International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1103
Analyzing the role of Segmental lining in the tunnels with Tunnel
Boring Machine (TBM) at Vishnugad Pipalkoti Hydroelectric project
(4*111 MW). A case study
Prashant Sharma1, Monu Rajpoot, Saurabh Soni3
¹ M. Tech Transportation Engineering, IIMT University Meerut (U.P.)
2Associate professor, Civil department, IIMT University Meerut (U.P.)
3 Professor, Civil department, IIMT University Meerut (U.P.)
-------------------------------------------------------------------------***------------------------------------------------------------------------
Abstract -Segmental Lining in tunnels have the potential to play a significant role in managing & providing sufficient
strength to the tunnels rather than time consuming concrete lining. The segmental lining or lining with precast segments is
very fast process as various segments which are pre-constructed or pre-casted with required grade of concrete &
reinforcement, categorized as per rocks classification and geological conditions of the tunnels gets installed with automatic
Tunnel Boring Machine (TBM). The process of installation is a continuous process i.e., just needed pre-casted segments to
install. Since direct cost of project is associated with time and hence studies and research are made to minimize the cost of
construction and reducing project duration. Concrete lining has proved to be a time-consuming process since involvement of
various necessary preparations viz. placing of reinforcement followed by shuttering that after concrete of necessary grade
according to the design mix needs to be feed and ultimately curing. Construction of the project gets delayed therefore to avoid
such issues concrete lining is now days replaced by the Segmental lining as this practice having various advantages when
compared with Concrete lining. (Segmental method also have a better aesthetic view than lining since it can’t be uniform).
Key Words: Concrete segments, Segmental Lining, Tunnel Boring Machine (TBM), Concrete Lining, rocks
classification, rock formation, headrace tunnel, shear zone.
1. INTRODUCTION
The project area of Vishnugad Pipalkoti Hydroelectric project is located at northern India in the province Uttarakhand at
Alaknanda River. The hydro power plant is containing a reservoir beside the river with intake and desilter`, the headrace
tunnel, surge shaft, underground powerhouse as well as the tailrace tunnel. The electric power of the plant is given with 4
x 111 MW. The report at hand is focusing at the segmental lining of the headrace tunnel, describing the geometrical design
of the segmental lining and its erecting structural analysis.
Salient features of VPHEP
Dam/ water level at
dams:
Type Concrete Gravity Dam, Length 89.55 m., Height 65 m., Top El-1270 m., Foundation El-
1205, FRL-1267 m.
Headrace tunnel: Length 13.4 Km, Dia. 8.8 m. (finish), Design flow: 228.86 m³/s and circular shaped
Surge Shaft Restricted Orifice Type, Dia. 15 m./22 m., Height 140 m.
Pressure shaft Nos 02/04, Type Circular, Dia. 5.2m/3.65 Length 310m/35m
Powerhouse Type U/G, Size 146x20.3x50, Unit 04 nos. (each 111 MW), Turbine types: Francis
Surge tank Type U/G, Size 150x16x35, Max. Surge Level 1040m, Min. 1026.5m
Tailrace tunnel Size 8.8 m. dia. (Horse shoe shaped), Length 3070 m.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1104
Plan view
1.1 Case study-Geology
(Pipalkoti and Gulabkoti formations are present along the headrace tunnel. Both rock formations are composed of
Dolomitic Limestone, Slates, Amphibolite, Quartzite and shear zones the percentage of Dolomitic Limestone is given with
38.25% while Slates are present with 56.56%. The amount of shear zones is given with 3.11%. Amphibolite is proposed
with a percentage of 0.74% while Quartzite is predicted for 1.34% of the total length.), the use of segments has the potential
to greatly improve the efficiency and sustainability of tunnel.
1.2 Plan view
The headrace tunnel of Vishnugad Pipalkoti H.E Project will be excavated by drill and blast method as well as by TBM
(Tunnel Boring Method). Tunnel alignment is composed of the following geometric elements the total length of the
headrace tunnel is 13’430.37m, where 12km are excavated by TBM and lined with segmental lining. The current report is
only focusing on the approximately 12.0km long head race tunnel excavated by TBM. This tunnel stretch will be
designated further as Vishnugad HRT.
1.3 Lining Segment’s dimensions
Irjet The following salient features have been defined to serve as a basis within the lining design
- Internal tunnel diameter: Di =8’800mm (as per requirement)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1105
- Segment thickness: st =350mm
- Excavation diameter: Dexc =9’860mm
- Segment width (nominal): sw =1’500mm
- Annular gap (nominally): a: =180mm (geometrically derived)
- Segment system: left / right ring system
Typical Section
1.4 Methodology- Facilities for TBM operation
 In order to start actual excavation of HRT by TBM there are various initial facilities are to be developed which
supports various functions such activities are listed below.
 Development of TBM Platform for assembly of TBM
 Development of Casting & Initial curing Yard
 Development of normal curing yard
 Development and installation of high-capacity power Plant
 Installation of Assembly support equipment’s.
1.5 Ring Installation
For assembling of the segment ring, the invert segment will be installed first, being put on the dowels of the
circumferential joint and resting on the invert pads, but in addition being held in position by means of the auxiliary thrust
cylinders of the TBM. Within the next steps the both left and right bottom and top sidewall segments will be installed and
kept in position by means of the auxiliary thrust cylinders. As last element of the ring, the key segment will be placed in
position by means of the auxiliary thrust cylinders. Now the complete ring is assembled.
Dowel connectors (three for each segment) have the function to facilitate the proper placement of the concrete segment
during the ring assembly and to guarantee the alignment when concrete segments come into contact with each other. They
feature a strong extraction force, that allows to withstand the gap pressure exerted on concrete segments from rubber
sealing gaskets and by the weight of the segment itself. They are made by extruded polyetilene (P6).
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1106
Dowel connector
Within the next step re‐gripping takes place, meaning that the tail shield of the TBM is pulled towards the front shield,
thereby releasing the last ring from its protection. During this procedure the auxiliary thrust cylinders are still under
pressure providing full support for the new ring. When the new ring has left the tail shield the segment lining immediately
is filled with pea‐gravel on top and bi‐component grout.
The maximum size of the pea‐gravel is 16mm (range of 8‐16 mm) and to be dimensioned and shaped to allow its injection
by using air pumps (concrete pump for dry mixture) mounted on the back‐up gantry. pea‐gravel is injected behind the
second‐last completely assembled ring. Pea‐gravel is injected using the holes presents on each ring, both higher holes on
both side segments and in the central and transverse hole at the crown segment. Bi component mortar is a mix of cement,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1107
bentonite, water accelerated with silicate. Immediately after injection the grouting holes will be plugged with suitable
wooden plugs to prevent the pea gravel/bi‐component mortar from escaping.
1.6 Lining type
The segmental lining system for Vishnugad HRT is specified as follows:
- Rhomboidal left/ right ring segment geometry
- Composed of 5 segments and one key segment per ring
- Two trapezoidal segments (S1 – Invert segment & S6 – Roof segment) and 4 rhomboidal segments (S2 to S4 – left/right,
upper and lower sidewall segments)
- Caulked grooves at segment intrados at longitudinal and circumferential joints
- Guiding rods in longitudinal joints for increasing segment installation accuracy
- Connectors at circumferential joint for increasing segment installation accuracy
- Gasket sealing at circumferential and longitudinal joint.
- Central water ditch respectively walking area.
The rhomboidal segment system has already proved to work sufficient at similar projects with large tunnel diameter.
Guiding rods in the longitudinal joints and connectors in the circumferential joints will help to achieve accuracy during
installation and backfilling of the segments.
The nomenclature of segments is designated with their installation sequence, beginning with S1 – Invert segment at first
and ending with S6 – roof segment, which has the function as key segment. Furthermore, the segment designation
indicates the type of ring. The suffix “L” stands for “left ring”, while the suffix “R” stands for “right ring”.
As example:
- S1L – Invert segment, left ring
- S4R – Lower sidewall segment left, right ring
Segment designation without suffix is describing segment features for right ring as well as for left ring.
S1 – Invert segment
The trapezoidal invert segment with its designation “S1” is the first segment to be installed within the tail shield. The
segment has two grouting openings located in the flat invert area, where also rail fixing inserts are located. Contact area is
defined with a width of 190mm at longitudinal joint and circumferential joint. At corners between circumferential joint
and longitudinal joint recesses are foreseen to avoid segment damage. The circumferential joint offers 3 connector
openings at leading side and 5 connector openings (3 standard connector + 2 openings for Anixter Bi-Cone) at trailing side.
S1-Invert segment S2 – Lower sidewall segment left,
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1108
S2 – Lower sidewall segment left
The lower sidewall segment at left side (in heading direction) is called “S2” and will be installed after invert segment “S1”.
The segment has two grouting openings for pea gravel application respectively for grouting purpose. The circumferential
joint is offering 4 connector openings (3 openings for standard connector + 1 opening for Anixter Bi-Cone) at trailing as
well as at leading joint. For centring purpose, the segment has a safety pin insert, fitted with plastic insert for proper final
closure.
S3 – Lower sidewall segment right
The lower sidewall segment is showing the same characteristics than segment S2, with additional fixing inserts to mount
some cable and pipe holder.
S3 – Lower sidewall segment right S4 - Upper sidewall segment left
S4 – Upper sidewall segment left
The upper sidewall segment left, designated as S4 is showing the same characteristics than segment S2, with additional
fixing inserts to mount the conveyor belt.
S5 – Upper sidewall segment right
Upper sidewall segment right is showing the same characteristics than segment S2.
S5 – Upper sidewall segment right S6– Roof segment,
S6 – roof segment
The roof segment, designated as S6 is the key stone of the segmental lining system. Beside the two radially located
grouting openings, in the top an additional inclined grouting opening is foreseen right in the centre line to increase the
effectivity of pea gravel application in the roof area. Corners between circumferential joint and longitudinal joint are fitted
with a recess to avoid segment damage. The leading circumferential joint is containing in total 5 connector openings, 3 for
standard connector and 2 for Bi-Cone connector, while on trailing circumferential joint the 3 standard connector openings
are foreseen.
1.7 SEGMENT JOINTS SEALING & SEGMENT REPAIR WORKS
SEALING
The next step during the normal activities (excavation and re‐gripping), in the range of the Back‐Up decks, the caulking
grooves will be closed with mortar and all repair works is done. Within the same step the major number of grouting holes
(about ¾) is filled with a repair mortar prior to contact grouting. The remain grouting holes later are fitted with packers
for grouting.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1109
SEGMENT REPAIR
Segments can be damaged in one of the three following phases:
1- Fabrication
2- Transport to the tunnel
3- Erection
Scope of this report is to define the principle of the repair procedure of damages held during the erection.
Two different types of damages can happen:
1- Edge broken
2- Crack appeared
To repair breaking the following procedure may be used:
1. Concrete surface cleaning and broken concrete parts removing. By using chisel, concrete surface will have new
roughness.
2. Washing by water with pressure.
3. Removing of water excess keeping wet the part to be repaired
4. Applying of admixture as per supplier technical sheet
5. Applying more than one layer considering that each layer has a thick of maximum 20 mm. the subsequent layers can be
applied when the previous is dried out.
6. At the end of the operation the surface will be smoothed out by spatula
7. Keeping wet the surface for the next 24 hours
Segment details
In the following sub chapters segment details will be described further in terms of:
- Longitudinal joint
- Circumferential joint
- Gasket sealing
- Grouting openings
- Inserts
- Safety pin openings
- Segment markings
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1110
Longitudinal joint
The longitudinal joint is showing a flat contact area between two segments, where forces will be transmitted. Inside the
symmetric contact area a guiding rod opening is located. Guiding rod opening radius is slightly bigger than the guiding rod
itself, avoiding load transmission over guiding rod. The intrados joint will be closed with mortar to improve the hydraulic
friction behaviour. The intrados joint is design in a self- locking principle, to avoid that mortar will fall into turbine water.
At extrados side of contact area a gasket sealing is located.
Longitudinal joint Circumferential joint with standard connector
Circumferential joint
Circumferential joint is showing a flat contact area between two segments, where piston forces will be transmitted. The
intrados joint will be closed with mortar to improve the hydraulic friction behaviour. The intrados joint is design in a self-
locking principle, to avoid that mortar will fall into turbine water. At extrados side of contact area a gasket sealing is
located.
Gasket sealing
Due to tender requirements a gasket sealing is required to withstand against a water pressure of 8.0bars. For achieving the
requirements gasket sealing “FAMA U.G.046A” will be used. Considering the systematic gap referring to the technical
specification shown in Annex 1, the required pressure of p=8.0bar can be reached with the following gaps:
- 5.3mm at offset 0mm
- 4.2mm at offset of 5mm
- 2.75mm at offset of 10mm
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1111
Grouting openings
Grouting openings are required for the filling in process of pea gravel as well as for grouting purpose. Due to hydraulic
reasons all grouting openings must be closed with mortar. Due to the shape of the grouting openings a self- locking effect
of the mortar plug is present, preventing the mortar from falling into turbine water.
Inserts
Two types of inserts are used in the current segmental lining.
 T10 insert
 Railway fixing insert
Railway fixing inserts are only used at S1- Invert segment, while T10 fixing insert is used for
all other fixing purpose as ventilation, conveyor- belt and pipe holders.
Safety pin opening
Due to the use of vacuum erector, safety pins openings are required to transmit shear forces
(self- weight during rotation) along vacuum plate.
Safety pin opening
1.8 SEGMENT JOINTS SEALING & SEGMENT REPAIR WORKS SEALING
Within a next step and during the normal activities (excavation and re‐gripping), in the range of the Back‐Up decks, the
caulking grooves will be closed with mortar and all repair works is done. Within the same step the major number of
grouting holes (about ¾) is filled with a repair mortar prior to contact grouting. The remain grouting holes later are fitted
with packers for grouting.
Grouting openings Fixing inserts
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1112
The material used to seal the joints between segment and rings are: Premixed mortar with Sika Monotop‐622 and/or Sika
Latex (mix design has to be studied in the job site); In special cases could be used SIKA Igas Nero or similar the mortar is
used to fill‐up the grooves along the perimeter at the intrados. Grooves are shaped to capture mortar, avoiding any
escaping toward tunnel. In a certain case, when water can flow from the bottom, along the perimeter of the invert
Segment, is applied a cord of special product (IGAS NERO SIKA) bituminous elastoplastic sealing agent.
1.9 Summary and final statement
The 13.40km long HRT (head race tunnel) of hydroelectric project Vishnugad Pipalkoti shall be excavated by a Double
Shield TBM and lined with a segmental lining. The design discharge is about Q=228m³/s, therefore an internal diameter of
øi=8.80m is foreseen. The foreseen rhomboidal gasket sealed segment system is composed of two trapezoidal segments
(Invert segment and roof segment) together with 4 rhomboidal segments. The 350mm thick segments will be bedded with
bi component mortar in the invert and pea gravel in the remaining circumference, which will be modified with contact
grouting in a separate step. Temporary distance bolts are foreseen for securing the segmental lining until the full bedding
is available. To achieve quite a smooth hydraulic behaviour all joints and large diameter openings have to be closed with
mortar. Guiding rods in longitudinal joints and connectors in circumferential joints are helping to achieve an accurate
segmental lining installation. An essential part of the segmental lining of VPHEP HRT is the grouting procedure. Over the
entire tunnel systematic contact grouting on cement basis will be applied. In special stretches borehole grouting for
consolidation, sealing or intervention purpose will be applied on cement basis. For intervention grouting also chemical
grouting material are common. The proposed method is considered to be most economic and has proved to work in
practice.
1.10. CONCLUSIONS
In this research paper, we analysed the role of Segments in tunnel management.
 We found that such technologies, such as segmental lining with the help of TBM have the potential to significantly
improve project completion timing while maintaining the quality standards.
 These systems use a range of technologies, including sensors in tunnels which are used for monitoring the movement
of hill, communication systems, and data analysis tools, to gather and the data and provide timely information to the
agencies.
 This work focuses on the crucial features that should be incorporated into the numerical model when examining the
response of a segmental liner which is generally employed in guard- driven tunnelling.
 The invariant ring model has been extensively used in design practice of shield-
driven round tunnel in soft ground due to its simplicity.
 Specialised TBM is equipped to construct tunnel in highly abrasive ground without impacting the grounds nearby.
REFERENCES
[1] Contract Agreement for EPC Contract for Civil works and Hydro-Mechanical Equipment works Including Penstock
Steel Liners, Vishnugad Pipalkoti HE Project (4*111MW) with M/s Hindustan Construction Company Limited Mumbai
(India).
[2] Studies on the key parameters in segmental lining design by- Zhenchang Guan ,Tao Deng , Gang Wang , Yujing Jiang.
[3] Tunnel Segment Gasket design – solutions & innovations - Bakhshi, Mehdi, and Nasri Verya.
[4] Sealing of joint, Neil Williamson, in Advanced Concrete Technology, 2003.
[5] Tunnel boring machine rock drilling & boring Zong-Xian Zhang, in Rock Fracture and Blasting, 2016
[6] IS:4756-1978 (reaffirmed 2002). Safety code for tunnelling work

More Related Content

Similar to Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Machine (TBM) at Vishnugad Pipalkoti Hydroelectric project (4*111 MW). A case study

IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET Journal
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyIRJET Journal
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
IRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre ReinforcementIRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre ReinforcementIRJET Journal
 
IRJET- Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...
IRJET-  	  Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...IRJET-  	  Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...
IRJET- Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...IRJET Journal
 
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET Journal
 
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu BarrageIRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu BarrageIRJET Journal
 
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...IRJET Journal
 
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...IRJET Journal
 
IRJET- Effect of Steel Ratio and Mineral Admixtures on Short Columns
IRJET- Effect of Steel Ratio and Mineral Admixtures on Short ColumnsIRJET- Effect of Steel Ratio and Mineral Admixtures on Short Columns
IRJET- Effect of Steel Ratio and Mineral Admixtures on Short ColumnsIRJET Journal
 
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sections
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel SectionsIRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sections
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel SectionsIRJET Journal
 
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...
IRJET-  	  Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...IRJET-  	  Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...IRJET Journal
 
SEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRY
SEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRYSEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRY
SEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRYIRJET Journal
 
IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...
IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...
IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...IRJET Journal
 
IRJET- Analysis of Different Configurations of Buckle Arrestors for Offsh...
IRJET-  	  Analysis of Different Configurations of Buckle Arrestors for Offsh...IRJET-  	  Analysis of Different Configurations of Buckle Arrestors for Offsh...
IRJET- Analysis of Different Configurations of Buckle Arrestors for Offsh...IRJET Journal
 
IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete BridgeIRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete BridgeIRJET Journal
 
Structural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesStructural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesEditor IJCATR
 
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Editor IJCATR
 
Experimental Study of Improvement in Confinement of Reinforced Concrete Column
Experimental Study of Improvement in Confinement of Reinforced Concrete ColumnExperimental Study of Improvement in Confinement of Reinforced Concrete Column
Experimental Study of Improvement in Confinement of Reinforced Concrete ColumnIRJET Journal
 
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET Journal
 

Similar to Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Machine (TBM) at Vishnugad Pipalkoti Hydroelectric project (4*111 MW). A case study (20)

IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
IRJET- Finite Element Analysis of Stempipe Used in Deepwater Pipeline Install...
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
IRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre ReinforcementIRJET- Sleeper Design using Fibre Reinforcement
IRJET- Sleeper Design using Fibre Reinforcement
 
IRJET- Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...
IRJET-  	  Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...IRJET-  	  Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...
IRJET- Effect of Pile Cap Thickness Variation on Load Carrying Capacity o...
 
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
IRJET- Experimental Investigation on RCC Long Hollow Circular Columns with FR...
 
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu BarrageIRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
IRJET- Analysis and Design of a Bridge at Bhoothathankettu Barrage
 
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...IRJET-  	  Study of Static Analysis on Conventional and Oblique Prestressed C...
IRJET- Study of Static Analysis on Conventional and Oblique Prestressed C...
 
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
 
IRJET- Effect of Steel Ratio and Mineral Admixtures on Short Columns
IRJET- Effect of Steel Ratio and Mineral Admixtures on Short ColumnsIRJET- Effect of Steel Ratio and Mineral Admixtures on Short Columns
IRJET- Effect of Steel Ratio and Mineral Admixtures on Short Columns
 
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sections
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel SectionsIRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sections
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sections
 
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...
IRJET-  	  Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...IRJET-  	  Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...
IRJET- Experimental Study on Buckling Behaviour of Cold-Formed Steel Sect...
 
SEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRY
SEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRYSEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRY
SEISMIC ANALYSIS OF TRANSFER SLAB STRUCTURE WITH DIFFERENT GEOMETRY
 
IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...
IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...
IRJET- Experimental Study on Behaviour of Strengthened R.C.C Column using Ext...
 
IRJET- Analysis of Different Configurations of Buckle Arrestors for Offsh...
IRJET-  	  Analysis of Different Configurations of Buckle Arrestors for Offsh...IRJET-  	  Analysis of Different Configurations of Buckle Arrestors for Offsh...
IRJET- Analysis of Different Configurations of Buckle Arrestors for Offsh...
 
IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete BridgeIRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
 
Structural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of BridgesStructural Health Monitoring and Strengthening Of Bridges
Structural Health Monitoring and Strengthening Of Bridges
 
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
Structural Health Monitoring and Strengthening Of BridgesStructural Health Mo...
 
Experimental Study of Improvement in Confinement of Reinforced Concrete Column
Experimental Study of Improvement in Confinement of Reinforced Concrete ColumnExperimental Study of Improvement in Confinement of Reinforced Concrete Column
Experimental Study of Improvement in Confinement of Reinforced Concrete Column
 
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
IRJET- Study on Causes of Cracks and its Remedial Measures in Reinforced Conc...
 

More from IRJET Journal

STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsIRJET Journal
 

More from IRJET Journal (20)

STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant Coefficients
 

Recently uploaded

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Machine (TBM) at Vishnugad Pipalkoti Hydroelectric project (4*111 MW). A case study

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1103 Analyzing the role of Segmental lining in the tunnels with Tunnel Boring Machine (TBM) at Vishnugad Pipalkoti Hydroelectric project (4*111 MW). A case study Prashant Sharma1, Monu Rajpoot, Saurabh Soni3 ¹ M. Tech Transportation Engineering, IIMT University Meerut (U.P.) 2Associate professor, Civil department, IIMT University Meerut (U.P.) 3 Professor, Civil department, IIMT University Meerut (U.P.) -------------------------------------------------------------------------***------------------------------------------------------------------------ Abstract -Segmental Lining in tunnels have the potential to play a significant role in managing & providing sufficient strength to the tunnels rather than time consuming concrete lining. The segmental lining or lining with precast segments is very fast process as various segments which are pre-constructed or pre-casted with required grade of concrete & reinforcement, categorized as per rocks classification and geological conditions of the tunnels gets installed with automatic Tunnel Boring Machine (TBM). The process of installation is a continuous process i.e., just needed pre-casted segments to install. Since direct cost of project is associated with time and hence studies and research are made to minimize the cost of construction and reducing project duration. Concrete lining has proved to be a time-consuming process since involvement of various necessary preparations viz. placing of reinforcement followed by shuttering that after concrete of necessary grade according to the design mix needs to be feed and ultimately curing. Construction of the project gets delayed therefore to avoid such issues concrete lining is now days replaced by the Segmental lining as this practice having various advantages when compared with Concrete lining. (Segmental method also have a better aesthetic view than lining since it can’t be uniform). Key Words: Concrete segments, Segmental Lining, Tunnel Boring Machine (TBM), Concrete Lining, rocks classification, rock formation, headrace tunnel, shear zone. 1. INTRODUCTION The project area of Vishnugad Pipalkoti Hydroelectric project is located at northern India in the province Uttarakhand at Alaknanda River. The hydro power plant is containing a reservoir beside the river with intake and desilter`, the headrace tunnel, surge shaft, underground powerhouse as well as the tailrace tunnel. The electric power of the plant is given with 4 x 111 MW. The report at hand is focusing at the segmental lining of the headrace tunnel, describing the geometrical design of the segmental lining and its erecting structural analysis. Salient features of VPHEP Dam/ water level at dams: Type Concrete Gravity Dam, Length 89.55 m., Height 65 m., Top El-1270 m., Foundation El- 1205, FRL-1267 m. Headrace tunnel: Length 13.4 Km, Dia. 8.8 m. (finish), Design flow: 228.86 m³/s and circular shaped Surge Shaft Restricted Orifice Type, Dia. 15 m./22 m., Height 140 m. Pressure shaft Nos 02/04, Type Circular, Dia. 5.2m/3.65 Length 310m/35m Powerhouse Type U/G, Size 146x20.3x50, Unit 04 nos. (each 111 MW), Turbine types: Francis Surge tank Type U/G, Size 150x16x35, Max. Surge Level 1040m, Min. 1026.5m Tailrace tunnel Size 8.8 m. dia. (Horse shoe shaped), Length 3070 m.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1104 Plan view 1.1 Case study-Geology (Pipalkoti and Gulabkoti formations are present along the headrace tunnel. Both rock formations are composed of Dolomitic Limestone, Slates, Amphibolite, Quartzite and shear zones the percentage of Dolomitic Limestone is given with 38.25% while Slates are present with 56.56%. The amount of shear zones is given with 3.11%. Amphibolite is proposed with a percentage of 0.74% while Quartzite is predicted for 1.34% of the total length.), the use of segments has the potential to greatly improve the efficiency and sustainability of tunnel. 1.2 Plan view The headrace tunnel of Vishnugad Pipalkoti H.E Project will be excavated by drill and blast method as well as by TBM (Tunnel Boring Method). Tunnel alignment is composed of the following geometric elements the total length of the headrace tunnel is 13’430.37m, where 12km are excavated by TBM and lined with segmental lining. The current report is only focusing on the approximately 12.0km long head race tunnel excavated by TBM. This tunnel stretch will be designated further as Vishnugad HRT. 1.3 Lining Segment’s dimensions Irjet The following salient features have been defined to serve as a basis within the lining design - Internal tunnel diameter: Di =8’800mm (as per requirement)
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1105 - Segment thickness: st =350mm - Excavation diameter: Dexc =9’860mm - Segment width (nominal): sw =1’500mm - Annular gap (nominally): a: =180mm (geometrically derived) - Segment system: left / right ring system Typical Section 1.4 Methodology- Facilities for TBM operation  In order to start actual excavation of HRT by TBM there are various initial facilities are to be developed which supports various functions such activities are listed below.  Development of TBM Platform for assembly of TBM  Development of Casting & Initial curing Yard  Development of normal curing yard  Development and installation of high-capacity power Plant  Installation of Assembly support equipment’s. 1.5 Ring Installation For assembling of the segment ring, the invert segment will be installed first, being put on the dowels of the circumferential joint and resting on the invert pads, but in addition being held in position by means of the auxiliary thrust cylinders of the TBM. Within the next steps the both left and right bottom and top sidewall segments will be installed and kept in position by means of the auxiliary thrust cylinders. As last element of the ring, the key segment will be placed in position by means of the auxiliary thrust cylinders. Now the complete ring is assembled. Dowel connectors (three for each segment) have the function to facilitate the proper placement of the concrete segment during the ring assembly and to guarantee the alignment when concrete segments come into contact with each other. They feature a strong extraction force, that allows to withstand the gap pressure exerted on concrete segments from rubber sealing gaskets and by the weight of the segment itself. They are made by extruded polyetilene (P6).
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1106 Dowel connector Within the next step re‐gripping takes place, meaning that the tail shield of the TBM is pulled towards the front shield, thereby releasing the last ring from its protection. During this procedure the auxiliary thrust cylinders are still under pressure providing full support for the new ring. When the new ring has left the tail shield the segment lining immediately is filled with pea‐gravel on top and bi‐component grout. The maximum size of the pea‐gravel is 16mm (range of 8‐16 mm) and to be dimensioned and shaped to allow its injection by using air pumps (concrete pump for dry mixture) mounted on the back‐up gantry. pea‐gravel is injected behind the second‐last completely assembled ring. Pea‐gravel is injected using the holes presents on each ring, both higher holes on both side segments and in the central and transverse hole at the crown segment. Bi component mortar is a mix of cement,
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1107 bentonite, water accelerated with silicate. Immediately after injection the grouting holes will be plugged with suitable wooden plugs to prevent the pea gravel/bi‐component mortar from escaping. 1.6 Lining type The segmental lining system for Vishnugad HRT is specified as follows: - Rhomboidal left/ right ring segment geometry - Composed of 5 segments and one key segment per ring - Two trapezoidal segments (S1 – Invert segment & S6 – Roof segment) and 4 rhomboidal segments (S2 to S4 – left/right, upper and lower sidewall segments) - Caulked grooves at segment intrados at longitudinal and circumferential joints - Guiding rods in longitudinal joints for increasing segment installation accuracy - Connectors at circumferential joint for increasing segment installation accuracy - Gasket sealing at circumferential and longitudinal joint. - Central water ditch respectively walking area. The rhomboidal segment system has already proved to work sufficient at similar projects with large tunnel diameter. Guiding rods in the longitudinal joints and connectors in the circumferential joints will help to achieve accuracy during installation and backfilling of the segments. The nomenclature of segments is designated with their installation sequence, beginning with S1 – Invert segment at first and ending with S6 – roof segment, which has the function as key segment. Furthermore, the segment designation indicates the type of ring. The suffix “L” stands for “left ring”, while the suffix “R” stands for “right ring”. As example: - S1L – Invert segment, left ring - S4R – Lower sidewall segment left, right ring Segment designation without suffix is describing segment features for right ring as well as for left ring. S1 – Invert segment The trapezoidal invert segment with its designation “S1” is the first segment to be installed within the tail shield. The segment has two grouting openings located in the flat invert area, where also rail fixing inserts are located. Contact area is defined with a width of 190mm at longitudinal joint and circumferential joint. At corners between circumferential joint and longitudinal joint recesses are foreseen to avoid segment damage. The circumferential joint offers 3 connector openings at leading side and 5 connector openings (3 standard connector + 2 openings for Anixter Bi-Cone) at trailing side. S1-Invert segment S2 – Lower sidewall segment left,
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1108 S2 – Lower sidewall segment left The lower sidewall segment at left side (in heading direction) is called “S2” and will be installed after invert segment “S1”. The segment has two grouting openings for pea gravel application respectively for grouting purpose. The circumferential joint is offering 4 connector openings (3 openings for standard connector + 1 opening for Anixter Bi-Cone) at trailing as well as at leading joint. For centring purpose, the segment has a safety pin insert, fitted with plastic insert for proper final closure. S3 – Lower sidewall segment right The lower sidewall segment is showing the same characteristics than segment S2, with additional fixing inserts to mount some cable and pipe holder. S3 – Lower sidewall segment right S4 - Upper sidewall segment left S4 – Upper sidewall segment left The upper sidewall segment left, designated as S4 is showing the same characteristics than segment S2, with additional fixing inserts to mount the conveyor belt. S5 – Upper sidewall segment right Upper sidewall segment right is showing the same characteristics than segment S2. S5 – Upper sidewall segment right S6– Roof segment, S6 – roof segment The roof segment, designated as S6 is the key stone of the segmental lining system. Beside the two radially located grouting openings, in the top an additional inclined grouting opening is foreseen right in the centre line to increase the effectivity of pea gravel application in the roof area. Corners between circumferential joint and longitudinal joint are fitted with a recess to avoid segment damage. The leading circumferential joint is containing in total 5 connector openings, 3 for standard connector and 2 for Bi-Cone connector, while on trailing circumferential joint the 3 standard connector openings are foreseen. 1.7 SEGMENT JOINTS SEALING & SEGMENT REPAIR WORKS SEALING The next step during the normal activities (excavation and re‐gripping), in the range of the Back‐Up decks, the caulking grooves will be closed with mortar and all repair works is done. Within the same step the major number of grouting holes (about ¾) is filled with a repair mortar prior to contact grouting. The remain grouting holes later are fitted with packers for grouting.
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1109 SEGMENT REPAIR Segments can be damaged in one of the three following phases: 1- Fabrication 2- Transport to the tunnel 3- Erection Scope of this report is to define the principle of the repair procedure of damages held during the erection. Two different types of damages can happen: 1- Edge broken 2- Crack appeared To repair breaking the following procedure may be used: 1. Concrete surface cleaning and broken concrete parts removing. By using chisel, concrete surface will have new roughness. 2. Washing by water with pressure. 3. Removing of water excess keeping wet the part to be repaired 4. Applying of admixture as per supplier technical sheet 5. Applying more than one layer considering that each layer has a thick of maximum 20 mm. the subsequent layers can be applied when the previous is dried out. 6. At the end of the operation the surface will be smoothed out by spatula 7. Keeping wet the surface for the next 24 hours Segment details In the following sub chapters segment details will be described further in terms of: - Longitudinal joint - Circumferential joint - Gasket sealing - Grouting openings - Inserts - Safety pin openings - Segment markings
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1110 Longitudinal joint The longitudinal joint is showing a flat contact area between two segments, where forces will be transmitted. Inside the symmetric contact area a guiding rod opening is located. Guiding rod opening radius is slightly bigger than the guiding rod itself, avoiding load transmission over guiding rod. The intrados joint will be closed with mortar to improve the hydraulic friction behaviour. The intrados joint is design in a self- locking principle, to avoid that mortar will fall into turbine water. At extrados side of contact area a gasket sealing is located. Longitudinal joint Circumferential joint with standard connector Circumferential joint Circumferential joint is showing a flat contact area between two segments, where piston forces will be transmitted. The intrados joint will be closed with mortar to improve the hydraulic friction behaviour. The intrados joint is design in a self- locking principle, to avoid that mortar will fall into turbine water. At extrados side of contact area a gasket sealing is located. Gasket sealing Due to tender requirements a gasket sealing is required to withstand against a water pressure of 8.0bars. For achieving the requirements gasket sealing “FAMA U.G.046A” will be used. Considering the systematic gap referring to the technical specification shown in Annex 1, the required pressure of p=8.0bar can be reached with the following gaps: - 5.3mm at offset 0mm - 4.2mm at offset of 5mm - 2.75mm at offset of 10mm
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1111 Grouting openings Grouting openings are required for the filling in process of pea gravel as well as for grouting purpose. Due to hydraulic reasons all grouting openings must be closed with mortar. Due to the shape of the grouting openings a self- locking effect of the mortar plug is present, preventing the mortar from falling into turbine water. Inserts Two types of inserts are used in the current segmental lining.  T10 insert  Railway fixing insert Railway fixing inserts are only used at S1- Invert segment, while T10 fixing insert is used for all other fixing purpose as ventilation, conveyor- belt and pipe holders. Safety pin opening Due to the use of vacuum erector, safety pins openings are required to transmit shear forces (self- weight during rotation) along vacuum plate. Safety pin opening 1.8 SEGMENT JOINTS SEALING & SEGMENT REPAIR WORKS SEALING Within a next step and during the normal activities (excavation and re‐gripping), in the range of the Back‐Up decks, the caulking grooves will be closed with mortar and all repair works is done. Within the same step the major number of grouting holes (about ¾) is filled with a repair mortar prior to contact grouting. The remain grouting holes later are fitted with packers for grouting. Grouting openings Fixing inserts
  • 10. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 05 | May 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 1112 The material used to seal the joints between segment and rings are: Premixed mortar with Sika Monotop‐622 and/or Sika Latex (mix design has to be studied in the job site); In special cases could be used SIKA Igas Nero or similar the mortar is used to fill‐up the grooves along the perimeter at the intrados. Grooves are shaped to capture mortar, avoiding any escaping toward tunnel. In a certain case, when water can flow from the bottom, along the perimeter of the invert Segment, is applied a cord of special product (IGAS NERO SIKA) bituminous elastoplastic sealing agent. 1.9 Summary and final statement The 13.40km long HRT (head race tunnel) of hydroelectric project Vishnugad Pipalkoti shall be excavated by a Double Shield TBM and lined with a segmental lining. The design discharge is about Q=228m³/s, therefore an internal diameter of øi=8.80m is foreseen. The foreseen rhomboidal gasket sealed segment system is composed of two trapezoidal segments (Invert segment and roof segment) together with 4 rhomboidal segments. The 350mm thick segments will be bedded with bi component mortar in the invert and pea gravel in the remaining circumference, which will be modified with contact grouting in a separate step. Temporary distance bolts are foreseen for securing the segmental lining until the full bedding is available. To achieve quite a smooth hydraulic behaviour all joints and large diameter openings have to be closed with mortar. Guiding rods in longitudinal joints and connectors in circumferential joints are helping to achieve an accurate segmental lining installation. An essential part of the segmental lining of VPHEP HRT is the grouting procedure. Over the entire tunnel systematic contact grouting on cement basis will be applied. In special stretches borehole grouting for consolidation, sealing or intervention purpose will be applied on cement basis. For intervention grouting also chemical grouting material are common. The proposed method is considered to be most economic and has proved to work in practice. 1.10. CONCLUSIONS In this research paper, we analysed the role of Segments in tunnel management.  We found that such technologies, such as segmental lining with the help of TBM have the potential to significantly improve project completion timing while maintaining the quality standards.  These systems use a range of technologies, including sensors in tunnels which are used for monitoring the movement of hill, communication systems, and data analysis tools, to gather and the data and provide timely information to the agencies.  This work focuses on the crucial features that should be incorporated into the numerical model when examining the response of a segmental liner which is generally employed in guard- driven tunnelling.  The invariant ring model has been extensively used in design practice of shield- driven round tunnel in soft ground due to its simplicity.  Specialised TBM is equipped to construct tunnel in highly abrasive ground without impacting the grounds nearby. REFERENCES [1] Contract Agreement for EPC Contract for Civil works and Hydro-Mechanical Equipment works Including Penstock Steel Liners, Vishnugad Pipalkoti HE Project (4*111MW) with M/s Hindustan Construction Company Limited Mumbai (India). [2] Studies on the key parameters in segmental lining design by- Zhenchang Guan ,Tao Deng , Gang Wang , Yujing Jiang. [3] Tunnel Segment Gasket design – solutions & innovations - Bakhshi, Mehdi, and Nasri Verya. [4] Sealing of joint, Neil Williamson, in Advanced Concrete Technology, 2003. [5] Tunnel boring machine rock drilling & boring Zong-Xian Zhang, in Rock Fracture and Blasting, 2016 [6] IS:4756-1978 (reaffirmed 2002). Safety code for tunnelling work