Controlling two dimension traffic light by
using PLC
Student Name: Muhammad Jawhar Anwar
Class: 4 Stage – Group:A1
Course Title: PLC Lab.
Department: Mechanical and Mechatronics Engineering
EXP NO: 5
College of Engineering
Salahaddin University-Erbil
Academic Year 2021-2022
2
Introduction
AUTOMATIC TRAFFIC SIGNAL CONTROL PLC BASED:
A traffic light or traffic signal is a signaling device positioned at a
road intersection, pedestrian crossing, or other location in order to indicate
when it is safe to drive, ride, or walk using a n universal color code
A traffic light, traffic signal, or stop light is a signaling device positioned at a
road intersection, pedestrian crossing, or other location in order to indicate
when it is safe to drive, ride, or walk using a universal color code
However for the pedestrians, there have only two lights, a red light and a green
light that mean go and stop Respectively The traffic lights have given many
benefits to all road users. Besides reducing the number of accidents, it made the
traffic flow smoothly and possibly could save people time.
Traffic load is highly dependent on parameters such as time, day, season,
weather and unpredictable situations such as accidents, special events or
construction activities. If these parameters are not taken into account, the traffic
control system will create bottlenecks and delays. A traffic control system that
solves these problems by continuously sensing and monitoring traffic conditions
and adjusting the timing of traffic lights according to the actual traffic load is
called an intelligent traffic control system. Traffic signals have strengths and
weaknesses that must be considered when deciding whether to install them.
Signal intersections can reduce delay for side road traffic and reduce the
occurrence of collisions by turning traffic and cross traffic. But they may also
cause delay for traffic on the main road, and often increase rear-end collisions by
up to 50%.
3
TIMER:
Timers are an electronics devices used to to provide time delay at different
conditions and situations. Range of timer in logix pro varies from 0-255. In
accordance with PLC there are three types of timers-
• ON delay timer
• OFF delay timer Pulse timer
4
Ladder Diagram:
It is a graphical programming language, initially programmed with simple
contacts that simulate the opening and closing of relays. Ladder Logic
programming has been expanded to include functions such as Counters, Timers,
shift registers and math operations. Ladder logic is a method of drawing electrical
logic schematics. It is now a graphical language very popular for programming
Programmable Logic Controllers (PLCs). The name is based on the observation
that programs in this language resemble ladders, with two vertical "rails" and a
series of horizontal "rungs" between them. A program in ladder logic, also called
a ladder diagram.
5
32767 sec/60 = 546.1167 min /60= = 9.1019 hr
While, for 11.6667 hr. for one day at least 3 timers required
Discussion
This method will help reduce congestion on roads and would help in coping with
accidents as the heavy vehicles and light vehicles will be in different lanes.
Resultantly, a solution to a much critical problem of traffic congestion and fatal
accidents is possible using this system. Thus the proposed system would make
our roads a safer place to travel. An intelligent traffic light system had
successfully been designed and developed. The sensors were interfaced with Lab
PLC Module. This interface is synchronized with the whole process of the traffic
system. This prototype can easily be implemented in real life situations.
Increasing the number of sensors to detect the presence of vehicles can further
enhance the design of the traffic light system. Another room of improvement is
to have the infrared sensors replaced with an imaging system/camera system so
that it has a wide range of detection capabilities, which can be enhanced and
ventured into a perfect traffic system.
WORKING
The ‘PLC’ program is designed to associate traffic light system working in
parallel with the barrier cut, consists of four stages: Now press push button
switch and process goes on
At First stage, in programmed 3 POLEs in all RED’S are ON condition. All
GREEN’S are OFF condition in particular time, the timer is ON
The second stage, when the time is completed only POLE-1 GREEN is ON
condition at a time POLE-1 RED is OFF condition remaining POLE-2 and
POLE-3 RED’S are ON condition and GREEN’S are OFF condition in
particular time
The third stage, when the time is completed only POLE-2 GREEN is ON
condition at a time POLE-2 RED is OFF condition, remaining POLE-1 and
POLE-3 RED’S are ON condition and GREEN’S are OFF condition in
particular time.
The fourth stage, when the time is completed only POLE-3 GREEN is ON
condition at a time POLE-3 RED is OFF condition, remaining POLE-1 and
POLE-2 RED’S are ON condition and GREEN’S are OFF condition in
particular time.
This process (step-2 and step-3 and step-4) conditions are continuously repeated.
When the push button is OFF the process will be STOP

More Related Content

Similar to PLC 5.pdf

Masters Report.PDF
Masters Report.PDFMasters Report.PDF
Masters Report.PDF
Don W. Lewis
 
Density based traffic light control
Density based traffic light controlDensity based traffic light control
Density based traffic light control
Rohit Nair
 
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
BRNSS Publication Hub
 
Rail gate controller ppt
Rail gate controller pptRail gate controller ppt
Rail gate controller ppt
Sajal Das
 

Similar to PLC 5.pdf (20)

Masters Report.PDF
Masters Report.PDFMasters Report.PDF
Masters Report.PDF
 
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
 
Design of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded systemDesign of intelligent traffic light controller using gsm & embedded system
Design of intelligent traffic light controller using gsm & embedded system
 
Bidirectional visitor counter
Bidirectional visitor counterBidirectional visitor counter
Bidirectional visitor counter
 
PLC (Programmable Logic Circuit)
PLC (Programmable Logic Circuit)PLC (Programmable Logic Circuit)
PLC (Programmable Logic Circuit)
 
Automated Water Filling and Mobile Charging Station Based on PLC
Automated Water Filling and Mobile Charging Station Based on PLCAutomated Water Filling and Mobile Charging Station Based on PLC
Automated Water Filling and Mobile Charging Station Based on PLC
 
Density based traffic light control
Density based traffic light controlDensity based traffic light control
Density based traffic light control
 
Advanced insrumentation lab manual
Advanced insrumentation lab manualAdvanced insrumentation lab manual
Advanced insrumentation lab manual
 
Traffic Light Controller Using Fpga
Traffic Light Controller Using FpgaTraffic Light Controller Using Fpga
Traffic Light Controller Using Fpga
 
Automation21
Automation21Automation21
Automation21
 
PLC 3.pdf
PLC 3.pdfPLC 3.pdf
PLC 3.pdf
 
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
 
Field Logic Controllers: The Next Generation of Control
Field Logic Controllers: The Next Generation of ControlField Logic Controllers: The Next Generation of Control
Field Logic Controllers: The Next Generation of Control
 
Group project dld assignement
Group project dld assignementGroup project dld assignement
Group project dld assignement
 
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
 
IRJET- Advanced Vehicle Parking using PLC
IRJET- Advanced Vehicle Parking using PLCIRJET- Advanced Vehicle Parking using PLC
IRJET- Advanced Vehicle Parking using PLC
 
PLC 4.docx
PLC 4.docxPLC 4.docx
PLC 4.docx
 
Rail gate controller ppt
Rail gate controller pptRail gate controller ppt
Rail gate controller ppt
 
New ppt seminor.pptx
New ppt seminor.pptxNew ppt seminor.pptx
New ppt seminor.pptx
 
cv1aditya
cv1adityacv1aditya
cv1aditya
 

More from Mahamad Jawhar (20)

text book Programmable-Logic-Controllers plc.pdf
text book Programmable-Logic-Controllers plc.pdftext book Programmable-Logic-Controllers plc.pdf
text book Programmable-Logic-Controllers plc.pdf
 
2.pdf
2.pdf2.pdf
2.pdf
 
3.pdf
3.pdf3.pdf
3.pdf
 
1.pdf
1.pdf1.pdf
1.pdf
 
robotic2.docx
robotic2.docxrobotic2.docx
robotic2.docx
 
Power Plant Engineering - (Malestrom) (1).pdf
Power Plant Engineering - (Malestrom) (1).pdfPower Plant Engineering - (Malestrom) (1).pdf
Power Plant Engineering - (Malestrom) (1).pdf
 
ref3.pdf
ref3.pdfref3.pdf
ref3.pdf
 
I-Section-US-1003.pdf
I-Section-US-1003.pdfI-Section-US-1003.pdf
I-Section-US-1003.pdf
 
ref.pdf
ref.pdfref.pdf
ref.pdf
 
lect 01 (1).pdf
lect 01 (1).pdflect 01 (1).pdf
lect 01 (1).pdf
 
plasma cutting.pdf
plasma cutting.pdfplasma cutting.pdf
plasma cutting.pdf
 
Grad. Proj. Poster Templete akam.docx
Grad. Proj. Poster Templete akam.docxGrad. Proj. Poster Templete akam.docx
Grad. Proj. Poster Templete akam.docx
 
project format writting 2.docx
project format writting 2.docxproject format writting 2.docx
project format writting 2.docx
 
PLC4.docx
PLC4.docxPLC4.docx
PLC4.docx
 
Project Cooling Tower.pptx
Project Cooling Tower.pptxProject Cooling Tower.pptx
Project Cooling Tower.pptx
 
final project.docx
final project.docxfinal project.docx
final project.docx
 
final project1.docx
final project1.docxfinal project1.docx
final project1.docx
 
project cooling tower.docx
project cooling tower.docxproject cooling tower.docx
project cooling tower.docx
 
robotic.docx
robotic.docxrobotic.docx
robotic.docx
 
report project.docx
report project.docxreport project.docx
report project.docx
 

Recently uploaded

Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 

Recently uploaded (20)

Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 

PLC 5.pdf

  • 1. 1 Controlling two dimension traffic light by using PLC Student Name: Muhammad Jawhar Anwar Class: 4 Stage – Group:A1 Course Title: PLC Lab. Department: Mechanical and Mechatronics Engineering EXP NO: 5 College of Engineering Salahaddin University-Erbil Academic Year 2021-2022
  • 2. 2 Introduction AUTOMATIC TRAFFIC SIGNAL CONTROL PLC BASED: A traffic light or traffic signal is a signaling device positioned at a road intersection, pedestrian crossing, or other location in order to indicate when it is safe to drive, ride, or walk using a n universal color code A traffic light, traffic signal, or stop light is a signaling device positioned at a road intersection, pedestrian crossing, or other location in order to indicate when it is safe to drive, ride, or walk using a universal color code However for the pedestrians, there have only two lights, a red light and a green light that mean go and stop Respectively The traffic lights have given many benefits to all road users. Besides reducing the number of accidents, it made the traffic flow smoothly and possibly could save people time. Traffic load is highly dependent on parameters such as time, day, season, weather and unpredictable situations such as accidents, special events or construction activities. If these parameters are not taken into account, the traffic control system will create bottlenecks and delays. A traffic control system that solves these problems by continuously sensing and monitoring traffic conditions and adjusting the timing of traffic lights according to the actual traffic load is called an intelligent traffic control system. Traffic signals have strengths and weaknesses that must be considered when deciding whether to install them. Signal intersections can reduce delay for side road traffic and reduce the occurrence of collisions by turning traffic and cross traffic. But they may also cause delay for traffic on the main road, and often increase rear-end collisions by up to 50%.
  • 3. 3 TIMER: Timers are an electronics devices used to to provide time delay at different conditions and situations. Range of timer in logix pro varies from 0-255. In accordance with PLC there are three types of timers- • ON delay timer • OFF delay timer Pulse timer
  • 4. 4 Ladder Diagram: It is a graphical programming language, initially programmed with simple contacts that simulate the opening and closing of relays. Ladder Logic programming has been expanded to include functions such as Counters, Timers, shift registers and math operations. Ladder logic is a method of drawing electrical logic schematics. It is now a graphical language very popular for programming Programmable Logic Controllers (PLCs). The name is based on the observation that programs in this language resemble ladders, with two vertical "rails" and a series of horizontal "rungs" between them. A program in ladder logic, also called a ladder diagram.
  • 5. 5 32767 sec/60 = 546.1167 min /60= = 9.1019 hr While, for 11.6667 hr. for one day at least 3 timers required Discussion This method will help reduce congestion on roads and would help in coping with accidents as the heavy vehicles and light vehicles will be in different lanes. Resultantly, a solution to a much critical problem of traffic congestion and fatal accidents is possible using this system. Thus the proposed system would make our roads a safer place to travel. An intelligent traffic light system had successfully been designed and developed. The sensors were interfaced with Lab PLC Module. This interface is synchronized with the whole process of the traffic system. This prototype can easily be implemented in real life situations. Increasing the number of sensors to detect the presence of vehicles can further enhance the design of the traffic light system. Another room of improvement is to have the infrared sensors replaced with an imaging system/camera system so that it has a wide range of detection capabilities, which can be enhanced and ventured into a perfect traffic system. WORKING The ‘PLC’ program is designed to associate traffic light system working in parallel with the barrier cut, consists of four stages: Now press push button switch and process goes on At First stage, in programmed 3 POLEs in all RED’S are ON condition. All GREEN’S are OFF condition in particular time, the timer is ON The second stage, when the time is completed only POLE-1 GREEN is ON condition at a time POLE-1 RED is OFF condition remaining POLE-2 and POLE-3 RED’S are ON condition and GREEN’S are OFF condition in particular time The third stage, when the time is completed only POLE-2 GREEN is ON condition at a time POLE-2 RED is OFF condition, remaining POLE-1 and POLE-3 RED’S are ON condition and GREEN’S are OFF condition in particular time. The fourth stage, when the time is completed only POLE-3 GREEN is ON condition at a time POLE-3 RED is OFF condition, remaining POLE-1 and POLE-2 RED’S are ON condition and GREEN’S are OFF condition in particular time. This process (step-2 and step-3 and step-4) conditions are continuously repeated. When the push button is OFF the process will be STOP