SlideShare a Scribd company logo
1 of 5
1
Controlling two dimension traffic light by
using PLC
Student Name: Muhammad Jawhar Anwar
Class: 4 Stage – Group:A1
Course Title: PLC Lab.
Department: Mechanical and Mechatronics Engineering
EXP NO: 5
College of Engineering
Salahaddin University-Erbil
Academic Year 2021-2022
2
Introduction
AUTOMATIC TRAFFIC SIGNAL CONTROLPLC BASED:
A traffic light or traffic signal is a signaling device positioned at a
road intersection, pedestrian crossing, or other location in order to indicate
when it is safe to drive, ride, or walk using a n universal color code
A traffic light, traffic signal, or stop light is a signaling device positioned at a
road intersection, pedestrian crossing, or other location in order to indicate
when it is safe to drive, ride, or walk using a universal color code
However for the pedestrians, there have only two lights, a red light and a green
light that mean go and stop Respectively The traffic lights have given many
benefits to all road users. Besides reducing the number of accidents, it made the
traffic flow smoothly and possibly could save people time.
Traffic load is highly dependent on parameters such as time, day, season,
weather and unpredictable situations such as accidents, special events or
construction activities. If these parameters are not taken into account, the traffic
control system will create bottlenecks and delays. A traffic controlsystem that
solves these problems by continuously sensing and monitoring traffic conditions
and adjusting the timing of traffic lights according to the actual traffic load is
called an intelligent traffic control system. Traffic signals have strengths and
weaknesses that must be considered when deciding whether to install them.
Signal intersections can reduce delay for side road traffic and reduce the
occurrence of collisions by turning traffic and cross traffic. But they may also
cause delay for traffic on the main road, and often increase rear-end collisions by
up to 50%.
3
TIMER:
Timers are an electronics devices used to to provide time delay at different
conditions and situations. Range of timer in logix pro varies from 0-255. In
accordancewith PLC there are three types of timers-
• ON delay timer
• OFF delay timer Pulse timer
4
Ladder Diagram:
It is a graphical programming language, initially programmed with simple
contacts that simulate the opening and closing of relays. Ladder Logic
programming has been expanded to include functions such as Counters, Timers,
shift registers and math operations. Ladder logic is a method of drawing electrical
logic schematics. It is now a graphical language very popular for programming
Programmable Logic Controllers (PLCs). The name is based on the observation
that programs in this language resemble ladders, with two vertical "rails" and a
series of horizontal "rungs" between them. A program in ladder logic, also called
a ladder diagram.
5
32767 sec/60 = 546.1167 min /60= = 9.1019 hr
While, for 11.6667 hr. for one day at least 3 timers required
Discussion
WORKING
The ‘PLC’ program is designed to associate traffic light system working in
parallel with the barrier cut, consists of four stages: Now press push button
switch and process goes on
At First stage, in programmed 3 POLEs in all RED’S are ON condition. All
GREEN’S are OFF condition in particular time, the timer is ON
The second stage, when the time is completed only POLE-1 GREEN is ON
condition at a time POLE-1 RED is OFF condition remaining POLE-2 and
POLE-3 RED’S are ON condition and GREEN’S are OFF condition in
particular time
The third stage, when the time is completed only POLE-2 GREEN is ON
condition at a time POLE-2 RED is OFF condition, remaining POLE-1 and
POLE-3 RED’S are ON condition and GREEN’S are OFF condition in
particular time.
The fourth stage, when the time is completed only POLE-3 GREEN is ON
condition at a time POLE-3 RED is OFF condition, remaining POLE-1 and
POLE-2 RED’S are ON condition and GREEN’S are OFF condition in
particular time.
This process (step-2and step-3 and step-4) conditions are continuously repeated.
When the push button is OFF the process will be STOP

More Related Content

Similar to Controlling two dimension traffic light by PLC

Parking Control System using PLC
Parking Control System using PLCParking Control System using PLC
Parking Control System using PLCZunAib Ali
 
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...paperpublications3
 
Programmable Logic Controller
Programmable Logic ControllerProgrammable Logic Controller
Programmable Logic ControllerHimshekhar Das
 
Group project dld assignement
Group project dld assignementGroup project dld assignement
Group project dld assignementAkhtarzeb Khan
 
Density based traffic light control
Density based traffic light controlDensity based traffic light control
Density based traffic light controlRohit Nair
 
Traffic Light Controller Using Fpga
Traffic Light Controller Using FpgaTraffic Light Controller Using Fpga
Traffic Light Controller Using FpgaIJERA Editor
 
Rail gate controller ppt
Rail gate controller pptRail gate controller ppt
Rail gate controller pptSajal Das
 
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)BRNSS Publication Hub
 
training report. automation,plc , scada
training report. automation,plc , scada training report. automation,plc , scada
training report. automation,plc , scada MdQutubuddin1
 
Advanced plc programming & scada system design
Advanced plc programming & scada system designAdvanced plc programming & scada system design
Advanced plc programming & scada system designlakshanwalpita
 
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
AfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdhAfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
AfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdhJohn Ajish
 
Bidirectional visitor counter
Bidirectional visitor counterBidirectional visitor counter
Bidirectional visitor counterZakir Gulzar
 
Plc and scada presentation
Plc and scada presentationPlc and scada presentation
Plc and scada presentationVikasKumar1628
 
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...TELKOMNIKA JOURNAL
 

Similar to Controlling two dimension traffic light by PLC (20)

Parking Control System using PLC
Parking Control System using PLCParking Control System using PLC
Parking Control System using PLC
 
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
Monitoring and Controlling Of Electric Overhead Travelling Crane Using PLC an...
 
Automation21
Automation21Automation21
Automation21
 
cv1aditya
cv1adityacv1aditya
cv1aditya
 
PLC.pdf
PLC.pdfPLC.pdf
PLC.pdf
 
Programmable Logic Controller
Programmable Logic ControllerProgrammable Logic Controller
Programmable Logic Controller
 
Group project dld assignement
Group project dld assignementGroup project dld assignement
Group project dld assignement
 
Density based traffic light control
Density based traffic light controlDensity based traffic light control
Density based traffic light control
 
Traffic Light Controller Using Fpga
Traffic Light Controller Using FpgaTraffic Light Controller Using Fpga
Traffic Light Controller Using Fpga
 
Rail gate controller ppt
Rail gate controller pptRail gate controller ppt
Rail gate controller ppt
 
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
Simplified Traffic Lights Using 8051 Maxim DS89C4XX Embedded Controller (MDE)
 
training report. automation,plc , scada
training report. automation,plc , scada training report. automation,plc , scada
training report. automation,plc , scada
 
Advanced plc programming & scada system design
Advanced plc programming & scada system designAdvanced plc programming & scada system design
Advanced plc programming & scada system design
 
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
AfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdhAfasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
Afasdhdfvjukgkrgdfbdzthgsdhgjjkvdxfhdfhfdh
 
Bidirectional visitor counter
Bidirectional visitor counterBidirectional visitor counter
Bidirectional visitor counter
 
Plc and scada presentation
Plc and scada presentationPlc and scada presentation
Plc and scada presentation
 
Plc & Scada report 4
Plc & Scada report 4Plc & Scada report 4
Plc & Scada report 4
 
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
A Solution to Partial Observability in Extended Kalman Filter Mobile Robot Na...
 
Shishupal plc
Shishupal plcShishupal plc
Shishupal plc
 
Chinmay pandya
Chinmay pandyaChinmay pandya
Chinmay pandya
 

More from Mahamad Jawhar

More from Mahamad Jawhar (20)

text book Programmable-Logic-Controllers plc.pdf
text book Programmable-Logic-Controllers plc.pdftext book Programmable-Logic-Controllers plc.pdf
text book Programmable-Logic-Controllers plc.pdf
 
2.pdf
2.pdf2.pdf
2.pdf
 
3.pdf
3.pdf3.pdf
3.pdf
 
1.pdf
1.pdf1.pdf
1.pdf
 
robotic2.docx
robotic2.docxrobotic2.docx
robotic2.docx
 
Power Plant Engineering - (Malestrom) (1).pdf
Power Plant Engineering - (Malestrom) (1).pdfPower Plant Engineering - (Malestrom) (1).pdf
Power Plant Engineering - (Malestrom) (1).pdf
 
ref3.pdf
ref3.pdfref3.pdf
ref3.pdf
 
I-Section-US-1003.pdf
I-Section-US-1003.pdfI-Section-US-1003.pdf
I-Section-US-1003.pdf
 
ref.pdf
ref.pdfref.pdf
ref.pdf
 
lect 01 (1).pdf
lect 01 (1).pdflect 01 (1).pdf
lect 01 (1).pdf
 
plasma cutting.pdf
plasma cutting.pdfplasma cutting.pdf
plasma cutting.pdf
 
Grad. Proj. Poster Templete akam.docx
Grad. Proj. Poster Templete akam.docxGrad. Proj. Poster Templete akam.docx
Grad. Proj. Poster Templete akam.docx
 
project format writting 2.docx
project format writting 2.docxproject format writting 2.docx
project format writting 2.docx
 
PLC4.docx
PLC4.docxPLC4.docx
PLC4.docx
 
Project Cooling Tower.pptx
Project Cooling Tower.pptxProject Cooling Tower.pptx
Project Cooling Tower.pptx
 
final project.docx
final project.docxfinal project.docx
final project.docx
 
final project1.docx
final project1.docxfinal project1.docx
final project1.docx
 
project cooling tower.docx
project cooling tower.docxproject cooling tower.docx
project cooling tower.docx
 
robotic.docx
robotic.docxrobotic.docx
robotic.docx
 
report project.docx
report project.docxreport project.docx
report project.docx
 

Recently uploaded

定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一fhhkjh
 
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一meq5nzfnk
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full NightCall Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call GirlsAyesha Khan
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一hnfusn
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
 
What Causes DPF Failure In VW Golf Cars & How Can They Be Prevented
What Causes DPF Failure In VW Golf Cars & How Can They Be PreventedWhat Causes DPF Failure In VW Golf Cars & How Can They Be Prevented
What Causes DPF Failure In VW Golf Cars & How Can They Be PreventedAutobahn Automotive Service
 
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...kexey39068
 
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一fjjhfuubb
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607dollysharma2066
 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualExcavator
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCRsoniya singh
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsFifth Gear Automotive
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一ga6c6bdl
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company PresentationMihajloManjak
 
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一ypfy7p5ld
 

Recently uploaded (20)

定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
定制(Plymouth文凭证书)普利茅斯大学毕业证毕业证成绩单学历认证原版一比一
 
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
定制多伦多大学毕业证(UofT毕业证)成绩单(学位证)原版一比一
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
Indian Downtown Call Girls # 00971528903066 # Indian Call Girls In Downtown D...
 
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full NightCall Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call Girls
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
 
What Causes DPF Failure In VW Golf Cars & How Can They Be Prevented
What Causes DPF Failure In VW Golf Cars & How Can They Be PreventedWhat Causes DPF Failure In VW Golf Cars & How Can They Be Prevented
What Causes DPF Failure In VW Golf Cars & How Can They Be Prevented
 
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
Call Girl Service Global Village Dubai +971509430017 Independent Call Girls G...
 
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
 
Not Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These SymptomsNot Sure About VW EGR Valve Health Look For These Symptoms
Not Sure About VW EGR Valve Health Look For These Symptoms
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
 
Digamma / CertiCon Company Presentation
Digamma / CertiCon Company  PresentationDigamma / CertiCon Company  Presentation
Digamma / CertiCon Company Presentation
 
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
 

Controlling two dimension traffic light by PLC

  • 1. 1 Controlling two dimension traffic light by using PLC Student Name: Muhammad Jawhar Anwar Class: 4 Stage – Group:A1 Course Title: PLC Lab. Department: Mechanical and Mechatronics Engineering EXP NO: 5 College of Engineering Salahaddin University-Erbil Academic Year 2021-2022
  • 2. 2 Introduction AUTOMATIC TRAFFIC SIGNAL CONTROLPLC BASED: A traffic light or traffic signal is a signaling device positioned at a road intersection, pedestrian crossing, or other location in order to indicate when it is safe to drive, ride, or walk using a n universal color code A traffic light, traffic signal, or stop light is a signaling device positioned at a road intersection, pedestrian crossing, or other location in order to indicate when it is safe to drive, ride, or walk using a universal color code However for the pedestrians, there have only two lights, a red light and a green light that mean go and stop Respectively The traffic lights have given many benefits to all road users. Besides reducing the number of accidents, it made the traffic flow smoothly and possibly could save people time. Traffic load is highly dependent on parameters such as time, day, season, weather and unpredictable situations such as accidents, special events or construction activities. If these parameters are not taken into account, the traffic control system will create bottlenecks and delays. A traffic controlsystem that solves these problems by continuously sensing and monitoring traffic conditions and adjusting the timing of traffic lights according to the actual traffic load is called an intelligent traffic control system. Traffic signals have strengths and weaknesses that must be considered when deciding whether to install them. Signal intersections can reduce delay for side road traffic and reduce the occurrence of collisions by turning traffic and cross traffic. But they may also cause delay for traffic on the main road, and often increase rear-end collisions by up to 50%.
  • 3. 3 TIMER: Timers are an electronics devices used to to provide time delay at different conditions and situations. Range of timer in logix pro varies from 0-255. In accordancewith PLC there are three types of timers- • ON delay timer • OFF delay timer Pulse timer
  • 4. 4 Ladder Diagram: It is a graphical programming language, initially programmed with simple contacts that simulate the opening and closing of relays. Ladder Logic programming has been expanded to include functions such as Counters, Timers, shift registers and math operations. Ladder logic is a method of drawing electrical logic schematics. It is now a graphical language very popular for programming Programmable Logic Controllers (PLCs). The name is based on the observation that programs in this language resemble ladders, with two vertical "rails" and a series of horizontal "rungs" between them. A program in ladder logic, also called a ladder diagram.
  • 5. 5 32767 sec/60 = 546.1167 min /60= = 9.1019 hr While, for 11.6667 hr. for one day at least 3 timers required Discussion WORKING The ‘PLC’ program is designed to associate traffic light system working in parallel with the barrier cut, consists of four stages: Now press push button switch and process goes on At First stage, in programmed 3 POLEs in all RED’S are ON condition. All GREEN’S are OFF condition in particular time, the timer is ON The second stage, when the time is completed only POLE-1 GREEN is ON condition at a time POLE-1 RED is OFF condition remaining POLE-2 and POLE-3 RED’S are ON condition and GREEN’S are OFF condition in particular time The third stage, when the time is completed only POLE-2 GREEN is ON condition at a time POLE-2 RED is OFF condition, remaining POLE-1 and POLE-3 RED’S are ON condition and GREEN’S are OFF condition in particular time. The fourth stage, when the time is completed only POLE-3 GREEN is ON condition at a time POLE-3 RED is OFF condition, remaining POLE-1 and POLE-2 RED’S are ON condition and GREEN’S are OFF condition in particular time. This process (step-2and step-3 and step-4) conditions are continuously repeated. When the push button is OFF the process will be STOP