Approximate Estimate and Planning of Old Tehsil Building Kalyan
Prof. Dipali P. Patil1, Prof. Prajakta Chavan2, Roshan H. Bhagat3, Rohan S. Vaidya3,
Atul D. Tawre3, Sujit S. Pawar3
1Assistant professor, Department of Civil Engineering, Dilkap Research of Engineering and Management Studies.
2Student, Department of Civil Engineering, Dilkap Research of Engineering and Management Studies.
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – The term of approximate estimate and
planning is an important task in the management of
construction project. An approximate estimate is the
probable cost of a work and is prepared before construction
is taken up. Early stage of planning and estimate plays an
important role in the success of any construction project.
Owners, contractor and donors are in need of reliable
conscientious information about the cost in the early stages
of the project, where very limited drawing and details are
available during this stage. The purpose of this project is to
remove slum near kalyan tehsil office and give proper
planning of govt. offices as well as the cost of the
construction will be economical. Which will gives the better
phase to the future.
Keywords: approximate estimate, planning,
construction cost.
1. INTRODUCTION
Estimate: before taking up any work for its execution, the
owner or builder should have a thorough knowledge
about the volume of work that can be completed within
the limits of his funds or the probable cost that may be
required to complete the proposed work. It is necessary to
prepare the probable cost or estimate for proposed work
from its plan and specification otherwise it may so happen
that the work has to stopped before its completion due to
the shortage of funds or of materials but an estimate is
never the actual cost of the work
.
1.1 Types of estimate
1.2 Approximate estimate
Approximate estimate is preliminary or rough
estimate. This is made to find out an approximate cost in a
short time and thus enable to responsible authority
concerned to consider the financial aspect of the scheme
for according sanction to the same. This estimate is
prepared after preliminary investigation, preliminary
surveying and where required sub-soil investigation and
tests to determine the safe bearing capacity may be
conducted. Approximate estimate for main projects as for
buildings, services like sanitary, water supply, drainage,
electric work, boundary wall, roads is any cost of land, are
made separately. At the end a general cost of abstract of
cost is drawn. Provision of contingency @ 5% to 10% is
added with the abstract which is total approximate cost of
the project. By the very name of approximate estimate is
importance should not be neglected. Because is there is
bulk difference between the approximate estimate and the
cost construction of a project this may misguide the
intention to undertake a project. Incase the approximate
estimated cost be too high, the project may be lift without
preparing its detailed estimate. On the other hand, if the
approximate estimated cost be too low then the project is
taken in hand to prepare detailed survey, investigations,
design, preparation of detailed drawings, detailed
estimates etc. But when it is found that the actual
estimated cost is much higher than the approximate
estimate then the project may be cancelled due to lack of
fund. So the entire labour, time expenses become useless.
Government or public Bodies or even private Owners used
to know the approximate estimated cost of the intended
project for approval to undertake detailed investigations,
to prepare detailed drawings, design and detailed
estimates etc.
1.3 Detailed estimate
In this, the estimate is divided in to sub-heads and
quantities of various items are calculated individually. In
the end of detailed quantities, an abstract cost giving
quantities of all items and rate of each items according
rates are sanctioned. In case rates which are not given in
sanctioned of schedule of rates, proper estimation shall be
attached. Detailed specification & report should also be
attached with the estimate. Technical sanction is given on
the detailed estimate.
2. PRINCIPLE OF PLANNING
2.1 Planning of building
Planning is the process of thinking about the activities
required to achieve a desired goal. A layout plan of
construction site is proper graphical representation of
buildings in development project, parking area, and other
part of structure of a development project. A site plan is
group of construction drawings, structural drawings
which use builder or contractor improvements to a
property.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4527
2.2 Principle of planning
Aspect:
Aspect means the peculiarity of the arrangement
of doors and windows in the external walls of a building
which permits the occupants to enjoy the gifts of nature
via sun, breeze, outside scenery etc.
Prospect:
Prospect is the term used to highlight the
architectural treatment given to a building so as to make it
aesthetically pleasing from outside and arranging external
doors and windows in such a manner that the occupants
are able to enjoy the desired outside views from certain
rooms.
Privacy:
Privacy is considered to be one of the most
important principles of planning in all buildings especially
in residential buildings. Privacy may be one part to
another part of the same building or it may be the privacy
of all parts of the building from neighboring buildings,
public streets or bye ways etc.
Furniture requirement:
The furniture requirements of a room or an
important depend upon the functions required to be
performed there in. The furniture requirements in house a
will be different from that of a class room in a school or an
operation theatre in a nursing home/hospital
Roominess
Roominess is to get maximum benefits from the
minimum dimension of a room. A square room appears
smaller then rectangular room of same area.
Due to importance to the arrangement of furniture
Following factors effecting roominess are
1. Size of room
2. Shape
3. Furniture used
4. Position of doors and windows
Grouping
We know that each lodging during possesses an
explicit operate and there is some inter-relationship of
sequence in between them. Grouping consists in
composing numerous rooms within the layout arrange of
the building in such a way that each one the rooms are
square measure placed in correct co-relation to their
functions and in proximity with each other. The essential
aim of grouping of the flat is to take care of the sequence
of their operate in line with their inter-relationship with
least interference.
Circulation
Circulation suggest that internal through faces or
access providing during a area or between rooms on
similar floor. Passage, halls and lobbies perform the
operate of circulation on the same floor. Such provisions
are square measure termed as horizontal circulation. On
the opposite hand, stairs, lifts, ramps etc., that serves the
aim of providing suggest that of access of access between
totally different floors get lined below the class of the term
vertical circulation.
Sanitation
The term sanitation covers not solely hygienic
convenience like privet, urinals, bath rooms, wash basins
etc., however conjointly correct p and adequate lightning
ventilation and facilities for general cleanup of the
building. From healthful concerns, all elements of the
building ought to be aired and lighted. The lighting of the
inside of the building is also done by natural lighting,
assisted natural lighting or by artificial lighting.
Flexibility
Flexibility suggest that planning bounds rooms
needed for designing for specific purpose in such a way
that they will be used for overlapping functions as and
once desired.
Elegance
Elegance is that the term accustomed specific the
result made by the elevation and general layout of the
building. It is necessary that its elevation should be
evolved that it should be aesthetically pleasing and its
layout ought to slot well in regard to the positioning and
its surrounding.
Economy
Economy is one among the vital issue that is
needed to be unbroken visible whereas involving any
theme. Each unit of the engineered up space could be a
operate of value and in and of itself the designer must
check that the building planned b him are often completed
among the funds obtainable for the project. Many other
times it becomes necessary to hold out range of alteration
within the plans to stay promonposal among the limitation
of funds. Out number of alteration in the plans to keep the
proposal within the limitation of funds
1 To find out the Approximate estimate of kalyan tehsil
building.
2 Planning of tehsil building.
3 Proper arrangement of offices.
4 Proper parking areas for offices.
Table -1: Data Collection
Tehsil area and other area.
Sr.no Description Source Data
A Revenue
department
Kalyan Area
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4528
1 Talathi office
katemanevali
Tehsil 31.32 sq.m
2 Hotel Tehsil 15.00 sq.m
3 Talathi office Tehsil 120.70
sq.m
4 Treasury Office Tehsil 32.00 Sq.M
5 Record room Tehsil 280.00
sq.m
6 Apar tehsil office Tehsil 21.60 sq.m
7 Tehsil office Tehsil 264.35sqm
8 Setu Kendra Tehsil
office
86.75 sq.m
9 City survey office Tehsil
office
24.00 sq.m
10 Toilet Tehsil
office
13.81 sq.m
Total 889.03
sq.m
B Police department Kalyan
1 Wireless room Tehsil
office
105.00
sq.m
2 Mahatma phule
station
Tehsil
office
428.80
sq.m
3 Jamadar room Tehsil
office
42.60 sq.m
4 Office Tehsil
office
46.80 sq.m
5 Crime branch Tehsil
office
178.27
sq.m
6 Toilet Tehsil
office
23.31 sq.m
7 Security office Tehsil
office
130.70
sq.m
Total 955.48
sq.m
C P.W.D OFFICE
1 Guest room A Tehsil
office
227.37
sq.m
2 Guest room B Tehsil
office
56.16 sq.m
3 Godown Tehsil
office
83.82 sq.m
Total 367.35
sq.m
Total area : A+B+C=2211.86 sq.m
3. RESULTS
3. 1Estimation of building
Plinth area of ground floor: 1236.30 sq.m
Plinth area of 1st floor : 1630.29 sq.m
Plinth area 2nd floor : 1335.72 sq.m
Total area = 4202.31sq.m
 Commercial area factor : 1.2 × 4202.31 =
5042.772
 TOTAL AREA : 5042.772
 Construction cost :PLINTH AREA × PLINTH AREA
RATE
5042.772 × 16000 = Rs.80684352/-
 Cost of electrification : 8% of construction cost
8/100 × 10633 = Rs. 6454748.16/-
 Cost of water supply and sanitation :7% of
construction cost
7/100 × 80684352= Rs. 5647904.64/-
 Cost of approach road &boundary wall : 3% of
construction cost
3/100 × 80684352 = Rs.2420530.56/-
 Cost of architectural : 3% of construction cost
3/100 × 80684352= Rs.2420530.56/-
 Add development charges : Total area x 100
5042.772 × 100= Rs.504277.2/-
 Add scrutiny fees 5 rs/sq.m on building cost
5 x 5042.772= Rs.25213.86/-
 Add Rcc consultant & Architectural charges : 3%
construction cost
3/100 x 8068435= Rs.2420530.56
 Total cost of building = Rs.9549808.54/-
 Contingencies = 5% on total cost of building
5/100 × 95498087.54= Rs.4774904.377/-
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4529
 Work charge establishment 1.5% total cost of
building 1.5/100 x 95498087.54=
Rs.1432471.313/-
 Contractor profit 10 total cost of building :
10/100×9549808.54=
Rs.9549808.754-
 Total cost structure Rs. 111255271.984/-
Gst 5% total cost structure Rs. 556263.5992/-
 Total Rs.116818035.5832/-
FSI =
=
= 1.5
NOTE: Consider 1.2 commercial area factor.
Fig no-1 Ground floor plan.
Fig no. 2 First floor plan.
Fig no. 3 Second floor plan.
4. CONCLUSION
Functional requirement are to be taken into
account for efficient planning of tehsil building and other
offices. The time spent for this purpose is really
worthwhile from the point of view of the correct approach
to planning and approximate estimate of old tehsil
building kalyan. Planning of all offices have been done as
per the by-laws. Proper parking are not available for the
public and office staff. Proper management of land . We
properly provided proper parking areas for offices as well
as public.
REFERENCES
[1] Reference book. Prof. M. Chakraborti.
[2] M. Montes March 2016 Estimating building
construction costs: analysis of the process based
budget model (POP Model), University Seville spain.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4530
[3] Nikhil K Gilson 2015Review of Cost Estimation Models
Toc H Institute of Science and Technology, Kerala,
India.
[4] Miss. Sharyu Patil May2016 Comparative Analysis
Of Expected Cost Of Construction Of Multistoried RCC
Structure Civil Engineering of Sanjay Ghodawat
Institute, Attire.
[5] Raut Vishwajit Mar 2017 General Estimation &
Abstract Sheet of Royal City, Ashok Polytechnic,
Maharashtra, India.
[6] M.V. Montes aug 2014 Estimating Building
Construction Costs by Production Processes
University of Seville spain.
[7] TGK Vasista Mar 2017 Towards Innovative Methods
Of Construction Cost Management And Control Ph. D
Research Scholar Sunrise University, Alwar.
[8] Dani jose mar 2015 functional planning of an
administrative building.

More Related Content

Similar to IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan

IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET Journal
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET-  	  Real Time Construction and Analyze of School Building at NagapattinamIRJET-  	  Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET Journal
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdfFaruq42
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERACOMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERAIRJET Journal
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1suzzanekan
 
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET Journal
 
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEHOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEAbraham Ncunge
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and CostingSakshi Kirar
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey BuildingIRJET Journal
 

Similar to IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan (20)

IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at NagapattinamIRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
 
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
IRJET-  	  Real Time Construction and Analyze of School Building at NagapattinamIRJET-  	  Real Time Construction and Analyze of School Building at Nagapattinam
IRJET- Real Time Construction and Analyze of School Building at Nagapattinam
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdfARC 425 - LECTURE RESOURCE 1  - Const Mgt.pdf
ARC 425 - LECTURE RESOURCE 1 - Const Mgt.pdf
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERACOMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
COMPARISON BETWEEN CONVENTIONAL AND PREFABRICATED BUILDING USING PRIMAVERA
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
IRJET- Project Economic Appraisal Techniques in Construction Industry - A Com...
 
Ch1 introduction
Ch1 introductionCh1 introduction
Ch1 introduction
 
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEHOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Ici individual
Ici individualIci individual
Ici individual
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
IRJET-  	  Optimized Project Planning and Scheduling of Multistorey BuildingIRJET-  	  Optimized Project Planning and Scheduling of Multistorey Building
IRJET- Optimized Project Planning and Scheduling of Multistorey Building
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4526 Approximate Estimate and Planning of Old Tehsil Building Kalyan Prof. Dipali P. Patil1, Prof. Prajakta Chavan2, Roshan H. Bhagat3, Rohan S. Vaidya3, Atul D. Tawre3, Sujit S. Pawar3 1Assistant professor, Department of Civil Engineering, Dilkap Research of Engineering and Management Studies. 2Student, Department of Civil Engineering, Dilkap Research of Engineering and Management Studies. ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – The term of approximate estimate and planning is an important task in the management of construction project. An approximate estimate is the probable cost of a work and is prepared before construction is taken up. Early stage of planning and estimate plays an important role in the success of any construction project. Owners, contractor and donors are in need of reliable conscientious information about the cost in the early stages of the project, where very limited drawing and details are available during this stage. The purpose of this project is to remove slum near kalyan tehsil office and give proper planning of govt. offices as well as the cost of the construction will be economical. Which will gives the better phase to the future. Keywords: approximate estimate, planning, construction cost. 1. INTRODUCTION Estimate: before taking up any work for its execution, the owner or builder should have a thorough knowledge about the volume of work that can be completed within the limits of his funds or the probable cost that may be required to complete the proposed work. It is necessary to prepare the probable cost or estimate for proposed work from its plan and specification otherwise it may so happen that the work has to stopped before its completion due to the shortage of funds or of materials but an estimate is never the actual cost of the work . 1.1 Types of estimate 1.2 Approximate estimate Approximate estimate is preliminary or rough estimate. This is made to find out an approximate cost in a short time and thus enable to responsible authority concerned to consider the financial aspect of the scheme for according sanction to the same. This estimate is prepared after preliminary investigation, preliminary surveying and where required sub-soil investigation and tests to determine the safe bearing capacity may be conducted. Approximate estimate for main projects as for buildings, services like sanitary, water supply, drainage, electric work, boundary wall, roads is any cost of land, are made separately. At the end a general cost of abstract of cost is drawn. Provision of contingency @ 5% to 10% is added with the abstract which is total approximate cost of the project. By the very name of approximate estimate is importance should not be neglected. Because is there is bulk difference between the approximate estimate and the cost construction of a project this may misguide the intention to undertake a project. Incase the approximate estimated cost be too high, the project may be lift without preparing its detailed estimate. On the other hand, if the approximate estimated cost be too low then the project is taken in hand to prepare detailed survey, investigations, design, preparation of detailed drawings, detailed estimates etc. But when it is found that the actual estimated cost is much higher than the approximate estimate then the project may be cancelled due to lack of fund. So the entire labour, time expenses become useless. Government or public Bodies or even private Owners used to know the approximate estimated cost of the intended project for approval to undertake detailed investigations, to prepare detailed drawings, design and detailed estimates etc. 1.3 Detailed estimate In this, the estimate is divided in to sub-heads and quantities of various items are calculated individually. In the end of detailed quantities, an abstract cost giving quantities of all items and rate of each items according rates are sanctioned. In case rates which are not given in sanctioned of schedule of rates, proper estimation shall be attached. Detailed specification & report should also be attached with the estimate. Technical sanction is given on the detailed estimate. 2. PRINCIPLE OF PLANNING 2.1 Planning of building Planning is the process of thinking about the activities required to achieve a desired goal. A layout plan of construction site is proper graphical representation of buildings in development project, parking area, and other part of structure of a development project. A site plan is group of construction drawings, structural drawings which use builder or contractor improvements to a property.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4527 2.2 Principle of planning Aspect: Aspect means the peculiarity of the arrangement of doors and windows in the external walls of a building which permits the occupants to enjoy the gifts of nature via sun, breeze, outside scenery etc. Prospect: Prospect is the term used to highlight the architectural treatment given to a building so as to make it aesthetically pleasing from outside and arranging external doors and windows in such a manner that the occupants are able to enjoy the desired outside views from certain rooms. Privacy: Privacy is considered to be one of the most important principles of planning in all buildings especially in residential buildings. Privacy may be one part to another part of the same building or it may be the privacy of all parts of the building from neighboring buildings, public streets or bye ways etc. Furniture requirement: The furniture requirements of a room or an important depend upon the functions required to be performed there in. The furniture requirements in house a will be different from that of a class room in a school or an operation theatre in a nursing home/hospital Roominess Roominess is to get maximum benefits from the minimum dimension of a room. A square room appears smaller then rectangular room of same area. Due to importance to the arrangement of furniture Following factors effecting roominess are 1. Size of room 2. Shape 3. Furniture used 4. Position of doors and windows Grouping We know that each lodging during possesses an explicit operate and there is some inter-relationship of sequence in between them. Grouping consists in composing numerous rooms within the layout arrange of the building in such a way that each one the rooms are square measure placed in correct co-relation to their functions and in proximity with each other. The essential aim of grouping of the flat is to take care of the sequence of their operate in line with their inter-relationship with least interference. Circulation Circulation suggest that internal through faces or access providing during a area or between rooms on similar floor. Passage, halls and lobbies perform the operate of circulation on the same floor. Such provisions are square measure termed as horizontal circulation. On the opposite hand, stairs, lifts, ramps etc., that serves the aim of providing suggest that of access of access between totally different floors get lined below the class of the term vertical circulation. Sanitation The term sanitation covers not solely hygienic convenience like privet, urinals, bath rooms, wash basins etc., however conjointly correct p and adequate lightning ventilation and facilities for general cleanup of the building. From healthful concerns, all elements of the building ought to be aired and lighted. The lighting of the inside of the building is also done by natural lighting, assisted natural lighting or by artificial lighting. Flexibility Flexibility suggest that planning bounds rooms needed for designing for specific purpose in such a way that they will be used for overlapping functions as and once desired. Elegance Elegance is that the term accustomed specific the result made by the elevation and general layout of the building. It is necessary that its elevation should be evolved that it should be aesthetically pleasing and its layout ought to slot well in regard to the positioning and its surrounding. Economy Economy is one among the vital issue that is needed to be unbroken visible whereas involving any theme. Each unit of the engineered up space could be a operate of value and in and of itself the designer must check that the building planned b him are often completed among the funds obtainable for the project. Many other times it becomes necessary to hold out range of alteration within the plans to stay promonposal among the limitation of funds. Out number of alteration in the plans to keep the proposal within the limitation of funds 1 To find out the Approximate estimate of kalyan tehsil building. 2 Planning of tehsil building. 3 Proper arrangement of offices. 4 Proper parking areas for offices. Table -1: Data Collection Tehsil area and other area. Sr.no Description Source Data A Revenue department Kalyan Area
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4528 1 Talathi office katemanevali Tehsil 31.32 sq.m 2 Hotel Tehsil 15.00 sq.m 3 Talathi office Tehsil 120.70 sq.m 4 Treasury Office Tehsil 32.00 Sq.M 5 Record room Tehsil 280.00 sq.m 6 Apar tehsil office Tehsil 21.60 sq.m 7 Tehsil office Tehsil 264.35sqm 8 Setu Kendra Tehsil office 86.75 sq.m 9 City survey office Tehsil office 24.00 sq.m 10 Toilet Tehsil office 13.81 sq.m Total 889.03 sq.m B Police department Kalyan 1 Wireless room Tehsil office 105.00 sq.m 2 Mahatma phule station Tehsil office 428.80 sq.m 3 Jamadar room Tehsil office 42.60 sq.m 4 Office Tehsil office 46.80 sq.m 5 Crime branch Tehsil office 178.27 sq.m 6 Toilet Tehsil office 23.31 sq.m 7 Security office Tehsil office 130.70 sq.m Total 955.48 sq.m C P.W.D OFFICE 1 Guest room A Tehsil office 227.37 sq.m 2 Guest room B Tehsil office 56.16 sq.m 3 Godown Tehsil office 83.82 sq.m Total 367.35 sq.m Total area : A+B+C=2211.86 sq.m 3. RESULTS 3. 1Estimation of building Plinth area of ground floor: 1236.30 sq.m Plinth area of 1st floor : 1630.29 sq.m Plinth area 2nd floor : 1335.72 sq.m Total area = 4202.31sq.m  Commercial area factor : 1.2 × 4202.31 = 5042.772  TOTAL AREA : 5042.772  Construction cost :PLINTH AREA × PLINTH AREA RATE 5042.772 × 16000 = Rs.80684352/-  Cost of electrification : 8% of construction cost 8/100 × 10633 = Rs. 6454748.16/-  Cost of water supply and sanitation :7% of construction cost 7/100 × 80684352= Rs. 5647904.64/-  Cost of approach road &boundary wall : 3% of construction cost 3/100 × 80684352 = Rs.2420530.56/-  Cost of architectural : 3% of construction cost 3/100 × 80684352= Rs.2420530.56/-  Add development charges : Total area x 100 5042.772 × 100= Rs.504277.2/-  Add scrutiny fees 5 rs/sq.m on building cost 5 x 5042.772= Rs.25213.86/-  Add Rcc consultant & Architectural charges : 3% construction cost 3/100 x 8068435= Rs.2420530.56  Total cost of building = Rs.9549808.54/-  Contingencies = 5% on total cost of building 5/100 × 95498087.54= Rs.4774904.377/-
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4529  Work charge establishment 1.5% total cost of building 1.5/100 x 95498087.54= Rs.1432471.313/-  Contractor profit 10 total cost of building : 10/100×9549808.54= Rs.9549808.754-  Total cost structure Rs. 111255271.984/- Gst 5% total cost structure Rs. 556263.5992/-  Total Rs.116818035.5832/- FSI = = = 1.5 NOTE: Consider 1.2 commercial area factor. Fig no-1 Ground floor plan. Fig no. 2 First floor plan. Fig no. 3 Second floor plan. 4. CONCLUSION Functional requirement are to be taken into account for efficient planning of tehsil building and other offices. The time spent for this purpose is really worthwhile from the point of view of the correct approach to planning and approximate estimate of old tehsil building kalyan. Planning of all offices have been done as per the by-laws. Proper parking are not available for the public and office staff. Proper management of land . We properly provided proper parking areas for offices as well as public. REFERENCES [1] Reference book. Prof. M. Chakraborti. [2] M. Montes March 2016 Estimating building construction costs: analysis of the process based budget model (POP Model), University Seville spain.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4530 [3] Nikhil K Gilson 2015Review of Cost Estimation Models Toc H Institute of Science and Technology, Kerala, India. [4] Miss. Sharyu Patil May2016 Comparative Analysis Of Expected Cost Of Construction Of Multistoried RCC Structure Civil Engineering of Sanjay Ghodawat Institute, Attire. [5] Raut Vishwajit Mar 2017 General Estimation & Abstract Sheet of Royal City, Ashok Polytechnic, Maharashtra, India. [6] M.V. Montes aug 2014 Estimating Building Construction Costs by Production Processes University of Seville spain. [7] TGK Vasista Mar 2017 Towards Innovative Methods Of Construction Cost Management And Control Ph. D Research Scholar Sunrise University, Alwar. [8] Dani jose mar 2015 functional planning of an administrative building.