SlideShare a Scribd company logo
1 of 30
8.2 Joyce Wee
Beam A-B/4 (Ground Floor | Secondary Beam)
Dead Load:
○1 Slab (A-B/ 3-4) = 3.6kN/m2
x (1.91m/2)
= 3.44kN/m
○2 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) 2/3
= 3.72kN/m
○3 Brick wall weight = 3m x 0.1m x 19kN/m3
=5.7kN/m
○4 Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 3.44 + 3.72 + 5.7 + 0.48
= 13.34kN/m
Live Load:
○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2)
= 2.0kN/m2 x (1.91m/2)
= 1.91kN/m
○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)
= 1.5kN/m2
x (3.1m/2)
= 2.33kN/m
Total Live Load:
Total Live Load = 1.91kN/m + 2.33kN/m
=4.24kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 2
Ultimate Load:
Ultimate Load = TDL(1.4) + TLL(1.6)
= 13.34(1.4) + 4.24(1.6)
= 25.46kN/m
Load Diagram for Beam (A-B/4)
Reaction Force:
∑m = 0
(RA x 3.1) – (25.46 x 3.1)(1.55) = 0
RA(3.1) – 122.34 = 0
RA = 122.34/3.1
RA = 39.46kN -----○A
∑fy = 0
RA + RB + (-25.46 x 3.1) = 0 -----○B
Substitute ○A into ○B
39.46 + RB – 78.926 = 0
RB = 78.926 – 39.46
RB = 39.5kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 3
Shear Force Diagram
Point 1 = 39.46kN
Point 2 = 39.46 + (-25.46 x 3.1)
= 39.46 x 78.926
= -39.5K
Point 3 = -39.5 + 39.5
= 0kN
Bending Moment Diagram
Peak = (39.46 x 1.55) x ½
= 30.58
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 4
Beam B-D/5 (Ground Floor | Secondary Beam)
Dead Load:
○1 Slab (B-D/3-5) = 3.6kN/m2
x (3.21m/2) 2/3
= 3.85kN/m
○2 Slab (B-D/5-6) = 3.6kN/m2
X (3.21m/2)2/3
= 3.85kN/m
○3 Beam self-weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load:
Total Dead Load = 3.85 + 3.85 + 0.48
= 8.18kN/m
Live Load:
○1 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3
= 1.5kN/m2 x (3.21m/2)2/3
= 1.605kN/m
At Slab (B-D/3-5),
Slab : Stairs = 3.21m : 1.4m
1.605 : α = 3.21 : 1.4
1.605/a = 3.21/1.4
a = 0.7kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 5
○2 Slab (B-D/3-5) = Corridor x (3.21m/2)2/3
= 4.0kN/m2 x (3.21m/2)2/3
= 4.28kN/m
At Slab (B-D/3-5),
Slab : Corridor = 3.21m : 1.81m
4.28 : α = 3.21 : 1.81
4.28/a = 3.21/1.81
a = 2.41kN/m
○3 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3
= 1.5kN/m2 x (3.21m/2)2/3
= 1.605kN/m
At Slab (B-D/3-5),
Slab : Stairs = 3.21m : 1.4m
1.605 : α = 3.21 : 1.4
1.605/a = 3.21/1.4
a = 0.7kN/m
○4 Slab (B-D/3-5) = Corridor x (3.21/2)2/3
= 4.0kN/m2 x (3.21/2)2/3
= 4.28kN/m
At Slab (B-D/3-5),
Slab : Corridor = 3.21m : 1.81m
4.28 : α = 3.21 : 1.81
4.28/a = 3.21/1.81
a = 2.41kN/m
Total Live Load:
Total Live Load at (B-C) = 0.7 + 0.7
= 1.4kN/m
Total Live Load at (C-D) = 2.41 + 2.41
= 4.82kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 6
Ultimate Load:
Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6)
= 8.18(1.4) + 1.4(1.6)
= 13.69kN/m
Ultimate Load at (C-D) = TDL(1.4) + TLL(1.6)
= 8.18(1.4) + 4.82(1.6)
= 19.16kN/m
Load Diagram of Beam (B-D/5):
Reaction Forces:
∑m = 0
RB(3.21) – (19.16 x 1.81)(0.91) – (13.69)(2.51) = 0
RB(3.21) – 31.56 – 34.36 = 0
RB = 65.92/3.21
RB = 20.54kN/m -----○A
∑fy = 0
RB+RD-(13.69 X 1.4) – (19.16 X 1.81) = 0 -----○B
Substitute ○A into ○B ,
20.54 + RD – 19.17 – 34.68 = 0
RD = 53.85 - 20.54
RD = 33.31kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 7
Shear Force Diagram:
Point 1 = 20.54
Point 2 = 20.54 – (13.69 x 1.4)
= 1.374
Point 3 = 1.374 – (19.16 x 1.81)
= -33.31
Point 4 = -33.31 + 33.31
= 0
Bending Moment Diagram:
Bending Moment 1
= (20.54 + 1.374)/2 x 1.4
= 15.34
Bending Moment 2
= 15.3398 + (1.374 x 0.3)/2
= 15.55
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 8
Beam B/3-6 (Ground Floor | Primary Beam)
Dead Load:
○1 Slab (A-B/3-4) = 3.6kN/m2
x (1.91m/2) 2/3
= 2.29kN/m
○2 Slab (A-B/4-6) = 3.6kN/m2
x (3.1m/2)
= 5.58kN/m
○3 Slab (B-D/3-5) = 3.6kN/m2
x (3.21m/2)
= 5.78kN/m
○4 Slab (B-D/5-6) = 3.6kN/m2
x (3.21m/2)
= 5.78kN/m
○5 Brick wall weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○6 Beam self-weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (B/3-4) = 2.29 + 5.78 + 5.7 + 1.44
= 15.21kN/m
Total Dead Load at (B/4-5) = 5.58 + 5.78 + 5.7 + 1.44
= 18.5kN/m
Total Dead Load at (B/5-6) = 5.58 + 5.78 + 5.7 + 1.44
= 18.5kN/m
Live Load:
○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) 2/3
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 9
= 2.0kN/m2
x (1.91m/2) 2/3
= 1.27kN/m
○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2)
= 1.5kN/m2
x (3.1m/2)
= 2.33kN/m
○3 Slab (B-D/ 3-4) = Stairs x (3.21m/2)
= 1.5kN/m2
x (3.21m/2)
= 2.41kN/m
○4 Slab (D-F/ 5-6) = Stairs x (3.21m/2)
= 1.5kN/m2
x (3.21m/2)
= 2.41kN/m
Total Live Load:
Total Live Load at (B/3-4) = 1.27 + 2.41
= 3.68kN/m
Total Live Load at (B/4-5) = 2.33 + 2.41
= 4.74kN/m
Total Live Load at (B/5-6) = 2.33 + 2.41
= 4.74kN/m
Ultimate Load:
Ultimate Load at (B/3-4) = TDL(1.4) + TLL(1.6)
= 15.21(1.4) + 3.68(1.6)
= 27.18kN/m
Ultimate Load at (B/4-6) = TDL(1.4) + TLL(1.6)
= 18.5(1.4) + 4.74(1.6)
= 33.48kN/m
Load Diagram of Beam (B/3-6):
○1 Referring to Beam (A-B/4), Point Load at B/4 = 39.5kN
○2 Referring to Beam (B-D/5), Point Load at B/5 = 20.76kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 10
Reaction Force:
∑m = 0
RB3(7.09) – (27.18 x 1.91)(6.14) – (39.5)(5.18) – (20.76)(3.39) – (33.48 x 5.18)(2.59) = 0
RB3(7.09) – 318.75 – 204.61 – 70.38 – 449.17 = 0
RB3 = 1042.91/7.09
RB3 = 147.1kN -----○A
∑fy = 0
RB3 + RB6 – 39.5 – 20.76 – 27.18(1.91) – 33.48(5.18) = 0 -----○B
Substitute ○A into ○B ,
147.1 + RB6 – 39.5 – 20.76 – 51.91 – 173.43 = 0
RB6 = 138.5kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 11
Shear Force Diagram:
Point 1 = 147.1
Point 2 = 147.1 – (27.18 x 1.91)
= 95.19
Point 3 = 95.19 – 39.5
= 55.69
Point 4 = 55.69 – (33.48 x 1.79)
= -4.24
Point 5 = -4.24 – 20.76
= -25
Point 6 = -25 – (33.48 x 3.39)
= - 138.5
Bending Moment Diagram:
Bending Point 1
= (147.1 + 95.19)/2 x 1.91
= 231.39
Bending Point 2
= 231.39 + (55.69 x 1.662)/2
= 277.67
Bending Point 3
= 277.67 – (4.24 x 0.128)/2
= 277.4
Bending Point 4
= 277.4 – (25 + 138.5)/2 x 3.39
= 0
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 12
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 13
Beam J/1-3 (First Floor | Secondary Beam)
Dead Load at Beam (J-K/2):
○1 Slab (J-K/1-2) = 3.6kN/m2
x (1.81m/2)2/3
= 2.172kN/m
○2 Slab (J-K/2-3) = 3.6kN/m2
x (1.6m/2)
= 2.88kN/m
○3 Brick Wall Load = 3.0m x 0.1m x 19kN/m3
= 5.7kN/m
○4 Beam Self-Weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load at Beam (J-K/2):
Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48
= 11.23kN/m
Live Load:
1 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3
= 2.0kN/m2
x (1.81m/2)2/3
= 1.21kN/m
2 Slab (J-K/2-3) = Bedroom x (1.6m/2)
= 1.5kN/m2
x (1.6m/2)
= 1.2kN/m
Total Live Load at Beam (J-K/2):
Total Live Load = 1.21 + 1.2
= 2.41kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 14
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 15
Ultimate Load at Beam (J-K/2):
Ultimate Load = TDL(1.4) + TLL(1.6)
= 11.23(1.4) + 2.41(1.6)
= 19.58kN/m2
Load Diagram of beam (J-K/2):
Reaction Force
∑m = 0
RJ (1.81) – (19.58 x 1.81)(0.91) = 0
RJ (1.81) – 32.35 = 0
RJ = 32.25/1.81
RJ = 17.82kN -----○A
∑fy = 0
RJ + RK – (19.58) (1.81) = 0 -----○B
Substitute ○A into ○B ,
17.82 + RK – 35.44 = 0
RK = 17.62kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 16
Dead Load at Beam J/1-3
○1 Slab (H-J/1-3)= 3.6kN/m2
x (4.19m/2)2/3
= 5.03kN/m
○2 Slab (J-K/1-2) = 3.6kN/m2
x (1.81m/2)
= 3.26kN/m
○3 Slab (J-K/2-3) = 3.6kN/m2
x (1.6m/2)2/3
= 1.92kN/m
○4 Brick Wall Weight = 3.0m x 0.1m x 19kN/m3
= 5.7kN/m
○5 Beam Self Weight = 0.1m x 0.2m x 24kN/m3
= 0.48kN/m
Total Dead Load at Beam (J/1-3):
Total Dead Load at (J/1-2) = 5.03 + 3.26 + 5.7 + 0.48
= 14.47kN/m
Total Dead Load at (J/2-3) = 5.03 + 1.92 + 5.7 + 0.48
= 13.13kN/m
Live Load at Beam J/1-3
○1 Slab (H-J/1-3) = Bedroom x (4,19m/2)2/3
= 1.5kN/m2
x (4.19m/2)2/3
= 2.095kN/m
○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)
= 2.0kN/m2
x (1.81m/2)
= 1.81kN/m
○3 Slab J-K/2-3) = Bedroom x 1.6m/2)2/3
= 1.5kN/m2
x 1.6m/2)2/3
= 0.8kN/m
Total Live Load at Beam J/1-3:
Total Live Load at (J/1-2) = 2.095 + 1.81
= 3.905kN/m
Total Live Load at (J/2-3) = 2.095 + 0.8
= 2.895kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 17
Ultimate Load at Beam J/1-3
Ultimate Load at (J/1-2) = TDL (1.4) + TLL (1.6)
=14.47(1.4) + 3.905(1.6)
= 26.51kN/m
Ultimate Load at (J/2-3) = TDL (1.4) + TLL (1.6)
= 13.13(1.4) + 2.9(1.6)
= 23.02kN/m
Load Diagram of Beam (J/1-3):
○1 Referring to Beam (J-K/2), Point Load at J/2 = 17.82kN
∑m = 0
RJ1(4.19) – (23.02 x 1.6) (0.8) – (17.82) (1.6) – (26.51 x 2.59) (2.9) = 0
RJ1(4.19) – 29.47 – 28.512 – 199.12 = 0
RJ1 = 257.1/4.19
RJ1 = 61.36kN -----○A
∑fy = 0
RJ1 + RJ2 – 17.82 – (26.51 x 2.59) – (23.02 x 1.6) = 0 -----○B
Substitute ○A into ○B ,
61.36 + RJ2 – 17.82 – 68.66 – 36.83 = 0
RJ2 = 61.95kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 18
Shear Force Diagram
Point 1 = 61.36
Point 2 = 61.36 – (26.51 x 2.59)
= -7.3
Point 3 = -7.3 – 17.82
= -25.12
Point 4 = -25.12 – (23.02 x 1.6)
= -61.95
Point 5 = -61.95 + 61.95
Bending Moment Diagram
Bending Point 1
= (61.36 x 2.3)/2
= 70.56
Bending Point 2
= 70.56 – (7.3 x 0.29)/2
= 69.5
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 19
Beam H-K/1 (First Floor | Primary Beam)
Dead Load:
○1 Slab (H-J/1-3)= 3.6kN/m2
x (4.19m/2)
= 7.542kN/m
○2 Slab (J-K/1-2) = 3.6kN/m2
x (1.81m/2)2/3
= 2.17kN/m
○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (H-J) = 7.542 + 5.7 + 1.44
= 14.68kN/m
Total Dead Load at (J-K) = 2.17 + 5.7 + 1.44
= 9.31kN/m
Live Load:
○1 Slab (H-J/1-3) = Bedroom x (4.19m/2)
= 1.5kN/m2
x (4.19m/2)
= 3.14kN/m
○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3
= 2.0kN/m2
x (1.81/2)2/3
= 1.21kN/m
Total Live Load:
Total Live Load at (H-J) = 3.14kN/m
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 20
Total Live Load at (J-K) = 1.21kN/m
Ultimate Load:
Ultimate Load at (H-J) = TDL (1.4) + TLL (1.6)
=14.68(1.4) + 3.14(1.6)
= 25.57kN/m
Ultimate Load at (J-K) = TDL (1.4) + TLL (1.6)
= 9.31(1.4) + 1.21(1.6)
= 14.97kN/m
Load Diagram of Beam (H-K/1):
○1 Referring to Beam (J/1-3), Point Load at J/1 = 61.36kN
∑m = 0
RH (6.3) – (25.57 X 4.49) (4.06) – (61.36) (1.81) – (14.97 X 1.81) (0.91) = 0
RH (6.3) – 466.13 – 111.06 – 24.66 = 0
RH = 601.85/6.3
RH = 95.53kN/m -----○A
∑fy = 0
RH + RK – 61.36 – (25.57 X 4.49) – (14.97 X 1.81) = 0 -----○B
Substitute ○A into ○B ,
95.53 + RK – 61.36 – 114.81 – 27.1 = 0
RK = 107.34kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 21
Shear Force Diagram
Point 1 = 95.53
Point 2 = 95.53 – (25.57 x 4.49)
= -19.28
Point 3 = -19.28 – 61.36
= -80.64
Point 4 = -80.64 – (14.97 x 1.81)
= -107.34
Point 5 = -107.34 + 107.34
= 0
Bending Moment Diagram
Bending Point 1
= (95.53 x 3.73)/2
= 178.163
Bending Point 2
= 178.163 - (19.28 x 0.76)/2
= 170.837
Bending Point 3
= 170.837 – (80.64 + 107.34)/2 x 1.81
= 0
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 22
Beam I-K/3 (First Floor | Primary Beam)
Dead Load
○1 Slab (H-J/1-3) = 3.6kN/m2
x (4.49m/2)
= 7.54kN/m
○2 Slab (I-N/3-5) = 3.6kN/m2
x (4.71/2)
= 8.48kN/m
○3 Slab (J-K/2-3) = 3.6kN/m2
x (1.6/2)
= 2.88kN/m
○4 Brick Wall Weight = 3m x 0.1m x 19kN/m3
= 5.7kN/m
○5 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3
= 1.44kN/m
Total Dead Load:
Total Dead Load at (I-J) = 7.54 + 8.48 + 5.7 + 1.44
= 23.16kN/m
Total Dead Load at (J-K) = 18.5kN/m
Live Load:
○1 Slab (H-J/1-3) = Bedroom x (4.49m/2)
= 1.5kN/m2
x (4.49m/2)
= 3.37kN/m
○2 Slab (I-N/3-5) = Living Room x (4.71m/2)
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 23
= 4.0kN/m2
x (4.71m/2)
= 9.4kN/m
○3 Slab (J-K/2-3) = Bedroom x (1.6m/2)
= 1.5kN/m2
x(1.6m/2)
= 1.2kN/m
Total Live Load:
Total Live Load at (I-J) = 3.37 + 9.4
= 12.77kN/m
Total Live Load at (J-K) = 9.4 + 1.2
= 10.6kN/m
Ultimate Load:
Ultimate Load at (I-J) = TDL (1.4) + TLL (1.6)
= 23.16(1.4) + 12.77(1.6)
= 52.85kN/m
Ultimate Load at (J-K) = TDL(1.4) + TLL(1.6)
= 18.5(1.4) + 10.6(1.6)
= 42.86kN/m
Load Diagram of Beam (I-K/3):
○1 Referring to Beam (J/1-3), Point Load at J/3 = 61.95kN/m
∑m = 0
RI(3.21) – (52.85 x 1.4) (2.51) – (61.95) (1.81) – (42.86 x 1.81) (0.91) = 0
RI(3.21) – 185.71 – 112.13 – 70.59 = 0
RI = 368.43/3.21
RI = 114.76kN -----○A
∑fy = 0
RI + RK – 61.95 – (52.85 X 1.4) – (42.86 X 1.81) = 0 -----○B
Substitute ○A into ○B ,
114.76 + RK – 61.95 – 73.99 – 77.58 = 0
RK = 98.76kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 24
Shear Force Diagram:
Point 1 = 114.76
Point 2 = 114.76 – (52.85 x 1.4)
=40.77
Point 3 = 40.77 – 61.95
= - 21.18
Point 4 = -21.18 – (42.86 x 1.81)
= -98.76
Point 5 = -98.76 + 98.76
= 0
Bending Moment Diagram
Bending Point 1
= (114.76 + 40.77)/2 x 1.4
= 108.87
Bending Point 2
= 108.87 - (21.18 + 98.76)/2 x 1.81
= 0
1.4 3.21
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 25
9.2 Joyce Wee
Column A/1 (Connected to All Floors)
-Roof Level-
Dead Load:
○1 Roof Slab = (3.155 x 2.09) m2
x 3.6kN/m2
= 6.59m2
x 3.6kN/m2
= 23.72kN
○2 Roof Beam = (3.155 + 2.09) m x 1.44kN/m
= 5.245m x 1.44kN/m
= 7.55kN
Total Dead Load at Roof Level
= 23.72kN + 7.55kN
= 31.27kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (3.155 x 2.09)m2 x 3.6kN/m2
○1 Bedroom
= 6.59m2
x 3.6kN/m2
= (2.09m x 3.155m) x 1.5kN/m2
= 23.72kN = 9.89kN
○2 Wall = (3.155m + 2.09m) x 5.7kN/m
= 5.245m x 5.7kN/m
= 29.9kN
○3 Beam = (3.155m + 2.09m) x 1.44kN/m
= 5.75m x 1.44kN/m
= 7.55kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN
= 67.65kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 26
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (3.155 + 2.09) m2
x 3.6kN/m2
○1 Bedroom
= 6.59m2
x 3.6kN/m2
= (3.155m x 2.09m) x 1.5kN/m2
= 23.72kN = 9.89kN
○2 Wall = (3.155m + 2.09m) x 5.7kN/m
= 5.245m x 5.7kN/m
= 29.9kN
○3 Beam = (3.155 + 2.09) m x 1.44kN/m
= 5.245m x 1.44kN/m
= 7.55kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN
= 67.65kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 31.27kN + 67.65kN + 67.65kN = 9.89kN + 9.89kN
= 166.57kN = 19.78kN
Ultimate Load at Column D/3
= TDL (1.4) + TLL (1.6)
= 166.57kN (1.4) + 19.78kN (1.6)
= 233.198kN + 31.648kN
= 264.85kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 27
Column D/3 (Connected to All Floors)
-Roof Level-
Dead Load: Live Load:
○1 Roof Slab = (3.66 x 3.94) m2
x 3.6kN/m2
= 14.42m2
x 3.6kN/m2
= 51.91kN
○2 Roof Beam = (2.09 + 1.61 + 2.05) m x 1.44kN/m
= 5.75m x 1.44kN/m
= 8.28kN
Total Dead Load at Roof Level
= 51.91kN + 8.28kN
= 60.19kN
-First Floor-
Dead Load: Live Load:
○1 Slab = (3.36m2
+ 2.98m2
+ 3.79m2
) x 3.6kN/m2
○1 Bedroom
= 10.13m2 x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2
= 36.468kN = 5.05kN
○2 Wall = (2.09m + 1.61m) x 5.7kN/m ○2 Corridor
= 3.7m x 5.7kN/m = (3.66m x 1.85m) x 4.0kN/m2
= 21.09kN = 27.08kN
○3 Beam = (2.09m + 1.61m + 2.05m) x 1.44kN/m
= 5.75m x 1.44kN/m
= 8.28kN
○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3
= 6.48kN
Total Dead Load at First Floor Total Live Load at First Floor
= 36.47kN + 21.09kN + 8.28kN + 6.48kN = 5.05kN + 27.08kN
= 72.32kN = 32.13kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 28
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (1.61 + 2.05)m x (2.09 + 1.85)m x 3.6kN/m2
○1 Bedroom
= (3.66m x 3.94m) x 3.6kN/m2
= (2.09m x 1.61m) x 1.5kN/m2
= 51.91kN = 5.05kN
○2 Wall = (2.05m + 2.09m + 1.61m) x 5.7kN/m ○2 Corridor
= 5.75m x 5.7kN/m = (1.85m x 1.61m) x 4.0kN/m2
= 32.78kN = 11.91kN
○3 Beam = (2.05 + 2.09 + 1.61 + 1.85) m x 1.44kN/m ○3 Kitchen
= 7.6m x 1.44kN/m = (3.94m x 2.05m) x 3.0kN/m2
= 10.944kN = 24.231kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 51.91kN + 32.78kN + 10.944kN + 6.48kN = 5.05kN + 11.91kN + 24.23kN
= 234.62kN = 41.19kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 60.19kN + 72.32kN + 102.11kN = 32.13kN + 41.19kN
= 234.62kN = 73.32kN
Ultimate Load at Column D/3
= TDL (1.4) + TLL (1.6)
= 234.62kN (1.4) + 73.32kN (1.6)
= 328.47kN + 117.312kN
= 445.78kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 29
Column D/6 (Acting on Ground Floor Only)
-Ground Floor-
Dead Load: Live Load:
○1 Slab = (1.7 + 1.34)m (1.61 + 3.83)m x 3.6kN/m2
○1 Corridor
= (3.04m x 5.444m) x 3.6kN/m2
= (1.61m x 1.7) x 4.0kN/m2
= 59.54kN = 10.95kN
○2 Wall = (1.7m + 3.83m) x 5.7kN/m ○2 Living Room
= 5.53m x 5.7kN/m = (1.61m + 3.83m) x 1.34m x 4.0kN/m2
= 31.52kN = 29.16kN
○3 Beam = (1.7 + 3.83 + 1.34 + 1.61) m x 1.44kN/m ○3 Storeroom
= 8.48m x 1.44kN/m = (1.7m x 3.83m) x 2.5kN/m2
= 12.214kN = 16.28kN
○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3
= 6.48kN
Total Dead Load at Ground Floor Total Live Load at Ground Floor
= 51.54kN + 31.52kN + 12.21kN + 6.48kN = 10.95kN + 29.16kN + 16.28kN
= 109.75kN = 56.39kN
Total Dead Load at Column D/3 Total Live Load at Column D/3
= 109.75kN = 56.39kN
Ultimate Load at Column D/3
= TDL (1.4) + TLL (1.6)
= 109.75kN (1.4) + 56.39kN (1.6)
= 153.65kN + 90.22kN
= 243.87kN
BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 30

More Related Content

What's hot

Structural Analysis of SIRI House
Structural Analysis of SIRI HouseStructural Analysis of SIRI House
Structural Analysis of SIRI HouseCarmen Chan
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Wen Yee
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02Winnie Ang
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school buildingRaghav Sankar
 
Building structures final
Building structures finalBuilding structures final
Building structures finalJamie Lee
 
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường họcđồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường họchttps://www.facebook.com/garmentspace
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
B structure power point
B structure power pointB structure power point
B structure power pointAnderson Wong
 
Individual report (final)
Individual report (final)Individual report (final)
Individual report (final)Chuah Say Yin
 
EXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWEXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWChuah Say Yin
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4Lam Yu
 
CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)Cyle Teal
 
Finite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal LoadingFinite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal LoadingMohammad Tawfik
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2Lam Yu
 

What's hot (17)

Structural Analysis of SIRI House
Structural Analysis of SIRI HouseStructural Analysis of SIRI House
Structural Analysis of SIRI House
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
1 perhitungan-balok
1 perhitungan-balok1 perhitungan-balok
1 perhitungan-balok
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school building
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường họcđồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
đồ áN bê tông cốt thép 2 thiết kế khung ngang trục 3 của một trường học
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Water tank design ppt
Water tank design pptWater tank design ppt
Water tank design ppt
 
B structure power point
B structure power pointB structure power point
B structure power point
 
Individual report (final)
Individual report (final)Individual report (final)
Individual report (final)
 
EXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWEXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOW
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4
 
CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)CIVE 801 - Course Project Report (Teal)
CIVE 801 - Course Project Report (Teal)
 
Finite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal LoadingFinite Element Analysis of the Beams Under Thermal Loading
Finite Element Analysis of the Beams Under Thermal Loading
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
 

Viewers also liked

Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...Joyce Wee
 
Truss Analysis Calculation
Truss Analysis CalculationTruss Analysis Calculation
Truss Analysis CalculationJoyce Wee
 
Building Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly CentreBuilding Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly CentreJoyce Wee
 
Internship Training and Report
Internship Training and ReportInternship Training and Report
Internship Training and ReportJoyce Wee
 
Cl final report
Cl final reportCl final report
Cl final reportJoyce Wee
 
Research assignment
Research assignmentResearch assignment
Research assignmentJoyce Wee
 
Business Reseach Report
Business Reseach ReportBusiness Reseach Report
Business Reseach ReportJoyce Wee
 
Horror Films Comparison Essay
Horror Films Comparison EssayHorror Films Comparison Essay
Horror Films Comparison EssayJoyce Wee
 
Cape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site AnalysisCape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site AnalysisJoyce Wee
 
Building Structure // Column Analysis Report
Building Structure // Column Analysis ReportBuilding Structure // Column Analysis Report
Building Structure // Column Analysis ReportLovie Tey
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri DrawingsXin Dean Chong
 
Group b site analysis
Group b   site analysis Group b   site analysis
Group b site analysis Chong jiayi
 
Building 3D apps with Javascript
Building 3D apps with JavascriptBuilding 3D apps with Javascript
Building 3D apps with JavascriptGraham Weldon
 
10.01.03.116 (Presentation on centroid)
10.01.03.116 (Presentation on centroid)10.01.03.116 (Presentation on centroid)
10.01.03.116 (Presentation on centroid)Preoti1234
 
Sachpazis_Circular Section Column Design & Analysis, Calculations according t...
Sachpazis_Circular Section Column Design & Analysis, Calculations according t...Sachpazis_Circular Section Column Design & Analysis, Calculations according t...
Sachpazis_Circular Section Column Design & Analysis, Calculations according t...Dr.Costas Sachpazis
 
Chapter 7.2 parabola
Chapter 7.2 parabolaChapter 7.2 parabola
Chapter 7.2 parabolasoma1996
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing ConstructionJoyce Wee
 
Balairung Seri Report
Balairung Seri ReportBalairung Seri Report
Balairung Seri ReportAmos Tan
 

Viewers also liked (20)

Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
Wapan Technique used in Ningbo Historic Museum to Revive Traditional Chinese ...
 
Truss Analysis Calculation
Truss Analysis CalculationTruss Analysis Calculation
Truss Analysis Calculation
 
Building Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly CentreBuilding Services in Public Buildings | Elderly Centre
Building Services in Public Buildings | Elderly Centre
 
Internship Training and Report
Internship Training and ReportInternship Training and Report
Internship Training and Report
 
CL BOARD
CL BOARDCL BOARD
CL BOARD
 
Cl final report
Cl final reportCl final report
Cl final report
 
CL BOARD
CL BOARDCL BOARD
CL BOARD
 
Research assignment
Research assignmentResearch assignment
Research assignment
 
Business Reseach Report
Business Reseach ReportBusiness Reseach Report
Business Reseach Report
 
Horror Films Comparison Essay
Horror Films Comparison EssayHorror Films Comparison Essay
Horror Films Comparison Essay
 
Cape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site AnalysisCape Rachado Reserve Forest Site Analysis
Cape Rachado Reserve Forest Site Analysis
 
Building Structure // Column Analysis Report
Building Structure // Column Analysis ReportBuilding Structure // Column Analysis Report
Building Structure // Column Analysis Report
 
Balai Seni Negeri Drawings
Balai Seni Negeri DrawingsBalai Seni Negeri Drawings
Balai Seni Negeri Drawings
 
Group b site analysis
Group b   site analysis Group b   site analysis
Group b site analysis
 
Building 3D apps with Javascript
Building 3D apps with JavascriptBuilding 3D apps with Javascript
Building 3D apps with Javascript
 
10.01.03.116 (Presentation on centroid)
10.01.03.116 (Presentation on centroid)10.01.03.116 (Presentation on centroid)
10.01.03.116 (Presentation on centroid)
 
Sachpazis_Circular Section Column Design & Analysis, Calculations according t...
Sachpazis_Circular Section Column Design & Analysis, Calculations according t...Sachpazis_Circular Section Column Design & Analysis, Calculations according t...
Sachpazis_Circular Section Column Design & Analysis, Calculations according t...
 
Chapter 7.2 parabola
Chapter 7.2 parabolaChapter 7.2 parabola
Chapter 7.2 parabola
 
Building Construction: Experiencing Construction
Building Construction: Experiencing ConstructionBuilding Construction: Experiencing Construction
Building Construction: Experiencing Construction
 
Balairung Seri Report
Balairung Seri ReportBalairung Seri Report
Balairung Seri Report
 

Similar to Beam and Column Analysis | Individual Component

Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Ong Seng Peng Jeff
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilationjisunfoo
 
Final structure report
Final structure reportFinal structure report
Final structure reportTay Jit Ying
 
Hb structure
Hb structureHb structure
Hb structurehongbinng
 
individual part
individual part individual part
individual part KC Wong
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual CaluculationPengeneee Peng
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension junAh Jun
 
Building Structure
Building Structure Building Structure
Building Structure Nicole Foo
 
B.structure report
B.structure reportB.structure report
B.structure reportjiuaN59
 
Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indiChong Yu Xuan
 
Gb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensinGb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensinshensin1015
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2 Ryan Kerry Jy
 
Building structure
Building structure Building structure
Building structure yenweizheng
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculationSheau Hui Tan
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculationJy Chong
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
Building Structure
Building StructureBuilding Structure
Building StructureBolin Loong
 
Building Structure Project 2 report
Building Structure Project 2 reportBuilding Structure Project 2 report
Building Structure Project 2 reportTan Jaden
 

Similar to Beam and Column Analysis | Individual Component (20)

Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
 
Final structure report
Final structure reportFinal structure report
Final structure report
 
Hb structure
Hb structureHb structure
Hb structure
 
individual part
individual part individual part
individual part
 
Individual Caluculation
Individual CaluculationIndividual Caluculation
Individual Caluculation
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension jun
 
Building Structure
Building Structure Building Structure
Building Structure
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indi
 
Gb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensinGb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensin
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
 
Building structure
Building structure Building structure
Building structure
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
Structures
StructuresStructures
Structures
 
Building Structure
Building StructureBuilding Structure
Building Structure
 
Beam Analysis
Beam AnalysisBeam Analysis
Beam Analysis
 
Building Structure Project 2 report
Building Structure Project 2 reportBuilding Structure Project 2 report
Building Structure Project 2 report
 

More from Joyce Wee

[MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report [MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report Joyce Wee
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project ReportJoyce Wee
 
Taman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site AnalysisTaman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site AnalysisJoyce Wee
 
Food and Culture Research Proposal
Food and Culture Research ProposalFood and Culture Research Proposal
Food and Culture Research ProposalJoyce Wee
 
SIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis ReportSIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis ReportJoyce Wee
 
SIBKL Acoustic Design
SIBKL Acoustic DesignSIBKL Acoustic Design
SIBKL Acoustic DesignJoyce Wee
 
Reaction Paper 3 Critical Regionalism
Reaction Paper 3  Critical RegionalismReaction Paper 3  Critical Regionalism
Reaction Paper 3 Critical RegionalismJoyce Wee
 
Reaction Paper 2 Geometry of Feeling
Reaction Paper 2  Geometry of FeelingReaction Paper 2  Geometry of Feeling
Reaction Paper 2 Geometry of FeelingJoyce Wee
 
Reaction paper 1 Learning from Las Vegas
Reaction paper 1  Learning from Las VegasReaction paper 1  Learning from Las Vegas
Reaction paper 1 Learning from Las VegasJoyce Wee
 
Comparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and GwanghwamunComparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and GwanghwamunJoyce Wee
 
Building Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus ShelterBuilding Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus ShelterJoyce Wee
 
44 king street report
44 king street report44 king street report
44 king street reportJoyce Wee
 
Stadium Negara Precedent Study Report
Stadium Negara Precedent Study ReportStadium Negara Precedent Study Report
Stadium Negara Precedent Study ReportJoyce Wee
 
Culture And Civil. Rome
Culture And Civil. RomeCulture And Civil. Rome
Culture And Civil. RomeJoyce Wee
 
Assignment 2
Assignment 2Assignment 2
Assignment 2Joyce Wee
 
Assignment 1
Assignment 1Assignment 1
Assignment 1Joyce Wee
 
Lake gardens EPC
Lake gardens EPCLake gardens EPC
Lake gardens EPCJoyce Wee
 
Notre dame EPC
Notre dame EPCNotre dame EPC
Notre dame EPCJoyce Wee
 

More from Joyce Wee (20)

[MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report [MGT60403] Project Management Final Report
[MGT60403] Project Management Final Report
 
Architecture Design Project Report
Architecture Design Project ReportArchitecture Design Project Report
Architecture Design Project Report
 
Taman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site AnalysisTaman Tasik Titiwangsa Site Analysis
Taman Tasik Titiwangsa Site Analysis
 
Food and Culture Research Proposal
Food and Culture Research ProposalFood and Culture Research Proposal
Food and Culture Research Proposal
 
SIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis ReportSIBKL Acoustic Design Analysis Report
SIBKL Acoustic Design Analysis Report
 
SIBKL Acoustic Design
SIBKL Acoustic DesignSIBKL Acoustic Design
SIBKL Acoustic Design
 
Reaction Paper 3 Critical Regionalism
Reaction Paper 3  Critical RegionalismReaction Paper 3  Critical Regionalism
Reaction Paper 3 Critical Regionalism
 
Reaction Paper 2 Geometry of Feeling
Reaction Paper 2  Geometry of FeelingReaction Paper 2  Geometry of Feeling
Reaction Paper 2 Geometry of Feeling
 
Reaction paper 1 Learning from Las Vegas
Reaction paper 1  Learning from Las VegasReaction paper 1  Learning from Las Vegas
Reaction paper 1 Learning from Las Vegas
 
Comparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and GwanghwamunComparing Jalan TAR and Gwanghwamun
Comparing Jalan TAR and Gwanghwamun
 
Building Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus ShelterBuilding Construction 2: Skeletal Structure - Bus Shelter
Building Construction 2: Skeletal Structure - Bus Shelter
 
44 king street report
44 king street report44 king street report
44 king street report
 
Stadium Negara Precedent Study Report
Stadium Negara Precedent Study ReportStadium Negara Precedent Study Report
Stadium Negara Precedent Study Report
 
Culture And Civil. Rome
Culture And Civil. RomeCulture And Civil. Rome
Culture And Civil. Rome
 
Final
FinalFinal
Final
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
Journal 2
Journal 2Journal 2
Journal 2
 
Assignment 1
Assignment 1Assignment 1
Assignment 1
 
Lake gardens EPC
Lake gardens EPCLake gardens EPC
Lake gardens EPC
 
Notre dame EPC
Notre dame EPCNotre dame EPC
Notre dame EPC
 

Recently uploaded

Data Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxData Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxFurkanTasci3
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home ServiceSapana Sha
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一
办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一
办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一F La
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...ThinkInnovation
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Callshivangimorya083
 
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...Pooja Nehwal
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceSapana Sha
 

Recently uploaded (20)

Data Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxData Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptx
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一
办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一
办理(Vancouver毕业证书)加拿大温哥华岛大学毕业证成绩单原版一比一
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
꧁❤ Greater Noida Call Girls Delhi ❤꧂ 9711199171 ☎️ Hard And Sexy Vip Call
 
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...{Pooja:  9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
{Pooja: 9892124323 } Call Girl in Mumbai | Jas Kaur Rate 4500 Free Hotel Del...
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
Call Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts ServiceCall Girls In Dwarka 9654467111 Escorts Service
Call Girls In Dwarka 9654467111 Escorts Service
 

Beam and Column Analysis | Individual Component

  • 1. 8.2 Joyce Wee Beam A-B/4 (Ground Floor | Secondary Beam) Dead Load: ○1 Slab (A-B/ 3-4) = 3.6kN/m2 x (1.91m/2) = 3.44kN/m ○2 Slab (A-B/ 4-6) = 3.6kN/m2 x (3.1m/2) 2/3 = 3.72kN/m ○3 Brick wall weight = 3m x 0.1m x 19kN/m3 =5.7kN/m ○4 Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load = 3.44 + 3.72 + 5.7 + 0.48 = 13.34kN/m Live Load: ○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) = 2.0kN/m2 x (1.91m/2) = 1.91kN/m ○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m Total Live Load: Total Live Load = 1.91kN/m + 2.33kN/m =4.24kN/m
  • 2. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 2 Ultimate Load: Ultimate Load = TDL(1.4) + TLL(1.6) = 13.34(1.4) + 4.24(1.6) = 25.46kN/m Load Diagram for Beam (A-B/4) Reaction Force: ∑m = 0 (RA x 3.1) – (25.46 x 3.1)(1.55) = 0 RA(3.1) – 122.34 = 0 RA = 122.34/3.1 RA = 39.46kN -----○A ∑fy = 0 RA + RB + (-25.46 x 3.1) = 0 -----○B Substitute ○A into ○B 39.46 + RB – 78.926 = 0 RB = 78.926 – 39.46 RB = 39.5kN
  • 3. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 3 Shear Force Diagram Point 1 = 39.46kN Point 2 = 39.46 + (-25.46 x 3.1) = 39.46 x 78.926 = -39.5K Point 3 = -39.5 + 39.5 = 0kN Bending Moment Diagram Peak = (39.46 x 1.55) x ½ = 30.58
  • 4. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 4 Beam B-D/5 (Ground Floor | Secondary Beam) Dead Load: ○1 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) 2/3 = 3.85kN/m ○2 Slab (B-D/5-6) = 3.6kN/m2 X (3.21m/2)2/3 = 3.85kN/m ○3 Beam self-weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load: Total Dead Load = 3.85 + 3.85 + 0.48 = 8.18kN/m Live Load: ○1 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3 = 1.5kN/m2 x (3.21m/2)2/3 = 1.605kN/m At Slab (B-D/3-5), Slab : Stairs = 3.21m : 1.4m 1.605 : α = 3.21 : 1.4 1.605/a = 3.21/1.4 a = 0.7kN/m
  • 5. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 5 ○2 Slab (B-D/3-5) = Corridor x (3.21m/2)2/3 = 4.0kN/m2 x (3.21m/2)2/3 = 4.28kN/m At Slab (B-D/3-5), Slab : Corridor = 3.21m : 1.81m 4.28 : α = 3.21 : 1.81 4.28/a = 3.21/1.81 a = 2.41kN/m ○3 Slab (B-D/3-5) = Stairs x (3.21m/2)2/3 = 1.5kN/m2 x (3.21m/2)2/3 = 1.605kN/m At Slab (B-D/3-5), Slab : Stairs = 3.21m : 1.4m 1.605 : α = 3.21 : 1.4 1.605/a = 3.21/1.4 a = 0.7kN/m ○4 Slab (B-D/3-5) = Corridor x (3.21/2)2/3 = 4.0kN/m2 x (3.21/2)2/3 = 4.28kN/m At Slab (B-D/3-5), Slab : Corridor = 3.21m : 1.81m 4.28 : α = 3.21 : 1.81 4.28/a = 3.21/1.81 a = 2.41kN/m Total Live Load: Total Live Load at (B-C) = 0.7 + 0.7 = 1.4kN/m Total Live Load at (C-D) = 2.41 + 2.41 = 4.82kN/m
  • 6. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 6 Ultimate Load: Ultimate Load at (B-C) = TDL(1.4) + TLL(1.6) = 8.18(1.4) + 1.4(1.6) = 13.69kN/m Ultimate Load at (C-D) = TDL(1.4) + TLL(1.6) = 8.18(1.4) + 4.82(1.6) = 19.16kN/m Load Diagram of Beam (B-D/5): Reaction Forces: ∑m = 0 RB(3.21) – (19.16 x 1.81)(0.91) – (13.69)(2.51) = 0 RB(3.21) – 31.56 – 34.36 = 0 RB = 65.92/3.21 RB = 20.54kN/m -----○A ∑fy = 0 RB+RD-(13.69 X 1.4) – (19.16 X 1.81) = 0 -----○B Substitute ○A into ○B , 20.54 + RD – 19.17 – 34.68 = 0 RD = 53.85 - 20.54 RD = 33.31kN/m
  • 7. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 7 Shear Force Diagram: Point 1 = 20.54 Point 2 = 20.54 – (13.69 x 1.4) = 1.374 Point 3 = 1.374 – (19.16 x 1.81) = -33.31 Point 4 = -33.31 + 33.31 = 0 Bending Moment Diagram: Bending Moment 1 = (20.54 + 1.374)/2 x 1.4 = 15.34 Bending Moment 2 = 15.3398 + (1.374 x 0.3)/2 = 15.55
  • 8. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 8 Beam B/3-6 (Ground Floor | Primary Beam) Dead Load: ○1 Slab (A-B/3-4) = 3.6kN/m2 x (1.91m/2) 2/3 = 2.29kN/m ○2 Slab (A-B/4-6) = 3.6kN/m2 x (3.1m/2) = 5.58kN/m ○3 Slab (B-D/3-5) = 3.6kN/m2 x (3.21m/2) = 5.78kN/m ○4 Slab (B-D/5-6) = 3.6kN/m2 x (3.21m/2) = 5.78kN/m ○5 Brick wall weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○6 Beam self-weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (B/3-4) = 2.29 + 5.78 + 5.7 + 1.44 = 15.21kN/m Total Dead Load at (B/4-5) = 5.58 + 5.78 + 5.7 + 1.44 = 18.5kN/m Total Dead Load at (B/5-6) = 5.58 + 5.78 + 5.7 + 1.44 = 18.5kN/m Live Load: ○1 Slab (A-B/ 3-4) = Bathroom x (1.91m/2) 2/3
  • 9. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 9 = 2.0kN/m2 x (1.91m/2) 2/3 = 1.27kN/m ○2 Slab (A-B/ 4-6) = Bedroom x (3.1m/2) = 1.5kN/m2 x (3.1m/2) = 2.33kN/m ○3 Slab (B-D/ 3-4) = Stairs x (3.21m/2) = 1.5kN/m2 x (3.21m/2) = 2.41kN/m ○4 Slab (D-F/ 5-6) = Stairs x (3.21m/2) = 1.5kN/m2 x (3.21m/2) = 2.41kN/m Total Live Load: Total Live Load at (B/3-4) = 1.27 + 2.41 = 3.68kN/m Total Live Load at (B/4-5) = 2.33 + 2.41 = 4.74kN/m Total Live Load at (B/5-6) = 2.33 + 2.41 = 4.74kN/m Ultimate Load: Ultimate Load at (B/3-4) = TDL(1.4) + TLL(1.6) = 15.21(1.4) + 3.68(1.6) = 27.18kN/m Ultimate Load at (B/4-6) = TDL(1.4) + TLL(1.6) = 18.5(1.4) + 4.74(1.6) = 33.48kN/m Load Diagram of Beam (B/3-6): ○1 Referring to Beam (A-B/4), Point Load at B/4 = 39.5kN ○2 Referring to Beam (B-D/5), Point Load at B/5 = 20.76kN
  • 10. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 10 Reaction Force: ∑m = 0 RB3(7.09) – (27.18 x 1.91)(6.14) – (39.5)(5.18) – (20.76)(3.39) – (33.48 x 5.18)(2.59) = 0 RB3(7.09) – 318.75 – 204.61 – 70.38 – 449.17 = 0 RB3 = 1042.91/7.09 RB3 = 147.1kN -----○A ∑fy = 0 RB3 + RB6 – 39.5 – 20.76 – 27.18(1.91) – 33.48(5.18) = 0 -----○B Substitute ○A into ○B , 147.1 + RB6 – 39.5 – 20.76 – 51.91 – 173.43 = 0 RB6 = 138.5kN
  • 11. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 11 Shear Force Diagram: Point 1 = 147.1 Point 2 = 147.1 – (27.18 x 1.91) = 95.19 Point 3 = 95.19 – 39.5 = 55.69 Point 4 = 55.69 – (33.48 x 1.79) = -4.24 Point 5 = -4.24 – 20.76 = -25 Point 6 = -25 – (33.48 x 3.39) = - 138.5 Bending Moment Diagram: Bending Point 1 = (147.1 + 95.19)/2 x 1.91 = 231.39 Bending Point 2 = 231.39 + (55.69 x 1.662)/2 = 277.67 Bending Point 3 = 277.67 – (4.24 x 0.128)/2 = 277.4 Bending Point 4 = 277.4 – (25 + 138.5)/2 x 3.39 = 0
  • 12. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 12
  • 13. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 13 Beam J/1-3 (First Floor | Secondary Beam) Dead Load at Beam (J-K/2): ○1 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3 = 2.172kN/m ○2 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2) = 2.88kN/m ○3 Brick Wall Load = 3.0m x 0.1m x 19kN/m3 = 5.7kN/m ○4 Beam Self-Weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load at Beam (J-K/2): Total Dead Load = 2.17 + 2.88 + 5.7 + 0.48 = 11.23kN/m Live Load: 1 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3 = 2.0kN/m2 x (1.81m/2)2/3 = 1.21kN/m 2 Slab (J-K/2-3) = Bedroom x (1.6m/2) = 1.5kN/m2 x (1.6m/2) = 1.2kN/m Total Live Load at Beam (J-K/2): Total Live Load = 1.21 + 1.2 = 2.41kN/m
  • 14. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 14
  • 15. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 15 Ultimate Load at Beam (J-K/2): Ultimate Load = TDL(1.4) + TLL(1.6) = 11.23(1.4) + 2.41(1.6) = 19.58kN/m2 Load Diagram of beam (J-K/2): Reaction Force ∑m = 0 RJ (1.81) – (19.58 x 1.81)(0.91) = 0 RJ (1.81) – 32.35 = 0 RJ = 32.25/1.81 RJ = 17.82kN -----○A ∑fy = 0 RJ + RK – (19.58) (1.81) = 0 -----○B Substitute ○A into ○B , 17.82 + RK – 35.44 = 0 RK = 17.62kN
  • 16. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 16 Dead Load at Beam J/1-3 ○1 Slab (H-J/1-3)= 3.6kN/m2 x (4.19m/2)2/3 = 5.03kN/m ○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2) = 3.26kN/m ○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6m/2)2/3 = 1.92kN/m ○4 Brick Wall Weight = 3.0m x 0.1m x 19kN/m3 = 5.7kN/m ○5 Beam Self Weight = 0.1m x 0.2m x 24kN/m3 = 0.48kN/m Total Dead Load at Beam (J/1-3): Total Dead Load at (J/1-2) = 5.03 + 3.26 + 5.7 + 0.48 = 14.47kN/m Total Dead Load at (J/2-3) = 5.03 + 1.92 + 5.7 + 0.48 = 13.13kN/m Live Load at Beam J/1-3 ○1 Slab (H-J/1-3) = Bedroom x (4,19m/2)2/3 = 1.5kN/m2 x (4.19m/2)2/3 = 2.095kN/m ○2 Slab (J-K/1-2) = Bathroom x (1.81m/2) = 2.0kN/m2 x (1.81m/2) = 1.81kN/m ○3 Slab J-K/2-3) = Bedroom x 1.6m/2)2/3 = 1.5kN/m2 x 1.6m/2)2/3 = 0.8kN/m Total Live Load at Beam J/1-3: Total Live Load at (J/1-2) = 2.095 + 1.81 = 3.905kN/m Total Live Load at (J/2-3) = 2.095 + 0.8 = 2.895kN/m
  • 17. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 17 Ultimate Load at Beam J/1-3 Ultimate Load at (J/1-2) = TDL (1.4) + TLL (1.6) =14.47(1.4) + 3.905(1.6) = 26.51kN/m Ultimate Load at (J/2-3) = TDL (1.4) + TLL (1.6) = 13.13(1.4) + 2.9(1.6) = 23.02kN/m Load Diagram of Beam (J/1-3): ○1 Referring to Beam (J-K/2), Point Load at J/2 = 17.82kN ∑m = 0 RJ1(4.19) – (23.02 x 1.6) (0.8) – (17.82) (1.6) – (26.51 x 2.59) (2.9) = 0 RJ1(4.19) – 29.47 – 28.512 – 199.12 = 0 RJ1 = 257.1/4.19 RJ1 = 61.36kN -----○A ∑fy = 0 RJ1 + RJ2 – 17.82 – (26.51 x 2.59) – (23.02 x 1.6) = 0 -----○B Substitute ○A into ○B , 61.36 + RJ2 – 17.82 – 68.66 – 36.83 = 0 RJ2 = 61.95kN
  • 18. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 18 Shear Force Diagram Point 1 = 61.36 Point 2 = 61.36 – (26.51 x 2.59) = -7.3 Point 3 = -7.3 – 17.82 = -25.12 Point 4 = -25.12 – (23.02 x 1.6) = -61.95 Point 5 = -61.95 + 61.95 Bending Moment Diagram Bending Point 1 = (61.36 x 2.3)/2 = 70.56 Bending Point 2 = 70.56 – (7.3 x 0.29)/2 = 69.5
  • 19. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 19 Beam H-K/1 (First Floor | Primary Beam) Dead Load: ○1 Slab (H-J/1-3)= 3.6kN/m2 x (4.19m/2) = 7.542kN/m ○2 Slab (J-K/1-2) = 3.6kN/m2 x (1.81m/2)2/3 = 2.17kN/m ○3 Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○4 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (H-J) = 7.542 + 5.7 + 1.44 = 14.68kN/m Total Dead Load at (J-K) = 2.17 + 5.7 + 1.44 = 9.31kN/m Live Load: ○1 Slab (H-J/1-3) = Bedroom x (4.19m/2) = 1.5kN/m2 x (4.19m/2) = 3.14kN/m ○2 Slab (J-K/1-2) = Bathroom x (1.81m/2)2/3 = 2.0kN/m2 x (1.81/2)2/3 = 1.21kN/m Total Live Load: Total Live Load at (H-J) = 3.14kN/m
  • 20. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 20 Total Live Load at (J-K) = 1.21kN/m Ultimate Load: Ultimate Load at (H-J) = TDL (1.4) + TLL (1.6) =14.68(1.4) + 3.14(1.6) = 25.57kN/m Ultimate Load at (J-K) = TDL (1.4) + TLL (1.6) = 9.31(1.4) + 1.21(1.6) = 14.97kN/m Load Diagram of Beam (H-K/1): ○1 Referring to Beam (J/1-3), Point Load at J/1 = 61.36kN ∑m = 0 RH (6.3) – (25.57 X 4.49) (4.06) – (61.36) (1.81) – (14.97 X 1.81) (0.91) = 0 RH (6.3) – 466.13 – 111.06 – 24.66 = 0 RH = 601.85/6.3 RH = 95.53kN/m -----○A ∑fy = 0 RH + RK – 61.36 – (25.57 X 4.49) – (14.97 X 1.81) = 0 -----○B Substitute ○A into ○B , 95.53 + RK – 61.36 – 114.81 – 27.1 = 0 RK = 107.34kN
  • 21. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 21 Shear Force Diagram Point 1 = 95.53 Point 2 = 95.53 – (25.57 x 4.49) = -19.28 Point 3 = -19.28 – 61.36 = -80.64 Point 4 = -80.64 – (14.97 x 1.81) = -107.34 Point 5 = -107.34 + 107.34 = 0 Bending Moment Diagram Bending Point 1 = (95.53 x 3.73)/2 = 178.163 Bending Point 2 = 178.163 - (19.28 x 0.76)/2 = 170.837 Bending Point 3 = 170.837 – (80.64 + 107.34)/2 x 1.81 = 0
  • 22. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 22 Beam I-K/3 (First Floor | Primary Beam) Dead Load ○1 Slab (H-J/1-3) = 3.6kN/m2 x (4.49m/2) = 7.54kN/m ○2 Slab (I-N/3-5) = 3.6kN/m2 x (4.71/2) = 8.48kN/m ○3 Slab (J-K/2-3) = 3.6kN/m2 x (1.6/2) = 2.88kN/m ○4 Brick Wall Weight = 3m x 0.1m x 19kN/m3 = 5.7kN/m ○5 Beam Self-Weight = 0.2m x 0.3m x 24kN/m3 = 1.44kN/m Total Dead Load: Total Dead Load at (I-J) = 7.54 + 8.48 + 5.7 + 1.44 = 23.16kN/m Total Dead Load at (J-K) = 18.5kN/m Live Load: ○1 Slab (H-J/1-3) = Bedroom x (4.49m/2) = 1.5kN/m2 x (4.49m/2) = 3.37kN/m ○2 Slab (I-N/3-5) = Living Room x (4.71m/2)
  • 23. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 23 = 4.0kN/m2 x (4.71m/2) = 9.4kN/m ○3 Slab (J-K/2-3) = Bedroom x (1.6m/2) = 1.5kN/m2 x(1.6m/2) = 1.2kN/m Total Live Load: Total Live Load at (I-J) = 3.37 + 9.4 = 12.77kN/m Total Live Load at (J-K) = 9.4 + 1.2 = 10.6kN/m Ultimate Load: Ultimate Load at (I-J) = TDL (1.4) + TLL (1.6) = 23.16(1.4) + 12.77(1.6) = 52.85kN/m Ultimate Load at (J-K) = TDL(1.4) + TLL(1.6) = 18.5(1.4) + 10.6(1.6) = 42.86kN/m Load Diagram of Beam (I-K/3): ○1 Referring to Beam (J/1-3), Point Load at J/3 = 61.95kN/m ∑m = 0 RI(3.21) – (52.85 x 1.4) (2.51) – (61.95) (1.81) – (42.86 x 1.81) (0.91) = 0 RI(3.21) – 185.71 – 112.13 – 70.59 = 0 RI = 368.43/3.21 RI = 114.76kN -----○A ∑fy = 0 RI + RK – 61.95 – (52.85 X 1.4) – (42.86 X 1.81) = 0 -----○B Substitute ○A into ○B , 114.76 + RK – 61.95 – 73.99 – 77.58 = 0 RK = 98.76kN
  • 24. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 24 Shear Force Diagram: Point 1 = 114.76 Point 2 = 114.76 – (52.85 x 1.4) =40.77 Point 3 = 40.77 – 61.95 = - 21.18 Point 4 = -21.18 – (42.86 x 1.81) = -98.76 Point 5 = -98.76 + 98.76 = 0 Bending Moment Diagram Bending Point 1 = (114.76 + 40.77)/2 x 1.4 = 108.87 Bending Point 2 = 108.87 - (21.18 + 98.76)/2 x 1.81 = 0 1.4 3.21
  • 25. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 25 9.2 Joyce Wee Column A/1 (Connected to All Floors) -Roof Level- Dead Load: ○1 Roof Slab = (3.155 x 2.09) m2 x 3.6kN/m2 = 6.59m2 x 3.6kN/m2 = 23.72kN ○2 Roof Beam = (3.155 + 2.09) m x 1.44kN/m = 5.245m x 1.44kN/m = 7.55kN Total Dead Load at Roof Level = 23.72kN + 7.55kN = 31.27kN -First Floor- Dead Load: Live Load: ○1 Slab = (3.155 x 2.09)m2 x 3.6kN/m2 ○1 Bedroom = 6.59m2 x 3.6kN/m2 = (2.09m x 3.155m) x 1.5kN/m2 = 23.72kN = 9.89kN ○2 Wall = (3.155m + 2.09m) x 5.7kN/m = 5.245m x 5.7kN/m = 29.9kN ○3 Beam = (3.155m + 2.09m) x 1.44kN/m = 5.75m x 1.44kN/m = 7.55kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN = 67.65kN
  • 26. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 26 -Ground Floor- Dead Load: Live Load: ○1 Slab = (3.155 + 2.09) m2 x 3.6kN/m2 ○1 Bedroom = 6.59m2 x 3.6kN/m2 = (3.155m x 2.09m) x 1.5kN/m2 = 23.72kN = 9.89kN ○2 Wall = (3.155m + 2.09m) x 5.7kN/m = 5.245m x 5.7kN/m = 29.9kN ○3 Beam = (3.155 + 2.09) m x 1.44kN/m = 5.245m x 1.44kN/m = 7.55kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 23.72kN + 29.9kN + 7.55kN + 6.48kN = 9.89kN = 67.65kN Total Dead Load at Column D/3 Total Live Load at Column D/3 = 31.27kN + 67.65kN + 67.65kN = 9.89kN + 9.89kN = 166.57kN = 19.78kN Ultimate Load at Column D/3 = TDL (1.4) + TLL (1.6) = 166.57kN (1.4) + 19.78kN (1.6) = 233.198kN + 31.648kN = 264.85kN
  • 27. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 27 Column D/3 (Connected to All Floors) -Roof Level- Dead Load: Live Load: ○1 Roof Slab = (3.66 x 3.94) m2 x 3.6kN/m2 = 14.42m2 x 3.6kN/m2 = 51.91kN ○2 Roof Beam = (2.09 + 1.61 + 2.05) m x 1.44kN/m = 5.75m x 1.44kN/m = 8.28kN Total Dead Load at Roof Level = 51.91kN + 8.28kN = 60.19kN -First Floor- Dead Load: Live Load: ○1 Slab = (3.36m2 + 2.98m2 + 3.79m2 ) x 3.6kN/m2 ○1 Bedroom = 10.13m2 x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2 = 36.468kN = 5.05kN ○2 Wall = (2.09m + 1.61m) x 5.7kN/m ○2 Corridor = 3.7m x 5.7kN/m = (3.66m x 1.85m) x 4.0kN/m2 = 21.09kN = 27.08kN ○3 Beam = (2.09m + 1.61m + 2.05m) x 1.44kN/m = 5.75m x 1.44kN/m = 8.28kN ○4 Column = (0.3m x 0.3m x 3.0m) x 24kN/m3 = 6.48kN Total Dead Load at First Floor Total Live Load at First Floor = 36.47kN + 21.09kN + 8.28kN + 6.48kN = 5.05kN + 27.08kN = 72.32kN = 32.13kN
  • 28. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 28 -Ground Floor- Dead Load: Live Load: ○1 Slab = (1.61 + 2.05)m x (2.09 + 1.85)m x 3.6kN/m2 ○1 Bedroom = (3.66m x 3.94m) x 3.6kN/m2 = (2.09m x 1.61m) x 1.5kN/m2 = 51.91kN = 5.05kN ○2 Wall = (2.05m + 2.09m + 1.61m) x 5.7kN/m ○2 Corridor = 5.75m x 5.7kN/m = (1.85m x 1.61m) x 4.0kN/m2 = 32.78kN = 11.91kN ○3 Beam = (2.05 + 2.09 + 1.61 + 1.85) m x 1.44kN/m ○3 Kitchen = 7.6m x 1.44kN/m = (3.94m x 2.05m) x 3.0kN/m2 = 10.944kN = 24.231kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 51.91kN + 32.78kN + 10.944kN + 6.48kN = 5.05kN + 11.91kN + 24.23kN = 234.62kN = 41.19kN Total Dead Load at Column D/3 Total Live Load at Column D/3 = 60.19kN + 72.32kN + 102.11kN = 32.13kN + 41.19kN = 234.62kN = 73.32kN Ultimate Load at Column D/3 = TDL (1.4) + TLL (1.6) = 234.62kN (1.4) + 73.32kN (1.6) = 328.47kN + 117.312kN = 445.78kN
  • 29. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 29 Column D/6 (Acting on Ground Floor Only) -Ground Floor- Dead Load: Live Load: ○1 Slab = (1.7 + 1.34)m (1.61 + 3.83)m x 3.6kN/m2 ○1 Corridor = (3.04m x 5.444m) x 3.6kN/m2 = (1.61m x 1.7) x 4.0kN/m2 = 59.54kN = 10.95kN ○2 Wall = (1.7m + 3.83m) x 5.7kN/m ○2 Living Room = 5.53m x 5.7kN/m = (1.61m + 3.83m) x 1.34m x 4.0kN/m2 = 31.52kN = 29.16kN ○3 Beam = (1.7 + 3.83 + 1.34 + 1.61) m x 1.44kN/m ○3 Storeroom = 8.48m x 1.44kN/m = (1.7m x 3.83m) x 2.5kN/m2 = 12.214kN = 16.28kN ○4 Column = 0.3m x 0.3m x 3.0m x 24kN/m3 = 6.48kN Total Dead Load at Ground Floor Total Live Load at Ground Floor = 51.54kN + 31.52kN + 12.21kN + 6.48kN = 10.95kN + 29.16kN + 16.28kN = 109.75kN = 56.39kN Total Dead Load at Column D/3 Total Live Load at Column D/3 = 109.75kN = 56.39kN Ultimate Load at Column D/3 = TDL (1.4) + TLL (1.6) = 109.75kN (1.4) + 56.39kN (1.6) = 153.65kN + 90.22kN = 243.87kN
  • 30. BUILDING STRUCTURE PROJECT2: BEAM AND COLUMN 30