International Journal of Civil Engineering and Technology (IJCIET)
Volume 8, Issue 1, January 2017, pp. 390–396, Article ID: IJCIET_08_01_044
Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
ISSN Print: 0976-6308 and ISSN Online: 0976-6316
© IAEME Publication
FACTORS EFFECTING THE FAILURE ANALYSIS
OF CONSTRUCTION PROJECTS
Sk. Azeez ahamed
M. Tech Student, Department of Civil Engineering,
K L University, Vaddeswaram-522502, A.P, India
SS. Asadi
Associate Dean-Academics, Civil Engineering Department,
KL University, Vaddeswaram - 522 502, A.P, India
ABSTRACT
Objective: Aim to bring out the contributions of the major factors that are leading to
failure of the construction projects around the city thus providing a better understanding of
aspects to be considered while initiation of a construction projects. Methodology: The
survey was planned taking into account the all basic elements bringing about the
disappointment of development undertakings. The positioning depended on a sliding scale
from 1 to 5, where 1 was the slightest and 5 was the most genuine. Findings : This analysis
attempts to elicit the perceptions of construction professionals by revisiting some of these
critical factors causing the failure of construction projects. A triangulated data collection
approach involving some questionnaires was administered to construction professionals to
elicit their perceptions on the 20 factors causing the failure of the construction projects.
This paper will give an overview and status of construction project management.
Applications: This is applied to bring out the contributions of the major factors that are
leading to failure of the construction projects around. Thus providing a better
understanding of aspects to be considered while initiation of a construction projects in
future.
Key words: Construction Company, sliding scale, construction project, failure factors,
Indian construction.
Cite this Article: Sk. Azeez ahamed and SS. Asadi, Factors Effecting The Failure Analysis
of Construction Projects. International Journal of Civil Engineering and Technology, 8(1),
2017, pp. 390–396.
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1
1. INTRODUCTION
Recently emerging construction projects have been showing detrimental progress. This study or
analysis gives an insight to the causes of failure of these projects on a deeper perspective not just
confined to the peripheral factors. The analysis performed would be on the data of the projects
provided by various construction projects1
. The data obtained from the projects which were
constructed by renowned players across the Geography.
Factors Effecting The Failure Analysis of Construction Projects
http://www.iaeme.com/IJCIET/index.asp 391 editor@iaeme.com
The achievement and disappointments of organization is not to a great degree troublesome
furthermore cause huge impacts in an economy. Development organizations are helpless against
insolvency because of divided nature of industry, high vulnerability, high rivalry, hazard included
and impressive changes in development volume2
. To perceive potential organization achievement
and disappointments at the soonest opportunity is imperative
Much can be scholarly through the disappointment of structures as opposed to investigation of
structures; the correct valuation for the reasons for disappointment helps us to refocus on our
applied comprehension of basic conduct. We could then evaluate our logical models, which are key
for effective outline practice, and help us to practice appropriate designing judgment.
To have the capacity to finish a fruitful development Failure Investigation, a specialist ought to
choose steps and methodology that will perform two things.
• Figure out what happened and why (considering different components prompting what happens)
• Give recommendation on the best way to keep it from happening once more.
• This analysis attempts to elicit the perceptions of construction professionals by revisiting some of
these critical factors causing the failure of construction projects.
2. METHODOLOGY
The questionnaire was designed based on the extensive literature review and encompassed all the
critical factors causing the failure of construction projects. Ranking of 20 critical factors
categorised into the following five groups as follows: the respondents were asked to provide the
ranking of each of the 20 critical factors that may lead construction projects to failure. The ranking
was based on a sliding scale (based on the severity of extent) from 1 to 5, where 1 was the least
serious and rank 5 as the most serious.
Survey administration the questionnaire and responses were distributed and received via
papers. The targeted key respondents were drawn from the construction industries including
officials in government; managers; consultants; designers and site supervisors working for
construction companies.
Pie charts are plotted using the averages of values generated from the LIKERT scale. The pie
charts depict the contributions of each
Factor in the failure of a project. Based on the factors contributing more towards the failure of
the project. Recommendations will be provided to mitigate the factors while execution there by
making a project successful. The detail methodology was given in Figure 1.
Sk. Azeez ahamed and SS. Asadi
http://www.iaeme.com/IJCIET/index.asp 392 editor@iaeme.com
Figure 1 Detailed methodology in flow chart
3. FACTORS CAUSING FAILURE
Organization achievement and disappointment is not greatly troublesome to an industry but rather
additionally cause huge impacts in an economy3
. Development organizations are dangerous to
liquidation because of the divided way of industry, high vulnerability, high rivalry, hazard included
and impressive variances in development volume. It is essential to perceive any potential
organization achievement and disappointments at the soonest.
3.1. Factors that are causing the failure of various projects:
The data will be collected with the help of questionnaire consisting of the below factors.
1. Poor design capacity and frequent design changes
2. Financial difficulties of contractor
3. unsuitable construction methods
4. Incompetence of project team
5. Poor site management and supervision
6. Slow payment of completed works
7. Financial difficulties of owner
8. Corruption
9. Bureaucratic administrative system
Factors Effecting The Failure Analysis of Construction Projects
http://www.iaeme.com/IJCIET/index.asp 393 editor@iaeme.com
10. Interest and inflation rates
11. Lack of accurate historical information
12. Unpredictable government policies and priorities
13. Lack of experience in complex projects
14. Inadequate legal framework
15. Incompetent subcontractors
16. Slow site handover
17. Defective works and reworks
18. Owners’ site clearance difficulties
19. Lack of capable owners
20. Improper planning and scheduling
We can broadly classify the factors into these major heads, Results and analysis are shown in
Table 1
Table 1 Results and analysis
4. KNOWLEDGE AND TECHNICAL ISSUES
• Poor design capacity and the frequent design changes
• Lack of experience in executing complicated projects
• Poor performance of contractors/ sub-contractors
• Lack of knowledge and ability in managing construction projects
S.No Particulars Rating
1 KNOWLEDGE AND TECHNICAL ISSUES
I Poor design capacity and frequent design changes 1.4
Ii Influence Of Obsolete or unsuitable construction methods 1.2
Iii Lack of accurate historical information 1.2
Iv Lack of experience in complex projects 1.1
V Influence Of Incompetent subcontractors 2.3
Vi Defective works and reworks 2
2 MANAGEMENT ISSUES
I Incompetence of project team 1.5
Ii Poor site management and supervision 1.9
Iii Influence Of Bureaucratic administrative system 2
Iv Slow site handover 2.2
V Lack of capable owners 1.9
Vi Improper planning and scheduling 1.8
3 FINANCIAL AND ECONOMIC ISSUES
I Financial difficulties of contractor 2.8
Ii Slow payment of completed works 2.9
Iii Influence Of Financial difficulties of owner 2.5
Iv Interest and inflation rates 2.4
4 SOCIAL AND LEGAL ISSUES
I Influence Of Corruption 1.3
Ii Unpredictable government polices and priorities 1.3
Iii Influence Of Inadequate legal framework 1.5
Iv Influence Of Owners’ site clearance difficulties 1.2
5 NATURAL PHENOMENON 1.2
Sk. Azeez ahamed and SS. Asadi
http://www.iaeme.com/IJCIET/index.asp 394 editor@iaeme.com
4.1. Management Issues
• Disregard of the significance of project planning process and poor project planning
• Lack of a systematic approach to manage the project and entire organisation
• Improper planning and scheduling play a major part in misleading the costs of activities that result
in huge expenses.
4.2. Financial and economic issues
• Lack of financial capacity of owner
• Economic volatility and high inflation
• The delay in payment
4.3. Social and Legal Issues
• Corruption and bribery in construction projects
• Influence of Unpredictable government polices and priorities
• Influence of Inadequate legal framework
• Influence of Owners’ site clearance difficulties.
The following factors are being considered for analysis of failure in various construction
projects going. The data will be collected with the help of questionnaire consisting of the above
factors4-6
. The Rating of Factors contributing to failure are tabulated in Table 2. Contribution of
various factors towards failure is shown in Figure.2
Table 2 Rating of Factors contributing to failure
S.No Factors Contribution Towards Failure
1 Knowledge And Technical Issues 9.2
2 Management Issues 11.3
3 Financial And Economical Issues 10.6
4 Social And Legal Aspects 5.3
5 Natural Phenomenon 1.2
Factors Effecting The Failure Analysis
http://www.iaeme.com/IJCIET/index.
Figure 2 Contribution of various factors towards failure
5. CONCLUSIONS
From the analysis of the data received from various construction projects going around the
following results were interpreted,
the project manager has to keep the following points to ensure the project runs without any
problems during the various phases.
failures occur due to the knowledge and technical issues such as Poor design capacity and the
frequent design changes, Lack of accurate historical information, Lack of experience
projects, Influence of Incompetent subcontractors, Defective works and reworks. The firm has to
keep in mind the sub contractors whom the work is being assigned to and the
As the incompetent sub contractors contribute as much as 6% to the failure of project.
company has to have a very through check up of the contractors by checking the contractor’s
previous works and his conduct certificate. Management of any firm forms the skeleton of the
company. An improper and in competent management always end the proj
firm needs good management for any project to succeed and it should be led by qualified
professionals. While analysis the management issues we have considered the following aspects
Influence of Incompetence of project team,
Influence of Bureaucratic administrative system,
Lack of capable owners, Influence Of Improper planning and scheduling
take care of slow site hand over and poor site management. They contribute to about 11 % towards
the failure of a project. The site management for any company plays an important role in curbing
the cost and reducing the damage to the property. This can be achiev
techniques. The cost or the money involved in executing a work decides the progress of the work.
The firm will try to minimise the cost to be incurred while executing a project. Various factors
shape the financial status of a project. We have considered
aspect that plays the spoil sport. Various factors such as financial difficulties of contractor, slow
payment of completed works, financial difficulties of owner, Interest and inflation rates were taken
for the study. Through the analysis of all the above factors it is evident that “Slow payments from
Factors Effecting The Failure Analysis of Construction Projects
IJCIET/index.asp 395 editor@iaeme.com
Contribution of various factors towards failure
From the analysis of the data received from various construction projects going around the
While a project is being initiated or executed the company or
the project manager has to keep the following points to ensure the project runs without any
problems during the various phases. This accounts to about one-quarter of the failure i.e. , 25% of
failures occur due to the knowledge and technical issues such as Poor design capacity and the
, Lack of accurate historical information, Lack of experience
competent subcontractors, Defective works and reworks. The firm has to
keep in mind the sub contractors whom the work is being assigned to and their area of expertise.
As the incompetent sub contractors contribute as much as 6% to the failure of project.
company has to have a very through check up of the contractors by checking the contractor’s
previous works and his conduct certificate. Management of any firm forms the skeleton of the
company. An improper and in competent management always end the project in huge losses. So a
firm needs good management for any project to succeed and it should be led by qualified
professionals. While analysis the management issues we have considered the following aspects
Influence of Incompetence of project team, Influence of Poor site management and supervision,
Influence of Bureaucratic administrative system, Influence Of Slow site handover, Influence Of
Influence Of Improper planning and scheduling. The management has to
and over and poor site management. They contribute to about 11 % towards
the failure of a project. The site management for any company plays an important role in curbing
the cost and reducing the damage to the property. This can be achieved by employing be
The cost or the money involved in executing a work decides the progress of the work.
The firm will try to minimise the cost to be incurred while executing a project. Various factors
shape the financial status of a project. We have considered the following aspects to determine the
aspect that plays the spoil sport. Various factors such as financial difficulties of contractor, slow
payment of completed works, financial difficulties of owner, Interest and inflation rates were taken
. Through the analysis of all the above factors it is evident that “Slow payments from
editor@iaeme.com
From the analysis of the data received from various construction projects going around the
While a project is being initiated or executed the company or
the project manager has to keep the following points to ensure the project runs without any
quarter of the failure i.e. , 25% of
failures occur due to the knowledge and technical issues such as Poor design capacity and the
, Lack of accurate historical information, Lack of experience in complex
competent subcontractors, Defective works and reworks. The firm has to
ir area of expertise.
As the incompetent sub contractors contribute as much as 6% to the failure of project. The
company has to have a very through check up of the contractors by checking the contractor’s
previous works and his conduct certificate. Management of any firm forms the skeleton of the
ect in huge losses. So a
firm needs good management for any project to succeed and it should be led by qualified
professionals. While analysis the management issues we have considered the following aspects
ce of Poor site management and supervision,
Influence Of Slow site handover, Influence Of
The management has to
and over and poor site management. They contribute to about 11 % towards
the failure of a project. The site management for any company plays an important role in curbing
ed by employing best
The cost or the money involved in executing a work decides the progress of the work.
The firm will try to minimise the cost to be incurred while executing a project. Various factors
the following aspects to determine the
aspect that plays the spoil sport. Various factors such as financial difficulties of contractor, slow
payment of completed works, financial difficulties of owner, Interest and inflation rates were taken
. Through the analysis of all the above factors it is evident that “Slow payments from
Sk. Azeez ahamed and SS. Asadi
http://www.iaeme.com/IJCIET/index.asp 396 editor@iaeme.com
the Client” and the “Financial difficulties of the contractor” are contributing to as much as 15 %
towards failure. These following factors have to be taken into consideration and before starting a
project the company has to keep in mind the financial aspect such as the capital needed and sources
of finance. If the contractor is unable to finance the project the works will run behind schedule
which ultimately cause cost over runs which on the whole contributes to the failure of any project.
The success of the projects does not depend only on the internal factors but also on the external
factors which is beyond the control of the firm. Factors such as Corruption Unpredictable
government polices and priorities, inadequate legal framework, Owners site clearance difficulties.
The factor that is mainly contributing towards the failure of the projects is inadequate legal frame
work and it contributes as much as 4% towards the failure. so the firm entering into the contract
has to be aware of all the legal aspects pertaining to the contract or else it leads to the termination
of contract which induces heavy loses towards the contractor as well as the client.
REFERENCES
[1] Chimwaso D K. An Evaluation of Cost Performance of Public Project Case of Botwana.
Conference Proceedings, Construction Industry Development in The New Millennium. 2nd
International Conference on Construction Industry Development and 1st Conference of CIB TG
29 on Construction in Developing Countries, Singapore. 2000.
[2] Du Plessis C D. Agenda 21 for Sustainable Construction in Developing Countries. A discussion
document, 2002.
[3] Abhijeet G, Pimplikar S S. Success and Failure Factors of Indian Construction Companies. The
International Journal Of Engineering And Science. 2014; 3(6), 52-58.
[4] Beatham S, Anumba C, Thorpe T, Hedges I. KPIs: a critical appraisal of their use in
construction, Benchmarking. An International Journal. 2004; 11(1), 93-117.
[5] Seyedreza S, Vahid S. Analysis Charts for Considering Delay Occurrence Significance. Indian
Journal of Science and Technology. 2016 July; 9(28), 1-6.
[6] Varun Teja T and SS Asadi, An Integrated Approach for Evaluation of Environmental Impact
Assessment-A Model Study. International Journal of Civil Engineering and Technology, 7(6),
2016, pp. 650–659.
[7] G.S. Sarma, SS. Asadi and S. Lakshmi Narayana, Creation of Web Based Decision Support
Information System for Evaluation of Topographic Characteristics Using Remote Sensing &
GIS and Visual Basic Programe. International Journal of Civil Engineering and Technology,
7(6), 2016, pp. 621–634.
[8] D. Satish Chandra, SS. Asadi and M.V.S. Raju, Design of Web Based Decision Support System
- Model Study of Vijayawada, A.P. International Journal of Civil Engineering and Technology,
7(6), 2016, pp.514–522.
[9] Dineshkumar B, Dhivyamenaga T. Study on Lean Principle Application in Construction
Industries. Indian Journal of Science and Technology. 2016 January, 9(2), 1-5.

More Related Content

What's hot

Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...IJMER
 
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...IAEME Publication
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...eSAT Journals
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overruneSAT Publishing House
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libreUTHM
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...IRJET Journal
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...iosrjce
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A ReviewIRJET Journal
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET Journal
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
 
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Sankalp Swarnkar
 

What's hot (15)

Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
Stakeholders’ Perception of the Causes and Effect of Construction Delays on P...
 
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...Developing an effective workflow module for productivity analysis using stati...
Developing an effective workflow module for productivity analysis using stati...
 
Effect of construction delays on project time overrun
Effect of construction delays on project time overrunEffect of construction delays on project time overrun
Effect of construction delays on project time overrun
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
Project delay and_cost_overrun-libre
Project delay and_cost_overrun-libreProject delay and_cost_overrun-libre
Project delay and_cost_overrun-libre
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
IJET-V2I6P23
IJET-V2I6P23IJET-V2I6P23
IJET-V2I6P23
 
IRJET- Delay in Construction its Causes and Mitigation: A Review
IRJET-  	  Delay in Construction its Causes and Mitigation: A ReviewIRJET-  	  Delay in Construction its Causes and Mitigation: A Review
IRJET- Delay in Construction its Causes and Mitigation: A Review
 
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
IRJET- Factors Influencing Time and Cost Overruns in Indian Construction Proj...
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017Reasons for the Delay and Cost Overrun in Residential Projects - 2017
Reasons for the Delay and Cost Overrun in Residential Projects - 2017
 

Viewers also liked

Vision of man
Vision of manVision of man
Vision of manNaveen Lobo
 
Comando directo- AsignaciĂłn de tareas
Comando directo- AsignaciĂłn de tareasComando directo- AsignaciĂłn de tareas
Comando directo- AsignaciĂłn de tareasmilagmk20
 
NORMAL MODE ANALYSIS OF CYLINDER HEAD COVER
NORMAL MODE ANALYSIS OF CYLINDER HEAD COVERNORMAL MODE ANALYSIS OF CYLINDER HEAD COVER
NORMAL MODE ANALYSIS OF CYLINDER HEAD COVERIAEME Publication
 
EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...
EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...
EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...IAEME Publication
 
Failure Analysis
Failure AnalysisFailure Analysis
Failure AnalysisScott Workman
 
Failure Mode and Effect Analysis
Failure Mode and Effect AnalysisFailure Mode and Effect Analysis
Failure Mode and Effect AnalysisPulkit Sharma
 
Lecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysisLecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysisbingrazonado
 
Basics of Failure Analysis
Basics of Failure AnalysisBasics of Failure Analysis
Basics of Failure Analysisevolve2013
 
CARIĂ‘O
CARIĂ‘OCARIĂ‘O
CARIĂ‘Overo145488
 
Eco-friendly Roofing
Eco-friendly RoofingEco-friendly Roofing
Eco-friendly RoofingTomGree
 
diapositiva lopez
diapositiva  lopezdiapositiva  lopez
diapositiva lopezyovani_2020
 
Computación básica
Computación básicaComputación básica
Computación básicaMarcos3085
 
PresentaciĂłn pagina web gobierno
PresentaciĂłn pagina web gobiernoPresentaciĂłn pagina web gobierno
PresentaciĂłn pagina web gobiernoAna Lamas
 
Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...
Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...
Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...Hernando Jaramillo Rivera
 
MANIFESTACIONES DE LA TECNOLOGĂŤA
MANIFESTACIONES DE LA TECNOLOGĂŤA MANIFESTACIONES DE LA TECNOLOGĂŤA
MANIFESTACIONES DE LA TECNOLOGĂŤA CamiloNaranjoTromp
 

Viewers also liked (20)

Internet
InternetInternet
Internet
 
Vision of man
Vision of manVision of man
Vision of man
 
Comando directo- AsignaciĂłn de tareas
Comando directo- AsignaciĂłn de tareasComando directo- AsignaciĂłn de tareas
Comando directo- AsignaciĂłn de tareas
 
Daniel
DanielDaniel
Daniel
 
NORMAL MODE ANALYSIS OF CYLINDER HEAD COVER
NORMAL MODE ANALYSIS OF CYLINDER HEAD COVERNORMAL MODE ANALYSIS OF CYLINDER HEAD COVER
NORMAL MODE ANALYSIS OF CYLINDER HEAD COVER
 
EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...
EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...
EFFECT OF CONCENTRATED ECCENTRIC LOAD IN LONGITUDINAL DIRECTION OF RECTANGULA...
 
Failure Analysis
Failure AnalysisFailure Analysis
Failure Analysis
 
Failure Analysis Methodology
Failure Analysis Methodology Failure Analysis Methodology
Failure Analysis Methodology
 
Failure Mode and Effect Analysis
Failure Mode and Effect AnalysisFailure Mode and Effect Analysis
Failure Mode and Effect Analysis
 
Failure Analysis : Laboratory studies
Failure Analysis : Laboratory studies Failure Analysis : Laboratory studies
Failure Analysis : Laboratory studies
 
Lecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysisLecture 1 introduction to failure analysis
Lecture 1 introduction to failure analysis
 
Basics of Failure Analysis
Basics of Failure AnalysisBasics of Failure Analysis
Basics of Failure Analysis
 
CARIĂ‘O
CARIĂ‘OCARIĂ‘O
CARIĂ‘O
 
Eco-friendly Roofing
Eco-friendly RoofingEco-friendly Roofing
Eco-friendly Roofing
 
Analisis de fallas
Analisis de fallasAnalisis de fallas
Analisis de fallas
 
diapositiva lopez
diapositiva  lopezdiapositiva  lopez
diapositiva lopez
 
Computación básica
Computación básicaComputación básica
Computación básica
 
PresentaciĂłn pagina web gobierno
PresentaciĂłn pagina web gobiernoPresentaciĂłn pagina web gobierno
PresentaciĂłn pagina web gobierno
 
Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...
Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...
Amigos as.. 10-2-7 CON EL AMOR A DIOS CONSEGUIMOS NUESTRA SALUD Y CON HONGOS ...
 
MANIFESTACIONES DE LA TECNOLOGĂŤA
MANIFESTACIONES DE LA TECNOLOGĂŤA MANIFESTACIONES DE LA TECNOLOGĂŤA
MANIFESTACIONES DE LA TECNOLOGĂŤA
 

Similar to FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS

IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTIRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projectsIRJET Journal
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfKarthikeyanP288430
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectIRJET Journal
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET Journal
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for ConstructionIRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...IRJET Journal
 
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza StripFactors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza StripDr. Amarjeet Singh
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
 
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsExploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsIRJET Journal
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSIAEME Publication
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET Journal
 
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...IAEME Publication
 

Similar to FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS (20)

IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECTINVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
INVESTIGATION ON CAUSES OF DELAYS IN RESIDENTIAL BUILDING CONSTRUCTION PROJECT
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
Ijciet 10 01_088
Ijciet 10 01_088Ijciet 10 01_088
Ijciet 10 01_088
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdf
 
Factor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road projectFactor Affecting Construction Cost and Time in road project
Factor Affecting Construction Cost and Time in road project
 
20320140503023
2032014050302320320140503023
20320140503023
 
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
IRJET- Schedule Delay Analysis in Construction Management using Primavera P6
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for Construction
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
 
IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...IRJET- Importance of Construction Management Documentation in Planning and Co...
IRJET- Importance of Construction Management Documentation in Planning and Co...
 
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza StripFactors Affecting Cost Escalation in Construction Projects in Gaza Strip
Factors Affecting Cost Escalation in Construction Projects in Gaza Strip
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
 
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential ProjectsExploratory Study of Causes and Effects of Delay in Indian Residential Projects
Exploratory Study of Causes and Effects of Delay in Indian Residential Projects
 
D012261521
D012261521D012261521
D012261521
 
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTSISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
ISSUES RELATED TO SUBCONTRACTING PRACTICES IN CONSTRUCTION PROJECTS
 
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...IRJET-  	  The Study on Evaluation of Cost Escalation in Infrastructure Proje...
IRJET- The Study on Evaluation of Cost Escalation in Infrastructure Proje...
 
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS

  • 1. http://www.iaeme.com/IJCIET/index.asp 390 editor@iaeme.com International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 1, January 2017, pp. 390–396, Article ID: IJCIET_08_01_044 Available online at http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 ISSN Print: 0976-6308 and ISSN Online: 0976-6316 © IAEME Publication FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS Sk. Azeez ahamed M. Tech Student, Department of Civil Engineering, K L University, Vaddeswaram-522502, A.P, India SS. Asadi Associate Dean-Academics, Civil Engineering Department, KL University, Vaddeswaram - 522 502, A.P, India ABSTRACT Objective: Aim to bring out the contributions of the major factors that are leading to failure of the construction projects around the city thus providing a better understanding of aspects to be considered while initiation of a construction projects. Methodology: The survey was planned taking into account the all basic elements bringing about the disappointment of development undertakings. The positioning depended on a sliding scale from 1 to 5, where 1 was the slightest and 5 was the most genuine. Findings : This analysis attempts to elicit the perceptions of construction professionals by revisiting some of these critical factors causing the failure of construction projects. A triangulated data collection approach involving some questionnaires was administered to construction professionals to elicit their perceptions on the 20 factors causing the failure of the construction projects. This paper will give an overview and status of construction project management. Applications: This is applied to bring out the contributions of the major factors that are leading to failure of the construction projects around. Thus providing a better understanding of aspects to be considered while initiation of a construction projects in future. Key words: Construction Company, sliding scale, construction project, failure factors, Indian construction. Cite this Article: Sk. Azeez ahamed and SS. Asadi, Factors Effecting The Failure Analysis of Construction Projects. International Journal of Civil Engineering and Technology, 8(1), 2017, pp. 390–396. http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=1 1. INTRODUCTION Recently emerging construction projects have been showing detrimental progress. This study or analysis gives an insight to the causes of failure of these projects on a deeper perspective not just confined to the peripheral factors. The analysis performed would be on the data of the projects provided by various construction projects1 . The data obtained from the projects which were constructed by renowned players across the Geography.
  • 2. Factors Effecting The Failure Analysis of Construction Projects http://www.iaeme.com/IJCIET/index.asp 391 editor@iaeme.com The achievement and disappointments of organization is not to a great degree troublesome furthermore cause huge impacts in an economy. Development organizations are helpless against insolvency because of divided nature of industry, high vulnerability, high rivalry, hazard included and impressive changes in development volume2 . To perceive potential organization achievement and disappointments at the soonest opportunity is imperative Much can be scholarly through the disappointment of structures as opposed to investigation of structures; the correct valuation for the reasons for disappointment helps us to refocus on our applied comprehension of basic conduct. We could then evaluate our logical models, which are key for effective outline practice, and help us to practice appropriate designing judgment. To have the capacity to finish a fruitful development Failure Investigation, a specialist ought to choose steps and methodology that will perform two things. • Figure out what happened and why (considering different components prompting what happens) • Give recommendation on the best way to keep it from happening once more. • This analysis attempts to elicit the perceptions of construction professionals by revisiting some of these critical factors causing the failure of construction projects. 2. METHODOLOGY The questionnaire was designed based on the extensive literature review and encompassed all the critical factors causing the failure of construction projects. Ranking of 20 critical factors categorised into the following five groups as follows: the respondents were asked to provide the ranking of each of the 20 critical factors that may lead construction projects to failure. The ranking was based on a sliding scale (based on the severity of extent) from 1 to 5, where 1 was the least serious and rank 5 as the most serious. Survey administration the questionnaire and responses were distributed and received via papers. The targeted key respondents were drawn from the construction industries including officials in government; managers; consultants; designers and site supervisors working for construction companies. Pie charts are plotted using the averages of values generated from the LIKERT scale. The pie charts depict the contributions of each Factor in the failure of a project. Based on the factors contributing more towards the failure of the project. Recommendations will be provided to mitigate the factors while execution there by making a project successful. The detail methodology was given in Figure 1.
  • 3. Sk. Azeez ahamed and SS. Asadi http://www.iaeme.com/IJCIET/index.asp 392 editor@iaeme.com Figure 1 Detailed methodology in flow chart 3. FACTORS CAUSING FAILURE Organization achievement and disappointment is not greatly troublesome to an industry but rather additionally cause huge impacts in an economy3 . Development organizations are dangerous to liquidation because of the divided way of industry, high vulnerability, high rivalry, hazard included and impressive variances in development volume. It is essential to perceive any potential organization achievement and disappointments at the soonest. 3.1. Factors that are causing the failure of various projects: The data will be collected with the help of questionnaire consisting of the below factors. 1. Poor design capacity and frequent design changes 2. Financial difficulties of contractor 3. unsuitable construction methods 4. Incompetence of project team 5. Poor site management and supervision 6. Slow payment of completed works 7. Financial difficulties of owner 8. Corruption 9. Bureaucratic administrative system
  • 4. Factors Effecting The Failure Analysis of Construction Projects http://www.iaeme.com/IJCIET/index.asp 393 editor@iaeme.com 10. Interest and inflation rates 11. Lack of accurate historical information 12. Unpredictable government policies and priorities 13. Lack of experience in complex projects 14. Inadequate legal framework 15. Incompetent subcontractors 16. Slow site handover 17. Defective works and reworks 18. Owners’ site clearance difficulties 19. Lack of capable owners 20. Improper planning and scheduling We can broadly classify the factors into these major heads, Results and analysis are shown in Table 1 Table 1 Results and analysis 4. KNOWLEDGE AND TECHNICAL ISSUES • Poor design capacity and the frequent design changes • Lack of experience in executing complicated projects • Poor performance of contractors/ sub-contractors • Lack of knowledge and ability in managing construction projects S.No Particulars Rating 1 KNOWLEDGE AND TECHNICAL ISSUES I Poor design capacity and frequent design changes 1.4 Ii Influence Of Obsolete or unsuitable construction methods 1.2 Iii Lack of accurate historical information 1.2 Iv Lack of experience in complex projects 1.1 V Influence Of Incompetent subcontractors 2.3 Vi Defective works and reworks 2 2 MANAGEMENT ISSUES I Incompetence of project team 1.5 Ii Poor site management and supervision 1.9 Iii Influence Of Bureaucratic administrative system 2 Iv Slow site handover 2.2 V Lack of capable owners 1.9 Vi Improper planning and scheduling 1.8 3 FINANCIAL AND ECONOMIC ISSUES I Financial difficulties of contractor 2.8 Ii Slow payment of completed works 2.9 Iii Influence Of Financial difficulties of owner 2.5 Iv Interest and inflation rates 2.4 4 SOCIAL AND LEGAL ISSUES I Influence Of Corruption 1.3 Ii Unpredictable government polices and priorities 1.3 Iii Influence Of Inadequate legal framework 1.5 Iv Influence Of Owners’ site clearance difficulties 1.2 5 NATURAL PHENOMENON 1.2
  • 5. Sk. Azeez ahamed and SS. Asadi http://www.iaeme.com/IJCIET/index.asp 394 editor@iaeme.com 4.1. Management Issues • Disregard of the significance of project planning process and poor project planning • Lack of a systematic approach to manage the project and entire organisation • Improper planning and scheduling play a major part in misleading the costs of activities that result in huge expenses. 4.2. Financial and economic issues • Lack of financial capacity of owner • Economic volatility and high inflation • The delay in payment 4.3. Social and Legal Issues • Corruption and bribery in construction projects • Influence of Unpredictable government polices and priorities • Influence of Inadequate legal framework • Influence of Owners’ site clearance difficulties. The following factors are being considered for analysis of failure in various construction projects going. The data will be collected with the help of questionnaire consisting of the above factors4-6 . The Rating of Factors contributing to failure are tabulated in Table 2. Contribution of various factors towards failure is shown in Figure.2 Table 2 Rating of Factors contributing to failure S.No Factors Contribution Towards Failure 1 Knowledge And Technical Issues 9.2 2 Management Issues 11.3 3 Financial And Economical Issues 10.6 4 Social And Legal Aspects 5.3 5 Natural Phenomenon 1.2
  • 6. Factors Effecting The Failure Analysis http://www.iaeme.com/IJCIET/index. Figure 2 Contribution of various factors towards failure 5. CONCLUSIONS From the analysis of the data received from various construction projects going around the following results were interpreted, the project manager has to keep the following points to ensure the project runs without any problems during the various phases. failures occur due to the knowledge and technical issues such as Poor design capacity and the frequent design changes, Lack of accurate historical information, Lack of experience projects, Influence of Incompetent subcontractors, Defective works and reworks. The firm has to keep in mind the sub contractors whom the work is being assigned to and the As the incompetent sub contractors contribute as much as 6% to the failure of project. company has to have a very through check up of the contractors by checking the contractor’s previous works and his conduct certificate. Management of any firm forms the skeleton of the company. An improper and in competent management always end the proj firm needs good management for any project to succeed and it should be led by qualified professionals. While analysis the management issues we have considered the following aspects Influence of Incompetence of project team, Influence of Bureaucratic administrative system, Lack of capable owners, Influence Of Improper planning and scheduling take care of slow site hand over and poor site management. They contribute to about 11 % towards the failure of a project. The site management for any company plays an important role in curbing the cost and reducing the damage to the property. This can be achiev techniques. The cost or the money involved in executing a work decides the progress of the work. The firm will try to minimise the cost to be incurred while executing a project. Various factors shape the financial status of a project. We have considered aspect that plays the spoil sport. Various factors such as financial difficulties of contractor, slow payment of completed works, financial difficulties of owner, Interest and inflation rates were taken for the study. Through the analysis of all the above factors it is evident that “Slow payments from Factors Effecting The Failure Analysis of Construction Projects IJCIET/index.asp 395 editor@iaeme.com Contribution of various factors towards failure From the analysis of the data received from various construction projects going around the While a project is being initiated or executed the company or the project manager has to keep the following points to ensure the project runs without any problems during the various phases. This accounts to about one-quarter of the failure i.e. , 25% of failures occur due to the knowledge and technical issues such as Poor design capacity and the , Lack of accurate historical information, Lack of experience competent subcontractors, Defective works and reworks. The firm has to keep in mind the sub contractors whom the work is being assigned to and their area of expertise. As the incompetent sub contractors contribute as much as 6% to the failure of project. company has to have a very through check up of the contractors by checking the contractor’s previous works and his conduct certificate. Management of any firm forms the skeleton of the company. An improper and in competent management always end the project in huge losses. So a firm needs good management for any project to succeed and it should be led by qualified professionals. While analysis the management issues we have considered the following aspects Influence of Incompetence of project team, Influence of Poor site management and supervision, Influence of Bureaucratic administrative system, Influence Of Slow site handover, Influence Of Influence Of Improper planning and scheduling. The management has to and over and poor site management. They contribute to about 11 % towards the failure of a project. The site management for any company plays an important role in curbing the cost and reducing the damage to the property. This can be achieved by employing be The cost or the money involved in executing a work decides the progress of the work. The firm will try to minimise the cost to be incurred while executing a project. Various factors shape the financial status of a project. We have considered the following aspects to determine the aspect that plays the spoil sport. Various factors such as financial difficulties of contractor, slow payment of completed works, financial difficulties of owner, Interest and inflation rates were taken . Through the analysis of all the above factors it is evident that “Slow payments from editor@iaeme.com From the analysis of the data received from various construction projects going around the While a project is being initiated or executed the company or the project manager has to keep the following points to ensure the project runs without any quarter of the failure i.e. , 25% of failures occur due to the knowledge and technical issues such as Poor design capacity and the , Lack of accurate historical information, Lack of experience in complex competent subcontractors, Defective works and reworks. The firm has to ir area of expertise. As the incompetent sub contractors contribute as much as 6% to the failure of project. The company has to have a very through check up of the contractors by checking the contractor’s previous works and his conduct certificate. Management of any firm forms the skeleton of the ect in huge losses. So a firm needs good management for any project to succeed and it should be led by qualified professionals. While analysis the management issues we have considered the following aspects ce of Poor site management and supervision, Influence Of Slow site handover, Influence Of The management has to and over and poor site management. They contribute to about 11 % towards the failure of a project. The site management for any company plays an important role in curbing ed by employing best The cost or the money involved in executing a work decides the progress of the work. The firm will try to minimise the cost to be incurred while executing a project. Various factors the following aspects to determine the aspect that plays the spoil sport. Various factors such as financial difficulties of contractor, slow payment of completed works, financial difficulties of owner, Interest and inflation rates were taken . Through the analysis of all the above factors it is evident that “Slow payments from
  • 7. Sk. Azeez ahamed and SS. Asadi http://www.iaeme.com/IJCIET/index.asp 396 editor@iaeme.com the Client” and the “Financial difficulties of the contractor” are contributing to as much as 15 % towards failure. These following factors have to be taken into consideration and before starting a project the company has to keep in mind the financial aspect such as the capital needed and sources of finance. If the contractor is unable to finance the project the works will run behind schedule which ultimately cause cost over runs which on the whole contributes to the failure of any project. The success of the projects does not depend only on the internal factors but also on the external factors which is beyond the control of the firm. Factors such as Corruption Unpredictable government polices and priorities, inadequate legal framework, Owners site clearance difficulties. The factor that is mainly contributing towards the failure of the projects is inadequate legal frame work and it contributes as much as 4% towards the failure. so the firm entering into the contract has to be aware of all the legal aspects pertaining to the contract or else it leads to the termination of contract which induces heavy loses towards the contractor as well as the client. REFERENCES [1] Chimwaso D K. An Evaluation of Cost Performance of Public Project Case of Botwana. Conference Proceedings, Construction Industry Development in The New Millennium. 2nd International Conference on Construction Industry Development and 1st Conference of CIB TG 29 on Construction in Developing Countries, Singapore. 2000. [2] Du Plessis C D. Agenda 21 for Sustainable Construction in Developing Countries. A discussion document, 2002. [3] Abhijeet G, Pimplikar S S. Success and Failure Factors of Indian Construction Companies. The International Journal Of Engineering And Science. 2014; 3(6), 52-58. [4] Beatham S, Anumba C, Thorpe T, Hedges I. KPIs: a critical appraisal of their use in construction, Benchmarking. An International Journal. 2004; 11(1), 93-117. [5] Seyedreza S, Vahid S. Analysis Charts for Considering Delay Occurrence Significance. Indian Journal of Science and Technology. 2016 July; 9(28), 1-6. [6] Varun Teja T and SS Asadi, An Integrated Approach for Evaluation of Environmental Impact Assessment-A Model Study. International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 650–659. [7] G.S. Sarma, SS. Asadi and S. Lakshmi Narayana, Creation of Web Based Decision Support Information System for Evaluation of Topographic Characteristics Using Remote Sensing & GIS and Visual Basic Programe. International Journal of Civil Engineering and Technology, 7(6), 2016, pp. 621–634. [8] D. Satish Chandra, SS. Asadi and M.V.S. Raju, Design of Web Based Decision Support System - Model Study of Vijayawada, A.P. International Journal of Civil Engineering and Technology, 7(6), 2016, pp.514–522. [9] Dineshkumar B, Dhivyamenaga T. Study on Lean Principle Application in Construction Industries. Indian Journal of Science and Technology. 2016 January, 9(2), 1-5.