.13kN
Ultimate dead load
(20.69kN + 117.33kN + 122.22kN) x 1.4 ​= 364.34kN
Ultimate live load
(4.12kN + 13.83kN + 17.13kN) x 1.6 ​= 56.13kN
Total ultimate load
364.34kN + 56.13kN ​= 420.47kN
Column 4,F (Lim Zanyu)
Roof plan
Dead load
Slab [(2.99m x 3.04m)] x 1.0kN/m² = 9.09kN
Beam (2.79m + 2.89m + 2.89m) x 1.62kN/m = 13.84kN
Total dead load
9.09kN + 13.84kN ​= 22.93kN
Live load
(2.99m x 3.04m) x 0.5kN/m² ​= 4.55kN
First floor plan
Wall (2.7m + 3.95m + 3.7m) x 8.55kN/m = ​88.49kN
Slabs [(1.1m x 3.95m) + (3.7m x 4.6m)] x 3.6kN/m² = ​77.29kN
Beams (5.6m + 3.7m + 3.7m + 5.6m + 2.3m) x 1.62kN/m = ​33.86kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
88.49kN + 77.29kN + 33.86kN + 3.24kN​= 202.88kN
Live load
[(1.1m x 3.95m) + (3.7m + 4.6m)] x 1.5kN/m² ​= 32.21kN
Ground floor plan
Dead load
Wall (3.1m + 3.9m) x 8.55kN/m = ​59.85kN
Slabs [(2.8m x 2.2m) + (3.9m x 3.4m)] x3.6kN/m² = ​69.91kN
Beam (5.6m + 3.9m + 2.8m) x 1.62kN/m = ​19.93kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
59.85kN + 69.91kN + 19.93kN + 3.24kN ​= 152.93kN
Live load
[(2.8m x 2.2m) + (3.9m x 3.4m)] x 1.5kN/m ​= 29.13kN
Ultimate dead load
(22.93kN + 202.88kN + 152.93kN) x 1.4 ​=​ ​530.23kN
Ultimate live load
(4.55kN + 32.21kN + 29.13) x 1.6 ​=​ ​105.42kN
Total ultimate load
530.23kN + 105.42kN ​= 635.65kN
Column 2,E (Teh Sin Ying)
Roof plan
Dead load
Slab [(4.81m x 3.4m)] x 1.0kN/m² = 16.35kN
Beam (2.89m + 1.28m + 1.9m + 1.78m) x 1.62kN/m = 12.72kN
Total dead load
16.35kN + 12.72kN​ = 29.07kN
Live load
(4.81m x 3.4m) x 0.5kN/m² ​= 8.175kN
First floor plan
Wall (2.97m + 1.89m + 1.75m) x 8.55kN/m = ​56.52kN
Slabs (4.86m x 3.25m) x 3.6kN/m² = ​56.86kN
Beams (2.97m + 1.89m + 1.9m + 1.35m) x 1.62kN/m = ​13.14kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
56.52kN + 56.86kN + 13.14kN + 3.24kN ​= 129.77kN
Live load
(4.86m x 3.25m) x 1.5kN/m² ​= 23.69kN
Ground floor plan
Dead load
Wall (1.17m + 1.89m + 1.9m) x 8.55kN/m = ​42.41kN
Slabs (4.86m + 3.25m) x3.6kN/m² = ​56.86kN
Beam (2.97m + 1.89m + 1.9m + 1.35m + 1.35m) x 1.62kN/m = ​15.33kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
42.41kN + 56.86kN + 15.33kN + 3.24kN ​= 117.84kN
Live load
(4.86m x 3.25m) x 1.5kN/m ​= 23.69kN
Ultimate dead load
(29.07kN + 129.77kN + 117.84kN) x 1.4 ​=​ ​387.35kN
Ultimate live load
(8.175kN + 23.69kN + 23.69kN) x 1.6 ​= 88.86kN
Total ultimate load
387.35kN + 88.86kN ​= 476.2kN
Column 1,E’ (Teh Sin Ying)
Roof plan
Dead load
Slab [(1.93m x 1.975m) + (0.937m x 0.426m)] x 1.0kN/m² = 4.209kN
Beam (1.675m + 1.776m + 0.937m) x 1.62kN/m = 7.109kN
Total dead load
4.209kN + 7.109kN​ = 11.32kN
Live load
(3.81kN + 0.399kN) x 0.5kN/m² ​= 2.11kN
First floor plan
Wall (2m + 2m + 0.85m + 0.85m) x 8.55kN/m = ​48.735kN
Slabs [(2m x 2m) + (0.5m x 0.85m)] x 3.6kN/m² = ​15.93kN
Beams (2m + 2m + 0.85m) x 1.62kN/m = ​7.857kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
48.735kN + 15.93kN + 7.857kN + 3.24kN ​= 75.762kN
Live load
[(2m x 2m) + (0.5m x 0.85m)] x 1.5kN/m² ​= 6.6375kN
Ground floor plan
Dead load
Wall (2m + 2m + 0.85m) x 8.55kN/m = ​41.48kN
Slabs [(2m x 2m) + (0.5m x 0.85m) x 3.6kN/m² = ​15.93kN
Beam (2m + 2m + 0.85m) x 1.62kN/m = ​7.857kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
41.48kN + 15.93kN + 7.857kN + 3.24kN ​= 68.51kN
Live load
[(2m x 2m) + (0.5m x 0.85m)] x 1.5kN/m² ​= 6.6375kN
Ultimate dead load
(11.32kN + 75.762kN + 68.51kN) x 1.4 ​=​ ​217.83kN
Ultimate live load
(2.11kN + 6.6375kN + 6.6375kN) x 1.6 ​= 24.62kN
Total ultimate load
217.83kN + 24.62kN ​= 242.45kN
Column 1,D (Yen Wei Zheng)
Roof plan
Dead load
Slab (2.56m x 4m) x 1.0kN/m² = 10.24kN
Beam (2.56m + 2.56m + 4m) x 1.62kN/m = 14.77kN
Total dead load
10.24kN + 14.77kN​ = 25kN
Live load
(2.56kN + 4kN) x 0.5kN/m² ​= 5.12kN
First floor plan
Wall (1.8m + 2.05m + 2.25m + 2.7m + 0.8m) x 8.55kN/m = ​82.08kN
Slabs [(2.7m x 2.05m) + (2.25m x 1.8m)] x 3.6kN/m² = ​20.115kN
Beams (1.8m + 2.05m + 2.25m + 2.7m + 0.8m) x 1.62kN/m = ​15.552kN
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
20.115kN + 82.08kN + 15.552kN + 3.24kN ​= 120.987kN
Live load
[(2.7m x 2.05m) + (2.25m x 1.8m)] x 1.5kN/m² ​= 14.38kN
Ground floor plan
Dead load
Wall (4.3m + 1.2m + 1.7m + 1.7m + 0.2m) x 8.55kN/m = ​77.805kN
Slabs (4.5m + 2m) x3.6kN/m² = ​32.4kN
Beam (4.3m + 1.2m + 1.7m + 1.7m + 0.2m) x 1.62kN/m = ​14.742kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
32.4kN + 77.805kN + 14.742kN + 3.24kN ​= 128.187kN
Live load
(4.5m x 2m) x 1.5kN/m ​= 13.5kN
Ultimate dead load
(120.987kN + 128.187kN + 25kN) x 1.4 ​=​ ​383.84kN
Ultimate live load
(14.38kN + 13.5kN + 5.12kN) x 1.6 ​= 52.8kN
Total ultimate load
383.84kN + 52.8kN ​= 436.64kN
Column 2,D (Yen Wei Zheng)
Ground floor plan
Dead load
Wall (1.1m + 1.1m + 1.2m + 2.1m + 1.7m + 1.7m + 0.75m) x 8.55kN/m = ​82.508kN
Slabs (4.6m + 2.1m) x3.6kN/m² = ​34.776kN
Beam (4.1m + 2.1m + 1.2m + 2.1m + 0.75m) x 1.62kN/m = ​16.605kN/m
Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN
Total dead load
34.776kN +82.508kN + 16.605kN + 3.24kN ​= 137.13kN
Live load
(4.6m x 2.1m) x 1.5kN/m ​= 14.49kN
Ultimate dead load
137.13kN x 1.4 ​=​ ​191.98kN
Ultimate live load
14.49kN x 1.6 ​= 23.18kN
Total ultimate load
191.98kN + 23.18kN ​= 215.16kN

More Related Content

What's hot

Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculationkimberlywjs
 
Building Structure
Building Structure Building Structure
Building Structure Nicole Foo
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structureKen Wong
 
B.structure report
B.structure reportB.structure report
B.structure reportjiuaN59
 
Analysis of composite beam and design of grannular piles foundation for kalya...
Analysis of composite beam and design of grannular piles foundation for kalya...Analysis of composite beam and design of grannular piles foundation for kalya...
Analysis of composite beam and design of grannular piles foundation for kalya...PrathyushaMalladi2
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowYee Len Wan
 
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)premkumar mk
 
Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...
Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...
Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...SEENET-MTP
 
PILE foundation (1).pptx
PILE foundation  (1).pptxPILE foundation  (1).pptx
PILE foundation (1).pptxNIKHILBANDWAL1
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...
Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...
Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...Dr.Costas Sachpazis
 
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Make Mannan
 
Phy i assign&answers_2011
Phy i assign&answers_2011Phy i assign&answers_2011
Phy i assign&answers_2011Sufi Sulaiman
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soilLatif Hyder Wadho
 
Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indiChong Yu Xuan
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Make Mannan
 

What's hot (20)

Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculation
 
Building Structure
Building Structure Building Structure
Building Structure
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Analysis of composite beam and design of grannular piles foundation for kalya...
Analysis of composite beam and design of grannular piles foundation for kalya...Analysis of composite beam and design of grannular piles foundation for kalya...
Analysis of composite beam and design of grannular piles foundation for kalya...
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
 
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
 
Ch05 ppts callister7e
Ch05 ppts callister7eCh05 ppts callister7e
Ch05 ppts callister7e
 
Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...
Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...
Sergey Sibiryakov "Galactic rotation curves vs. ultra-light dark matter: Impl...
 
PILE foundation (1).pptx
PILE foundation  (1).pptxPILE foundation  (1).pptx
PILE foundation (1).pptx
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...
Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...
Sachpazis_CANTILEVER RETAINING WALL Analysis & DESIGN Example According to IB...
 
Beam Analysis
Beam AnalysisBeam Analysis
Beam Analysis
 
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
Numerical problem bearing capacity terzaghi , group pile capacity (usefulsear...
 
Phy i assign&answers_2011
Phy i assign&answers_2011Phy i assign&answers_2011
Phy i assign&answers_2011
 
Chapter2
Chapter2Chapter2
Chapter2
 
Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soil
 
Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indi
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
 

Similar to Column

Hazelscolumn (1)
Hazelscolumn (1)Hazelscolumn (1)
Hazelscolumn (1)Ong Shi Hui
 
B structure
B structure B structure
B structure Andy Heng
 
Building Structure
Building StructureBuilding Structure
Building StructureBolin Loong
 
Individual calculation
Individual calculation Individual calculation
Individual calculation Jamie Lee
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures ReportJoe Onn Lim
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Ong Seng Peng Jeff
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 eLam Yu
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDavid Chavez Huerto
 
Preliminary design of column
Preliminary design of columnPreliminary design of column
Preliminary design of columnila vamsi krishna
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2 Ryan Kerry Jy
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentJoyce Wee
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Dr.Costas Sachpazis
 
MSE Wall Design Calculation.pdf
MSE Wall Design Calculation.pdfMSE Wall Design Calculation.pdf
MSE Wall Design Calculation.pdfZin Soul
 
Column analysis c4 & c14
Column analysis c4 & c14Column analysis c4 & c14
Column analysis c4 & c14shensin1015
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan strukturKomang Satriawan
 

Similar to Column (20)

Hazelscolumn (1)
Hazelscolumn (1)Hazelscolumn (1)
Hazelscolumn (1)
 
B structure
B structure B structure
B structure
 
Building Structure
Building StructureBuilding Structure
Building Structure
 
Individual calculation
Individual calculation Individual calculation
Individual calculation
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Lamyu column 1 e
Lamyu column 1 eLamyu column 1 e
Lamyu column 1 e
 
Diseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigasDiseño y calculo de un puente de placa y vigas
Diseño y calculo de un puente de placa y vigas
 
Preliminary design of column
Preliminary design of columnPreliminary design of column
Preliminary design of column
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
 
ESAUnit2.ppt
ESAUnit2.pptESAUnit2.ppt
ESAUnit2.ppt
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
 
MSE Wall Design Calculation.pdf
MSE Wall Design Calculation.pdfMSE Wall Design Calculation.pdf
MSE Wall Design Calculation.pdf
 
Column analysis c4 & c14
Column analysis c4 & c14Column analysis c4 & c14
Column analysis c4 & c14
 
Structures
StructuresStructures
Structures
 
Laporan prancangan struktur
Laporan prancangan strukturLaporan prancangan struktur
Laporan prancangan struktur
 

More from yenweizheng

Urban comparative essay
Urban comparative essayUrban comparative essay
Urban comparative essayyenweizheng
 
Food & culture
Food & cultureFood & culture
Food & cultureyenweizheng
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdfyenweizheng
 
Vertical transportation system
Vertical transportation systemVertical transportation system
Vertical transportation systemyenweizheng
 
Mechancal ventilatio
Mechancal ventilatioMechancal ventilatio
Mechancal ventilatioyenweizheng
 
Introduction of air conditioning system
Introduction of air conditioning systemIntroduction of air conditioning system
Introduction of air conditioning systemyenweizheng
 
Fire protection system bservice
Fire protection system bserviceFire protection system bservice
Fire protection system bserviceyenweizheng
 
Conclusion reference
Conclusion  referenceConclusion  reference
Conclusion referenceyenweizheng
 
Introduction b services
Introduction b servicesIntroduction b services
Introduction b servicesyenweizheng
 
Pj street essay.docx
Pj street essay.docxPj street essay.docx
Pj street essay.docxyenweizheng
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final reportyenweizheng
 
Business report (1)
Business report (1)Business report (1)
Business report (1)yenweizheng
 

More from yenweizheng (20)

Urban comparative essay
Urban comparative essayUrban comparative essay
Urban comparative essay
 
Wz synopsis
Wz synopsisWz synopsis
Wz synopsis
 
Food & culture
Food & cultureFood & culture
Food & culture
 
Bscience report
Bscience reportBscience report
Bscience report
 
Bsci ii (1)
Bsci ii (1)Bsci ii (1)
Bsci ii (1)
 
Bsci ii
Bsci iiBsci ii
Bsci ii
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdf
 
Transient
TransientTransient
Transient
 
Proposal
ProposalProposal
Proposal
 
Design brief
Design briefDesign brief
Design brief
 
Service report
Service reportService report
Service report
 
Vertical transportation system
Vertical transportation systemVertical transportation system
Vertical transportation system
 
Mechancal ventilatio
Mechancal ventilatioMechancal ventilatio
Mechancal ventilatio
 
Introduction of air conditioning system
Introduction of air conditioning systemIntroduction of air conditioning system
Introduction of air conditioning system
 
Fire protection system bservice
Fire protection system bserviceFire protection system bservice
Fire protection system bservice
 
Conclusion reference
Conclusion  referenceConclusion  reference
Conclusion reference
 
Introduction b services
Introduction b servicesIntroduction b services
Introduction b services
 
Pj street essay.docx
Pj street essay.docxPj street essay.docx
Pj street essay.docx
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final report
 
Business report (1)
Business report (1)Business report (1)
Business report (1)
 

Recently uploaded

From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...Florian Roscheck
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998YohFuh
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubaihf8803863
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Callshivangimorya083
 
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...shivangimorya083
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfRachmat Ramadhan H
 
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...Pooja Nehwal
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
Data Warehouse , Data Cube Computation
Data Warehouse   , Data Cube ComputationData Warehouse   , Data Cube Computation
Data Warehouse , Data Cube Computationsit20ad004
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...Suhani Kapoor
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 

Recently uploaded (20)

From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...From idea to production in a day – Leveraging Azure ML and Streamlit to build...
From idea to production in a day – Leveraging Azure ML and Streamlit to build...
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
 
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
 
Russian Call Girls Dwarka Sector 15 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Dwarka Sector 15 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Dwarka Sector 15 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Dwarka Sector 15 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in  KishangarhDelhi 99530 vip 56974 Genuine Escort Service Call Girls in  Kishangarh
Delhi 99530 vip 56974 Genuine Escort Service Call Girls in Kishangarh
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdfMarket Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
Market Analysis in the 5 Largest Economic Countries in Southeast Asia.pdf
 
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
Data Warehouse , Data Cube Computation
Data Warehouse   , Data Cube ComputationData Warehouse   , Data Cube Computation
Data Warehouse , Data Cube Computation
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 

Column

  • 1. Column W, C (Teo Vi Vien) Roof Plan Dead Load Slab [ (1.89m x 4.84m) + (0.73m x 3.93m) ] x 1.0 kN/m² = 12.02 kN Beam (1.59m + 1.97m + 2.73m + 0.72m ) x 1.62 kN/m = 11.36 kN Total Dead load = 12.02 + 11.36 = 23.38 kN Live Load (9.15m² + 2.87m²) x 0.5kN/m² = 6 kN First Floor Plan Dead Load Wall (1.45m + 0.6m + 0.875m + 2.35m) x 8.55kN/m = 45.1 kN Slab [ (1.45m + 0.875m) x (2.25m + 2.35m) ] x 3.6 kN/m² = 38.5 kN Beam (1.45m + 0.875m + 2.25m + 2.35m) x 1.62 kN/m = 11.22 kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN Total Dead Load = 45.1kN + 38.5kN + 11.22kN + 3.24kN = 98.06 kN Live Load (2.325m x 4.6m) x 1.5 kN/m² = 16.04 kN Ultimate Dead Load (98.06 kN + 23.38 kN) x 1.4 = 170.02 kN Ultimate Live Load (16.04kN + 6 kN) x 1.6 = 35.26 kN Total Ultimate Load 170.02 kN + 35.26 kN = 205.28 kN
  • 2. Column 4, E (Teo Vi Vien) Roof Plan Dead Load Slab (4.26m x 3.04m) x 1.0 kN/m² = 12.95 kN Beam (4.26m + 2.89m ) x 1.62 kN/m = 11.36 kN Total Dead load = 12.95 kN + 11.58 kN = 24.53 kN Live Load (4.26m² + 3.04m²) x 0.5kN/m² = 6.475 kN First Floor Plan Dead Load Wall (3.87m + 1.35m) x 8.55kN/m = 44.63 kN Slab [ (2.91m + 3.87m) x (1.35m + 2.97m) ] x 3.6 kN/m² = 54.98 kN Beam (2.91m + 2.91m + 1.8m + 2.97m + 1.35m) x 1.62 kN/m = 19.34 kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN Total Dead Load = 44.63 kN + 54.98 kN + 19.34 kN + 3.24 kN = 122.19 kN Live Load [(2.91m x 3.87m) + (1.35m x 2.97m) ] x 1.5 kN/m² = 22.91 kN Ground Floor Plan Dead Load Wall (2.91m + 1.35m + 2.97m) x 8.55kN/m = 61.82 kN Slab (4.26m x 2.97m) x 3.6 kN/m² = 45.55 kN Beam (2.91m + 2.97m + 1.35m) x 1.62 kN/m = 11.71 kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN Total Dead Load = 61.82 kN + 45.55 kN + 11.71 kN + 3.24 kN = 122.32 kN Live Load (4.26m x 2.97m) x 1.5 kN/m² = 18.98 kN Ultimate Dead Load (122.19 kN + 122.32 kN + 24.53 kN) x 1.4 = 376.66 kN Ultimate Live Load (22.91 kN + 18.98 kN + 6.475 kN) x 1.6 = 77.38 kN Total Ultimate Load 376.66 kN + 77.38 kN = 454.04 kN
  • 3. Column 1, E (Teo Chong Yih) Roof Plan Dead Load Slab (1.93m x 3.4m) x 1.0 kN/m² = 6.56 kN Beam (1.78m + 3.4m ) x 1.62 kN/m = 8.39 kN Total Dead load = 6.56 kN + 8.39 kN = 14.95 kN Live Load (1.93m x 3.4m) x 0.5kN/m² = 3.28 kN First Floor Plan Dead Load Wall (3.1m + 1.9m) x 8.55kN/m = 42.75 kN Slab (3.1m x 1.9m) x 3.6 kN/m² = 21.2 kN Beam (3.1m + 1.9m) x 1.62 kN/m = 8.1 kN Column 0.3m x 0.15m x 3m x 24 kN/m³ = 3.24 kN Total Dead Load = 42.75 kN + 21.2 kN + 8.1 kN + 3.24 kN = 75.29 kN Live Load (3.1m x 1.9m) x 1.5 kN/m² =8.84 kN Ground Floor Plan Dead Load Wall (3.1m + 1.9m + 1.35m) x 8.55kN/m = 54.29 kN Slab (3.1m x 1.9m) x 3.6 kN/m² = 21.2 kN Beam (3.1m + 1.9m + 1.35m) x 1.62 kN/m = 10.29 kN Column 0.3m x 0.15m x 3m x 24 kN/m³ = 3.24 kN Total Dead Load = 54.29 kN +21.2 kN + 10.29 kN + 3.24 kN = 89.02 kN Live Load (3.1m x 1.9m) x 1.5 kN/m² =8.84 kN Ultimate Dead Load (75.29 kN + 89.02 kN + 14.95 kN) x 1.4 = 250.96 kN Ultimate Live Load (8.84 kN + 8.84 kN +3.28 kN) x 1.6 = 33.54 kN Total Ultimate Load 250.96 kN + 33.54 kN = 284.5 kN
  • 4. Column X, C ( Teo Chong Yih) Roof Plan Dead Load Slab (4.85m x 2.23m) ] x 1.0 kN/m² = 10.82 kN Beam (0.8m + 4.85m + 1.13m) x 1.62 kN/m = 10.98 kN Total Dead load = 10.82 kN + 10.98 kN = 21.8 kN Live Load (4.85m x 2.23m) x 0.5kN/m² = 5.41 kN First Floor Plan Dead Load Wall (2.23m + 0.85m + 0.6m) x 8.55kN/m = 31.46kN Slab [ (1.05m + 0.6m) x (2.23m + 2.4m) ] x 3.6 kN/m² = 27.5 kN Beam (2.3m + 2.4m + 1.3m + 0.9m + 0.9m) x 1.62 kN/m = 12.64 kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = 3.24 kN Total Dead Load =31.46kN + 27.5kN + 12.64kN + 3.24kN = 74.84 kN Live Load (1.65m x 4.63m) x 1.5 kN/m² = 11.46 kN Ultimate Dead Load (74.84kN + 21.8 kN) x 1.4 = 135.3 kN Ultimate Live Load (11.46kN + 5.41 kN) x 1.6 = 26.99 kN Total Ultimate Load 135.3 kN + 26.99 kN = 162.29 kN
  • 5. Column 4,D (Lim Zanyu) Roof plan Dead load Slab [(1.43m x 2.38m) + (2.69m x 1.8m)] x 1.0kN/m² = 8.25kN Beam (1.13m + 2.21m + 2.69m + 1.65m) x 1.62kN/m = 12.44kN Total dead load 8.25kN + 12.44kN ​= 20.69kN Live load [(2.2m x 1.35m) + (2.45m x 2.55m)] x 0.5kN/m²= 4.12kN First floor plan Dead load Wall (1.35m + 2.6m + 2.55m) x 8.55kN/m = ​72.68kN Slab [(2.2m x 1.35m) x (2.45m x 2.55m)] x 3.6kN/m² = ​23.51kN Beams (1.35m + 2.6M + 2.55m + 2.55m) x 1.62kN/m = ​17.9kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 72.68kN + 23.52kN + 17.9kN + 3.24kN ​= 117.33kN Live load [(2.2m x 1.35m) + (2.45m x 2.55m)] x 1.5kN/m² ​= 13.83kN Ground floor plan Dead load Wall (1.3m + 2.85m + 3.1m) x 8.55kN/m = ​61.99kN Slab [(2.85m x 1.3m) + (2.3m x 3.1m) + (0.25m x 2.3m)] x 3.6kN/m² = ​41.11kN Beams (1.3m + 2.85m + 3.1m + 2.55m) x 1.62kN/m = ​15.88kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 61.99kN + 41.11kN + 15.88kN + 3.24kN ​= 122.22kN Live load [(2.85m x 1.3m) + (2.3m x 3.1m) + (0.25m x 2.3m)] x1.5kN/m² ​= 17.13kN Ultimate dead load (20.69kN + 117.33kN + 122.22kN) x 1.4 ​= 364.34kN Ultimate live load (4.12kN + 13.83kN + 17.13kN) x 1.6 ​= 56.13kN Total ultimate load 364.34kN + 56.13kN ​= 420.47kN
  • 6. Column 4,F (Lim Zanyu) Roof plan Dead load Slab [(2.99m x 3.04m)] x 1.0kN/m² = 9.09kN Beam (2.79m + 2.89m + 2.89m) x 1.62kN/m = 13.84kN Total dead load 9.09kN + 13.84kN ​= 22.93kN Live load (2.99m x 3.04m) x 0.5kN/m² ​= 4.55kN First floor plan Wall (2.7m + 3.95m + 3.7m) x 8.55kN/m = ​88.49kN Slabs [(1.1m x 3.95m) + (3.7m x 4.6m)] x 3.6kN/m² = ​77.29kN Beams (5.6m + 3.7m + 3.7m + 5.6m + 2.3m) x 1.62kN/m = ​33.86kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 88.49kN + 77.29kN + 33.86kN + 3.24kN​= 202.88kN Live load [(1.1m x 3.95m) + (3.7m + 4.6m)] x 1.5kN/m² ​= 32.21kN Ground floor plan Dead load Wall (3.1m + 3.9m) x 8.55kN/m = ​59.85kN Slabs [(2.8m x 2.2m) + (3.9m x 3.4m)] x3.6kN/m² = ​69.91kN Beam (5.6m + 3.9m + 2.8m) x 1.62kN/m = ​19.93kN/m Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 59.85kN + 69.91kN + 19.93kN + 3.24kN ​= 152.93kN Live load [(2.8m x 2.2m) + (3.9m x 3.4m)] x 1.5kN/m ​= 29.13kN Ultimate dead load (22.93kN + 202.88kN + 152.93kN) x 1.4 ​=​ ​530.23kN Ultimate live load (4.55kN + 32.21kN + 29.13) x 1.6 ​=​ ​105.42kN Total ultimate load 530.23kN + 105.42kN ​= 635.65kN
  • 7. Column 2,E (Teh Sin Ying) Roof plan Dead load Slab [(4.81m x 3.4m)] x 1.0kN/m² = 16.35kN Beam (2.89m + 1.28m + 1.9m + 1.78m) x 1.62kN/m = 12.72kN Total dead load 16.35kN + 12.72kN​ = 29.07kN Live load (4.81m x 3.4m) x 0.5kN/m² ​= 8.175kN First floor plan Wall (2.97m + 1.89m + 1.75m) x 8.55kN/m = ​56.52kN Slabs (4.86m x 3.25m) x 3.6kN/m² = ​56.86kN Beams (2.97m + 1.89m + 1.9m + 1.35m) x 1.62kN/m = ​13.14kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 56.52kN + 56.86kN + 13.14kN + 3.24kN ​= 129.77kN Live load (4.86m x 3.25m) x 1.5kN/m² ​= 23.69kN Ground floor plan Dead load Wall (1.17m + 1.89m + 1.9m) x 8.55kN/m = ​42.41kN Slabs (4.86m + 3.25m) x3.6kN/m² = ​56.86kN Beam (2.97m + 1.89m + 1.9m + 1.35m + 1.35m) x 1.62kN/m = ​15.33kN/m Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 42.41kN + 56.86kN + 15.33kN + 3.24kN ​= 117.84kN Live load (4.86m x 3.25m) x 1.5kN/m ​= 23.69kN Ultimate dead load (29.07kN + 129.77kN + 117.84kN) x 1.4 ​=​ ​387.35kN Ultimate live load (8.175kN + 23.69kN + 23.69kN) x 1.6 ​= 88.86kN Total ultimate load 387.35kN + 88.86kN ​= 476.2kN
  • 8. Column 1,E’ (Teh Sin Ying) Roof plan Dead load Slab [(1.93m x 1.975m) + (0.937m x 0.426m)] x 1.0kN/m² = 4.209kN Beam (1.675m + 1.776m + 0.937m) x 1.62kN/m = 7.109kN Total dead load 4.209kN + 7.109kN​ = 11.32kN Live load (3.81kN + 0.399kN) x 0.5kN/m² ​= 2.11kN First floor plan Wall (2m + 2m + 0.85m + 0.85m) x 8.55kN/m = ​48.735kN Slabs [(2m x 2m) + (0.5m x 0.85m)] x 3.6kN/m² = ​15.93kN Beams (2m + 2m + 0.85m) x 1.62kN/m = ​7.857kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 48.735kN + 15.93kN + 7.857kN + 3.24kN ​= 75.762kN Live load [(2m x 2m) + (0.5m x 0.85m)] x 1.5kN/m² ​= 6.6375kN Ground floor plan Dead load Wall (2m + 2m + 0.85m) x 8.55kN/m = ​41.48kN Slabs [(2m x 2m) + (0.5m x 0.85m) x 3.6kN/m² = ​15.93kN Beam (2m + 2m + 0.85m) x 1.62kN/m = ​7.857kN/m Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 41.48kN + 15.93kN + 7.857kN + 3.24kN ​= 68.51kN Live load [(2m x 2m) + (0.5m x 0.85m)] x 1.5kN/m² ​= 6.6375kN Ultimate dead load (11.32kN + 75.762kN + 68.51kN) x 1.4 ​=​ ​217.83kN Ultimate live load (2.11kN + 6.6375kN + 6.6375kN) x 1.6 ​= 24.62kN Total ultimate load 217.83kN + 24.62kN ​= 242.45kN
  • 9. Column 1,D (Yen Wei Zheng) Roof plan Dead load Slab (2.56m x 4m) x 1.0kN/m² = 10.24kN Beam (2.56m + 2.56m + 4m) x 1.62kN/m = 14.77kN Total dead load 10.24kN + 14.77kN​ = 25kN Live load (2.56kN + 4kN) x 0.5kN/m² ​= 5.12kN First floor plan Wall (1.8m + 2.05m + 2.25m + 2.7m + 0.8m) x 8.55kN/m = ​82.08kN Slabs [(2.7m x 2.05m) + (2.25m x 1.8m)] x 3.6kN/m² = ​20.115kN Beams (1.8m + 2.05m + 2.25m + 2.7m + 0.8m) x 1.62kN/m = ​15.552kN Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 20.115kN + 82.08kN + 15.552kN + 3.24kN ​= 120.987kN Live load [(2.7m x 2.05m) + (2.25m x 1.8m)] x 1.5kN/m² ​= 14.38kN Ground floor plan Dead load Wall (4.3m + 1.2m + 1.7m + 1.7m + 0.2m) x 8.55kN/m = ​77.805kN Slabs (4.5m + 2m) x3.6kN/m² = ​32.4kN Beam (4.3m + 1.2m + 1.7m + 1.7m + 0.2m) x 1.62kN/m = ​14.742kN/m Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 32.4kN + 77.805kN + 14.742kN + 3.24kN ​= 128.187kN Live load (4.5m x 2m) x 1.5kN/m ​= 13.5kN Ultimate dead load (120.987kN + 128.187kN + 25kN) x 1.4 ​=​ ​383.84kN Ultimate live load (14.38kN + 13.5kN + 5.12kN) x 1.6 ​= 52.8kN Total ultimate load 383.84kN + 52.8kN ​= 436.64kN
  • 10. Column 2,D (Yen Wei Zheng) Ground floor plan Dead load Wall (1.1m + 1.1m + 1.2m + 2.1m + 1.7m + 1.7m + 0.75m) x 8.55kN/m = ​82.508kN Slabs (4.6m + 2.1m) x3.6kN/m² = ​34.776kN Beam (4.1m + 2.1m + 1.2m + 2.1m + 0.75m) x 1.62kN/m = ​16.605kN/m Column (0.3m x 0.15m x 3m x 24 kN/m³ ) = ​3.24kN Total dead load 34.776kN +82.508kN + 16.605kN + 3.24kN ​= 137.13kN Live load (4.6m x 2.1m) x 1.5kN/m ​= 14.49kN Ultimate dead load 137.13kN x 1.4 ​=​ ​191.98kN Ultimate live load 14.49kN x 1.6 ​= 23.18kN Total ultimate load 191.98kN + 23.18kN ​= 215.16kN