International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 833
Technique of Finding the Defect in Software Testing
VIJAY PRATAP KATIYAR
Computer Science Department, Faculty of Engineering and Technology, Rama University, Kanpur,
Uttar Pradesh, India
---------------------------------------------------------------------***----------------------------------------------------------------------
ABSTRACT:- Software testing is a process of executing a program or application with the intent of finding the software
bugs. It can also be stated as the process of validating and verifying that a software program or application or product:
Meets the business and technical requirements that guided it's design and development.
Software testing is the most significant stage of the Software Development Life Cycle. Projects underneath testing goes
through different stages such as test analysis, test planning, test case, test case review process, test execution process,
requirement traceability matrix (RTM), defect tracking bug logging and tracking), test execution report and closure.
In terms of software, defects means whenever expected results not meet actual results. Generally defect is known as a bug.
lt talks about the complete life cycle of a bug right from the stage it was found, fixed, re-test, and close.
This paper basically deals with entire process of bug life cycle and how to avoid the bug. To avoid the bug, Test Engineer
should prepare the bug report template which consists of various steps. Complete the bug free task.
Keywords
Test Plan, Bug Life Cycle, Classification of Defect, Black-box Technique.
1. INTRODUCTION
Software testing is completed with different stages such as test analysis, test planning, test case, test case review process,
test execution process, requirement traceability matrix (RTM), defect tracking (bug logging and tracking), test execution
report and closure. Software testing is the major activity of estimating and accomplishing product with an observation to
find out faults. It is the procedure where the system constraints and system modules are implemented and estimated
manually or by using automation tools to figure out whether the system is fulfilling the specific requisites or not. [1]
The term ”bug” refers to software defects, and the term has been a publicly accepted term for software defect since first
referred to as such in Harvard Mark I days [2].
Debuggers are crucial tools needed in the development process, actually during the development of the average software
project at least half of the time is spent debugging. [2][3]. In spite of that, the debuggers most commonly used to debug
software aren’t taught to students to any great extent. Debuggers are in general studied very little, for example compared
to compilers. Most debuggers offer more sophisticated functions such as running a program ”step-by-step”, pause
application execution to examine its current state, and tracking the value changes of variables A debugger is a Complex
piece of software that can be is used to test and “debug” other applications. Their internals require sophisticated
algorithms and data structures to be able to perform their objective. Debuggers are used to analyze and find out why
software doesn’t behave as expected. They help developers to understand the software and to find the cause of a software
glitch. The developer can with the help of the debugger find and repair the glitch to allow the software to work according
to its original intent. The debugger can control the software being debugged so it can allow the developers to follow the
execution flow of the software, and in that way verify that the software executes as expected.
A Test plan is a document describing the scope, approach, objectives, resources, and schedule of a software testing effort.
It identifies the items to be tested [4, 5], items not be tested, who will do the testing, the test approach followed, what will be
the pass/fail criteria. It is also a document we share with the Business Analysts, Project Managers, Development teams.
This is to enhance the level of transparency into the QA team’s [5] working to the external teams. It is documented by the
QA Manager/QA Lead based on the inputs from the QA team members. Test plan is not static and is updated on an on
demand basis.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 834
2. BRIEF LITERATURE SURVEY
2.1 Test Plan
Test plan is a dynamic document that derives entire testing activities. It is prepared in the beginning as soon as the
requirement is gathered. Following are the attributes of test plan.
A. Objective: It shows that, what is the aim of writing the test plan. This test plan is written to test the functionality of
product.
B. Scope: It consists of two sub part:
(i) In scope i.e., features which needs to be tested.
(ii) Out of scope i.e., features which need not to be tested.
C. Test Methodology: It defines the types of testing which needs to be performed by test engineer for start particular
release. Testing types are shown as below:
(i) Start with smoke testing (test basic and critical features of an application.)
(ii) Functional testing
(iii) Integration Testing
(iv) System Testing
(v) Regression Testing
(vi) Compatibility Testing
D. Approach, Test Environment, Templates, Roles and Responsibilities, Effort estimation, Entry and exit criteria, Schedule,
Automation, Defect tracking, Assumption, Deliverables, Risks, Mitigation/Backup/Contingency plan.
E. Test Plan Identifier ,Test Items, Software Risk Issues ,Features to be Tested ,Features not to be Tested ,Approach ,Item
Pass/Fail Criteria , Suspension Criteria and Resumption Requirements , Test Deliverables ,Remaining Test Tasks ,Staffing
and Training Needs ,Responsibilities , Schedule ,Approvals ,Glossary[6]
Table 1
TEST CASE TEMPLATE
HEADER
Test Case Name Id
Test Case Type Functional/Integration/Systems
Requirement
Module
Status
Severity Critical/Major/Minor
Release
Version
Pre-Condition
Test Data
Brief Description
BODY
Steps
Inputs
Description
Expected Result
Actual Result
Status
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 835
Comments
FOOTER
Author
Date
Approved By
Reviewed BY
[9][10]
2.2 Bug Life Cycle
Bug life cycle is a complete life cycle of a bug. Whenever a bug is fixed, we retest the bug and change the status accordingly.
It might be closed or re-open. We get bugs because of
 Wrong code i.e., logic of the program is wrong or functionality does not work according to the requirement.
 Missing code i.e., developer has forgotten to develop that particular feature and it is not available in the
application.
 Extra coding i.e., developer has created a feature which is not available in the requirement but exists in
application.
Following are the entire process of bug life cycle:
STEPS:-
 As soon as we get a bug status of bug is “New/Open”.
 The bug is reported to the concerned person by changing the status as “Assigned”.
 Once developer gets the bug, first he is going to go through the bug i.e., check if it is valid or not then if it is valid
bug start re-producing the bug i.e., perform the actions on the application according to steps mentioned in the bug
report and then change the code.
 Once the code changes are done, the developer changes the status to “fixed”.
 The test Engineer starts re-testing the bug and if it is fixed properly then changes the status to “closed”. Else if bug
is still exists then status is change to “reopen” and assign it back once again to the developer.
This process continues until the bug is “fixed” or “closed”. [7][8]
Fig-1
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 836
2.3 Classification of Defect
A defect in software testing is an error in programming or logic that causes a program to failure or to produce
wrong/unexpected outcome.
Following are the different types of defects/bug:
A. Invalid or rejected bug
Whenever scenario is wrong and developer does not accept it as a bug then it is called invalid/rejected bug.
This bug generally occurred due to the following cases:
Case 1:- if Test Engineer misunderstood the requirement and may log the bug then developer will change the status to
invalid. Then again Test Engineer go through it and if he also feel that it’s invalid and closes the bug by keeping the status
as close.
Case 2:- if developer misunderstood the requirement and changes the status to invalid after go through. The Test Engineer
will go through the bug and he also may reproduce it and if the bug exists really he changes the status from invalid to re-
open.
B. Duplicate bug
When same bug is found by different Test Engineer then it is known as duplicate bug. This bug is occurred because of
following reasons:
 Common features (modules) which is access by both the Test Engineer.
 Dependent features.
SOLUTION FOR AVOID DUPLICATE BUG
i. Search in bug repository, if bug already exists, do not log (report) a bug. If bug does not exist, log (report) a bug and store
in bug repository.
ii. Send it to developer and carbon copy to all test engineers.
C. Not-Reproducible bug
Developer accepts the bug but not able to find the same bug after following the navigation steps mentioned in the bug
report.
Reasons for not-reproducible bug:
 Platform mismatch
i. Server mismatch
Test Engineer tests the application in one server and developer may reproduce the bug in another server, to avoid this
mention server name in bug report.
ii. Environment mismatch
Test Engineer tests the application in different operating system and browser and developer may reproduce the bug in
different operating system and Browser, to avoid this mention platform name in bug report.
 Data mismatch
Scenario may be correct, but for testing an application, Test Engineer use different data and developer may use different
data for reproducing the bug, to avoid this mention test data in bug report.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 837
 Build mismatch
Test Engineer got a bug in one build and developer reproduce the same bug in different/another build due to time
constraint it is known as build mismatch.
D. Can’t fix bug
Developer accept the bug, also able to reproduce it but not able to perform code changes due to some reasons. These
reasons are as follows that’s why developer can’t fix the bug:
1. Core of code (bug is in the core of code)
2. No technology support
If there will be major changes in bug then developer can’t say that can’t fix that bug. Can’t fix bug should be minor bug but
all minor bug cannot be can’t fix bug.
E. In-consistent bug
In first time Test Engineer found a bug but after that he is not able to find the same bug in next time, so to avoid the
inconsistency Test Engineer should take the screenshot and follow the following steps:
1. As soon as Test Engineer got the bug first to take the final screenshot of that bug.
2. Re-confirm the bug whether it is consistent or not.
3. If bug is consistent then search the bug in bug repository. If bug report is not found then prepare the bug report and
send it to the developer.
F. Deferred/Postpone bug
Even though there is a bug, it is postpone to the future releases due to time constraint. Due to time constraint developer
going to make it to deferred i.e. he will fix it in next release. In the initial builds, bugs can’t be deferred but in the later
stages due to the time limit he can deferred the bug. But the test engineer will check that bug can be really deferred or not.
Deferred bug can be minor bug but the entire minor bug cannot be deferred. We cannot close the bug until it is fixed in
next release.
G. Requests for Enhancement
These are the suggestion given by the test engineer towards the enhancement of the application.
Table 2
[9][10]
BUG REPORT TEMPLATE
1. Date:
2. Reporter :
3. Assigned to :
4. Status :
5. Severity :
6. Priority :
7. Server :
8. Platform :
9. Test Data :
10. Build # :
12. Brief Description :
13.Steps to reproduce :
14. Observation :
15.Expected result
16. Attachments
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 838
3. METHODOLOGY
Black-Box Design Technique
Equivalence partitioning - Equivalence partitioning or equivalence class partitioning (ECP) is a software testing
technique that divides the input data of a software unit into partitions of equivalent data from which test cases can be
derived. In principle, test cases are designed to cover each partition at least once. This technique tries to define test cases
that uncover classes of errors, thereby reducing the total number of test cases that must be developed. An advantage of
this approach is reduction in the time required for testing software due to lesser number of test cases.
Equivalence partitioning is typically applied to the inputs of a tested component, but may be applied to the outputs in rare
cases. The equivalence partitions are usually derived from the requirements specification for input attributes that
influence the processing of the test object.[11]
Boundary Value Analysis- Boundary value analysis (BVA) is based on testing at the boundaries between partitions.
Here we have both valid boundaries (in the valid partitions) and invalid boundaries (in the invalid partitions).
As an example, consider a printer that has an input option of the number of copies to be made, from 1 to 99. To apply
boundary value analysis, we will take the minimum and maximum (boundary) values from the valid partition (1 and 99 in
this case) together with the first or last value respectively in each of the invalid partitions adjacent to the valid partition (0
and 100 in this case). In this example we would have three equivalence partitioning tests (one from each of the three
partitions) and four boundary value tests. Consider the bank system described in the previous section in equivalence
partitioning.
Because the boundary values are defined as those values on the edge of a partition, we have identified the following
boundary values: -$0.01 (an invalid boundary value because it is at the edge of an invalid partition), $0.00, $100.00,
$100.01, $999.99 and $1000.00, all valid boundary values. So by applying boundary value analysis we will have six tests
for boundary values. [11]
Decision Tables - Decision tables are a concise visual representation for specifying which actions to perform depending
on given conditions. They are algorithms whose output is a set of actions. The information expressed in decision tables
could also be represented as decision trees or in a programming language as a series of if-then-else and switch-case
statements.
Each decision corresponds to a variable, relation or predicate whose possible values are listed among the condition
alternatives. Each action is a procedure or operation to perform, and the entries specify whether (or in what order) the
action is to be performed for the set of condition alternatives the entry corresponds to.
To make them more concise, many decision tables include in their condition alternatives a don't care symbol. This can be a
hyphen [12] or blank although using a blank is discouraged as it may merely indicate that the decision table has not been
finished. One of the uses of decision tables is to reveal conditions under which certain input factors are irrelevant on the
actions to be taken, allowing these input tests to be skipped and thereby streamlining decision-making procedures.[13],
Aside from the basic four quadrant structure, decision tables vary widely in the way the condition alternatives and action
entries are don’t care symbol represented.[14] Some decision tables use simple true/false values to represent the
alternatives to a condition (similar to if-then-else), other demonstration tables may use numbered alternatives (similar to
switch-case), and some tables even use fuzzy logic or probabilistic representations for condition alternatives.[16] In a
similar way, action entries can simply represent whether an action is to be performed (check the actions to perform), or in
more advanced decision tables, the sequencing of actions to perform (number the actions to perform).
A decision table is considered balanced [13] or complete [18] if it includes every possible combination of input variables. In
other words, balanced decision tables prescribe an action in every situation where the input variables are provided.[13]
State transition table - In automata theory and sequential logic, a state transition table is a table showing what state (or
states in the case of a nondeterministic finite automaton) a finite semi automaton or finite state machine will move to,
based on the current state and other inputs. A state table is essentially a truth table in which some of the inputs are the
current state, and the outputs include the next state, along with other outputs. [23]
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 839
State Transition testing, a black box testing technique, in which outputs are triggered by changes to the input conditions or
changes to 'state' of the system. In other words, tests are designed to execute valid and invalid state transitions
When to use?-
 When we have sequence of events that occur and associated conditions that apply to those events
 When the proper handling of a particular event depends on the events and conditions that have occurred in the
past
 It is used for real time systems with various states and transitions involved
Example: A System's transition is represented as shown in the below diagram:
Fig-2
The tests are derived from the above state and transition and below are the possible scenarios that need to be tested.
Table 3
Tests Tests 1 Tests 2 Tests 3
Start State Off On On
Input Switch ON Switch Off Switch Off
Output Light ON Light Off Fault
Finish State ON OFF On
[15]
4. RESULT
With the help of Testing we can reduce the bug from the software but it cannot prove that there is no remaining bug or
software is bug free. The main reasons for bug rejections are improper bug reports and inadequate information of test
engineer over the developed project. To avoid such kind of bug we should prepare a proper bug report. To start the testing
process firstly test engineer should have a clear knowledge of requirement. After that he can clearly identify the bug. He
should prepare the test document and test plan as per the requirement. Based on these test plan further test engineers can
prepare the test case where all the positive as well as negative scenarios are included. And prepare test case, test scenario,
bug report template in such a way that any other person can easily reproduce the same scenario or identify the bug
without wasting time over reviews and rework. Development team as well as testing team should be a part of requirement
gathering team for enhanced understanding of software requirements. It will help the project team to have a proper
proposal of scope and restrictions to avoid rework.
5. CONCLUSIONS
Requirement Analysis forms the backbone of software. Software is bug free with the help of software testing processes like
as testing design techniques, software test plan, test case execution, test strategies etc.
If we prepare the proper bug report then the entire bug should be resolved by developer easily.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 840
Development team also understands the requirement and they resolved the bugs and send the report to the Tester. By this
process client get the bug free software.
Today, testing is the most challenging and dominating activity used by industry, therefore, improvement in its
effectiveness, both with respect to the time and resources, is taken as a major factor by many researchers The purpose of
testing can be quality assurance, verification, and validation or reliability estimation.
6. REFERENCES
[1] Itti Hooda, et al. “Software Test Process, Testing Types and Techniques”, International Journal of Computer
Applications (0975 –8887) February 2015, Volume 111 – No 13.
[2] Jonathan B. Rosenberg. How Debuggers Work. John Wiley & Sons, London, 1996
[3] Quantify the time and cost saved using reversible debuggers. Survey done on Cambridge Judge Business School, 2012.
[4] Roger S. Pressman “ Software Engg. A Practitioner’s Approach “, 6th Edition.
[5] Si Huang, Myra Cohen, and Atif M. Memon(2010) “Repairing GUI Test Suites Using a Genetic Algorithm, “In Proceedings
of the 3rd IEEE International Conference on Software Testing Verification and Validation(ICST).
[6] Cirstian Cadar et al,“ Symbolic Execution for Software Testing in PracticePreliminary Assessment “, ICSE, May, 2011.
[7] Aranda, J., & Venolia, G., et al. “The Secret Life of Bugs: Going Past the Error and Omissions in Software Repositories”,
31st IEEE International Conference on software Engineering (ICSE), 2009, pp298-308.
[8] Qin, F., Tucek, J., & Zhou, Y., et al. “Treating Bugs As Allergies: A Safe Method for Surviving Software Failures”,
Proceedings of the10th conference on Hot Topics in Operating Systems (HOTOS), 2005, Vol. 10, pp.19-19.
[9] Breu, S., Premraj, R., Sillito, J., & Zimmermann, T., et al. “Information needs in bug reports: improving cooperation
between developers and users”, Proceedings of the 2010 ACM conference on Computer supported cooperative
work(CSCW ), 2010, pp301-310.
[10] Giovanni Denaro, Bernhard Scholz, Zhi Quan Zhou, et al. "Automated Software Testing and Analysis: Techniques,
Practices and Tools", 2014 47th Hawaii International Conference on System Sciences, p. 260, 2007,
doi:10.1109/HICSS.2007.96.
[11] Burnstein, Ilene (2003), Practical Software Testing, Springer-Verlag, p. 623, ISBN 0-387-95131-8
[12] Ross, Ronald G. (2005). "Decision Tables, Part 2 ~ The Route to Completeness". Business Rules Journal. 6 (8).
Retrieved 11 November 2017.
[13] Snow, Paul (19 July 2012). "Decision Tables". DTRules: A Java Based Decision Table Rules Engine. Retrieved 11
November 2017.
[14] Rogers, William T. "Decision Table Examples: Medical Insurance". Saint Xavier University Systems Analysis and
Design. Archived from the original on March 29, 2007.
[15]https://www.tutorialspoint.com/software_testing_dictionary/state_transition.htm
[16]Breen, Michael (2005), "Experience of using a lightweight formal specification method for a commercial embedded
system product line" (PDF), Requirements Engineering Journal, 10 (2), doi:10.1007/s00766-004-0209-1

More Related Content

What's hot

STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)Ch Fahadi
 
Manual testing-training-institute-in-marathahalli
Manual testing-training-institute-in-marathahalliManual testing-training-institute-in-marathahalli
Manual testing-training-institute-in-marathahallisiyaram ray
 
Interview questions for manual testing technology.
Interview questions for manual testing technology.Interview questions for manual testing technology.
Interview questions for manual testing technology.Vinay Agnihotri
 
Manual Testing Questions
Manual Testing QuestionsManual Testing Questions
Manual Testing QuestionsUser1test
 
Practical Software Testing Tools
Practical Software Testing ToolsPractical Software Testing Tools
Practical Software Testing ToolsDr Ganesh Iyer
 
functional testing
functional testing functional testing
functional testing bharathanche
 
Test Process
Test ProcessTest Process
Test Processtokarthik
 
defect tracking and management
defect tracking and management   defect tracking and management
defect tracking and management Manish Chaurasia
 
Strategies For Software Test Documentation
Strategies For Software Test Documentation Strategies For Software Test Documentation
Strategies For Software Test Documentation Vishwak Solution
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycleNikhil Sharma
 
Verifcation and Validation
Verifcation and ValidationVerifcation and Validation
Verifcation and ValidationSaggitariusArrow
 
Priority based software development and testing technique
Priority based software development and testing techniquePriority based software development and testing technique
Priority based software development and testing techniqueBTCTechnologies
 

What's hot (20)

STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)STLC (Software Testing Life Cycle)
STLC (Software Testing Life Cycle)
 
Manual testing-training-institute-in-marathahalli
Manual testing-training-institute-in-marathahalliManual testing-training-institute-in-marathahalli
Manual testing-training-institute-in-marathahalli
 
Interview questions for manual testing technology.
Interview questions for manual testing technology.Interview questions for manual testing technology.
Interview questions for manual testing technology.
 
Manual Testing Questions
Manual Testing QuestionsManual Testing Questions
Manual Testing Questions
 
Software testing
Software testingSoftware testing
Software testing
 
Practical Software Testing Tools
Practical Software Testing ToolsPractical Software Testing Tools
Practical Software Testing Tools
 
Software testing overview subbu
Software testing overview subbuSoftware testing overview subbu
Software testing overview subbu
 
functional testing
functional testing functional testing
functional testing
 
Stlc 12 Steps Ppt
Stlc 12 Steps PptStlc 12 Steps Ppt
Stlc 12 Steps Ppt
 
Test Process
Test ProcessTest Process
Test Process
 
defect tracking and management
defect tracking and management   defect tracking and management
defect tracking and management
 
Testing Tools
Testing ToolsTesting Tools
Testing Tools
 
Strategies For Software Test Documentation
Strategies For Software Test Documentation Strategies For Software Test Documentation
Strategies For Software Test Documentation
 
Software testing
Software testing   Software testing
Software testing
 
Software testing life cycle
Software testing life cycleSoftware testing life cycle
Software testing life cycle
 
Software test life cycle
Software test life cycleSoftware test life cycle
Software test life cycle
 
Software testing
Software testingSoftware testing
Software testing
 
Introduction & Manual Testing
Introduction & Manual TestingIntroduction & Manual Testing
Introduction & Manual Testing
 
Verifcation and Validation
Verifcation and ValidationVerifcation and Validation
Verifcation and Validation
 
Priority based software development and testing technique
Priority based software development and testing techniquePriority based software development and testing technique
Priority based software development and testing technique
 

Similar to Technique of Finding Software Defects

Bug life cycle
Bug life cycleBug life cycle
Bug life cycleBugRaptors
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTINGacemindia
 
Software testing interview Q&A – Part 2
Software testing interview Q&A – Part 2Software testing interview Q&A – Part 2
Software testing interview Q&A – Part 2Khoa Bui
 
Software Testing - A sneak preview By Srikanth
Software Testing - A sneak preview By SrikanthSoftware Testing - A sneak preview By Srikanth
Software Testing - A sneak preview By SrikanthSrikanth Krishnamoorthy
 
Learn software testing with tech partnerz 3
Learn software testing with tech partnerz 3Learn software testing with tech partnerz 3
Learn software testing with tech partnerz 3Techpartnerz
 
EFFECTIVE TEST CASE DESING: A REVIEW
EFFECTIVE TEST CASE DESING: A REVIEWEFFECTIVE TEST CASE DESING: A REVIEW
EFFECTIVE TEST CASE DESING: A REVIEWJournal For Research
 
Software testing & Quality Assurance
Software testing & Quality Assurance Software testing & Quality Assurance
Software testing & Quality Assurance Webtech Learning
 
11 steps of testing process - By Harshil Barot
11 steps of testing process - By Harshil Barot11 steps of testing process - By Harshil Barot
11 steps of testing process - By Harshil BarotHarshil Barot
 
ISTQB Chapter 1 Fundamentals of Testing
ISTQB Chapter 1  Fundamentals of TestingISTQB Chapter 1  Fundamentals of Testing
ISTQB Chapter 1 Fundamentals of Testingssuser2d9936
 
QA interview questions and answers
QA interview questions and answersQA interview questions and answers
QA interview questions and answersMehul Chauhan
 
Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx14941
 
IRJET- Research Study on Testing Mantle in SDLC
IRJET- Research Study on Testing Mantle in SDLCIRJET- Research Study on Testing Mantle in SDLC
IRJET- Research Study on Testing Mantle in SDLCIRJET Journal
 
IRJET- A Review on Bug Tracking System
IRJET- A Review on Bug Tracking SystemIRJET- A Review on Bug Tracking System
IRJET- A Review on Bug Tracking SystemIRJET Journal
 
Reading Summary - Effective Software Defect Tracking + Pragmatic Unit Testing
Reading Summary - Effective Software Defect Tracking + Pragmatic Unit TestingReading Summary - Effective Software Defect Tracking + Pragmatic Unit Testing
Reading Summary - Effective Software Defect Tracking + Pragmatic Unit TestingArtemisa Yescas Engler
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-timeSunil Pandey
 
20MCE14_Software Testing and Quality Assurance Notes.pdf
20MCE14_Software Testing and Quality Assurance Notes.pdf20MCE14_Software Testing and Quality Assurance Notes.pdf
20MCE14_Software Testing and Quality Assurance Notes.pdfDSIVABALASELVAMANIMC
 
Software Testing
Software TestingSoftware Testing
Software TestingSengu Msc
 

Similar to Technique of Finding Software Defects (20)

Bug life cycle
Bug life cycleBug life cycle
Bug life cycle
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
Software testing interview Q&A – Part 2
Software testing interview Q&A – Part 2Software testing interview Q&A – Part 2
Software testing interview Q&A – Part 2
 
Software Testing - A sneak preview By Srikanth
Software Testing - A sneak preview By SrikanthSoftware Testing - A sneak preview By Srikanth
Software Testing - A sneak preview By Srikanth
 
Learn software testing with tech partnerz 3
Learn software testing with tech partnerz 3Learn software testing with tech partnerz 3
Learn software testing with tech partnerz 3
 
EFFECTIVE TEST CASE DESING: A REVIEW
EFFECTIVE TEST CASE DESING: A REVIEWEFFECTIVE TEST CASE DESING: A REVIEW
EFFECTIVE TEST CASE DESING: A REVIEW
 
Software testing & Quality Assurance
Software testing & Quality Assurance Software testing & Quality Assurance
Software testing & Quality Assurance
 
11 steps of testing process - By Harshil Barot
11 steps of testing process - By Harshil Barot11 steps of testing process - By Harshil Barot
11 steps of testing process - By Harshil Barot
 
ISTQB Chapter 1 Fundamentals of Testing
ISTQB Chapter 1  Fundamentals of TestingISTQB Chapter 1  Fundamentals of Testing
ISTQB Chapter 1 Fundamentals of Testing
 
QA interview questions and answers
QA interview questions and answersQA interview questions and answers
QA interview questions and answers
 
Aim (A).pptx
Aim (A).pptxAim (A).pptx
Aim (A).pptx
 
SE-Testing.ppt
SE-Testing.pptSE-Testing.ppt
SE-Testing.ppt
 
stm f.pdf
stm f.pdfstm f.pdf
stm f.pdf
 
T0 numtq0nje=
T0 numtq0nje=T0 numtq0nje=
T0 numtq0nje=
 
IRJET- Research Study on Testing Mantle in SDLC
IRJET- Research Study on Testing Mantle in SDLCIRJET- Research Study on Testing Mantle in SDLC
IRJET- Research Study on Testing Mantle in SDLC
 
IRJET- A Review on Bug Tracking System
IRJET- A Review on Bug Tracking SystemIRJET- A Review on Bug Tracking System
IRJET- A Review on Bug Tracking System
 
Reading Summary - Effective Software Defect Tracking + Pragmatic Unit Testing
Reading Summary - Effective Software Defect Tracking + Pragmatic Unit TestingReading Summary - Effective Software Defect Tracking + Pragmatic Unit Testing
Reading Summary - Effective Software Defect Tracking + Pragmatic Unit Testing
 
52892006 manual-testing-real-time
52892006 manual-testing-real-time52892006 manual-testing-real-time
52892006 manual-testing-real-time
 
20MCE14_Software Testing and Quality Assurance Notes.pdf
20MCE14_Software Testing and Quality Assurance Notes.pdf20MCE14_Software Testing and Quality Assurance Notes.pdf
20MCE14_Software Testing and Quality Assurance Notes.pdf
 
Software Testing
Software TestingSoftware Testing
Software Testing
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Technique of Finding Software Defects

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 833 Technique of Finding the Defect in Software Testing VIJAY PRATAP KATIYAR Computer Science Department, Faculty of Engineering and Technology, Rama University, Kanpur, Uttar Pradesh, India ---------------------------------------------------------------------***---------------------------------------------------------------------- ABSTRACT:- Software testing is a process of executing a program or application with the intent of finding the software bugs. It can also be stated as the process of validating and verifying that a software program or application or product: Meets the business and technical requirements that guided it's design and development. Software testing is the most significant stage of the Software Development Life Cycle. Projects underneath testing goes through different stages such as test analysis, test planning, test case, test case review process, test execution process, requirement traceability matrix (RTM), defect tracking bug logging and tracking), test execution report and closure. In terms of software, defects means whenever expected results not meet actual results. Generally defect is known as a bug. lt talks about the complete life cycle of a bug right from the stage it was found, fixed, re-test, and close. This paper basically deals with entire process of bug life cycle and how to avoid the bug. To avoid the bug, Test Engineer should prepare the bug report template which consists of various steps. Complete the bug free task. Keywords Test Plan, Bug Life Cycle, Classification of Defect, Black-box Technique. 1. INTRODUCTION Software testing is completed with different stages such as test analysis, test planning, test case, test case review process, test execution process, requirement traceability matrix (RTM), defect tracking (bug logging and tracking), test execution report and closure. Software testing is the major activity of estimating and accomplishing product with an observation to find out faults. It is the procedure where the system constraints and system modules are implemented and estimated manually or by using automation tools to figure out whether the system is fulfilling the specific requisites or not. [1] The term ”bug” refers to software defects, and the term has been a publicly accepted term for software defect since first referred to as such in Harvard Mark I days [2]. Debuggers are crucial tools needed in the development process, actually during the development of the average software project at least half of the time is spent debugging. [2][3]. In spite of that, the debuggers most commonly used to debug software aren’t taught to students to any great extent. Debuggers are in general studied very little, for example compared to compilers. Most debuggers offer more sophisticated functions such as running a program ”step-by-step”, pause application execution to examine its current state, and tracking the value changes of variables A debugger is a Complex piece of software that can be is used to test and “debug” other applications. Their internals require sophisticated algorithms and data structures to be able to perform their objective. Debuggers are used to analyze and find out why software doesn’t behave as expected. They help developers to understand the software and to find the cause of a software glitch. The developer can with the help of the debugger find and repair the glitch to allow the software to work according to its original intent. The debugger can control the software being debugged so it can allow the developers to follow the execution flow of the software, and in that way verify that the software executes as expected. A Test plan is a document describing the scope, approach, objectives, resources, and schedule of a software testing effort. It identifies the items to be tested [4, 5], items not be tested, who will do the testing, the test approach followed, what will be the pass/fail criteria. It is also a document we share with the Business Analysts, Project Managers, Development teams. This is to enhance the level of transparency into the QA team’s [5] working to the external teams. It is documented by the QA Manager/QA Lead based on the inputs from the QA team members. Test plan is not static and is updated on an on demand basis.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 834 2. BRIEF LITERATURE SURVEY 2.1 Test Plan Test plan is a dynamic document that derives entire testing activities. It is prepared in the beginning as soon as the requirement is gathered. Following are the attributes of test plan. A. Objective: It shows that, what is the aim of writing the test plan. This test plan is written to test the functionality of product. B. Scope: It consists of two sub part: (i) In scope i.e., features which needs to be tested. (ii) Out of scope i.e., features which need not to be tested. C. Test Methodology: It defines the types of testing which needs to be performed by test engineer for start particular release. Testing types are shown as below: (i) Start with smoke testing (test basic and critical features of an application.) (ii) Functional testing (iii) Integration Testing (iv) System Testing (v) Regression Testing (vi) Compatibility Testing D. Approach, Test Environment, Templates, Roles and Responsibilities, Effort estimation, Entry and exit criteria, Schedule, Automation, Defect tracking, Assumption, Deliverables, Risks, Mitigation/Backup/Contingency plan. E. Test Plan Identifier ,Test Items, Software Risk Issues ,Features to be Tested ,Features not to be Tested ,Approach ,Item Pass/Fail Criteria , Suspension Criteria and Resumption Requirements , Test Deliverables ,Remaining Test Tasks ,Staffing and Training Needs ,Responsibilities , Schedule ,Approvals ,Glossary[6] Table 1 TEST CASE TEMPLATE HEADER Test Case Name Id Test Case Type Functional/Integration/Systems Requirement Module Status Severity Critical/Major/Minor Release Version Pre-Condition Test Data Brief Description BODY Steps Inputs Description Expected Result Actual Result Status
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 835 Comments FOOTER Author Date Approved By Reviewed BY [9][10] 2.2 Bug Life Cycle Bug life cycle is a complete life cycle of a bug. Whenever a bug is fixed, we retest the bug and change the status accordingly. It might be closed or re-open. We get bugs because of  Wrong code i.e., logic of the program is wrong or functionality does not work according to the requirement.  Missing code i.e., developer has forgotten to develop that particular feature and it is not available in the application.  Extra coding i.e., developer has created a feature which is not available in the requirement but exists in application. Following are the entire process of bug life cycle: STEPS:-  As soon as we get a bug status of bug is “New/Open”.  The bug is reported to the concerned person by changing the status as “Assigned”.  Once developer gets the bug, first he is going to go through the bug i.e., check if it is valid or not then if it is valid bug start re-producing the bug i.e., perform the actions on the application according to steps mentioned in the bug report and then change the code.  Once the code changes are done, the developer changes the status to “fixed”.  The test Engineer starts re-testing the bug and if it is fixed properly then changes the status to “closed”. Else if bug is still exists then status is change to “reopen” and assign it back once again to the developer. This process continues until the bug is “fixed” or “closed”. [7][8] Fig-1
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 836 2.3 Classification of Defect A defect in software testing is an error in programming or logic that causes a program to failure or to produce wrong/unexpected outcome. Following are the different types of defects/bug: A. Invalid or rejected bug Whenever scenario is wrong and developer does not accept it as a bug then it is called invalid/rejected bug. This bug generally occurred due to the following cases: Case 1:- if Test Engineer misunderstood the requirement and may log the bug then developer will change the status to invalid. Then again Test Engineer go through it and if he also feel that it’s invalid and closes the bug by keeping the status as close. Case 2:- if developer misunderstood the requirement and changes the status to invalid after go through. The Test Engineer will go through the bug and he also may reproduce it and if the bug exists really he changes the status from invalid to re- open. B. Duplicate bug When same bug is found by different Test Engineer then it is known as duplicate bug. This bug is occurred because of following reasons:  Common features (modules) which is access by both the Test Engineer.  Dependent features. SOLUTION FOR AVOID DUPLICATE BUG i. Search in bug repository, if bug already exists, do not log (report) a bug. If bug does not exist, log (report) a bug and store in bug repository. ii. Send it to developer and carbon copy to all test engineers. C. Not-Reproducible bug Developer accepts the bug but not able to find the same bug after following the navigation steps mentioned in the bug report. Reasons for not-reproducible bug:  Platform mismatch i. Server mismatch Test Engineer tests the application in one server and developer may reproduce the bug in another server, to avoid this mention server name in bug report. ii. Environment mismatch Test Engineer tests the application in different operating system and browser and developer may reproduce the bug in different operating system and Browser, to avoid this mention platform name in bug report.  Data mismatch Scenario may be correct, but for testing an application, Test Engineer use different data and developer may use different data for reproducing the bug, to avoid this mention test data in bug report.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 837  Build mismatch Test Engineer got a bug in one build and developer reproduce the same bug in different/another build due to time constraint it is known as build mismatch. D. Can’t fix bug Developer accept the bug, also able to reproduce it but not able to perform code changes due to some reasons. These reasons are as follows that’s why developer can’t fix the bug: 1. Core of code (bug is in the core of code) 2. No technology support If there will be major changes in bug then developer can’t say that can’t fix that bug. Can’t fix bug should be minor bug but all minor bug cannot be can’t fix bug. E. In-consistent bug In first time Test Engineer found a bug but after that he is not able to find the same bug in next time, so to avoid the inconsistency Test Engineer should take the screenshot and follow the following steps: 1. As soon as Test Engineer got the bug first to take the final screenshot of that bug. 2. Re-confirm the bug whether it is consistent or not. 3. If bug is consistent then search the bug in bug repository. If bug report is not found then prepare the bug report and send it to the developer. F. Deferred/Postpone bug Even though there is a bug, it is postpone to the future releases due to time constraint. Due to time constraint developer going to make it to deferred i.e. he will fix it in next release. In the initial builds, bugs can’t be deferred but in the later stages due to the time limit he can deferred the bug. But the test engineer will check that bug can be really deferred or not. Deferred bug can be minor bug but the entire minor bug cannot be deferred. We cannot close the bug until it is fixed in next release. G. Requests for Enhancement These are the suggestion given by the test engineer towards the enhancement of the application. Table 2 [9][10] BUG REPORT TEMPLATE 1. Date: 2. Reporter : 3. Assigned to : 4. Status : 5. Severity : 6. Priority : 7. Server : 8. Platform : 9. Test Data : 10. Build # : 12. Brief Description : 13.Steps to reproduce : 14. Observation : 15.Expected result 16. Attachments
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 838 3. METHODOLOGY Black-Box Design Technique Equivalence partitioning - Equivalence partitioning or equivalence class partitioning (ECP) is a software testing technique that divides the input data of a software unit into partitions of equivalent data from which test cases can be derived. In principle, test cases are designed to cover each partition at least once. This technique tries to define test cases that uncover classes of errors, thereby reducing the total number of test cases that must be developed. An advantage of this approach is reduction in the time required for testing software due to lesser number of test cases. Equivalence partitioning is typically applied to the inputs of a tested component, but may be applied to the outputs in rare cases. The equivalence partitions are usually derived from the requirements specification for input attributes that influence the processing of the test object.[11] Boundary Value Analysis- Boundary value analysis (BVA) is based on testing at the boundaries between partitions. Here we have both valid boundaries (in the valid partitions) and invalid boundaries (in the invalid partitions). As an example, consider a printer that has an input option of the number of copies to be made, from 1 to 99. To apply boundary value analysis, we will take the minimum and maximum (boundary) values from the valid partition (1 and 99 in this case) together with the first or last value respectively in each of the invalid partitions adjacent to the valid partition (0 and 100 in this case). In this example we would have three equivalence partitioning tests (one from each of the three partitions) and four boundary value tests. Consider the bank system described in the previous section in equivalence partitioning. Because the boundary values are defined as those values on the edge of a partition, we have identified the following boundary values: -$0.01 (an invalid boundary value because it is at the edge of an invalid partition), $0.00, $100.00, $100.01, $999.99 and $1000.00, all valid boundary values. So by applying boundary value analysis we will have six tests for boundary values. [11] Decision Tables - Decision tables are a concise visual representation for specifying which actions to perform depending on given conditions. They are algorithms whose output is a set of actions. The information expressed in decision tables could also be represented as decision trees or in a programming language as a series of if-then-else and switch-case statements. Each decision corresponds to a variable, relation or predicate whose possible values are listed among the condition alternatives. Each action is a procedure or operation to perform, and the entries specify whether (or in what order) the action is to be performed for the set of condition alternatives the entry corresponds to. To make them more concise, many decision tables include in their condition alternatives a don't care symbol. This can be a hyphen [12] or blank although using a blank is discouraged as it may merely indicate that the decision table has not been finished. One of the uses of decision tables is to reveal conditions under which certain input factors are irrelevant on the actions to be taken, allowing these input tests to be skipped and thereby streamlining decision-making procedures.[13], Aside from the basic four quadrant structure, decision tables vary widely in the way the condition alternatives and action entries are don’t care symbol represented.[14] Some decision tables use simple true/false values to represent the alternatives to a condition (similar to if-then-else), other demonstration tables may use numbered alternatives (similar to switch-case), and some tables even use fuzzy logic or probabilistic representations for condition alternatives.[16] In a similar way, action entries can simply represent whether an action is to be performed (check the actions to perform), or in more advanced decision tables, the sequencing of actions to perform (number the actions to perform). A decision table is considered balanced [13] or complete [18] if it includes every possible combination of input variables. In other words, balanced decision tables prescribe an action in every situation where the input variables are provided.[13] State transition table - In automata theory and sequential logic, a state transition table is a table showing what state (or states in the case of a nondeterministic finite automaton) a finite semi automaton or finite state machine will move to, based on the current state and other inputs. A state table is essentially a truth table in which some of the inputs are the current state, and the outputs include the next state, along with other outputs. [23]
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 839 State Transition testing, a black box testing technique, in which outputs are triggered by changes to the input conditions or changes to 'state' of the system. In other words, tests are designed to execute valid and invalid state transitions When to use?-  When we have sequence of events that occur and associated conditions that apply to those events  When the proper handling of a particular event depends on the events and conditions that have occurred in the past  It is used for real time systems with various states and transitions involved Example: A System's transition is represented as shown in the below diagram: Fig-2 The tests are derived from the above state and transition and below are the possible scenarios that need to be tested. Table 3 Tests Tests 1 Tests 2 Tests 3 Start State Off On On Input Switch ON Switch Off Switch Off Output Light ON Light Off Fault Finish State ON OFF On [15] 4. RESULT With the help of Testing we can reduce the bug from the software but it cannot prove that there is no remaining bug or software is bug free. The main reasons for bug rejections are improper bug reports and inadequate information of test engineer over the developed project. To avoid such kind of bug we should prepare a proper bug report. To start the testing process firstly test engineer should have a clear knowledge of requirement. After that he can clearly identify the bug. He should prepare the test document and test plan as per the requirement. Based on these test plan further test engineers can prepare the test case where all the positive as well as negative scenarios are included. And prepare test case, test scenario, bug report template in such a way that any other person can easily reproduce the same scenario or identify the bug without wasting time over reviews and rework. Development team as well as testing team should be a part of requirement gathering team for enhanced understanding of software requirements. It will help the project team to have a proper proposal of scope and restrictions to avoid rework. 5. CONCLUSIONS Requirement Analysis forms the backbone of software. Software is bug free with the help of software testing processes like as testing design techniques, software test plan, test case execution, test strategies etc. If we prepare the proper bug report then the entire bug should be resolved by developer easily.
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 840 Development team also understands the requirement and they resolved the bugs and send the report to the Tester. By this process client get the bug free software. Today, testing is the most challenging and dominating activity used by industry, therefore, improvement in its effectiveness, both with respect to the time and resources, is taken as a major factor by many researchers The purpose of testing can be quality assurance, verification, and validation or reliability estimation. 6. REFERENCES [1] Itti Hooda, et al. “Software Test Process, Testing Types and Techniques”, International Journal of Computer Applications (0975 –8887) February 2015, Volume 111 – No 13. [2] Jonathan B. Rosenberg. How Debuggers Work. John Wiley & Sons, London, 1996 [3] Quantify the time and cost saved using reversible debuggers. Survey done on Cambridge Judge Business School, 2012. [4] Roger S. Pressman “ Software Engg. A Practitioner’s Approach “, 6th Edition. [5] Si Huang, Myra Cohen, and Atif M. Memon(2010) “Repairing GUI Test Suites Using a Genetic Algorithm, “In Proceedings of the 3rd IEEE International Conference on Software Testing Verification and Validation(ICST). [6] Cirstian Cadar et al,“ Symbolic Execution for Software Testing in PracticePreliminary Assessment “, ICSE, May, 2011. [7] Aranda, J., & Venolia, G., et al. “The Secret Life of Bugs: Going Past the Error and Omissions in Software Repositories”, 31st IEEE International Conference on software Engineering (ICSE), 2009, pp298-308. [8] Qin, F., Tucek, J., & Zhou, Y., et al. “Treating Bugs As Allergies: A Safe Method for Surviving Software Failures”, Proceedings of the10th conference on Hot Topics in Operating Systems (HOTOS), 2005, Vol. 10, pp.19-19. [9] Breu, S., Premraj, R., Sillito, J., & Zimmermann, T., et al. “Information needs in bug reports: improving cooperation between developers and users”, Proceedings of the 2010 ACM conference on Computer supported cooperative work(CSCW ), 2010, pp301-310. [10] Giovanni Denaro, Bernhard Scholz, Zhi Quan Zhou, et al. "Automated Software Testing and Analysis: Techniques, Practices and Tools", 2014 47th Hawaii International Conference on System Sciences, p. 260, 2007, doi:10.1109/HICSS.2007.96. [11] Burnstein, Ilene (2003), Practical Software Testing, Springer-Verlag, p. 623, ISBN 0-387-95131-8 [12] Ross, Ronald G. (2005). "Decision Tables, Part 2 ~ The Route to Completeness". Business Rules Journal. 6 (8). Retrieved 11 November 2017. [13] Snow, Paul (19 July 2012). "Decision Tables". DTRules: A Java Based Decision Table Rules Engine. Retrieved 11 November 2017. [14] Rogers, William T. "Decision Table Examples: Medical Insurance". Saint Xavier University Systems Analysis and Design. Archived from the original on March 29, 2007. [15]https://www.tutorialspoint.com/software_testing_dictionary/state_transition.htm [16]Breen, Michael (2005), "Experience of using a lightweight formal specification method for a commercial embedded system product line" (PDF), Requirements Engineering Journal, 10 (2), doi:10.1007/s00766-004-0209-1