International Burch university                 Course : Building Construction Technology I
Architecture department                                                Date : xx / xx / xxxx
Sarajevo




                           Building Construction Technology I


  Professor : Prof.dr.Nerman Rustempasic
  Assistant : M.Sc. Ahmed El Sayed
   For the different construction activities like
       Brick work above 5 ft
       Surface finishing works like plastering, painting, walling etc.
       Renovation, repair and alteration works.
       Roof and slab pouring

    Some temporary nature supports and structures are required like

       Formwork     (Supporting Structure)
       Scaf foldings (arrangement for working plate forms)
       Shoring      (supporting method for unsafe structure)
       Underpinning (Method of strengthening an existing
                      structure’s footing)
Definitions
    Its is an artificial support provided below and around the precast or cast insitue
        concrete work
   Definition
   Qualities of formwork
   Types of formwork
   Formwork detail for different structural members
   Removal of formwork
   Maintenance of formwork
   Cost of formwork
   Advantages of steel form work
   Its is an artificial support provided below and around the
    precast or cast insitue concrete work.

   Formwork is commonly made of
       Steel
       wood

   Formwork construction & casting is of prime importance in
    concrete industry. It share a significant amount of concrete
    cost.
   It should be water tight

   It should be strong

   It can be reusable

   Its contact surface should be uniform

   It should be according to the size of member.
   Formwork are mainly of two types
       Steel formwork
       Wooden formwork

   Steel formwork is made of
       steel sheets
       Angle Iron
       Tee Iron

   Wooden formwork consists of
       Props
       Planks battens
       Ledgers
       sheeting
 In concrete construction formwork is commonly
  provided for the following structural members.
 Foundations
 Wall
 Column
 Slabs & beams
 Stairs
 Wall foundations
 It consists of
     Plywood   Sheeting
     Struts
 Column
  Foundations
 It consists of
     Side Supports
     Side Planks

     Cleats
                      Cleats

                      Side Support
                                     Side Planks
Vertical Posts

   It consists of
       Timber sheeting
       Vertical posts          Struts
       Horizontal members
       Rackers
       Stakes
       Wedges
   Af ter completing
    one side of
    formwork
    reinforcement is
    provided at the
    place then the
    second side
    formwork is
    provided.
   It consists of the
    following
     Side   & End Planks
     Yoke

     Nut   & Bolts
   Two end & two side
    planks are joined by
    the yokes and bolts.
   It consists of
       Sole plates
       Wedges
       Props
       Head tree
       Planks
       Batten
       Ledgers
   Beam formwork rests
    on head tree
   Slab form work rests
    on battens and joists
   If prop height are more
    than 8’ provide
    horizontal braces.
   It consists of            Riser Planks
     Vertical   & inclined
      posts
     Inclined members



     Wooden     Planks or
      sheeting
     Stringer

     Riser Planks
Time of formwork removal depends on the
  following factors
2. Type of Cement
    • Rapid hardening cements require lesser time as
       compared to OPC (Ordinary Portland Cement)
3. Ratio of concrete mix
    • Rich ratio concrete gain strength earlier as
       compared to weak ratio concrete.
4. Weather condition
    1. Hydration process accelerates in hot weather
       conditions as compared to cold and humid
       weather conditions.
Sr.                                                  OPC               Rapid
No                                              (Ordinary Portland   Hardening
         Structural Member                           Cement)
                                                                      Cement
1     Beam sides, walls & Columns                  2-3 Days           2 Days
2     Slab (Vertical Supports remains intact)       4 Days            3 Days
3     Slab (Complete Formwork removal)              10 Days           5 Days
4     Beams (Removal of Sheeting, Props             8 Days            5 Days
      remains intact)

5     Beams & Arches (Complete                      14 Days           5-8 Days
      formwork removal) (up to 6 m span)

6     Beams & Arches (Complete                      21 Days          8-10 Days
      formwork removal) (more than 6 m span)
   Due to continuous use wooden planks & steel plates
    surfaces become uneven and require maintenance.
   For wooden formwork use cardboard or plastic fiber
    board. Bolt hole places must also be repaired.
   For steel formwork plates must be leveled by mallet
    and loose corners must be welded.
   For normal works cost of formwork is about
    30%-40% of the concrete cost.
   For special works cost of formwork is about
    50%-60% of the concrete cost.
   Formwork cost is controlled by the following
    factors
       Formwork Material cost
       Formwork erecting cost
       Formwork removal cost
       Formwork jointing cost (Nails and Cables)
       Labor charges.
 It can be used for a no. of times.
 It is non absorbent.

 Smooth finish surface obtained.

 No shrinkage of formwork occurs.

 Easy to use.

 Its volume is less

 Its strength is more.
Definitions
    It’s a temporary structure to provide a platform at different levels of a building for
        workers and Materials.
    Following are the types of scaffolds
    1.   Single Scaffolds
    2.   Double Scaffolds
    3.   Ladder Scaffolds
    4.   Cantilever Scaffolds
    5.   Suspended Scaffolds
    6.   Steel or Tubular Scaffolds
   Scaffold
     It is the temporary support system provided for the
      construction & maintenance purposes.
     It consists of supports and a working platform for
      workers and Materials.
   Scaffolding
     Method   of construction of scaffolds is called
      scaffolding.
   It consists of
     Standards (v posts)
      (10 cm)
     Putlogs (7.5 x 7.5)
     Ledgers (
                            1.2 m
     Wooden boards
     Braces
    Used for ordinary
      buildings
   It consists of
     Two rows of standards.
     15 cm, 1.5 m

     Shores are provided.



   Used for superior
    works
   It consists of

     Brackets  for
      Plate form.
   It consists of
     Cantilever
     Struts
     Standards
     Putlogs
     Plate forms

   It is used above
    ground level
   It consists of
     Ropes
     Working platforms
    Ropes can be raised
      Manually or
      mechanically
    Used for light
      construction and
      finishing works of
      multistory buildings.
   It consists of
     Steel tubes (1-1/2” – 2-1/2” diameter)
     Coupler or Clamps (to hold pipes in different
      positions)
     Prop nuts (to hold single pipes)

     Bolts, Nuts & washers

     Wedge & Clip
   Double Coupler
      It joins ledgers and standards.
   Swivel Coupler
      Composed of two single couplers and used to join two scaffolds at any
        angle.
   Putlog Coupler
      Used to join putlogs with transom.
   Base Plate
      Used at the base of the standards.
   Split joint Pin
      It’s a connection fitting used to join scaffold tubes.
   Reveal Pin
      It fit in to the end of a tube to form an adjustable strut.
   Putlog end
      A flat plate used at the end of a scaffold to convert it in to a putlog.
   http://www.advancescaffold.com/international-st
Definitions
    It is the method of providing temporary support (shores) to an unsafe structure.
   Definition
     Itis the method of providing temporary support
      (shores) to an unsafe structure.
   Types of Shoring
     Horizontal shoring or flying shoring
     Vertical shoring or dead shoring

     Inclined Shoring or flying shoring
   It consists of
     Horizontal
      beam or strut
     Wall plates
     Cleats
     Straining
      beams
   Used to
    support two
    adjacent
    buildings.
   It consists of
     Dead
      shores
     Sole plates

     Needles

     Props

   Used for
    rebuilding of
    walls.
   It consists of
     Rackers
     Needles
     Cleats
     Braces
     Sole   plate
   Used to
    strengthen a
    wall.
Building Construction Technology I Course Overview
Building Construction Technology I Course Overview
Building Construction Technology I Course Overview
Building Construction Technology I Course Overview
Building Construction Technology I Course Overview
Building Construction Technology I Course Overview

More Related Content

What's hot

Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction purvi golecha
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materialsAkash Patel
 
Roof structures and Types of roofs
Roof structures and Types of roofsRoof structures and Types of roofs
Roof structures and Types of roofsAbhishek kumar
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measuressabnisajit
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated componentsSofia Rajesh
 
Doors and windows
Doors and windowsDoors and windows
Doors and windowsanimesh91
 
Exterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionExterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionTaha Padrawala
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 

What's hot (20)

Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materials
 
Roof structures and Types of roofs
Roof structures and Types of roofsRoof structures and Types of roofs
Roof structures and Types of roofs
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
Roofing materials
Roofing materialsRoofing materials
Roofing materials
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Formwork
FormworkFormwork
Formwork
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
BRICK MASONRY
BRICK MASONRYBRICK MASONRY
BRICK MASONRY
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
HOLLOW BRICKS
HOLLOW BRICKSHOLLOW BRICKS
HOLLOW BRICKS
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Doors & windows
Doors & windowsDoors & windows
Doors & windows
 
Exterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building ConstructionExterior and interior Finishes- Building Construction
Exterior and interior Finishes- Building Construction
 
Walls
WallsWalls
Walls
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 

Viewers also liked

Formwork design vs falsework design key differences
Formwork design vs falsework design  key differencesFormwork design vs falsework design  key differences
Formwork design vs falsework design key differencesscaffolddesign
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineeringFazal-E- Jalal
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awarenessedale07
 
Introduction to Setting Out a Building
Introduction to Setting Out a BuildingIntroduction to Setting Out a Building
Introduction to Setting Out a BuildingSteve Jarvis
 
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS LOUIS WAYNE
 
building material
building materialbuilding material
building materialnicocarlos
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Dexter Ng
 
Building materials elements of civil engineering
Building materials elements of civil engineeringBuilding materials elements of civil engineering
Building materials elements of civil engineeringPriyank Bhimani
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of buildingARUN KUMAR
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Green Building Construction in India
Green Building Construction in IndiaGreen Building Construction in India
Green Building Construction in Indiaintellobuild
 

Viewers also liked (20)

Formwork design vs falsework design key differences
Formwork design vs falsework design  key differencesFormwork design vs falsework design  key differences
Formwork design vs falsework design key differences
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Mortars and Plasters
Mortars and PlastersMortars and Plasters
Mortars and Plasters
 
Introduction to Setting Out a Building
Introduction to Setting Out a BuildingIntroduction to Setting Out a Building
Introduction to Setting Out a Building
 
Insulating material
Insulating materialInsulating material
Insulating material
 
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS CIVIL ENGINEERING  CONSTRUCTIONS MATERIALS
CIVIL ENGINEERING CONSTRUCTIONS MATERIALS
 
Glass
GlassGlass
Glass
 
Timber-II
Timber-IITimber-II
Timber-II
 
Plastic
PlasticPlastic
Plastic
 
building material
building materialbuilding material
building material
 
Scaffolding Technique
Scaffolding TechniqueScaffolding Technique
Scaffolding Technique
 
Non Ferrous Metal
Non Ferrous MetalNon Ferrous Metal
Non Ferrous Metal
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1
 
Building materials elements of civil engineering
Building materials elements of civil engineeringBuilding materials elements of civil engineering
Building materials elements of civil engineering
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Green Building Construction in India
Green Building Construction in IndiaGreen Building Construction in India
Green Building Construction in India
 
Scaffolds ppt construction
Scaffolds ppt constructionScaffolds ppt construction
Scaffolds ppt construction
 

Similar to Building Construction Technology I Course Overview

Similar to Building Construction Technology I Course Overview (20)

8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
formwork.pdf
formwork.pdfformwork.pdf
formwork.pdf
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpining
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
FormWork
FormWork FormWork
FormWork
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Form Work
Form Work Form Work
Form Work
 
Formwork
FormworkFormwork
Formwork
 
From work & shuttering
From work & shutteringFrom work & shuttering
From work & shuttering
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Formwork
FormworkFormwork
Formwork
 
RCC Elements column, beam.
RCC Elements  column, beam.RCC Elements  column, beam.
RCC Elements column, beam.
 
Timber Structure.pdf
Timber Structure.pdfTimber Structure.pdf
Timber Structure.pdf
 

More from Hamdija Velagic

Introduction to Arch Week 14
Introduction to Arch Week 14Introduction to Arch Week 14
Introduction to Arch Week 14Hamdija Velagic
 
Introduction to Arch Week 13
Introduction to Arch Week 13Introduction to Arch Week 13
Introduction to Arch Week 13Hamdija Velagic
 
Introduction to Arch Week 11
Introduction to Arch Week 11Introduction to Arch Week 11
Introduction to Arch Week 11Hamdija Velagic
 
Introduction to Arch List of potential questions
Introduction to Arch List of potential questionsIntroduction to Arch List of potential questions
Introduction to Arch List of potential questionsHamdija Velagic
 
Architecture form space order
Architecture form space orderArchitecture form space order
Architecture form space orderHamdija Velagic
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffoldingHamdija Velagic
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldingsHamdija Velagic
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction siteHamdija Velagic
 
Building Construction 6. intro to building materials
Building Construction 6. intro to building materialsBuilding Construction 6. intro to building materials
Building Construction 6. intro to building materialsHamdija Velagic
 
6. intro to building materials
6. intro to building materials6. intro to building materials
6. intro to building materialsHamdija Velagic
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building ConstructionHamdija Velagic
 
Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]Hamdija Velagic
 
New Intro to Architecture Week 4
New Intro to Architecture Week 4New Intro to Architecture Week 4
New Intro to Architecture Week 4Hamdija Velagic
 
Building Construction 4. tender offer
Building Construction 4. tender offerBuilding Construction 4. tender offer
Building Construction 4. tender offerHamdija Velagic
 
Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]Hamdija Velagic
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
Building Construction 2. rules and definition in construction
Building Construction 2. rules and definition in constructionBuilding Construction 2. rules and definition in construction
Building Construction 2. rules and definition in constructionHamdija Velagic
 
Building Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participantsBuilding Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participantsHamdija Velagic
 

More from Hamdija Velagic (20)

Introduction to Arch Week 14
Introduction to Arch Week 14Introduction to Arch Week 14
Introduction to Arch Week 14
 
Introduction to Arch Week 13
Introduction to Arch Week 13Introduction to Arch Week 13
Introduction to Arch Week 13
 
Introduction to Arch Week 11
Introduction to Arch Week 11Introduction to Arch Week 11
Introduction to Arch Week 11
 
Introduction to Arch List of potential questions
Introduction to Arch List of potential questionsIntroduction to Arch List of potential questions
Introduction to Arch List of potential questions
 
Architecture form space order
Architecture form space orderArchitecture form space order
Architecture form space order
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffolding
 
8. formworks and scaffoldings
8. formworks and scaffoldings8. formworks and scaffoldings
8. formworks and scaffoldings
 
Building Construction 7. construction site
Building Construction 7. construction siteBuilding Construction 7. construction site
Building Construction 7. construction site
 
Building Construction 6. intro to building materials
Building Construction 6. intro to building materialsBuilding Construction 6. intro to building materials
Building Construction 6. intro to building materials
 
6. intro to building materials
6. intro to building materials6. intro to building materials
6. intro to building materials
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
5. construction equipment Building Construction
5. construction equipment Building Construction5. construction equipment Building Construction
5. construction equipment Building Construction
 
Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]Intro to Architecture Week 5 [compatibility mode]
Intro to Architecture Week 5 [compatibility mode]
 
New Intro to Architecture Week 4
New Intro to Architecture Week 4New Intro to Architecture Week 4
New Intro to Architecture Week 4
 
Building Construction 4. tender offer
Building Construction 4. tender offerBuilding Construction 4. tender offer
Building Construction 4. tender offer
 
Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]Intro to Arch Week 4 [compatibility mode]
Intro to Arch Week 4 [compatibility mode]
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
Building Construction 2. rules and definition in construction
Building Construction 2. rules and definition in constructionBuilding Construction 2. rules and definition in construction
Building Construction 2. rules and definition in construction
 
Building Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participantsBuilding Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participants
 

Recently uploaded

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 

Recently uploaded (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 

Building Construction Technology I Course Overview

  • 1. International Burch university Course : Building Construction Technology I Architecture department Date : xx / xx / xxxx Sarajevo Building Construction Technology I Professor : Prof.dr.Nerman Rustempasic Assistant : M.Sc. Ahmed El Sayed
  • 2. For the different construction activities like  Brick work above 5 ft  Surface finishing works like plastering, painting, walling etc.  Renovation, repair and alteration works.  Roof and slab pouring Some temporary nature supports and structures are required like  Formwork (Supporting Structure)  Scaf foldings (arrangement for working plate forms)  Shoring (supporting method for unsafe structure)  Underpinning (Method of strengthening an existing structure’s footing)
  • 3. Definitions Its is an artificial support provided below and around the precast or cast insitue concrete work
  • 4. Definition  Qualities of formwork  Types of formwork  Formwork detail for different structural members  Removal of formwork  Maintenance of formwork  Cost of formwork  Advantages of steel form work
  • 5. Its is an artificial support provided below and around the precast or cast insitue concrete work.  Formwork is commonly made of  Steel  wood  Formwork construction & casting is of prime importance in concrete industry. It share a significant amount of concrete cost.
  • 6. It should be water tight  It should be strong  It can be reusable  Its contact surface should be uniform  It should be according to the size of member.
  • 7. Formwork are mainly of two types  Steel formwork  Wooden formwork  Steel formwork is made of  steel sheets  Angle Iron  Tee Iron  Wooden formwork consists of  Props  Planks battens  Ledgers  sheeting
  • 8.  In concrete construction formwork is commonly provided for the following structural members.  Foundations  Wall  Column  Slabs & beams  Stairs
  • 9.  Wall foundations  It consists of  Plywood Sheeting  Struts
  • 10.  Column Foundations  It consists of  Side Supports  Side Planks  Cleats Cleats Side Support Side Planks
  • 11. Vertical Posts  It consists of  Timber sheeting  Vertical posts Struts  Horizontal members  Rackers  Stakes  Wedges  Af ter completing one side of formwork reinforcement is provided at the place then the second side formwork is provided.
  • 12. It consists of the following  Side & End Planks  Yoke  Nut & Bolts  Two end & two side planks are joined by the yokes and bolts.
  • 13.
  • 14.
  • 15. It consists of  Sole plates  Wedges  Props  Head tree  Planks  Batten  Ledgers  Beam formwork rests on head tree  Slab form work rests on battens and joists  If prop height are more than 8’ provide horizontal braces.
  • 16.
  • 17. It consists of Riser Planks  Vertical & inclined posts  Inclined members  Wooden Planks or sheeting  Stringer  Riser Planks
  • 18.
  • 19. Time of formwork removal depends on the following factors 2. Type of Cement • Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 3. Ratio of concrete mix • Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 4. Weather condition 1. Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions.
  • 20. Sr. OPC Rapid No (Ordinary Portland Hardening Structural Member Cement) Cement 1 Beam sides, walls & Columns 2-3 Days 2 Days 2 Slab (Vertical Supports remains intact) 4 Days 3 Days 3 Slab (Complete Formwork removal) 10 Days 5 Days 4 Beams (Removal of Sheeting, Props 8 Days 5 Days remains intact) 5 Beams & Arches (Complete 14 Days 5-8 Days formwork removal) (up to 6 m span) 6 Beams & Arches (Complete 21 Days 8-10 Days formwork removal) (more than 6 m span)
  • 21. Due to continuous use wooden planks & steel plates surfaces become uneven and require maintenance.  For wooden formwork use cardboard or plastic fiber board. Bolt hole places must also be repaired.  For steel formwork plates must be leveled by mallet and loose corners must be welded.
  • 22. For normal works cost of formwork is about 30%-40% of the concrete cost.  For special works cost of formwork is about 50%-60% of the concrete cost.  Formwork cost is controlled by the following factors  Formwork Material cost  Formwork erecting cost  Formwork removal cost  Formwork jointing cost (Nails and Cables)  Labor charges.
  • 23.  It can be used for a no. of times.  It is non absorbent.  Smooth finish surface obtained.  No shrinkage of formwork occurs.  Easy to use.  Its volume is less  Its strength is more.
  • 24. Definitions It’s a temporary structure to provide a platform at different levels of a building for workers and Materials.
  • 25. Following are the types of scaffolds 1. Single Scaffolds 2. Double Scaffolds 3. Ladder Scaffolds 4. Cantilever Scaffolds 5. Suspended Scaffolds 6. Steel or Tubular Scaffolds
  • 26. Scaffold  It is the temporary support system provided for the construction & maintenance purposes.  It consists of supports and a working platform for workers and Materials.  Scaffolding  Method of construction of scaffolds is called scaffolding.
  • 27. It consists of  Standards (v posts) (10 cm)  Putlogs (7.5 x 7.5)  Ledgers ( 1.2 m  Wooden boards  Braces Used for ordinary buildings
  • 28.
  • 29. It consists of  Two rows of standards.  15 cm, 1.5 m  Shores are provided.  Used for superior works
  • 30.
  • 31. It consists of  Brackets for Plate form.
  • 32. It consists of  Cantilever  Struts  Standards  Putlogs  Plate forms  It is used above ground level
  • 33. It consists of  Ropes  Working platforms Ropes can be raised Manually or mechanically Used for light construction and finishing works of multistory buildings.
  • 34. It consists of  Steel tubes (1-1/2” – 2-1/2” diameter)  Coupler or Clamps (to hold pipes in different positions)  Prop nuts (to hold single pipes)  Bolts, Nuts & washers  Wedge & Clip
  • 35.
  • 36.
  • 37. Double Coupler  It joins ledgers and standards.  Swivel Coupler  Composed of two single couplers and used to join two scaffolds at any angle.  Putlog Coupler  Used to join putlogs with transom.  Base Plate  Used at the base of the standards.  Split joint Pin  It’s a connection fitting used to join scaffold tubes.  Reveal Pin  It fit in to the end of a tube to form an adjustable strut.  Putlog end  A flat plate used at the end of a scaffold to convert it in to a putlog.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42. http://www.advancescaffold.com/international-st
  • 43. Definitions It is the method of providing temporary support (shores) to an unsafe structure.
  • 44. Definition  Itis the method of providing temporary support (shores) to an unsafe structure.  Types of Shoring  Horizontal shoring or flying shoring  Vertical shoring or dead shoring  Inclined Shoring or flying shoring
  • 45. It consists of  Horizontal beam or strut  Wall plates  Cleats  Straining beams  Used to support two adjacent buildings.
  • 46.
  • 47.
  • 48. It consists of  Dead shores  Sole plates  Needles  Props  Used for rebuilding of walls.
  • 49.
  • 50. It consists of  Rackers  Needles  Cleats  Braces  Sole plate  Used to strengthen a wall.