FORMWORK/SHUTTERING
CONTENTS
• DEFINITION OFFORMWORK
• REQUIREMENTS OFA GOOD FORMWORK
• CATEGORIES OF FORMWORK
• TYPES OFFORMWORK
• PROCESS OFFORM WORKCONSTRUCTION
• DESHUTTERING
• FAILURE OF FORMWORK
• SAFETY PRECAUTION
DEFINITION OF FORMWORK
Formwork is amould or open box, like container into
which fresh concrete is poured and compacted.
When the concrete is set, the formwork is removed and a
solid mass is produced in the shape of the inner face of
the formwork.
It should be capable of carrying all imposed dead and
live loads apart from its own weight.
REQUIREMENTS OF AGOOD FORMWORK
Materials should be cheap and reusable.
Swelling and shrinkage should be minimum.
Surface should be smooth, and afford easystripping.
Light in weight , so that easy to transfer.
It should be practically water proof , so that it should not absorb
water from concrete.
The material of formwork should not warp or get distorted when
exposed to the elements.
The joints in the formwork should be tight against leakage of
cement grout.
 Deflection should be minimum.
CATEGORIES OF FORMWORK
CONVENTIONAL: The formwork is built on site out of timber or moisture -
resistant particle board. It is easy to produce but time -consuming for larger
structures, and the plywood facing has a relatively short lifespan. It is still used
extensively where the labour costs are lower than the costs for procuring
reusable formwork.
M ODERN-DAY FORMWORK :This formwork system are
mostly modular, which are designed for speed and
efficiency. The main types of formwork systems in used
now are
 Table form/flying formwork
 System column formwork
 Slip formwork
 Tunnel formwork
ENGINEERED/PRE-FABRICATED FORMWORK: This formwork is
built out of prefabricated modules with a metal frame (usually steel
or aluminium) and covered on the application (concrete) side with
material having the wanted surface structure (steel, aluminium,
timber, etc.).
Major objectives considered in formwork
 Quality
 Safety
 Economy
Quality:
Forms must be designed and built with sufficient
stiffness and accuracy so that the size, shape, position, and
finish of the cast concrete are maintained .
Safety:
Forms must be built sufficient strength and factor of
safety so that they have the capable of all supporting
loads .
Economy:
Forms must be built efficiently, minimizing time and
cost.
TYPESOF FORMWORK MATERIALS
TIMBER
STEEL
PLASTIC
ALUMINIUM
TIMBER FORMWORK:
Most common material used for
bracing the member, hence called
as the traditional formwork.
Can easily be cut to size on site.
ADVANTAGES OF TIMBERFORMWORK:
 Easy handling because its light weight.
 Easy to disassemble.
 Damaged parts can be replaced with new one.
 It has good thermal insulation which makes it
useful to be used in colder regions.
 Reduced site labour.
 Can be built to exceed 60 year design life.
DISADVANTAGES OF TIMBERFORMWORK:
 Can’t be used for long, have limited reuse.
 If timber is dry, it will absorb moisture from wet
concrete which could weaken the resultant concrete
member.
 Timber with high moisture content (more than
20% moisture content), wet concrete will
shrink & cup
leading to open joints & leakage of grout.
STEEL FORMWORK:
Steel forms are stronger,
durable and have longer life
than timber formwork and
their reuses are more in
number.
Steel forms can be installed
and dismantled with
greater ease and speed.
ADVANTAGES OF STEELFORMWORK:
 Very strong and able to carry loads
 Easy to be fixed.
 Uniform size and surface.
 Can be used for more number of times.
 More durable than timber formwork.
 No shrinkage of formwork occurs.
DISADVANTAGES OF STEELFORMWORK:
 More expensive than wood.
 Due to high weight handlingis difficult.
 Excessive lossof heat.
 Limited size and shape.
PLASTICFORMWORK:
ADVANTAGES OF PLASTICFORMWORK:
 Light weight.
 Reusable.
 Chemical resistant.
 Fungus and termites resistant.
 Can be easily cut and nail by using wood working.
 Damages on the formwork can be easily removed.
 Very useful for complex shaped and special features.
DISADVANTAGES OF PLASTICFORMWORK:
 Expensive at first.
 Load carrying capacity low.
 Damage the plastic by the heat.
ALUMINIUM FORMWORK:
Aluminium is strong and light,
and consequently fewer,
supports and ties are required.
ADVANTAGES OF ALUMINIUM FORMWORK:
 Monolithic crack free structures.
 Doesn’t require timber or plywood for construction
activities.
 Casting of walls and slabs possible simultaneously.
 Doesn’t required skilled labour.
DISADVANTAGES OF ALUMINIUM FORMWORK:
 Architectural changes are not possible on the structure.
 Due to the tremendous speed of construction, working
capital finance needs to the planned in advance.
PROCESS OF FORMWORK
CONSTRUCTION
FORMWORK FOR VARIOUS STRUCTURAL MEMBERS
FORMWORKFOR WALL
It consists of
-Timber sheeting
-Vertical posts
-Horizontal member
-Rackers
-Stakes
-Wedges
Wall formwork and its components
FORMWORK FOR COLUMN
Itconsistsof
-Side and end planks
-Yoke
-Nuts and bolts
Two end and two side planks are joined by
the yokes and bolts.
Erection s equence for a column:
cleared fPrior to positioning column formwork check that steel for the columnhas been inspected and
or casting.
- Position formwork for the column from predeterminedgrids.
- Plumb formwork both ways and securely support using adjustable steel props.
- The propping angle should be 45° to the floor.
- Ensure the steel props are safely secured to the column formwork and
the floor, and that adjustment for pushing and pulling isoperational.
- Set out the positions of column clamps from a storeyrod.
- Transfer the column clamp positions from the storey rod onto columnformwork.
- Use nails to support the arms of column clamps while wedging.
- Position and wedge the bottom, middle and top clampssets.
- Check the formwork at the top for square.
- Position and wedge the remainder of the columnclamps.
- Using a plumb bob suspended from a gauge block plumb the column
 When all the column formwork is securely propped a final check must be ma
de for plumb and column alignment before and immediately after the
concrete has been poured and vibrated.
Formwork for staircase
 Points to consider when designing
staircase formwork:
Stair formwork must support the weight
of concrete.
Because of the slope of the stair, some of
the force is transmitted to the sideways. All
formwork must be well tied together to
prevent sideway movement.
Erection sequence for a beam:
 Marking out and setting height for formwork
 Assemble and position props, adjustable head jacks, formworks,
bearers and spreaders.
 Construct and erect sidewalls and beam soffit.
 Position of sole plates.
DESHUTTERING
“DESHUTTERING” means the process of removing the shuttering.
Order and method of removing formwork:
Shutte ri ng formi ng verti cal fac es of wal ls, beams
and colum ns sho ul d be re moved firs t. Shutte ri ng
form ing soffit to slab sho ul d be re moved ne xt.
Shutte ri ng formi ng soffit to beams or othe r
he avy loade d members sho ul d be re moved in the
end.
Time of removal of formwork:
Sl
.
N
o
Structural Member
OPC
(Ordinary Portland
Cement)
Rapid
Hardening
Cement
1 Beam sides, walls & Columns 2-3 Days 2 Days
2 Slab (Vertical Supports remains intact) 4 Days 3 Days
3 Slab (Complete Formwork removal) 10 Days 5 Days
4 Beams (Removal of Sheeting,
Props remains intact)
8 Days 5 Days
5 Beams & Arches (Complete formwork
removal) (up to 6 m span)
14 Days 5-8 Days
6 Beams & Arches (Complete
formwork removal) (more than 6 m
span)
21 Days 8-10 Days
Cost of formwork:
For normal works formwork costs about 30 -40% of
the concrete cost.
Failure of formwork
 Generally someunexpectedeventcausesone member
tofail,thenothersbecomeoverloaded ormisaligneda
ndtheentireformwork
structurecollapses.
 Vibration.
 Inadequatebracing.
 Unstablesoilunderfoundations.
 Inadequatecontrolofconcrete placement.
 Lackofattentionofformworkdetails.
 Inadequatecrossbracingandhorizontal
bracingofshores.
 Passingtraffic.
 Movementof workers andequipmenton the
formwork.
SAFETY PRECAUTION
 Mate ri al us ed for the construc tion of form wo rk must ful fill the
specificati on.
 Formwo rk is fixed firml y and pro perl y.
 Construc tion are a must be pro tected to pre vent vandal ism of
form wo rk .
 Warni ng sign must be put up at the are a whe re the form wo rk
is fixed to pre vent entranc e of people that may dam ag e the
form wo rk .
 The form wo rk must be inspected before the conc re te is po ure d.
Reference- N. Natesh

More Related Content

What's hot (20)

Concrete works
Concrete worksConcrete works
Concrete works
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Formwork
FormworkFormwork
Formwork
 
blockwork
 blockwork blockwork
blockwork
 
BUILDING MATERIALS 1
BUILDING MATERIALS 1BUILDING MATERIALS 1
BUILDING MATERIALS 1
 
Formwork
FormworkFormwork
Formwork
 
Concrete block
Concrete blockConcrete block
Concrete block
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Different rolled steel bars and sections
Different rolled steel bars and sectionsDifferent rolled steel bars and sections
Different rolled steel bars and sections
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Building construction materials
Building construction materialsBuilding construction materials
Building construction materials
 
one way two way slabs.pptx
one way two way slabs.pptxone way two way slabs.pptx
one way two way slabs.pptx
 
Deep foundation - pile foundation
Deep foundation - pile foundationDeep foundation - pile foundation
Deep foundation - pile foundation
 
Concrete blocks and their types
Concrete blocks and their typesConcrete blocks and their types
Concrete blocks and their types
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
Ground floor
Ground floorGround floor
Ground floor
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 

Similar to Farmwork shuttering

Similar to Farmwork shuttering (20)

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Formwork
FormworkFormwork
Formwork
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
Shuttering PPT.pptx
Shuttering PPT.pptxShuttering PPT.pptx
Shuttering PPT.pptx
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
 
Formwork 151220193813
Formwork 151220193813Formwork 151220193813
Formwork 151220193813
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Form Work
Form Work Form Work
Form Work
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 

More from Kishor Ade

Balbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaBalbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaKishor Ade
 
THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]Kishor Ade
 
First lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneFirst lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneKishor Ade
 
Demolition work of existing building
Demolition work of existing buildingDemolition work of existing building
Demolition work of existing buildingKishor Ade
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingKishor Ade
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table SurveyKishor Ade
 
Compass surveying
Compass surveying Compass surveying
Compass surveying Kishor Ade
 
Natural Beauty of India...............!
Natural Beauty of India...............!Natural Beauty of India...............!
Natural Beauty of India...............!Kishor Ade
 
Life will be never ending..........!
Life will be never ending..........!Life will be never ending..........!
Life will be never ending..........!Kishor Ade
 
Specification Writing-I
Specification Writing-I Specification Writing-I
Specification Writing-I Kishor Ade
 
Research Methodology Module-08
Research Methodology Module-08Research Methodology Module-08
Research Methodology Module-08Kishor Ade
 
Research Methodology Module-07
Research Methodology Module-07Research Methodology Module-07
Research Methodology Module-07Kishor Ade
 
Research Methodology Module-06
Research Methodology Module-06Research Methodology Module-06
Research Methodology Module-06Kishor Ade
 
Research Methodology Module-05
Research Methodology Module-05Research Methodology Module-05
Research Methodology Module-05Kishor Ade
 
Research Methodology Module-04
Research Methodology Module-04Research Methodology Module-04
Research Methodology Module-04Kishor Ade
 

More from Kishor Ade (20)

Motivation
MotivationMotivation
Motivation
 
Contouring
ContouringContouring
Contouring
 
Balbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavitaBalbharati aani kumarbhartitalya marathi kavita
Balbharati aani kumarbhartitalya marathi kavita
 
THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]THEORY OF STRUCTURES-I [B. ARCH.]
THEORY OF STRUCTURES-I [B. ARCH.]
 
First lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college PuneFirst lecture on First year at Trinity Architecture college Pune
First lecture on First year at Trinity Architecture college Pune
 
Demolition work of existing building
Demolition work of existing buildingDemolition work of existing building
Demolition work of existing building
 
Levelling
LevellingLevelling
Levelling
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass surveying
Compass surveying Compass surveying
Compass surveying
 
Natural Beauty of India...............!
Natural Beauty of India...............!Natural Beauty of India...............!
Natural Beauty of India...............!
 
Life will be never ending..........!
Life will be never ending..........!Life will be never ending..........!
Life will be never ending..........!
 
Structures-V
Structures-VStructures-V
Structures-V
 
Specification Writing-I
Specification Writing-I Specification Writing-I
Specification Writing-I
 
Research Methodology Module-08
Research Methodology Module-08Research Methodology Module-08
Research Methodology Module-08
 
Research Methodology Module-07
Research Methodology Module-07Research Methodology Module-07
Research Methodology Module-07
 
Research Methodology Module-06
Research Methodology Module-06Research Methodology Module-06
Research Methodology Module-06
 
Research Methodology Module-05
Research Methodology Module-05Research Methodology Module-05
Research Methodology Module-05
 
Research Methodology Module-04
Research Methodology Module-04Research Methodology Module-04
Research Methodology Module-04
 

Recently uploaded

Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 

Recently uploaded (20)

9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 

Farmwork shuttering

  • 2. CONTENTS • DEFINITION OFFORMWORK • REQUIREMENTS OFA GOOD FORMWORK • CATEGORIES OF FORMWORK • TYPES OFFORMWORK • PROCESS OFFORM WORKCONSTRUCTION • DESHUTTERING • FAILURE OF FORMWORK • SAFETY PRECAUTION
  • 3. DEFINITION OF FORMWORK Formwork is amould or open box, like container into which fresh concrete is poured and compacted. When the concrete is set, the formwork is removed and a solid mass is produced in the shape of the inner face of the formwork. It should be capable of carrying all imposed dead and live loads apart from its own weight.
  • 4.
  • 5. REQUIREMENTS OF AGOOD FORMWORK Materials should be cheap and reusable. Swelling and shrinkage should be minimum. Surface should be smooth, and afford easystripping. Light in weight , so that easy to transfer. It should be practically water proof , so that it should not absorb water from concrete. The material of formwork should not warp or get distorted when exposed to the elements. The joints in the formwork should be tight against leakage of cement grout.  Deflection should be minimum.
  • 6. CATEGORIES OF FORMWORK CONVENTIONAL: The formwork is built on site out of timber or moisture - resistant particle board. It is easy to produce but time -consuming for larger structures, and the plywood facing has a relatively short lifespan. It is still used extensively where the labour costs are lower than the costs for procuring reusable formwork.
  • 7. M ODERN-DAY FORMWORK :This formwork system are mostly modular, which are designed for speed and efficiency. The main types of formwork systems in used now are  Table form/flying formwork  System column formwork  Slip formwork  Tunnel formwork
  • 8.
  • 9.
  • 10. ENGINEERED/PRE-FABRICATED FORMWORK: This formwork is built out of prefabricated modules with a metal frame (usually steel or aluminium) and covered on the application (concrete) side with material having the wanted surface structure (steel, aluminium, timber, etc.).
  • 11. Major objectives considered in formwork  Quality  Safety  Economy
  • 12. Quality: Forms must be designed and built with sufficient stiffness and accuracy so that the size, shape, position, and finish of the cast concrete are maintained . Safety: Forms must be built sufficient strength and factor of safety so that they have the capable of all supporting loads . Economy: Forms must be built efficiently, minimizing time and cost.
  • 14. TIMBER FORMWORK: Most common material used for bracing the member, hence called as the traditional formwork. Can easily be cut to size on site.
  • 15.
  • 16. ADVANTAGES OF TIMBERFORMWORK:  Easy handling because its light weight.  Easy to disassemble.  Damaged parts can be replaced with new one.  It has good thermal insulation which makes it useful to be used in colder regions.  Reduced site labour.  Can be built to exceed 60 year design life.
  • 17. DISADVANTAGES OF TIMBERFORMWORK:  Can’t be used for long, have limited reuse.  If timber is dry, it will absorb moisture from wet concrete which could weaken the resultant concrete member.  Timber with high moisture content (more than 20% moisture content), wet concrete will shrink & cup leading to open joints & leakage of grout.
  • 18. STEEL FORMWORK: Steel forms are stronger, durable and have longer life than timber formwork and their reuses are more in number. Steel forms can be installed and dismantled with greater ease and speed.
  • 19.
  • 20. ADVANTAGES OF STEELFORMWORK:  Very strong and able to carry loads  Easy to be fixed.  Uniform size and surface.  Can be used for more number of times.  More durable than timber formwork.  No shrinkage of formwork occurs.
  • 21. DISADVANTAGES OF STEELFORMWORK:  More expensive than wood.  Due to high weight handlingis difficult.  Excessive lossof heat.  Limited size and shape.
  • 23.
  • 24. ADVANTAGES OF PLASTICFORMWORK:  Light weight.  Reusable.  Chemical resistant.  Fungus and termites resistant.  Can be easily cut and nail by using wood working.  Damages on the formwork can be easily removed.  Very useful for complex shaped and special features.
  • 25. DISADVANTAGES OF PLASTICFORMWORK:  Expensive at first.  Load carrying capacity low.  Damage the plastic by the heat.
  • 26. ALUMINIUM FORMWORK: Aluminium is strong and light, and consequently fewer, supports and ties are required.
  • 27.
  • 28. ADVANTAGES OF ALUMINIUM FORMWORK:  Monolithic crack free structures.  Doesn’t require timber or plywood for construction activities.  Casting of walls and slabs possible simultaneously.  Doesn’t required skilled labour.
  • 29. DISADVANTAGES OF ALUMINIUM FORMWORK:  Architectural changes are not possible on the structure.  Due to the tremendous speed of construction, working capital finance needs to the planned in advance.
  • 30. PROCESS OF FORMWORK CONSTRUCTION FORMWORK FOR VARIOUS STRUCTURAL MEMBERS
  • 31. FORMWORKFOR WALL It consists of -Timber sheeting -Vertical posts -Horizontal member -Rackers -Stakes -Wedges
  • 32. Wall formwork and its components
  • 33. FORMWORK FOR COLUMN Itconsistsof -Side and end planks -Yoke -Nuts and bolts Two end and two side planks are joined by the yokes and bolts.
  • 34. Erection s equence for a column: cleared fPrior to positioning column formwork check that steel for the columnhas been inspected and or casting. - Position formwork for the column from predeterminedgrids. - Plumb formwork both ways and securely support using adjustable steel props. - The propping angle should be 45° to the floor. - Ensure the steel props are safely secured to the column formwork and the floor, and that adjustment for pushing and pulling isoperational. - Set out the positions of column clamps from a storeyrod. - Transfer the column clamp positions from the storey rod onto columnformwork. - Use nails to support the arms of column clamps while wedging. - Position and wedge the bottom, middle and top clampssets. - Check the formwork at the top for square. - Position and wedge the remainder of the columnclamps. - Using a plumb bob suspended from a gauge block plumb the column  When all the column formwork is securely propped a final check must be ma de for plumb and column alignment before and immediately after the concrete has been poured and vibrated.
  • 35. Formwork for staircase  Points to consider when designing staircase formwork: Stair formwork must support the weight of concrete. Because of the slope of the stair, some of the force is transmitted to the sideways. All formwork must be well tied together to prevent sideway movement.
  • 36.
  • 37. Erection sequence for a beam:  Marking out and setting height for formwork  Assemble and position props, adjustable head jacks, formworks, bearers and spreaders.  Construct and erect sidewalls and beam soffit.  Position of sole plates.
  • 38. DESHUTTERING “DESHUTTERING” means the process of removing the shuttering. Order and method of removing formwork: Shutte ri ng formi ng verti cal fac es of wal ls, beams and colum ns sho ul d be re moved firs t. Shutte ri ng form ing soffit to slab sho ul d be re moved ne xt. Shutte ri ng formi ng soffit to beams or othe r he avy loade d members sho ul d be re moved in the end.
  • 39. Time of removal of formwork: Sl . N o Structural Member OPC (Ordinary Portland Cement) Rapid Hardening Cement 1 Beam sides, walls & Columns 2-3 Days 2 Days 2 Slab (Vertical Supports remains intact) 4 Days 3 Days 3 Slab (Complete Formwork removal) 10 Days 5 Days 4 Beams (Removal of Sheeting, Props remains intact) 8 Days 5 Days 5 Beams & Arches (Complete formwork removal) (up to 6 m span) 14 Days 5-8 Days 6 Beams & Arches (Complete formwork removal) (more than 6 m span) 21 Days 8-10 Days
  • 40. Cost of formwork: For normal works formwork costs about 30 -40% of the concrete cost.
  • 42.  Generally someunexpectedeventcausesone member tofail,thenothersbecomeoverloaded ormisaligneda ndtheentireformwork structurecollapses.  Vibration.  Inadequatebracing.  Unstablesoilunderfoundations.  Inadequatecontrolofconcrete placement.  Lackofattentionofformworkdetails.  Inadequatecrossbracingandhorizontal bracingofshores.  Passingtraffic.  Movementof workers andequipmenton the formwork.
  • 43. SAFETY PRECAUTION  Mate ri al us ed for the construc tion of form wo rk must ful fill the specificati on.  Formwo rk is fixed firml y and pro perl y.  Construc tion are a must be pro tected to pre vent vandal ism of form wo rk .  Warni ng sign must be put up at the are a whe re the form wo rk is fixed to pre vent entranc e of people that may dam ag e the form wo rk .  The form wo rk must be inspected before the conc re te is po ure d.