TESTING LIFE CYCLE PPT

  1. 1. STC Technologies Pvt LtdSTC ThirdEye Technology Testing Life Cycle(TLC)Testing Life Cycle(TLC)  Test plan preparationTest plan preparation  Test case designTest case design  Test execution and Test Log preparationTest execution and Test Log preparation  Defect TrackingDefect Tracking  Test report preparationTest report preparation
  2. 2. STC Technologies Pvt LtdSTC ThirdEye Technology TLCTLC  Test PlanTest Plan : A document that defines the overall: A document that defines the overall testing approach is called Test Plan.testing approach is called Test Plan.  Test Case DesignTest Case Design: Document that defines what is: Document that defines what is selected to test,and describes theselected to test,and describes the expected result is called Testexpected result is called Test Design.Set of procedures inorder toDesign.Set of procedures inorder to find out the defects.find out the defects.  Test ExecutionTest Execution : Executing the test cases.: Executing the test cases.
  3. 3. STC Technologies Pvt LtdSTC ThirdEye Technology TLCTLC  Test logTest log : Pass and fail information will be: Pass and fail information will be stored in this test log.stored in this test log.  Defect trackingDefect tracking : All the failed items will come under: All the failed items will come under the defect tracking. (closing defect)the defect tracking. (closing defect)  Test reportTest report : Reports are generated during: Reports are generated during the TLC.Final test summary report.the TLC.Final test summary report. (generated at the end of testing for(generated at the end of testing for making decisions)making decisions)
  4. 4. STC Technologies Pvt LtdSTC ThirdEye Technology Test Plan Preparation (manual)Test Plan Preparation (manual)  Test ObjectiveTest Objective :: A test objective is simply aA test objective is simply a testing “goal”.It is a statement oftesting “goal”.It is a statement of what the tester is expected towhat the tester is expected to perform during the testing activity.perform during the testing activity.  Test strategyTest strategy :: 1.1. Techniques that are going to be used duringTechniques that are going to be used during the testing.the testing. 2. What types of tests must be conducted.2. What types of tests must be conducted. 3. What stages of testing are3. What stages of testing are required.(e.g.unit,system)required.(e.g.unit,system)
  5. 5. STC Technologies Pvt LtdSTC ThirdEye Technology Test Risk Analysis:Test Risk Analysis: A risk is a condition that can result in a loss.The riskA risk is a condition that can result in a loss.The risk that may occur/arise during the analysis of the testing.that may occur/arise during the analysis of the testing. * The probability that the negative event* The probability that the negative event will occur.will occur.
  6. 6. STC Technologies Pvt LtdSTC ThirdEye Technology Risk identified - - - Unavailability of resources - software hardware etc . Mitigation plan - - - What are the ways to overcome
  7. 7. STC Technologies Pvt LtdSTC ThirdEye Technology Test schedule & ResourcesTest schedule & Resources Task Duration ResourceTask Duration Resource Test plan 3 1Test plan 3 1 Test design 5 3Test design 5 3
  8. 8. STC Technologies Pvt LtdSTC ThirdEye Technology Roles and ResponsibilitiesRoles and Responsibilities  Test ManagerTest Manager - Manages the entire- Manages the entire testing activity (approve).testing activity (approve).  Test leaderTest leader - Prepare the test plan, Review- Prepare the test plan, Review test case, monitor defecttest case, monitor defect tracking and Reportstracking and Reports Preparation.Preparation.  Test EngineerTest Engineer - Prepare test case design and- Prepare test case design and Daily reports.Daily reports.
  9. 9. STC Technologies Pvt LtdSTC ThirdEye Technology Communications ApproachCommunications Approach The communications during the projectThe communications during the project will be informed through this communicationwill be informed through this communication approach.approach.
  10. 10. STC Technologies Pvt LtdSTC ThirdEye Technology Test Environment The Test Bed for the Testing Activity isThe Test Bed for the Testing Activity is identified. Like,identified. Like, * Software Requirements.* Software Requirements. * hardware Requirements.* hardware Requirements.
  11. 11. STC Technologies Pvt LtdSTC ThirdEye Technology Automated Test Tools  Identify which tools is used for each individualIdentify which tools is used for each individual testtest  Should know the test level criteriaShould know the test level criteria
  12. 12. STC Technologies Pvt LtdSTC ThirdEye Technology Test Case Design (manual)  Test case IDTest case ID : Sys_xyz_o1: Sys_xyz_o1  Test case descriptionTest case description : A short note about: A short note about the testing.the testing.  Test case procedureTest case procedure : Each and every step: Each and every step has to be mentionedhas to be mentioned in test casein test case procedure.procedure.  Test inputs (or) Test DataTest inputs (or) Test Data : Input data: Input data
  13. 13. STC Technologies Pvt LtdSTC ThirdEye Technology  Expected resultExpected result : The Expected out come: The Expected out come of the test case.of the test case. Test ExecutionTest Execution Actual result : What we have received is the: What we have received is the actual result.actual result.  Expected result = Actual result then the test isExpected result = Actual result then the test is pass otherwise it is fail.pass otherwise it is fail.
  14. 14. STC Technologies Pvt LtdSTC ThirdEye Technology Test LogTest Log Test Case IDTest Case ID Test CaseTest Case DescriptionDescription TestTest status/Resultstatus/Result Sys_xyz_01Sys_xyz_01 dfgdfgdfgdfg FailFail Sys_xyz_02Sys_xyz_02 hgfhgfhhgfhgfh PassPass * Failed test case are going to be the defects
  15. 15. STC Technologies Pvt LtdSTC ThirdEye Technology Defect TrackingDefect Tracking  All the failed test execution/defects will come underAll the failed test execution/defects will come under the defect tracking.the defect tracking.  Defect Tracking ContainsDefect Tracking Contains::  Defect IdDefect Id : Sys_def_xyz_o1: Sys_def_xyz_o1  Test case IdTest case Id : Sys_xyz_o1: Sys_xyz_o1
  16. 16. STC Technologies Pvt LtdSTC ThirdEye Technology Defect TrackingDefect Tracking  Defect DescriptionDefect Description : Specify the defect.: Specify the defect.  Defect Recovery procedureDefect Recovery procedure:: Repeating the sameRepeating the same test cases with some modifications.test cases with some modifications.
  17. 17. STC Technologies Pvt LtdSTC ThirdEye Technology Defect StatusDefect Status The Current Status of the defectsThe Current Status of the defects  NewNew  OpenOpen  FixedFixed  ReopenReopen  ClosedClosed  RejectedRejected
  18. 18. STC Technologies Pvt LtdSTC ThirdEye Technology Defects SeverityDefects Severity  CriticalCritical  MajorMajor  MinorMinor
  19. 19. STC Technologies Pvt LtdSTC ThirdEye Technology Defect ClassificationDefect Classification Critical System inoperable Implementation that does not meet the requirement Defects that may cause the system to hang, crash, produce incorrect or unexpected behavior, corrupt user data with no work around Major Major functions disabled or incorrect Non-conformance to standards Defects that cause incorrect behavior with known workaround Important areas of the system are affected which would not cause operational failure Minor/Trivial Defects that affect limited areas of functionality that either can be worked around or ignored
  20. 20. STC Technologies Pvt LtdSTC ThirdEye Technology Defects PriorityDefects Priority  HighHigh  ModerateModerate  LowLow

×