Analysis of Beams
Identify One Way or Two Way Slab
Ly = Longer side of slab
Lx - shorter side of slab
Slab A-B/2-6:
	 3.5 ÷ 3.6 = 0.97 ≤ 2, Two way slab
Slab A-B/6-8:
	 3.5 ÷ 2.7 = 1.3 ≤ 2, Two way slab
Slab B-H/2-6:
	 6.9 ÷ 3.6 = 1.92 ≤ 2, Two way slab
Slab B-h/6-8:
	 6.9 ÷ 2.7 = 2.56 ≥ 2, One way slab
SECOND FLOOR
B
F
1
2
5
7
10
CA E H
3
4
6
8
9
11
14
13
D
12
G
AV ROOM
MASTER
FAMILY / STUDY
MASTER SUITEBATH
ROOF TERRACE
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PENGE YEP SIANG 0315259
Beam A-B/6
Dead Load
Dead load from slab A-B/2-6
= 4.2 kN / m² × (3.5/2)
= 7.35 kN/m
Convert triangular load to UDL
7.35× ⅔ = 4.9 kN/m
Dead load from slab A-B/6-8
= 4.2 kN / m² × (2.7/2)
= 5.67kN/m
Total dead load A/2-8
= 8.84 + 1.44 + 4.9+5.67
= 20.85 kN/m
SECOND FLOOR
1
2
5
7
10
3
4
6
8
9
11
14
13
12
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
A B H
6
8
20.85kN/m
8.84kN/m
A6 B6
Brick Wall
Beam Self-weight
Slab A-B/2-6
Slab A-B/6-8
Total Dead Load
1.44kN/m
4.9kN/m
5.67kN/m
Live Load
Live load from slab A-B/2-6
= 2.0 kN / m² × (3.5/2)
= 3.5 kN/m
Convert triangular load to UDL
3.5 × ⅔ = 2.33 kN/m
Live load from slab A-B/6-8
= 2.0 kN / m² × (2.7/2)
= 2.7 kN/m
Total live load A-B/6
= 2.33 + 2.7
= 5.03 kN/m
Ultimate Load
Dead load factor = 1.4
Live load factor = 1.6
Ultimate load A-B/6
= (20.85 × 1.4) + (5.03 × 1.6)
= 29.19 + 8.05
= 37.24 kN/m
Reaction
Convert UDL to Point load
37.24 ×3.5 = 130.34kN
Reaction force = ½ Total Load
130.34 ÷ 2 = 65.17kN
Bending Moment
At point A6, there is no area = 0kN
At point B6,
area of triangle (+ve) + area of
triangle (-ve)
= ½(65.17 × 3.5/2) + ½(-65.17 × 3.5/2)
= 57.03 - 57.03
= 0
5.03kN/m
A6
A6
A6
+
+
-
B6
B6
B6
Slab A-B/2-6
Ultimate Load
Slab A-B/6-8
Total Live Load
2.7kN/m
2.33kN/m
37.24kN/m
37.24kN/m
65.17kN
0kN
0kN
65.17kN
-65.17kN
57.03
0kN
0kN
65.17kN
3.5m
Beam A/2-8
Dead Load
Dead load from slab A-B/2-6
= 4.2 kN / m² × (3.5/2)
= 7.35kN/m
Dead load from slab A-B/6-8
= 4.2 kN / m² × (2.7/2)
= 5.67 kN/m
Convert triangular load to UDL
5.67 × ⅔ = 3.78 kN/m
Total dead load A/2-6
= 8.84 + 1.44 + 7.35
= 17.63 kN/m
Total deal load A/6-8
= 8.84 + 1.44 + 3.78
= 14.06 kN/m
SECOND FLOOR
1
2
5
7
10
3
4
6
8
9
11
14
13
12
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
A B H
6
8
14.06kN/m17.63kN/m
8.84kN/m
A2 A6 A8
Brick Wall
Beam Self-weight
Slab A-B/2-6
Slab A-B/6-8
Total Dead Load
1.44kN/m
7.35kN/m
3.78kN/m
Live Load
Live load from slab A-B/2-6
= 2.0 kN / m² × (3.5/2)
= 3.5 kN/m
Live load from slab A-B/6-8
= 2.0 kN / m² × (2.7/2)
= 2.7 kN/m
Convert triangular load to UDL
2.7 × ⅔ = 1.8 kN/m
Total live load A/2-6
= 3.5 kN/m
Total live load A/6-8
= 1.8 kN/m
Ultimate Load
Dead load factor = 1.4
Live load factor = 1.6
Ultimate load A/2-6
= (17.63 × 1.4) + (3.5 × 1.6)
= 30.28 kN/m
Ultimate load A/6-8
= (14.06 × 1.4) + (1.8 × 1.6)
= 22.56 kN/m
1.8kN/m
22.56kN/m
3.5kN/m
30.28kN/m
A2
A2
A6
A6
A8
A8
Slab A-B/2-6
Slab A-B/6-8
Total Live Load
Total Live Load
3.5kN/m
1.8kN/m
Reaction
Convert UDL to Point load
30.28 × 3.6 = 109.0 kN
22.56 × 2.7 = 60.91 kN
∑M = 0
= RA2
(6.3) - 109(4.5) - 65.17(2.7) -
22.56(1.35)
= 6.3 RA2
- 490.5 - 175.96 - 30.46
= 6.3 RA2
- 696.92
RA2
= 696.92 ÷ 6.3
= 110.62 kN
∑Fy
= RA8
+ 110.62 - 109 - 65.17 - 60.91
= RA8
- 124.46
RA8
= 124.46 kN
22.56kN
65.17kN
3.6m 2.7m
30.28kN/m
110.62kN
110.62kN
124.46kN
-124.46kN
-63.55kN
202.03
1.62kN
A2
+
+
-
A6 A8
Bending Moment
At point A2, there is no area = 0kN
At point A6,
area of trapezium
= ½ × (110.62 + 1.62) × 3.6
= 202.03
At point A8
area of trapezium (+ve) + area of
trapezium (-ve)
= 202.03 + ½(-63.55-124.46)(2.7)
= 202.03 - 202.03
= 0
0kN
0kN
0kN
0kN
SECOND FLOOR
1
2
5
7
10
3
4
6
8
9
11
14
13
12
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
A B H
6
8
Beam B/2-6
Dead Load
Dead load from slab A-B/2-6
= 4.2 kN / m² × (3.5/2)
= 7.35 kN/m
Dead load from slab B-H/2-6
= 4.2 kN / m² × (3.6/2)
= 7.56kN/m
Convert triangular load to UDL
7.56× ⅔ = 5.04 kN/m
Total dead load B/2-6= 8.84 +
1.44 + 7.35 +5.04
= 22.67 kN/m
22.67kN/m
8.84kN/m
B2 B6
Brick Wall
Beam Self-weight
Slab A-B/2-6
Slab B-H/2-6
Total Dead Load
1.44kN/m
7.35kN/m
5.04kN/m
Live Load
Live load from slab A-B/2-6
= 2.0 kN / m² × (3.5/2)
= 3.5 kN/m
Live load from slab B-H/2-6
= 1.5 kN / m² × (2.7/2)
= 2.03 kN/m
Convert triangular load to UDL
2.03 × ⅔ = 1.35 kN/m
Total live load B/2-6
= 3.5 + 1.35
= 4.85 kN/m
Ultimate Load
Dead load factor = 1.4
Live load factor = 1.6
Ultimate load B/2-6
= (22.67 × 1.4) + (4.85 × 1.6)
= 31.74 + 7.76
= 39.5 kN/m
Reaction
Convert UDL to Point load
39.5 ×3.6 = 142.2 kN
Reaction force = ½ Total Load
142.2 ÷ 2 = 71.1 kN
Bending Moment
At point B2, there is no area = 0kN
At point B6,
area of triangle (+ve) + area of
triangle (-ve)
= ½(71.1 × 3.6/2) + ½(-71.1 × 3.6/2)
= 63.99 - 63.99
= 0
4.85kN/m
B2
B2
B2
+
+
-
B6
B6
B6
Slab A-B/2-6
Ultimate Load
Slab B-H/2-6
Total Live Load
1.35kN/m
3.5kN/m
39.5kN/m
39.5kN/m
71.1kN
0kN
0kN
71.1kN
-71.1kN
63.99
0kN
0kN
71.1kN
3.6m
SECOND FLOOR
1
2
5
7
10
3
4
6
8
9
11
14
13
12
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
A B H
6
8
Beam B/6-8
Dead Load
Dead load from slab A-B/6-8
= 4.2 kN / m² × (2.7/2)
= 5.67 kN/m
Dead load from slab B-H/6-8
= 0kN/m
Total dead load B/2-6
= 8.84 + 1.44 + 5.67
= 15.95kN/m
15.95kN/m
8.84kN/m
B6 B8
Brick Wall
Beam Self-weight
Slab A-B/6-8
Slab B-H/6-8
Total Dead Load
1.44kN/m
5.67kN/m
0kN/m
Live Load
Live load from slab A-B/6-8
= 2.0 kN / m² × (3.5/2)
= 3.5 kN/m
Live load from slab B-H/6-8
= 0 kN/m
Total live load B/6-8
= 3.5 kN/m
Ultimate Load
Dead load factor = 1.4
Live load factor = 1.6
Ultimate load B/6-8
= (15.95× 1.4) + (3.5 × 1.6)
= 22.33 + 5.6
= 27.93 kN/m
Reaction
Convert UDL to Point load
27.93 ×2.7 = 75.41 kN
Reaction force = ½ Total Load
75.41 ÷ 2 = 37.71 kN
Bending Moment
At point B6, there is no area = 0kN
At point B8,
area of triangle (+ve) + area of
triangle (-ve)
= ½(37.71 × 2.7/2) + ½(-37.71 × 2.7/2)
= 25.45 - 25.45
= 0
3.5kN/m
B6
B6
B6
+
+
-
B8
B8
B8
Slab A-B/6-8
Ultimate Load
Slab B-H/6-8
Total Live Load
0kN/m
3.5kN/m
27.93kN/m
27.93kN/m
37.71kN
0kN
0kN
37.71kN
-37.71kN
25.45
0kN
0kN
37.71kN
2.7m
SECOND FLOOR
1
2
5
7
10
3
4
6
8
9
11
14
13
12
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
A B H
6
8
Beam B-H/6
Dead Load
Dead load from slab B-H/2-6
= 4.2 kN/m² × (3.6/2)
= 7.56 kN/m
Dead load from slab B-H/6-8
= 4.2 kN/m2
× (2.7/2)
= 5.67kN/m
Total dead load B/2-6
= 8.84 + 1.44 + 7.56 = 5.67
= 23.51kN/m
23.51kN/m
8.84kN/m
B6 H6
Brick Wall
Beam Self-weight
Slab B-H/2-6
Slab B-H/6-8
Total Dead Load
1.44kN/m
7.56kN/m
5.67kN/m
Live Load
Live load from slab B-H/2-6
= 1.5 kN / m² × (3.5/2)
= 2.63 kN/m
Live load from slab B-H/6-8
= 1.5 kN/m2
× (2.7/2)
= 2.03kN/m
Total live load B/6-8
= 2.63 + 2.03
= 4.66 kN/m
Ultimate Load
Dead load factor = 1.4
Live load factor = 1.6
Ultimate load B/6-8
= (23.51× 1.4) + (4.66 × 1.6)
= 32.91 + 7.46
= 40.37 kN/m
Reaction
Convert UDL to Point load
40.37 × 6.9 = 278.55 kN
Reaction force = ½ Total Load
278.55 ÷ 2 = 139.28 kN
Bending Moment
At point B6, there is no area = 0kN
At point H6,
area of triangle (+ve) + area of
triangle (-ve)
= ½(139.28 × 6.9/2) + ½(-139.28 × 6.9/2)
= 240.26 - 240.26
= 0
4.66kN/m
B6
B6
B6
+
+
-
H6
H6
H6
Slab B-H/2-6
Ultimate Load
Slab B-H/6-8
Total Live Load
2.03kN/m
2.63kN/m
40.37kN/m
40.37kN/m
139.28kN
0kN
0kN
139.28kN
-139.28kN
240.26
0kN
0kN
139.28kN
6.9m
SECOND FLOOR
1
2
5
7
10
3
4
6
8
9
11
14
13
12
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
A B H
6
8
Beam H/2-8
Dead Load
Dead load from slab B-H/2-6
= 4.2 kN / m² × (3.5/2)
= 7.35kN/m
Convert triangular load to UDL
7.35× ⅔ = 4.9 kN/m
Dead load from slab B-H/6-8
= 0 kN/m
Total dead load H/2-6
= 8.84 + 1.44 + 4.9
= 15.18kN/m
Total deal load A/6-8
= 8.84 + 1.44
= 10.28 kN/m
10.28kN/m15.18kN/m
8.84kN/m
H2 H6 H8
Brick Wall
Beam Self-weight
Slab B-H/2-6
Slab B-H/6-8
Total Dead Load
1.44kN/m
4.9kN/m
0kN/m
Live Load
Live load from slab B-H/2-6
= 1.5 kN / m² × (3.5/2)
= 2.63 kN/m
Convert triangular load to UDL
2.63 × ⅔ = 1.75 kN/m
Live load from slab B-H/6-8
= 0 kN/m
Total live load H/2-6
= 1.75 kN/m
Total live load H/6-8
= 0 kN/m
Ultimate Load
Dead load factor = 1.4
Live load factor = 1.6
Ultimate load A/2-6
= (15.18 × 1.4) + (1.75 × 1.6)
= 24.05 kN/m
Ultimate load A/6-8
= (10.28 × 1.4) + (0 × 1.6)
= 14.39 kN/m
0kN/m
14.39kN/m
1.75kN/m
24.05kN/m
H2
A2
H6
A6
H8
A8
Slab B-H/2-6
Slab B-H/6-8
Total Live Load
Total Live Load
1.75kN/m
0kN/m
Reaction
Convert UDL to Point load
24.05 × 3.6 = 86.58 kN
14.39 × 2.7 = 38.85 kN
∑M = 0
= RH2
(6.3) - 86.58(4.5) - 139.28(2.7) -
38.85(1.35)
= 6.3 RH2
- 389.61 - 376.06 - 52.45
= 6.3 RH2
- 818.12
RA2
= 818.12 ÷ 6.3
= 129.86 kN
∑Fy
= RH8
+ 129.86 - 86.58 - 139.28 -
38.85
= RH8
- 134.85
RH8
= 134.85 kN
14.39kN
139.28kN
3.6m 2.7m
24.05kN/m
129.86kN
129.86kN
134.85kN
-134.85kN
-96kN
311.65
43.28kN
H2
+
+
-
H6 H8
Bending Moment
At point H2, there is no area = 0kN
At point H6,
area of trapezium
= ½ × (129.86 + 43.28) × 3.6
= 311.65
At point A8
area of trapezium (+ve) + area of
trapezium (-ve)
= 311.65 + ½(-96 - 134.85 )(2.7)
= 311.65 - 311.65
= 0
0kN
0kN
0kN
0kN
Column A2
Area of load acting on column
= (6.3/2) × (3.5/2)
= 5.51m2
Dead load
Ground floor:
Beam: 	1.44kN/m × (3.15 + 1.75) 		 = 7.06kN
Slab:	3.6kN/m2
× 5.51m2
			 = 19.84kN
Wall:	 8.84kN/m × (3.15 + 1.75) 		 = 43.31kN
First floor:
Beam: 	1.44kN/m × (3.15 + 1.75) 		 = 7.06kN
Slab:	3.0kN/m2
× 5.51m2
			 = 16.53kN
Wall:	 8.84kN/m × (3.15 + 1.75) 		 = 43.31kN
Second floor:
Beam: 	1.44kN/m × (3.15 + 1.75) 		 = 7.06kN
Slab:	4.2kN/m2
× 5.51m2
			 = 23.14kN
Wall:	 8.84kN/m × (3.15 + 1.75) 		 = 43.31kN
Total dead load
3(7.06) + 19.84 + 16.53 + 23.14 + 3(43.31)	 = 210.62kN
Live load
Ground floor:
Bathroom	2.0kN/m2
× 5.51m2
	 = 11.02kN
First floor:
Bedroom	1.5kN/m2
× 5.51m2
	 = 8.27kN
Second floor:
Bathroom	2.0kN/m2
× 5.51m2
	 = 11.02kN
Total live load
11.02 + 8.27 + 11.02			 = 30.31kN
Total load
210.62 + 30.31				 = 240.93kN
Analysis of Column
SECOND FLOOR
F
1
2
3
5
6
7
8
10
11
14
13
D G
AV ROOM
FAMILY / STUDY
MASTER SUITEBATH
ROOF TERRACE
MASTER
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
GROUND FLOOR
DRY KITCHEN
DINING
WET KITCHEN
MAID
TERRACE
BATH 6
GUEST
LIVING
FOYER
STORE
BATH 7
STAIRS
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
FIRST FLOOR
BEDROOM 4
RC FLAT ROOF
BATH 3
BATH 4
BEDROOM 3
BATH 2
DRESSING
BEDROOM 5 BEDROOM 2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
GROUND FLOOR FIRST FLOOR SECOND FLOOR
A A AB B BH H H
6
8
SECOND FLOOR
F
1
2
3
5
6
7
8
10
11
14
13
D G
AV ROOM
FAMILY / STUDY
MASTER SUITEBATH
ROOF TERRACE
MASTER
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
FIRST FLOOR
BEDROOM 4
RC FLAT ROOF
BATH 3
BATH 4
BEDROOM 3
BATH 2
DRESSING
BEDROOM 5 BEDROOM 2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
GROUND FLOOR
DRY KITCHEN
DINING
WET KITCHEN
MAID
TERRACE
BATH 6
GUEST
LIVING
FOYER
STORE
BATH 7
STAIRS
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Column A8
Area of load acting on column
= (6.3/2) × (3.5/2)
= 5.51m2
Dead load
Ground floor:
Beam: 	1.44kN/m × (3.15 + 1.75 + 2.4) 	 = 10.51kN
Slab:	3.6kN/m2
× 9.71m2
			= 34.96kN
Wall:	 8.84kN/m × (3.15 + 1.75 + 2.4) 	 = 64.53kN
First floor:
Beam: 	1.44kN/m × (3.15 + 1.75 + 2.4) 	 = 10.51kN
Slab:	3.0kN/m2
× 5.51m2
			 = 16.53kN
Wall:	 8.84kN/m × (3.15 + 1.75 + 2.4) 	 = 64.53kN
Second floor:
Beam: 	1.44kN/m × (3.15 + 1.75 + 2.4) 	 = 10.51kN
Slab:	4.2kN/m2
× 5.51m2
			 = 23.14kN
Wall:	 8.84kN/m × (3.15 + 1.75 + 2.4) 	 = 64.53kN
Total dead load
3(10.51) + 34.96 + 16.53 + 23.14 + 3(64.53)	 = 299.75kN
Area of load acting on column (ground floor)
= (6.3/2 + 4.8/2) × (3.5/2)
= 9.71m2
Live load
Ground floor:
Guest		 1.5kN/m2
× 5.51m2
	 = 8.27kN
Stair		 2.0kN/m2
× 4.2m2
	 = 8.4kN
First floor:
Bedroom	1.5kN/m2
× 5.51m2
	 = 8.27kN
Second floor:
Dressing	2.0kN/m2
× 5.51m2
	 = 11.02kN
room
Total live load
8.27 + 8.4 + 8.27 + 11.02		 = 35.96kN
Total load
299.75 + 35.96				 = 335.71kN
2
GROUND FLOOR FIRST FLOOR SECOND FLOOR
A A AB B BH H H
6
8
SECOND FLOOR
F
1
2
3
5
6
7
8
10
11
14
13
D G
AV ROOM
FAMILY / STUDY
MASTER SUITEBATH
ROOF TERRACE
MASTER
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
GROUND FLOOR
DRY KITCHEN
DINING
WET KITCHEN
MAID
TERRACE
BATH 6
GUEST
LIVING
FOYER
STORE
BATH 7
STAIRS
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
FIRST FLOOR
BEDROOM 4
RC FLAT ROOF
BATH 3
BATH 4
BEDROOM 3
BATH 2
DRESSING
BEDROOM 5 BEDROOM 2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
2
GROUND FLOOR FIRST FLOOR SECOND FLOOR
A A AB B BH H H
6
8
Column B2
Area of load acting on column
= [(3.6/2) × (3.5/2 + 2)] + [(3/2) × 2]
= 9.75m2
Dead load
Ground floor:
Beam: 	1.44kN/m × (1.75 + 1.8 + 1.5) 	 = 7.27kN
Slab:	3.6kN/m2
× 9.75m2
			 = 35.1kN
Wall:	 8.84kN/m × (1.75 + 1.8 + 1.5) 	 = 44.64kN
First floor:
Beam: 	1.44kN/m × (1.75 + 1.8 + 1.5) 	 = 7.27kN
Slab:	3.0kN/m2
× 9.75m2
			 = 29.25kN
Wall:	 8.84kN/m × (1.75 + 1.8 + 2.0)		 = 49.06kN
Second floor:
Beam: 	1.44kN/m × (1.75 + 1.8 + 3.45)	 = 10.08kN
Slab:	4.2kN/m2
× 9.36m2
			 = 39.31kN
Wall:	 8.84kN/m × (1.75 + 1.8 + 3.45) 	 = 61.88kN
Total dead load
2(7.27) + 35.1 + 44.64 + 29.25 + 49.06 +
10.08 + 39.31 + 61.88				 = 283.86kN
Live load
Ground floor:
Bathroom	2.0kN/m2
× 3.15m2
	 = 6.3kN
Dining		 2.0kN/m2
× 6.6m2
	 = 13.2kN
First floor:
Bedroom	1.5kN/m2
× 3.15m2
	 = 4.73kN
Bathroom	2.0kN/m2
× 3.6m2
	 = 7.2kN
Second floor:
Bathroom	2.0kN/m2
× 3.15m2
	 = 6.3kN
Bedroom	1.5kN/m2
× 6.21m2
	 = 9.32kN
Total live load
6.3 + 13.2 + 4.73 + 7.2 + 6.3 + 9.32	 = 47.05kN
Total load
283.86 + 47.05				 = 330.91kN
Area of load acting on column (second floor)
= (3.6/2) × (3.5/2 + 6.9/2)
= 9.36m2
2
GROUND FLOOR FIRST FLOOR SECOND FLOOR
A A AB B BH H H
6
8
Column B6
Area of load acting on column
= (3.6/2 + 2.7/2) × (3.5/2 + 2)
= 11.81m2
Dead load
Ground floor:
Beam: 	1.44kN/m × (1.35 + 1.8)		 = 4.54kN
Slab:	3.6kN/m2
× 11.81m2
			 = 42.52kN
Wall:	 8.84kN/m × (1.35 + 1.8) 		 = 27.85kN
First floor:
Beam: 	1.44kN/m × (1.35 + 1.8 + 2.0) 	 = 7.42kN
Slab:	3.0kN/m2
× 11.81m2
			 = 35.43kN
Wall:	 8.84kN/m × (1.35 + 1.8 + 2.0)		 = 45.53kN
Second floor:
Beam: 	1.44kN/m × (1.75 + 1.8 + 1.35 + 3.45)= 12.02kN
Slab:	4.2kN/m2
× 16.38m2
			 = 68.8kN
Wall:	 8.84kN/m × (1.75 + 1.8)		 = 31.38kN
Total dead load
4.54 + 42.52 + 27.85 + 7.42 + 35.42 + 45.53 +
12.02 + 68.8 + 31.38				 = 275.48kN
Live load
Ground floor:
Guest		 2.0kN/m2
× 5.51m2
	 = 11.02kN
Dining		 2.0kN/m2
× 6.3m2
	 = 12.6kN
First floor:
Bedroom	1.5kN/m2
× 8.31m2
	 = 12.47kN
Bathroom	2.0kN/m2
× 3.6m2
	 = 7.2kN
Second floor:
Bathroom	2.0kN/m2
× 3.15m2
	 = 6.3kN
Bedroom	1.5kN/m2
× 10.87m2
	 = 16.31kN
Dressing	1.5kN/m2
× 2.36m2
	 = 3.54kN
Total live load
11.02 + 12.6 + 12.47 + 7.2 + 6.3 + 16.31 + 3.54	
= 69.44kN
Total load
275.48 + 69.44			 = 344.92kN
Area of load acting on column (second floor)
= (3.6/2 + 2.7/2) × (3.5/2 + 6.9/2)
= 16.38m2
SECOND FLOOR
F
1
2
3
5
6
7
8
10
11
14
13
D G
AV ROOM
FAMILY / STUDY
MASTER SUITEBATH
ROOF TERRACE
MASTER
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
FIRST FLOOR
BEDROOM 4
RC FLAT ROOF
BATH 3
BATH 4
BEDROOM 3
BATH 2
DRESSING
BEDROOM 5 BEDROOM 2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
F
1
2
3
5
6
7
8
10
11
14
13
D G
GROUND FLOOR
DRY KITCHEN
DINING
WET KITCHEN
MAID
TERRACE
BATH 6
GUEST
LIVING
FOYER
STORE
BATH 7
STAIRS
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

More Related Content

What's hot

Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indiChong Yu Xuan
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
individual part
individual part individual part
individual part KC Wong
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Ong Seng Peng Jeff
 
B structure
B structure B structure
B structure Andy Heng
 
Building structures final
Building structures finalBuilding structures final
Building structures finalJamie Lee
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
Building Structure Project 2 report
Building Structure Project 2 reportBuilding Structure Project 2 report
Building Structure Project 2 reportTan Jaden
 
Mt 610 phasetransformationsinsolids_i
Mt 610 phasetransformationsinsolids_iMt 610 phasetransformationsinsolids_i
Mt 610 phasetransformationsinsolids_iAbhijeet Dash
 
Individual calculation
Individual calculation Individual calculation
Individual calculation Jamie Lee
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Patch Yuen
 
Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculationkimberlywjs
 
Coupling JOREK and STARWALL for Non-linear Resistive-wall Simulations
Coupling JOREK and STARWALL for Non-linear Resistive-wall SimulationsCoupling JOREK and STARWALL for Non-linear Resistive-wall Simulations
Coupling JOREK and STARWALL for Non-linear Resistive-wall SimulationsRachel McAdams
 
Structure Final Assignment
Structure Final AssignmentStructure Final Assignment
Structure Final AssignmentSow Wei Henn
 
Gate 2017 mechanical engineering evening session
Gate 2017 mechanical engineering evening session Gate 2017 mechanical engineering evening session
Gate 2017 mechanical engineering evening session kulkarni Academy
 
Gate 2017 me 1 solutions with explanations
Gate 2017 me 1 solutions with explanationsGate 2017 me 1 solutions with explanations
Gate 2017 me 1 solutions with explanationskulkarni Academy
 
Ch13 z5e equilibrium
Ch13 z5e equilibriumCh13 z5e equilibrium
Ch13 z5e equilibriumblachman
 

What's hot (19)

Chong yu xuan bstruc indi
Chong yu xuan bstruc indiChong yu xuan bstruc indi
Chong yu xuan bstruc indi
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
individual part
individual part individual part
individual part
 
Beam Analysis
Beam AnalysisBeam Analysis
Beam Analysis
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
B structure
B structure B structure
B structure
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
Building Structure Project 2 report
Building Structure Project 2 reportBuilding Structure Project 2 report
Building Structure Project 2 report
 
Mt 610 phasetransformationsinsolids_i
Mt 610 phasetransformationsinsolids_iMt 610 phasetransformationsinsolids_i
Mt 610 phasetransformationsinsolids_i
 
Individual calculation
Individual calculation Individual calculation
Individual calculation
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculation
 
Coupling JOREK and STARWALL for Non-linear Resistive-wall Simulations
Coupling JOREK and STARWALL for Non-linear Resistive-wall SimulationsCoupling JOREK and STARWALL for Non-linear Resistive-wall Simulations
Coupling JOREK and STARWALL for Non-linear Resistive-wall Simulations
 
Structure Final Assignment
Structure Final AssignmentStructure Final Assignment
Structure Final Assignment
 
Gate 2017 mechanical engineering evening session
Gate 2017 mechanical engineering evening session Gate 2017 mechanical engineering evening session
Gate 2017 mechanical engineering evening session
 
Gate 2017 me 1 solutions with explanations
Gate 2017 me 1 solutions with explanationsGate 2017 me 1 solutions with explanations
Gate 2017 me 1 solutions with explanations
 
Ch13 z5e equilibrium
Ch13 z5e equilibriumCh13 z5e equilibrium
Ch13 z5e equilibrium
 
Nanoscale 2014
Nanoscale 2014Nanoscale 2014
Nanoscale 2014
 

Viewers also liked

Sachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) example
Sachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) exampleSachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) example
Sachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) exampleDr.Costas Sachpazis
 
presentation on rectangular beam design singly or doubly (wsd)
presentation on rectangular beam design singly or doubly (wsd)presentation on rectangular beam design singly or doubly (wsd)
presentation on rectangular beam design singly or doubly (wsd)raihan mannan
 
Test before Final ( T Beam )
Test before Final ( T Beam )Test before Final ( T Beam )
Test before Final ( T Beam )S M Rahat Rahman
 
Mathcad 17-slab design
Mathcad   17-slab designMathcad   17-slab design
Mathcad 17-slab designmichael mutitu
 
Lecture notes in flexural analysis & design of singly reinforced beams and on...
Lecture notes in flexural analysis & design of singly reinforced beams and on...Lecture notes in flexural analysis & design of singly reinforced beams and on...
Lecture notes in flexural analysis & design of singly reinforced beams and on...PUP Lopez College of Civil Engg.
 
Lec.8 strength design method t beams
Lec.8   strength design method t beamsLec.8   strength design method t beams
Lec.8 strength design method t beamsMuthanna Abbu
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignFawad Najam
 
23576671 presentation
23576671 presentation23576671 presentation
23576671 presentationtasteamit37
 
Two way slab
Two way slabTwo way slab
Two way slabillpa
 
BIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGNBIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGNshawon_sb
 
A Rhetorical Identification Analysis of English Political Public Speaking: Jo...
A Rhetorical Identification Analysis of English Political Public Speaking: Jo...A Rhetorical Identification Analysis of English Political Public Speaking: Jo...
A Rhetorical Identification Analysis of English Political Public Speaking: Jo...Bahram Kazemian
 
Your EX campaign
Your EX campaignYour EX campaign
Your EX campaignRadu Artin
 
Canadian Sales First Quarter 2016
Canadian Sales First Quarter 2016Canadian Sales First Quarter 2016
Canadian Sales First Quarter 2016Stradablog
 
Arabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s Model
Arabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s ModelArabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s Model
Arabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s ModelBahram Kazemian
 

Viewers also liked (20)

Sachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) example
Sachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) exampleSachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) example
Sachpazis: Two-way RC Slab Slab Analysis & Design (EN1992-1-1:2004) example
 
presentation on rectangular beam design singly or doubly (wsd)
presentation on rectangular beam design singly or doubly (wsd)presentation on rectangular beam design singly or doubly (wsd)
presentation on rectangular beam design singly or doubly (wsd)
 
Test before Final ( T Beam )
Test before Final ( T Beam )Test before Final ( T Beam )
Test before Final ( T Beam )
 
T beam TYPES
T beam TYPEST beam TYPES
T beam TYPES
 
Lecture notes in chapter 1
Lecture notes in chapter 1Lecture notes in chapter 1
Lecture notes in chapter 1
 
Mathcad 17-slab design
Mathcad   17-slab designMathcad   17-slab design
Mathcad 17-slab design
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Lecture notes in flexural analysis & design of singly reinforced beams and on...
Lecture notes in flexural analysis & design of singly reinforced beams and on...Lecture notes in flexural analysis & design of singly reinforced beams and on...
Lecture notes in flexural analysis & design of singly reinforced beams and on...
 
Lecture notes in chapter 2 (Principles of RCD)
Lecture notes in chapter 2 (Principles of RCD)Lecture notes in chapter 2 (Principles of RCD)
Lecture notes in chapter 2 (Principles of RCD)
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Lec.8 strength design method t beams
Lec.8   strength design method t beamsLec.8   strength design method t beams
Lec.8 strength design method t beams
 
CE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column DesignCE 72.52 - Lecture 5 - Column Design
CE 72.52 - Lecture 5 - Column Design
 
23576671 presentation
23576671 presentation23576671 presentation
23576671 presentation
 
Two way slab
Two way slabTwo way slab
Two way slab
 
BIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGNBIAXIAL COLUMN DESIGN
BIAXIAL COLUMN DESIGN
 
A Rhetorical Identification Analysis of English Political Public Speaking: Jo...
A Rhetorical Identification Analysis of English Political Public Speaking: Jo...A Rhetorical Identification Analysis of English Political Public Speaking: Jo...
A Rhetorical Identification Analysis of English Political Public Speaking: Jo...
 
Your EX campaign
Your EX campaignYour EX campaign
Your EX campaign
 
Canadian Sales First Quarter 2016
Canadian Sales First Quarter 2016Canadian Sales First Quarter 2016
Canadian Sales First Quarter 2016
 
Week 11 collecting_data
Week 11 collecting_dataWeek 11 collecting_data
Week 11 collecting_data
 
Arabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s Model
Arabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s ModelArabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s Model
Arabic Fairy-tales: An Analysis of Hatim Tai’s Story within Propp’s Model
 

Similar to Individual Caluculation

Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentJoyce Wee
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2Lam Yu
 
Building Structure
Building Structure Building Structure
Building Structure Nicole Foo
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4Lam Yu
 
B.structure report
B.structure reportB.structure report
B.structure reportjiuaN59
 
Lamyu 3
Lamyu 3Lamyu 3
Lamyu 3Lam Yu
 
Yung Part, structure
Yung Part, structureYung Part, structure
Yung Part, structureYung Kai
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculationJy Chong
 
Building structure real
Building structure realBuilding structure real
Building structure realong93
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final reportCanisius Bong
 
Building structure
Building structure Building structure
Building structure yenweizheng
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilationjisunfoo
 
Lamyu 1
Lamyu 1Lamyu 1
Lamyu 1Lam Yu
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structureKen Wong
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowYee Len Wan
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 

Similar to Individual Caluculation (20)

Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
Structures
StructuresStructures
Structures
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
 
Building Structure
Building Structure Building Structure
Building Structure
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Lamyu 3
Lamyu 3Lamyu 3
Lamyu 3
 
Yung Part, structure
Yung Part, structureYung Part, structure
Yung Part, structure
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
 
Building structure real
Building structure realBuilding structure real
Building structure real
 
Building Structure Final report
Building Structure Final reportBuilding Structure Final report
Building Structure Final report
 
Building structure
Building structure Building structure
Building structure
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
 
Lamyu 1
Lamyu 1Lamyu 1
Lamyu 1
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
 
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC BungalowStructures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
Structures (Group Assignment) - Structural Design and Analysis of a RC Bungalow
 
1622828460.pdf
1622828460.pdf1622828460.pdf
1622828460.pdf
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 

More from Pengeneee Peng (20)

INTEGRATION
INTEGRATIONINTEGRATION
INTEGRATION
 
SENTUL
SENTULSENTUL
SENTUL
 
CALCULATION
CALCULATIONCALCULATION
CALCULATION
 
ACOUSTIC
ACOUSTICACOUSTIC
ACOUSTIC
 
LIGHTING
LIGHTINGLIGHTING
LIGHTING
 
Thematic Analysis
Thematic AnalysisThematic Analysis
Thematic Analysis
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
[Group] building structure project
[Group] building structure project[Group] building structure project
[Group] building structure project
 
Bcon1
Bcon1Bcon1
Bcon1
 
Studio presentation
Studio presentationStudio presentation
Studio presentation
 
Binder2
Binder2Binder2
Binder2
 
COMP APP 2A
COMP APP 2ACOMP APP 2A
COMP APP 2A
 
Work In Progress 1
Work In Progress 1Work In Progress 1
Work In Progress 1
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
BCON Report
BCON ReportBCON Report
BCON Report
 
BCON Report
BCON  ReportBCON  Report
BCON Report
 
DV 2C
DV 2CDV 2C
DV 2C
 
DV 2B
DV 2BDV 2B
DV 2B
 
Portfolio
PortfolioPortfolio
Portfolio
 
Case Study
Case StudyCase Study
Case Study
 

Recently uploaded

Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailDesigntroIntroducing
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 

Recently uploaded (20)

Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detail
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 

Individual Caluculation

  • 1. Analysis of Beams Identify One Way or Two Way Slab Ly = Longer side of slab Lx - shorter side of slab Slab A-B/2-6: 3.5 ÷ 3.6 = 0.97 ≤ 2, Two way slab Slab A-B/6-8: 3.5 ÷ 2.7 = 1.3 ≤ 2, Two way slab Slab B-H/2-6: 6.9 ÷ 3.6 = 1.92 ≤ 2, Two way slab Slab B-h/6-8: 6.9 ÷ 2.7 = 2.56 ≥ 2, One way slab SECOND FLOOR B F 1 2 5 7 10 CA E H 3 4 6 8 9 11 14 13 D 12 G AV ROOM MASTER FAMILY / STUDY MASTER SUITEBATH ROOF TERRACE PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PENGE YEP SIANG 0315259
  • 2. Beam A-B/6 Dead Load Dead load from slab A-B/2-6 = 4.2 kN / m² × (3.5/2) = 7.35 kN/m Convert triangular load to UDL 7.35× ⅔ = 4.9 kN/m Dead load from slab A-B/6-8 = 4.2 kN / m² × (2.7/2) = 5.67kN/m Total dead load A/2-8 = 8.84 + 1.44 + 4.9+5.67 = 20.85 kN/m SECOND FLOOR 1 2 5 7 10 3 4 6 8 9 11 14 13 12 PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 A B H 6 8 20.85kN/m 8.84kN/m A6 B6 Brick Wall Beam Self-weight Slab A-B/2-6 Slab A-B/6-8 Total Dead Load 1.44kN/m 4.9kN/m 5.67kN/m
  • 3. Live Load Live load from slab A-B/2-6 = 2.0 kN / m² × (3.5/2) = 3.5 kN/m Convert triangular load to UDL 3.5 × ⅔ = 2.33 kN/m Live load from slab A-B/6-8 = 2.0 kN / m² × (2.7/2) = 2.7 kN/m Total live load A-B/6 = 2.33 + 2.7 = 5.03 kN/m Ultimate Load Dead load factor = 1.4 Live load factor = 1.6 Ultimate load A-B/6 = (20.85 × 1.4) + (5.03 × 1.6) = 29.19 + 8.05 = 37.24 kN/m Reaction Convert UDL to Point load 37.24 ×3.5 = 130.34kN Reaction force = ½ Total Load 130.34 ÷ 2 = 65.17kN Bending Moment At point A6, there is no area = 0kN At point B6, area of triangle (+ve) + area of triangle (-ve) = ½(65.17 × 3.5/2) + ½(-65.17 × 3.5/2) = 57.03 - 57.03 = 0 5.03kN/m A6 A6 A6 + + - B6 B6 B6 Slab A-B/2-6 Ultimate Load Slab A-B/6-8 Total Live Load 2.7kN/m 2.33kN/m 37.24kN/m 37.24kN/m 65.17kN 0kN 0kN 65.17kN -65.17kN 57.03 0kN 0kN 65.17kN 3.5m
  • 4. Beam A/2-8 Dead Load Dead load from slab A-B/2-6 = 4.2 kN / m² × (3.5/2) = 7.35kN/m Dead load from slab A-B/6-8 = 4.2 kN / m² × (2.7/2) = 5.67 kN/m Convert triangular load to UDL 5.67 × ⅔ = 3.78 kN/m Total dead load A/2-6 = 8.84 + 1.44 + 7.35 = 17.63 kN/m Total deal load A/6-8 = 8.84 + 1.44 + 3.78 = 14.06 kN/m SECOND FLOOR 1 2 5 7 10 3 4 6 8 9 11 14 13 12 PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 A B H 6 8 14.06kN/m17.63kN/m 8.84kN/m A2 A6 A8 Brick Wall Beam Self-weight Slab A-B/2-6 Slab A-B/6-8 Total Dead Load 1.44kN/m 7.35kN/m 3.78kN/m
  • 5. Live Load Live load from slab A-B/2-6 = 2.0 kN / m² × (3.5/2) = 3.5 kN/m Live load from slab A-B/6-8 = 2.0 kN / m² × (2.7/2) = 2.7 kN/m Convert triangular load to UDL 2.7 × ⅔ = 1.8 kN/m Total live load A/2-6 = 3.5 kN/m Total live load A/6-8 = 1.8 kN/m Ultimate Load Dead load factor = 1.4 Live load factor = 1.6 Ultimate load A/2-6 = (17.63 × 1.4) + (3.5 × 1.6) = 30.28 kN/m Ultimate load A/6-8 = (14.06 × 1.4) + (1.8 × 1.6) = 22.56 kN/m 1.8kN/m 22.56kN/m 3.5kN/m 30.28kN/m A2 A2 A6 A6 A8 A8 Slab A-B/2-6 Slab A-B/6-8 Total Live Load Total Live Load 3.5kN/m 1.8kN/m
  • 6. Reaction Convert UDL to Point load 30.28 × 3.6 = 109.0 kN 22.56 × 2.7 = 60.91 kN ∑M = 0 = RA2 (6.3) - 109(4.5) - 65.17(2.7) - 22.56(1.35) = 6.3 RA2 - 490.5 - 175.96 - 30.46 = 6.3 RA2 - 696.92 RA2 = 696.92 ÷ 6.3 = 110.62 kN ∑Fy = RA8 + 110.62 - 109 - 65.17 - 60.91 = RA8 - 124.46 RA8 = 124.46 kN 22.56kN 65.17kN 3.6m 2.7m 30.28kN/m 110.62kN 110.62kN 124.46kN -124.46kN -63.55kN 202.03 1.62kN A2 + + - A6 A8 Bending Moment At point A2, there is no area = 0kN At point A6, area of trapezium = ½ × (110.62 + 1.62) × 3.6 = 202.03 At point A8 area of trapezium (+ve) + area of trapezium (-ve) = 202.03 + ½(-63.55-124.46)(2.7) = 202.03 - 202.03 = 0 0kN 0kN 0kN 0kN
  • 7. SECOND FLOOR 1 2 5 7 10 3 4 6 8 9 11 14 13 12 PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 A B H 6 8 Beam B/2-6 Dead Load Dead load from slab A-B/2-6 = 4.2 kN / m² × (3.5/2) = 7.35 kN/m Dead load from slab B-H/2-6 = 4.2 kN / m² × (3.6/2) = 7.56kN/m Convert triangular load to UDL 7.56× ⅔ = 5.04 kN/m Total dead load B/2-6= 8.84 + 1.44 + 7.35 +5.04 = 22.67 kN/m 22.67kN/m 8.84kN/m B2 B6 Brick Wall Beam Self-weight Slab A-B/2-6 Slab B-H/2-6 Total Dead Load 1.44kN/m 7.35kN/m 5.04kN/m
  • 8. Live Load Live load from slab A-B/2-6 = 2.0 kN / m² × (3.5/2) = 3.5 kN/m Live load from slab B-H/2-6 = 1.5 kN / m² × (2.7/2) = 2.03 kN/m Convert triangular load to UDL 2.03 × ⅔ = 1.35 kN/m Total live load B/2-6 = 3.5 + 1.35 = 4.85 kN/m Ultimate Load Dead load factor = 1.4 Live load factor = 1.6 Ultimate load B/2-6 = (22.67 × 1.4) + (4.85 × 1.6) = 31.74 + 7.76 = 39.5 kN/m Reaction Convert UDL to Point load 39.5 ×3.6 = 142.2 kN Reaction force = ½ Total Load 142.2 ÷ 2 = 71.1 kN Bending Moment At point B2, there is no area = 0kN At point B6, area of triangle (+ve) + area of triangle (-ve) = ½(71.1 × 3.6/2) + ½(-71.1 × 3.6/2) = 63.99 - 63.99 = 0 4.85kN/m B2 B2 B2 + + - B6 B6 B6 Slab A-B/2-6 Ultimate Load Slab B-H/2-6 Total Live Load 1.35kN/m 3.5kN/m 39.5kN/m 39.5kN/m 71.1kN 0kN 0kN 71.1kN -71.1kN 63.99 0kN 0kN 71.1kN 3.6m
  • 9. SECOND FLOOR 1 2 5 7 10 3 4 6 8 9 11 14 13 12 PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 A B H 6 8 Beam B/6-8 Dead Load Dead load from slab A-B/6-8 = 4.2 kN / m² × (2.7/2) = 5.67 kN/m Dead load from slab B-H/6-8 = 0kN/m Total dead load B/2-6 = 8.84 + 1.44 + 5.67 = 15.95kN/m 15.95kN/m 8.84kN/m B6 B8 Brick Wall Beam Self-weight Slab A-B/6-8 Slab B-H/6-8 Total Dead Load 1.44kN/m 5.67kN/m 0kN/m
  • 10. Live Load Live load from slab A-B/6-8 = 2.0 kN / m² × (3.5/2) = 3.5 kN/m Live load from slab B-H/6-8 = 0 kN/m Total live load B/6-8 = 3.5 kN/m Ultimate Load Dead load factor = 1.4 Live load factor = 1.6 Ultimate load B/6-8 = (15.95× 1.4) + (3.5 × 1.6) = 22.33 + 5.6 = 27.93 kN/m Reaction Convert UDL to Point load 27.93 ×2.7 = 75.41 kN Reaction force = ½ Total Load 75.41 ÷ 2 = 37.71 kN Bending Moment At point B6, there is no area = 0kN At point B8, area of triangle (+ve) + area of triangle (-ve) = ½(37.71 × 2.7/2) + ½(-37.71 × 2.7/2) = 25.45 - 25.45 = 0 3.5kN/m B6 B6 B6 + + - B8 B8 B8 Slab A-B/6-8 Ultimate Load Slab B-H/6-8 Total Live Load 0kN/m 3.5kN/m 27.93kN/m 27.93kN/m 37.71kN 0kN 0kN 37.71kN -37.71kN 25.45 0kN 0kN 37.71kN 2.7m
  • 11. SECOND FLOOR 1 2 5 7 10 3 4 6 8 9 11 14 13 12 PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 A B H 6 8 Beam B-H/6 Dead Load Dead load from slab B-H/2-6 = 4.2 kN/m² × (3.6/2) = 7.56 kN/m Dead load from slab B-H/6-8 = 4.2 kN/m2 × (2.7/2) = 5.67kN/m Total dead load B/2-6 = 8.84 + 1.44 + 7.56 = 5.67 = 23.51kN/m 23.51kN/m 8.84kN/m B6 H6 Brick Wall Beam Self-weight Slab B-H/2-6 Slab B-H/6-8 Total Dead Load 1.44kN/m 7.56kN/m 5.67kN/m
  • 12. Live Load Live load from slab B-H/2-6 = 1.5 kN / m² × (3.5/2) = 2.63 kN/m Live load from slab B-H/6-8 = 1.5 kN/m2 × (2.7/2) = 2.03kN/m Total live load B/6-8 = 2.63 + 2.03 = 4.66 kN/m Ultimate Load Dead load factor = 1.4 Live load factor = 1.6 Ultimate load B/6-8 = (23.51× 1.4) + (4.66 × 1.6) = 32.91 + 7.46 = 40.37 kN/m Reaction Convert UDL to Point load 40.37 × 6.9 = 278.55 kN Reaction force = ½ Total Load 278.55 ÷ 2 = 139.28 kN Bending Moment At point B6, there is no area = 0kN At point H6, area of triangle (+ve) + area of triangle (-ve) = ½(139.28 × 6.9/2) + ½(-139.28 × 6.9/2) = 240.26 - 240.26 = 0 4.66kN/m B6 B6 B6 + + - H6 H6 H6 Slab B-H/2-6 Ultimate Load Slab B-H/6-8 Total Live Load 2.03kN/m 2.63kN/m 40.37kN/m 40.37kN/m 139.28kN 0kN 0kN 139.28kN -139.28kN 240.26 0kN 0kN 139.28kN 6.9m
  • 13. SECOND FLOOR 1 2 5 7 10 3 4 6 8 9 11 14 13 12 PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 A B H 6 8 Beam H/2-8 Dead Load Dead load from slab B-H/2-6 = 4.2 kN / m² × (3.5/2) = 7.35kN/m Convert triangular load to UDL 7.35× ⅔ = 4.9 kN/m Dead load from slab B-H/6-8 = 0 kN/m Total dead load H/2-6 = 8.84 + 1.44 + 4.9 = 15.18kN/m Total deal load A/6-8 = 8.84 + 1.44 = 10.28 kN/m 10.28kN/m15.18kN/m 8.84kN/m H2 H6 H8 Brick Wall Beam Self-weight Slab B-H/2-6 Slab B-H/6-8 Total Dead Load 1.44kN/m 4.9kN/m 0kN/m
  • 14. Live Load Live load from slab B-H/2-6 = 1.5 kN / m² × (3.5/2) = 2.63 kN/m Convert triangular load to UDL 2.63 × ⅔ = 1.75 kN/m Live load from slab B-H/6-8 = 0 kN/m Total live load H/2-6 = 1.75 kN/m Total live load H/6-8 = 0 kN/m Ultimate Load Dead load factor = 1.4 Live load factor = 1.6 Ultimate load A/2-6 = (15.18 × 1.4) + (1.75 × 1.6) = 24.05 kN/m Ultimate load A/6-8 = (10.28 × 1.4) + (0 × 1.6) = 14.39 kN/m 0kN/m 14.39kN/m 1.75kN/m 24.05kN/m H2 A2 H6 A6 H8 A8 Slab B-H/2-6 Slab B-H/6-8 Total Live Load Total Live Load 1.75kN/m 0kN/m
  • 15. Reaction Convert UDL to Point load 24.05 × 3.6 = 86.58 kN 14.39 × 2.7 = 38.85 kN ∑M = 0 = RH2 (6.3) - 86.58(4.5) - 139.28(2.7) - 38.85(1.35) = 6.3 RH2 - 389.61 - 376.06 - 52.45 = 6.3 RH2 - 818.12 RA2 = 818.12 ÷ 6.3 = 129.86 kN ∑Fy = RH8 + 129.86 - 86.58 - 139.28 - 38.85 = RH8 - 134.85 RH8 = 134.85 kN 14.39kN 139.28kN 3.6m 2.7m 24.05kN/m 129.86kN 129.86kN 134.85kN -134.85kN -96kN 311.65 43.28kN H2 + + - H6 H8 Bending Moment At point H2, there is no area = 0kN At point H6, area of trapezium = ½ × (129.86 + 43.28) × 3.6 = 311.65 At point A8 area of trapezium (+ve) + area of trapezium (-ve) = 311.65 + ½(-96 - 134.85 )(2.7) = 311.65 - 311.65 = 0 0kN 0kN 0kN 0kN
  • 16. Column A2 Area of load acting on column = (6.3/2) × (3.5/2) = 5.51m2 Dead load Ground floor: Beam: 1.44kN/m × (3.15 + 1.75) = 7.06kN Slab: 3.6kN/m2 × 5.51m2 = 19.84kN Wall: 8.84kN/m × (3.15 + 1.75) = 43.31kN First floor: Beam: 1.44kN/m × (3.15 + 1.75) = 7.06kN Slab: 3.0kN/m2 × 5.51m2 = 16.53kN Wall: 8.84kN/m × (3.15 + 1.75) = 43.31kN Second floor: Beam: 1.44kN/m × (3.15 + 1.75) = 7.06kN Slab: 4.2kN/m2 × 5.51m2 = 23.14kN Wall: 8.84kN/m × (3.15 + 1.75) = 43.31kN Total dead load 3(7.06) + 19.84 + 16.53 + 23.14 + 3(43.31) = 210.62kN Live load Ground floor: Bathroom 2.0kN/m2 × 5.51m2 = 11.02kN First floor: Bedroom 1.5kN/m2 × 5.51m2 = 8.27kN Second floor: Bathroom 2.0kN/m2 × 5.51m2 = 11.02kN Total live load 11.02 + 8.27 + 11.02 = 30.31kN Total load 210.62 + 30.31 = 240.93kN Analysis of Column SECOND FLOOR F 1 2 3 5 6 7 8 10 11 14 13 D G AV ROOM FAMILY / STUDY MASTER SUITEBATH ROOF TERRACE MASTER PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G GROUND FLOOR DRY KITCHEN DINING WET KITCHEN MAID TERRACE BATH 6 GUEST LIVING FOYER STORE BATH 7 STAIRS PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G FIRST FLOOR BEDROOM 4 RC FLAT ROOF BATH 3 BATH 4 BEDROOM 3 BATH 2 DRESSING BEDROOM 5 BEDROOM 2 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 GROUND FLOOR FIRST FLOOR SECOND FLOOR A A AB B BH H H 6 8
  • 17. SECOND FLOOR F 1 2 3 5 6 7 8 10 11 14 13 D G AV ROOM FAMILY / STUDY MASTER SUITEBATH ROOF TERRACE MASTER PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G FIRST FLOOR BEDROOM 4 RC FLAT ROOF BATH 3 BATH 4 BEDROOM 3 BATH 2 DRESSING BEDROOM 5 BEDROOM 2 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G GROUND FLOOR DRY KITCHEN DINING WET KITCHEN MAID TERRACE BATH 6 GUEST LIVING FOYER STORE BATH 7 STAIRS PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT Column A8 Area of load acting on column = (6.3/2) × (3.5/2) = 5.51m2 Dead load Ground floor: Beam: 1.44kN/m × (3.15 + 1.75 + 2.4) = 10.51kN Slab: 3.6kN/m2 × 9.71m2 = 34.96kN Wall: 8.84kN/m × (3.15 + 1.75 + 2.4) = 64.53kN First floor: Beam: 1.44kN/m × (3.15 + 1.75 + 2.4) = 10.51kN Slab: 3.0kN/m2 × 5.51m2 = 16.53kN Wall: 8.84kN/m × (3.15 + 1.75 + 2.4) = 64.53kN Second floor: Beam: 1.44kN/m × (3.15 + 1.75 + 2.4) = 10.51kN Slab: 4.2kN/m2 × 5.51m2 = 23.14kN Wall: 8.84kN/m × (3.15 + 1.75 + 2.4) = 64.53kN Total dead load 3(10.51) + 34.96 + 16.53 + 23.14 + 3(64.53) = 299.75kN Area of load acting on column (ground floor) = (6.3/2 + 4.8/2) × (3.5/2) = 9.71m2 Live load Ground floor: Guest 1.5kN/m2 × 5.51m2 = 8.27kN Stair 2.0kN/m2 × 4.2m2 = 8.4kN First floor: Bedroom 1.5kN/m2 × 5.51m2 = 8.27kN Second floor: Dressing 2.0kN/m2 × 5.51m2 = 11.02kN room Total live load 8.27 + 8.4 + 8.27 + 11.02 = 35.96kN Total load 299.75 + 35.96 = 335.71kN 2 GROUND FLOOR FIRST FLOOR SECOND FLOOR A A AB B BH H H 6 8
  • 18. SECOND FLOOR F 1 2 3 5 6 7 8 10 11 14 13 D G AV ROOM FAMILY / STUDY MASTER SUITEBATH ROOF TERRACE MASTER PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G GROUND FLOOR DRY KITCHEN DINING WET KITCHEN MAID TERRACE BATH 6 GUEST LIVING FOYER STORE BATH 7 STAIRS PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G FIRST FLOOR BEDROOM 4 RC FLAT ROOF BATH 3 BATH 4 BEDROOM 3 BATH 2 DRESSING BEDROOM 5 BEDROOM 2 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT 2 GROUND FLOOR FIRST FLOOR SECOND FLOOR A A AB B BH H H 6 8 Column B2 Area of load acting on column = [(3.6/2) × (3.5/2 + 2)] + [(3/2) × 2] = 9.75m2 Dead load Ground floor: Beam: 1.44kN/m × (1.75 + 1.8 + 1.5) = 7.27kN Slab: 3.6kN/m2 × 9.75m2 = 35.1kN Wall: 8.84kN/m × (1.75 + 1.8 + 1.5) = 44.64kN First floor: Beam: 1.44kN/m × (1.75 + 1.8 + 1.5) = 7.27kN Slab: 3.0kN/m2 × 9.75m2 = 29.25kN Wall: 8.84kN/m × (1.75 + 1.8 + 2.0) = 49.06kN Second floor: Beam: 1.44kN/m × (1.75 + 1.8 + 3.45) = 10.08kN Slab: 4.2kN/m2 × 9.36m2 = 39.31kN Wall: 8.84kN/m × (1.75 + 1.8 + 3.45) = 61.88kN Total dead load 2(7.27) + 35.1 + 44.64 + 29.25 + 49.06 + 10.08 + 39.31 + 61.88 = 283.86kN Live load Ground floor: Bathroom 2.0kN/m2 × 3.15m2 = 6.3kN Dining 2.0kN/m2 × 6.6m2 = 13.2kN First floor: Bedroom 1.5kN/m2 × 3.15m2 = 4.73kN Bathroom 2.0kN/m2 × 3.6m2 = 7.2kN Second floor: Bathroom 2.0kN/m2 × 3.15m2 = 6.3kN Bedroom 1.5kN/m2 × 6.21m2 = 9.32kN Total live load 6.3 + 13.2 + 4.73 + 7.2 + 6.3 + 9.32 = 47.05kN Total load 283.86 + 47.05 = 330.91kN Area of load acting on column (second floor) = (3.6/2) × (3.5/2 + 6.9/2) = 9.36m2
  • 19. 2 GROUND FLOOR FIRST FLOOR SECOND FLOOR A A AB B BH H H 6 8 Column B6 Area of load acting on column = (3.6/2 + 2.7/2) × (3.5/2 + 2) = 11.81m2 Dead load Ground floor: Beam: 1.44kN/m × (1.35 + 1.8) = 4.54kN Slab: 3.6kN/m2 × 11.81m2 = 42.52kN Wall: 8.84kN/m × (1.35 + 1.8) = 27.85kN First floor: Beam: 1.44kN/m × (1.35 + 1.8 + 2.0) = 7.42kN Slab: 3.0kN/m2 × 11.81m2 = 35.43kN Wall: 8.84kN/m × (1.35 + 1.8 + 2.0) = 45.53kN Second floor: Beam: 1.44kN/m × (1.75 + 1.8 + 1.35 + 3.45)= 12.02kN Slab: 4.2kN/m2 × 16.38m2 = 68.8kN Wall: 8.84kN/m × (1.75 + 1.8) = 31.38kN Total dead load 4.54 + 42.52 + 27.85 + 7.42 + 35.42 + 45.53 + 12.02 + 68.8 + 31.38 = 275.48kN Live load Ground floor: Guest 2.0kN/m2 × 5.51m2 = 11.02kN Dining 2.0kN/m2 × 6.3m2 = 12.6kN First floor: Bedroom 1.5kN/m2 × 8.31m2 = 12.47kN Bathroom 2.0kN/m2 × 3.6m2 = 7.2kN Second floor: Bathroom 2.0kN/m2 × 3.15m2 = 6.3kN Bedroom 1.5kN/m2 × 10.87m2 = 16.31kN Dressing 1.5kN/m2 × 2.36m2 = 3.54kN Total live load 11.02 + 12.6 + 12.47 + 7.2 + 6.3 + 16.31 + 3.54 = 69.44kN Total load 275.48 + 69.44 = 344.92kN Area of load acting on column (second floor) = (3.6/2 + 2.7/2) × (3.5/2 + 6.9/2) = 16.38m2 SECOND FLOOR F 1 2 3 5 6 7 8 10 11 14 13 D G AV ROOM FAMILY / STUDY MASTER SUITEBATH ROOF TERRACE MASTER PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G FIRST FLOOR BEDROOM 4 RC FLAT ROOF BATH 3 BATH 4 BEDROOM 3 BATH 2 DRESSING BEDROOM 5 BEDROOM 2 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT F 1 2 3 5 6 7 8 10 11 14 13 D G GROUND FLOOR DRY KITCHEN DINING WET KITCHEN MAID TERRACE BATH 6 GUEST LIVING FOYER STORE BATH 7 STAIRS PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT