International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 175
SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION
Jyoti Deupa
M. Tech in Civil Engineering
School of Engineering and Technology, Sharda University, India
----------------------------------------------------------------------------***--------------------------------------------------------------------------
Abstract – In the developing country like India construction work plays an important role to increase the economy of the
country. Also with the growing population urbanization is being the need of time. A good construction project has to focus on
saving both time and money without losing the quality of work. One of the factor influencing the project time and economy is
formwork. Different types of formworks are available in terms of material and function, so it becomes necessary to select a
suitable formwork for a particular project. In Indian construction mostly aluminum (MIVAN technology) and conventional
formworks are being used among which aluminum formwork is considered to save time and money for mass housing projects and
large scale construction whereas, conventional formworks are found cheaper for small scale projects. For speedy construction
MIVAN technology is best suited as it is easy to install and gives better finish. Apart other formwork systems like prefabricated,
tunnel formwork etc. aluminum and timber formworks are commonly used as these are easily available almost all over India.
Key Words: formwork, MIVAN technology, conventional formwork system, aluminum formwork, mass housing
1. INTRODUCTION
Formwork is defined as a temporary structure which acts as support and mould for fresh concrete until it can take its own
weight[1]. The structural system of temporary supports that holds formwork in position is termed as false work[2]. When
concrete member gains sufficient hardness and strength formwork is removed and the process is known as stripping[2].
Formwork is considered as important construction material since quality of structural members is also effected by the quality
of formwork. Conventionally, formworks are made out of timber but with the advancement of technology formworks made of
different materials can be found. In recent technologies formworks are made of aluminum, plastic, timber with steel bracings,
prefabricated etc. which are being used worldwide in construction industries. Traditional timber formwork system,
Engineered formwork system, reusable plastic formwork system, stay in place formwork system, flexible formwork system
etc. are some types of formwork systems used all over the world on the basis of material. Similarly on the basis of method of
use table/flying formwork, climbing formwork, tunnel formwork, jump formwork, slip formwork are seen in practice[3].But in
Indian construction practice mostly wooden and Engineered formwork systems are seen. In any construction project
formwork are considered to be important factor which influence project cost and time as it consists of 35-45% of total cost of
structural work [4] and it is found that formwork requires 20-25% of construction cost[5]. Selection of formwork depends on
factors such as project type, project duration, cost, location of project etc. Also high labor intensity of works, poor quality of
materials and structures are also considered as problem related to selection of formwork technology[6]. In modern days,
various formworks are available in the market. In India present formwork techniques mainly available are: Prefabrication
Technology, System formwork Technology, Precast Technology[7]. These formworks has many advantages such as higher
floor cycle rate, lower material rate and lower material wastage, large number of reuses, low maintenance cost and smooth
surface finish[8]. The main characteristics of good formwork:-
1. To provide the safety of the structure during implementation and use [6].
2. To ensure appropriate technical quality such as proper stiffness, placement, assembly, disassembly and geometry
of the formwork structure [6].
3. To be economic in order to minimize the time and cost associated with the formwork[9].
Formworks play important role in saving project cost and time so it is necessary to select an appropriate formwork for any
type of project. Formworks with different material are available in market among which conventional (wooden) formwork
and aluminum formwork are mostly seen in Indian construction practice. Between these two types of formworks conventional
and modern conventional formworks are mostly used due to low cost and easy availability.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 176
2. METHODOLOGY
This study was based on document analysis. Several books and articles were collected as the literature of this study. Almost all
documents were accessed from online sources. Various words/phrases related to title of this study were used as keywords to
search related articles from authentic sources. Related literature was studied deeply and carefully. Required information was
noted down and systematically recorded in a notebook. For every information, page of the notebook was divided into three
parts. Needed information was clearly and separately written in third part, appropriate referencing was written in second part
and the category (introduction, literature review, discussion etc.) in which it should be included was written in first part.
Finally, collected data were written to prepare review paper with proper citations using Mendeley software.
3. RESULTS
3.1 Comparison of conventional, aluminum and steel formwork
In India, these two formworks are seem to be widely used in various range of construction projects. Selecting a suitable
formwork can give good outcomes to the project. For this, advantages and disadvantages of both type of formworks should
be known along with their suitability for the given project. Top five factors affecting the formwork selection are time factor,
surface finish, lifespan, cost and safety.
3.1.1 Conventional Formwork system
It is the oldest type of formwork made from timber plank and plywood[10]. These types of formwork can be reused up to 4-5
times and can be easily available all over the India. In conventional type of formwork the floor cycle is minimum of 3-4
weeks[11]. For making wooden formwork the timber should be well seasoned, free from rots and other defects such as
cracks and warps. It should be able to withstand the load applied in it during casting of the concrete member. To improve
some of the disadvantages of conventional formwork system, modern conventional formwork system is brought in use
which uses steel props and various types of jacks ( U jacks, T jacks) as support instead of timber support and plywood sheets
are used instead of timber planks on slab decks, beams and columns[12].
3.1.2 Advantages of conventional formwork system
Timber shuttering is used mostly in residential buildings and small projects very commonly. It is famous for its light weight,
flexibility and easy availability at most of the places[13]. Conventional formwork system requires low initial and
maintenance cost as compared to mivan and steel shuttering technology[14]. They can be made in different shape and size as
per the need.
3.1.3 Disadvantages of conventional formwork system
Conventional formworks are only suitable for low rise buildings but they can effect the project cost and duration for high rise
buildings. These type of formworks have less load carrying capacity than aluminum and steel formwork system[4]. Also it
gives low productivity and reusability. Use of wooden shuttering requires more time and labor. If the corners and joints are
not fixed properly, grout may come out in the form of slurry which will lead to poor quality of structural member[10]. During
construction if timber is dry then it can absorb moisture from the concrete[3]. This type of formwork leaves the surface of
the structure rough and to obtain smooth finishes plastering is required. When the useful time period of conventional
formwork is over then it has zero salvage value[15].
3.2 Aluminum Formwork System
Aluminum formwork consists of aluminum panels which consists wall panel, deck panel, staircase panel, deck beam, with
props, tie rods and pin for attaching purpose[16]. Prop heads are specially designed in such way that deck panels can be
removed without disturbing the props.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 177
3.2.1 Advantages of aluminum formwork system
Aluminum forms are used to construct shear walls and other RCC structures, hence no plastering is required as it gives
smooth finishing. These forms can be lifted manually and are easy in erection and dismantling[16]. These kind of formwork
gives large number of repetition which allows speedy construction[17]. This system allows cast-in-situ construction and
monolithic construction. Labor requirement is less as compared to timber formwork[18]. After removal of formwork
finishing line can be seen due to lower panel size[18]. It gives good salvage value when the useful life span is over. Mivan
shuttering gives large carpet area and better seismic resistance[19]. This type of shuttering is considered as environment
friendly as no trees has to cut down for its manufacture[20].
3.2.2 Disadvantages of aluminum formwork system
The main drawbacks of mivan technology are high initial and maintenance cost, structural symmetry is required and skilled
labors are required at every stage of construction[21]. No alterations can be done once formwork is constructed[22]. Like
conventional system it does not provide flexibility in construction. For small projects they can over cost the overall
construction.
3.3 Steel formwork system
Steel formworks are used largely in large projects or in situation where large number of reuses of the shuttering are
possible[14]. It is considered good for curved structure such as chimney, tanks, column below plinth level, sewer, tunnel and
retaining walls [23].
3.3.1 Advantages of Steel Formwork
Steel formworks are durable, strong and have longer life span also it is easy to install and dismantle. These types of forms do
not absorb moisture from concrete preventing honey combing of structure[13]. Steel shuttering can be reused up to 100 to
120 times[15].
3.3.2 Disadvantages of Steel Formwork
Steel formwork is durable and strong as aluminum formwork but it is heavier than aluminum formwork due to high
density[22]. It requires skilled manpower for erection and proper care should be taken while pouring concrete into it.
In various studies above mostly comparison of aluminum and conventional formwork are mentioned. This comparison is
based on mainly project time, cost and better construction quality. Conventional formwork technology is used from a very long
time in constructions which is considered to be economical in initial investment and also easily available all over India. But
construction with conventional formwork takes more time than advance formwork technology. Also these type of shuttering
give poor surface finish, requires skilled labour to assemble as well as to dissemble[1]. Conventional formwork system has
more wastage, zero scrap value and the number of reusability of these kind of formwork is up to 5-7 times only. Several other
factors should also be considered while using wooden formwork, such as safety conditions, weather condition, proper storage
etc. In a comparison made among conventional, aluminum and plastech formworks in 22 storey building plastech formwork
seemed to be best option[8].
On the other hand MIVAN technology has given best performances for large projects, villas, mass housing or buildings more
than 20 stories. These formworks are easy to handle, store, reusable +200 times with low wastage and high scrap value, gives
faster floor cycle[24]. Also use of this formwork gives better construction quality, speedy construction and can be used
without skilled manpower. Aluminum formworks are easy to carry but contraction cracks can be seen as its demerit.
Implementing advancement in formwork will improve the quality of work in construction compared to traditional formwork
by nearly 25-30%. The duration of project gets reduced by nearly 15-20% whereas cost gets reduced by 20-25% and the
overall safety and efficiency of the work gets improved by 10-15%[25].
4. DISCUSSION
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 178
5. CONCLUSION
Based on the literature review it can be concluded that to meet the construction demand of present day the modern formwork
techniques are considered capable for speedy construction. In large projects such as mass housing, towers, villas etc. It is
better to use aluminum formwork and steel formwork rather than conventional formwork due to its faster floor cycle, better
surface finish, easy handling and more number of repetitions. On the other hand, wooden formworks are best suited for small
housing projects due to its low initial cost, easy installation and availability. Better selection of shuttering method as well as
material for a construction project can enhance the project quality as well as its rate of completion. Instead of sticking only on
conventional formwork system engineer should able to realize suitability of types of formworks according to the project.
Hence, the selection of formwork for any kind of building project depends on the importance given to the time and cost of the
project. The result of this study will help engineers and other technical persons to know different types of formworks with
their merits and demerits for proper selection based on the nature and size of the project, so that quality construction could be
achieved in estimated time and budget.
REFERENCES
[1] . A. K., “Comparative Study and Decision Making for a Formwork Technique To Be Adopted on a Construction Site in
Mumbai,” Int. J. Res. Eng. Technol., vol. 04, no. 12, pp. 234–238, 2015, doi: 10.15623/ijret.2015.0412045.
[2] A. N. Kote and A. R. Nandeshwar, “Duration Comparison of Mivan Formwork over the Conventional Formwork,” Int. J.
Res. Eng. Appl. Manag., pp. 37–39, 2020, [Online]. Available: www.mfeformwork.com/ProductServic.
[3] S. SAGAR and V. KUMAR PAUL, “an Investigation of Different Formwork System for High Rise Building Construction
and for Decision Support System,” pp. 56–63, 2020, doi: 10.31705/faru.2020.6.
[4] J. R. Naik, N. B. S. Rao, and R. S. M. Suresh, “Comparative Study of Existing Column Formwork,” J. Emerg. Technol. Innov.
Res., vol. 2, no. 6, pp. 1734–1739, 2015.
[5] M. S. Gaddam and A. Achuthan, “A comparative study on newly emerging type of formwork systems with conventional
type of form work systems,” in Materials Today: Proceedings, Jan. 2020, vol. 33, pp. 736–740, doi:
10.1016/j.matpr.2020.06.090.
[6] O. Kurakova, “Use of formwork construction systems in,” vol. 03026, pp. 1–7, 2018.
[7] C. Effective, “Aluminium Formwork- An Innovation in Construction Technology,” no. January 2014, pp. 30–37.
[8] N. Jawanjal, “Comparative study of various vertical formwork systems and preparation of formwork selection model
using fuzzy logic,” Int. J. Sci. Res., vol. 4, no. 7, pp. 5–8, 2016.
[9] K. Brózda and J. Selejdak, “Safety of Formworks in the Engineering and General Construction Sector,” Syst. Saf. Hum. -
Tech. Facil. - Environ., vol. 1, no. 1, pp. 284–290, 2019, doi: 10.2478/czoto-2019-0037.
[10] S. A. Ahmad, A. Kumar, and A. Khan, “a Brief Study on the Types of Shuttering and Their Comparison,” Int. Res. J. Eng.
Technol., vol. 3, no. 5, pp. 3240–3242, 2016.
[11] P. M. H, A. Padole, and A. A. Plasterwala, “Design and Cost Analysis of Advanced Shuttering,” vol. 7, no. 3, pp. 98–105,
2019.
[12] “A COMPARATIVE STUDY FOR EVALUATION OF DIFFERENT FORM WORK SYSTEMS UTILIZATION IN CONSTRUCTION
PROJECTS.”
[13] M. Gebrehiwot and T. Getachew, “Assessment on the Effect of Using Different Types of Formwork Materials on Building
Construction : A Case Study in Benshangul Gumuz Region,” Int. J. Constr. Eng. Manag., vol. 9, no. 4, pp. 119–125, 2020,
doi: 10.5923/j.ijcem.20200904.02.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 179
[14] P. Dinesh and M. Soundararajan, “Analysis of Effective Selection of Formwork System Based on Various Factors for
Construction Projects,” Int. J. Adv. Res. Trends Eng. Technol., vol. 4, no. 11, 2017.
[15] K. Loganathan and K. E. Viswanathan, “a Study Report on Cost, Duration and Quality Analysis of Different Formworks in
High-Rise Building,” Int. J. Sci. Eng. Res., vol. 7, no. 4, pp. 190–195, 2016.
[16] Aaditya, “Scope of Aluminium Formwork Technology in Affordable Housing Scheme Based on Cost and Duration,” pp.
150–156, 2018.
[17] V. Prasanna and K. C. Sekar, “A COMPARATIVE STUDY ON VARIOUS TECHNIQUES IN CONSTRUCTION INDUSTRY,” vol.
7, no. 4, pp. 85–90, 2016.
[18] A. W. Sebastian, “SUITABILITY OF MODULAR ALUMINIUM,” vol. 9, no. 6, pp. 421–426, 2018.
[19] P. D. Suryakant and P. D. D. B, “‘ Emerging Trends in Formwork - Cost Analysis & Effectiveness of Mivan Formwork over
the Conventional Formwork ,’” pp. 27–30.
[20] N. Parekh, B. M. Marvadi, and U. Patel, “Comparative Studies of Construction ( Conventional Technique Vs Aluminium
Formwork Techniques ),” J. Information, Knowl. Res. Civ. Eng., vol. 3, no. 2, pp. 279–287, 2015.
[21] A. Gulghane, N. Pitale, and S. Sanghai, “Time and Cost Optimization of Construction Project Using Mivan Technology,”
vol. 8, no. 8, pp. 70–74, 2018, doi: 10.9790/9622-0808027074.
[22] P. Anuj and P. Vaishali, “To Study About Comparative Techniques of Formwork to Manage Cost of Construction,” Int. J.
Manag. Technol. Eng., vol. 8, no. 119, pp. 119–124, 2018.
[23] S. S. Asadi and P. V. Praneeth, “A comparative study for evaluation of different form work systems utilization in
construction projects,” Int. J. Mech. Eng. Technol., vol. 8, no. 11, pp. 21–29, 2017.
[24] “Journal of Advances and Scholarly Researches in Allied Education.”
[25] I. A. Shaik and B. G. Rahul, “A Critical Study on Technological Advancements of Formwork in Construction Project
Management,” no. 6, pp. 120–124, 2019.

More Related Content

Similar to SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION

Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...IRJET Journal
 
A STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARING
A STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARINGA STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARING
A STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARINGIRJET Journal
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMAvjverma123
 
Analysis of Formwork in Multistory Building
Analysis of Formwork in Multistory BuildingAnalysis of Formwork in Multistory Building
Analysis of Formwork in Multistory Buildingcedmmantc5411
 
Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...
Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...
Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...IRJET Journal
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...IRJET Journal
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORKQadir Raza
 
IRJET- Alternative Designs for Gable Industrial Structure
IRJET-  	  Alternative Designs for Gable Industrial StructureIRJET-  	  Alternative Designs for Gable Industrial Structure
IRJET- Alternative Designs for Gable Industrial StructureIRJET Journal
 
IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...
IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...
IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...IRJET Journal
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallIRJET Journal
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”IRJET Journal
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Arthur Wilson
 
IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...
IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...
IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...IRJET Journal
 
IRJET - Review on Study of Space Frame Structure System
IRJET -  	  Review on Study of Space Frame Structure SystemIRJET -  	  Review on Study of Space Frame Structure System
IRJET - Review on Study of Space Frame Structure SystemIRJET Journal
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Comparative Study of Codal Provisions for Pre-Engineered Buildings
Comparative Study of  Codal Provisions for Pre-Engineered BuildingsComparative Study of  Codal Provisions for Pre-Engineered Buildings
Comparative Study of Codal Provisions for Pre-Engineered BuildingsIRJET Journal
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 

Similar to SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION (20)

Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...Introduction to advanced TUNNEL Formwork system: Case study of  ‘Rohan - Abhi...
Introduction to advanced TUNNEL Formwork system: Case study of ‘Rohan - Abhi...
 
A STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARING
A STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARINGA STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARING
A STUDY AND DESIGN ANALYSIS FOR INJECTION MOULD FOR PLASTIC BEARING
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMA
 
Analysis of Formwork in Multistory Building
Analysis of Formwork in Multistory BuildingAnalysis of Formwork in Multistory Building
Analysis of Formwork in Multistory Building
 
Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...
Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...
Study of Dome Structure Using Finite Element-Based Software E-Tab for Dynamic...
 
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
NOVEL METHODS AND MATERIALS FOR CONCRETE FLOOR SLAB CONSTRUCTION FOR SMALL FA...
 
MIVAN FRAMEWORK
MIVAN FRAMEWORKMIVAN FRAMEWORK
MIVAN FRAMEWORK
 
IRJET- Alternative Designs for Gable Industrial Structure
IRJET-  	  Alternative Designs for Gable Industrial StructureIRJET-  	  Alternative Designs for Gable Industrial Structure
IRJET- Alternative Designs for Gable Industrial Structure
 
IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...
IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...
IRJET- Comparative Study of Multi-Storey Multi-Span G+4 Building by PEB and C...
 
Development OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound WallDevelopment OF Low Cost Durable Precast Compound Wall
Development OF Low Cost Durable Precast Compound Wall
 
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”IRJET-  	  Methodology of 3S Construction Method “Prefabrication Technology”
IRJET- Methodology of 3S Construction Method “Prefabrication Technology”
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...
IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...
IRJET-Cost Comparison Between Frames with Solid Slab and Ribbed Slab using HC...
 
Table formwork
Table formwork Table formwork
Table formwork
 
IRJET - Review on Study of Space Frame Structure System
IRJET -  	  Review on Study of Space Frame Structure SystemIRJET -  	  Review on Study of Space Frame Structure System
IRJET - Review on Study of Space Frame Structure System
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Comparative Study of Codal Provisions for Pre-Engineered Buildings
Comparative Study of  Codal Provisions for Pre-Engineered BuildingsComparative Study of  Codal Provisions for Pre-Engineered Buildings
Comparative Study of Codal Provisions for Pre-Engineered Buildings
 
Irjet v4 i7530
Irjet v4 i7530Irjet v4 i7530
Irjet v4 i7530
 
FORGING HAMMER
FORGING HAMMERFORGING HAMMER
FORGING HAMMER
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 

Recently uploaded (20)

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 

SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 175 SELECTION OF FORMWORKS FOR BUILDING CONSTRUCTION Jyoti Deupa M. Tech in Civil Engineering School of Engineering and Technology, Sharda University, India ----------------------------------------------------------------------------***-------------------------------------------------------------------------- Abstract – In the developing country like India construction work plays an important role to increase the economy of the country. Also with the growing population urbanization is being the need of time. A good construction project has to focus on saving both time and money without losing the quality of work. One of the factor influencing the project time and economy is formwork. Different types of formworks are available in terms of material and function, so it becomes necessary to select a suitable formwork for a particular project. In Indian construction mostly aluminum (MIVAN technology) and conventional formworks are being used among which aluminum formwork is considered to save time and money for mass housing projects and large scale construction whereas, conventional formworks are found cheaper for small scale projects. For speedy construction MIVAN technology is best suited as it is easy to install and gives better finish. Apart other formwork systems like prefabricated, tunnel formwork etc. aluminum and timber formworks are commonly used as these are easily available almost all over India. Key Words: formwork, MIVAN technology, conventional formwork system, aluminum formwork, mass housing 1. INTRODUCTION Formwork is defined as a temporary structure which acts as support and mould for fresh concrete until it can take its own weight[1]. The structural system of temporary supports that holds formwork in position is termed as false work[2]. When concrete member gains sufficient hardness and strength formwork is removed and the process is known as stripping[2]. Formwork is considered as important construction material since quality of structural members is also effected by the quality of formwork. Conventionally, formworks are made out of timber but with the advancement of technology formworks made of different materials can be found. In recent technologies formworks are made of aluminum, plastic, timber with steel bracings, prefabricated etc. which are being used worldwide in construction industries. Traditional timber formwork system, Engineered formwork system, reusable plastic formwork system, stay in place formwork system, flexible formwork system etc. are some types of formwork systems used all over the world on the basis of material. Similarly on the basis of method of use table/flying formwork, climbing formwork, tunnel formwork, jump formwork, slip formwork are seen in practice[3].But in Indian construction practice mostly wooden and Engineered formwork systems are seen. In any construction project formwork are considered to be important factor which influence project cost and time as it consists of 35-45% of total cost of structural work [4] and it is found that formwork requires 20-25% of construction cost[5]. Selection of formwork depends on factors such as project type, project duration, cost, location of project etc. Also high labor intensity of works, poor quality of materials and structures are also considered as problem related to selection of formwork technology[6]. In modern days, various formworks are available in the market. In India present formwork techniques mainly available are: Prefabrication Technology, System formwork Technology, Precast Technology[7]. These formworks has many advantages such as higher floor cycle rate, lower material rate and lower material wastage, large number of reuses, low maintenance cost and smooth surface finish[8]. The main characteristics of good formwork:- 1. To provide the safety of the structure during implementation and use [6]. 2. To ensure appropriate technical quality such as proper stiffness, placement, assembly, disassembly and geometry of the formwork structure [6]. 3. To be economic in order to minimize the time and cost associated with the formwork[9]. Formworks play important role in saving project cost and time so it is necessary to select an appropriate formwork for any type of project. Formworks with different material are available in market among which conventional (wooden) formwork and aluminum formwork are mostly seen in Indian construction practice. Between these two types of formworks conventional and modern conventional formworks are mostly used due to low cost and easy availability.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 176 2. METHODOLOGY This study was based on document analysis. Several books and articles were collected as the literature of this study. Almost all documents were accessed from online sources. Various words/phrases related to title of this study were used as keywords to search related articles from authentic sources. Related literature was studied deeply and carefully. Required information was noted down and systematically recorded in a notebook. For every information, page of the notebook was divided into three parts. Needed information was clearly and separately written in third part, appropriate referencing was written in second part and the category (introduction, literature review, discussion etc.) in which it should be included was written in first part. Finally, collected data were written to prepare review paper with proper citations using Mendeley software. 3. RESULTS 3.1 Comparison of conventional, aluminum and steel formwork In India, these two formworks are seem to be widely used in various range of construction projects. Selecting a suitable formwork can give good outcomes to the project. For this, advantages and disadvantages of both type of formworks should be known along with their suitability for the given project. Top five factors affecting the formwork selection are time factor, surface finish, lifespan, cost and safety. 3.1.1 Conventional Formwork system It is the oldest type of formwork made from timber plank and plywood[10]. These types of formwork can be reused up to 4-5 times and can be easily available all over the India. In conventional type of formwork the floor cycle is minimum of 3-4 weeks[11]. For making wooden formwork the timber should be well seasoned, free from rots and other defects such as cracks and warps. It should be able to withstand the load applied in it during casting of the concrete member. To improve some of the disadvantages of conventional formwork system, modern conventional formwork system is brought in use which uses steel props and various types of jacks ( U jacks, T jacks) as support instead of timber support and plywood sheets are used instead of timber planks on slab decks, beams and columns[12]. 3.1.2 Advantages of conventional formwork system Timber shuttering is used mostly in residential buildings and small projects very commonly. It is famous for its light weight, flexibility and easy availability at most of the places[13]. Conventional formwork system requires low initial and maintenance cost as compared to mivan and steel shuttering technology[14]. They can be made in different shape and size as per the need. 3.1.3 Disadvantages of conventional formwork system Conventional formworks are only suitable for low rise buildings but they can effect the project cost and duration for high rise buildings. These type of formworks have less load carrying capacity than aluminum and steel formwork system[4]. Also it gives low productivity and reusability. Use of wooden shuttering requires more time and labor. If the corners and joints are not fixed properly, grout may come out in the form of slurry which will lead to poor quality of structural member[10]. During construction if timber is dry then it can absorb moisture from the concrete[3]. This type of formwork leaves the surface of the structure rough and to obtain smooth finishes plastering is required. When the useful time period of conventional formwork is over then it has zero salvage value[15]. 3.2 Aluminum Formwork System Aluminum formwork consists of aluminum panels which consists wall panel, deck panel, staircase panel, deck beam, with props, tie rods and pin for attaching purpose[16]. Prop heads are specially designed in such way that deck panels can be removed without disturbing the props.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 177 3.2.1 Advantages of aluminum formwork system Aluminum forms are used to construct shear walls and other RCC structures, hence no plastering is required as it gives smooth finishing. These forms can be lifted manually and are easy in erection and dismantling[16]. These kind of formwork gives large number of repetition which allows speedy construction[17]. This system allows cast-in-situ construction and monolithic construction. Labor requirement is less as compared to timber formwork[18]. After removal of formwork finishing line can be seen due to lower panel size[18]. It gives good salvage value when the useful life span is over. Mivan shuttering gives large carpet area and better seismic resistance[19]. This type of shuttering is considered as environment friendly as no trees has to cut down for its manufacture[20]. 3.2.2 Disadvantages of aluminum formwork system The main drawbacks of mivan technology are high initial and maintenance cost, structural symmetry is required and skilled labors are required at every stage of construction[21]. No alterations can be done once formwork is constructed[22]. Like conventional system it does not provide flexibility in construction. For small projects they can over cost the overall construction. 3.3 Steel formwork system Steel formworks are used largely in large projects or in situation where large number of reuses of the shuttering are possible[14]. It is considered good for curved structure such as chimney, tanks, column below plinth level, sewer, tunnel and retaining walls [23]. 3.3.1 Advantages of Steel Formwork Steel formworks are durable, strong and have longer life span also it is easy to install and dismantle. These types of forms do not absorb moisture from concrete preventing honey combing of structure[13]. Steel shuttering can be reused up to 100 to 120 times[15]. 3.3.2 Disadvantages of Steel Formwork Steel formwork is durable and strong as aluminum formwork but it is heavier than aluminum formwork due to high density[22]. It requires skilled manpower for erection and proper care should be taken while pouring concrete into it. In various studies above mostly comparison of aluminum and conventional formwork are mentioned. This comparison is based on mainly project time, cost and better construction quality. Conventional formwork technology is used from a very long time in constructions which is considered to be economical in initial investment and also easily available all over India. But construction with conventional formwork takes more time than advance formwork technology. Also these type of shuttering give poor surface finish, requires skilled labour to assemble as well as to dissemble[1]. Conventional formwork system has more wastage, zero scrap value and the number of reusability of these kind of formwork is up to 5-7 times only. Several other factors should also be considered while using wooden formwork, such as safety conditions, weather condition, proper storage etc. In a comparison made among conventional, aluminum and plastech formworks in 22 storey building plastech formwork seemed to be best option[8]. On the other hand MIVAN technology has given best performances for large projects, villas, mass housing or buildings more than 20 stories. These formworks are easy to handle, store, reusable +200 times with low wastage and high scrap value, gives faster floor cycle[24]. Also use of this formwork gives better construction quality, speedy construction and can be used without skilled manpower. Aluminum formworks are easy to carry but contraction cracks can be seen as its demerit. Implementing advancement in formwork will improve the quality of work in construction compared to traditional formwork by nearly 25-30%. The duration of project gets reduced by nearly 15-20% whereas cost gets reduced by 20-25% and the overall safety and efficiency of the work gets improved by 10-15%[25]. 4. DISCUSSION
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 178 5. CONCLUSION Based on the literature review it can be concluded that to meet the construction demand of present day the modern formwork techniques are considered capable for speedy construction. In large projects such as mass housing, towers, villas etc. It is better to use aluminum formwork and steel formwork rather than conventional formwork due to its faster floor cycle, better surface finish, easy handling and more number of repetitions. On the other hand, wooden formworks are best suited for small housing projects due to its low initial cost, easy installation and availability. Better selection of shuttering method as well as material for a construction project can enhance the project quality as well as its rate of completion. Instead of sticking only on conventional formwork system engineer should able to realize suitability of types of formworks according to the project. Hence, the selection of formwork for any kind of building project depends on the importance given to the time and cost of the project. The result of this study will help engineers and other technical persons to know different types of formworks with their merits and demerits for proper selection based on the nature and size of the project, so that quality construction could be achieved in estimated time and budget. REFERENCES [1] . A. K., “Comparative Study and Decision Making for a Formwork Technique To Be Adopted on a Construction Site in Mumbai,” Int. J. Res. Eng. Technol., vol. 04, no. 12, pp. 234–238, 2015, doi: 10.15623/ijret.2015.0412045. [2] A. N. Kote and A. R. Nandeshwar, “Duration Comparison of Mivan Formwork over the Conventional Formwork,” Int. J. Res. Eng. Appl. Manag., pp. 37–39, 2020, [Online]. Available: www.mfeformwork.com/ProductServic. [3] S. SAGAR and V. KUMAR PAUL, “an Investigation of Different Formwork System for High Rise Building Construction and for Decision Support System,” pp. 56–63, 2020, doi: 10.31705/faru.2020.6. [4] J. R. Naik, N. B. S. Rao, and R. S. M. Suresh, “Comparative Study of Existing Column Formwork,” J. Emerg. Technol. Innov. Res., vol. 2, no. 6, pp. 1734–1739, 2015. [5] M. S. Gaddam and A. Achuthan, “A comparative study on newly emerging type of formwork systems with conventional type of form work systems,” in Materials Today: Proceedings, Jan. 2020, vol. 33, pp. 736–740, doi: 10.1016/j.matpr.2020.06.090. [6] O. Kurakova, “Use of formwork construction systems in,” vol. 03026, pp. 1–7, 2018. [7] C. Effective, “Aluminium Formwork- An Innovation in Construction Technology,” no. January 2014, pp. 30–37. [8] N. Jawanjal, “Comparative study of various vertical formwork systems and preparation of formwork selection model using fuzzy logic,” Int. J. Sci. Res., vol. 4, no. 7, pp. 5–8, 2016. [9] K. Brózda and J. Selejdak, “Safety of Formworks in the Engineering and General Construction Sector,” Syst. Saf. Hum. - Tech. Facil. - Environ., vol. 1, no. 1, pp. 284–290, 2019, doi: 10.2478/czoto-2019-0037. [10] S. A. Ahmad, A. Kumar, and A. Khan, “a Brief Study on the Types of Shuttering and Their Comparison,” Int. Res. J. Eng. Technol., vol. 3, no. 5, pp. 3240–3242, 2016. [11] P. M. H, A. Padole, and A. A. Plasterwala, “Design and Cost Analysis of Advanced Shuttering,” vol. 7, no. 3, pp. 98–105, 2019. [12] “A COMPARATIVE STUDY FOR EVALUATION OF DIFFERENT FORM WORK SYSTEMS UTILIZATION IN CONSTRUCTION PROJECTS.” [13] M. Gebrehiwot and T. Getachew, “Assessment on the Effect of Using Different Types of Formwork Materials on Building Construction : A Case Study in Benshangul Gumuz Region,” Int. J. Constr. Eng. Manag., vol. 9, no. 4, pp. 119–125, 2020, doi: 10.5923/j.ijcem.20200904.02.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 09 | Sep 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 179 [14] P. Dinesh and M. Soundararajan, “Analysis of Effective Selection of Formwork System Based on Various Factors for Construction Projects,” Int. J. Adv. Res. Trends Eng. Technol., vol. 4, no. 11, 2017. [15] K. Loganathan and K. E. Viswanathan, “a Study Report on Cost, Duration and Quality Analysis of Different Formworks in High-Rise Building,” Int. J. Sci. Eng. Res., vol. 7, no. 4, pp. 190–195, 2016. [16] Aaditya, “Scope of Aluminium Formwork Technology in Affordable Housing Scheme Based on Cost and Duration,” pp. 150–156, 2018. [17] V. Prasanna and K. C. Sekar, “A COMPARATIVE STUDY ON VARIOUS TECHNIQUES IN CONSTRUCTION INDUSTRY,” vol. 7, no. 4, pp. 85–90, 2016. [18] A. W. Sebastian, “SUITABILITY OF MODULAR ALUMINIUM,” vol. 9, no. 6, pp. 421–426, 2018. [19] P. D. Suryakant and P. D. D. B, “‘ Emerging Trends in Formwork - Cost Analysis & Effectiveness of Mivan Formwork over the Conventional Formwork ,’” pp. 27–30. [20] N. Parekh, B. M. Marvadi, and U. Patel, “Comparative Studies of Construction ( Conventional Technique Vs Aluminium Formwork Techniques ),” J. Information, Knowl. Res. Civ. Eng., vol. 3, no. 2, pp. 279–287, 2015. [21] A. Gulghane, N. Pitale, and S. Sanghai, “Time and Cost Optimization of Construction Project Using Mivan Technology,” vol. 8, no. 8, pp. 70–74, 2018, doi: 10.9790/9622-0808027074. [22] P. Anuj and P. Vaishali, “To Study About Comparative Techniques of Formwork to Manage Cost of Construction,” Int. J. Manag. Technol. Eng., vol. 8, no. 119, pp. 119–124, 2018. [23] S. S. Asadi and P. V. Praneeth, “A comparative study for evaluation of different form work systems utilization in construction projects,” Int. J. Mech. Eng. Technol., vol. 8, no. 11, pp. 21–29, 2017. [24] “Journal of Advances and Scholarly Researches in Allied Education.” [25] I. A. Shaik and B. G. Rahul, “A Critical Study on Technological Advancements of Formwork in Construction Project Management,” no. 6, pp. 120–124, 2019.