GB22
Determine One Way or Two Way Slab:
Slab 3b-4a / C-D
Ly/Lx= 3/2
1.5, <2
(Two way slab)
Slab 3b-4a / D-E
Ly/Lx= 3/3
1, <2
(Two way slab)
Slab self-weight= 0.15m x 24kN/m3
3.6kN/m2
Dead Load
Beam self-weight= 0.15m x 0.3m x 24kN/m3
1.08kN/m
Brickwall weight= 3.0m x 0.15m x 19kN/m3
8.55kN/m
Dead Load 3b-4a / C-D (two way)= 3.6kN/m2 x 2/2
3.6kN/m
Dead Load 3b-4a / D-E (two way)= 3.6kN/m2 x 3/2 x 2/3
3.6kN/m
Total Dead Load = (1.08 + 8.55 + 3.6 + 3.6 )kN/m2
16.83 kN/m
Live Load
Live Load 3b-4a / C-D = 1.5kN/m2 x 2/2
1.5kN/m
Live Load 3b-4a / D-E = 2.0kN/m2 x 3/2 x 2/3
2.0kN/m
Total Live Load = (1.5+2) kN/m
3.50kN/m
Ultimate Load
Ultimate Dead Load= 16.83kN/m x 1.4
23.56kN/m
Ultimate Live Load= 3.5kN/m x 1.6
5.6kN/m
Total Ultimate Load= (23.56+5.6)kN/m
29.16kN/m
Reaction Forces
Total Load = 29.16kN/m x 3m
87.48kN
∑Ma=0
0= -3Rb + 87.48(1.5)
Rb= 43.74kN
∑Fy=0
0=43.74+Ra-87.48
Ra=43.74kN
Shear Force Diagram
Bending Moment Diagram
Positive Area= 1/2 x 2 x 43.74
32.81kN/m
Negative Area= 1/2 x 2 x 43.74
32.81kN/m
1.08kN/m
3b 4a3m
3.6kN/m
8.55kN/m
3.6kN/m
16.83kN/m
1.5kN/m
3b 4a3m
3.5kN/m
2.0kN/m
29.16kN/m
3b 4a
3m
87.48kN
3b 4a
3m
1.5m
87.48kN
Rb=43.74kNRa
87.48kN
Rb=43.74kNRa=43.74kN
3b 4a
3m
43.74kN/m
-43.74kN/m
3b 4a
3m
32.81kN/m
32.81-32.81=0
1
2
3
4
5
6
7
8
9
10
11
12
GB20
Determine One Way or Two Way Slab:
Slab 2-4 / B-C
Ly/Lx= 7/5
1.4, <2
(Two way slab)
Slab 2-3b / C-D
Ly/Lx= 5/5
1, <2
(Two way slab)
Slab 3b-4a / C-D
Ly/Lx= 3/2
1.5, <2
(Two way slab)
Slab self-weight= 0.15m x 24kN/m3
3.6kN/m2
Dead Load
Beam self-weight= 0.15m x 0.3m x 24kN/m3
1.08kN/m
Brickwall weight= 3.0m x 0.15m x 19kN/m3
8.55kN/m
Dead Load 2-4 / B-C (two way)= 3.6kN/m2 x 5/2
9.0kN/m
Dead Load 2-3b / C-E (two way)= 3.6kN/m2 x 5/2 x 2/3
6.0kN/m
Dead Load 3b-4a / C-D (two way)= 3.6kN/m2 x 2/2
3.6kN/m
Total Dead Load
For 2-3b = (1.08 + 8.55 + 9 + 6 )kN/m2
24.63kN/m2
For 3b-4 = (1.08 + 8.55 + 9 + 3.6 )kN/m2
22.23kN/m2
Live Load
Live Load on Slab 2-4 / B-C (two way)= 2.0kN/m2 x 5/2
5.0kN/m
Live Load on Slab 2-3b / C-E (two way)= 2.0kN/m2 x 5/2 x 2/3
3.33kN/m
Live Load on Slab 3b-4a / C-D (two way)= 1.5kN/m2 x 2/2
1.5kN/m
Total Live Load
For 2-3b = (5 + 3.33 )kN/m2
8.33kN/m2
For 3b-4 = (5 + 1.5 )kN/m2
6.5kN/m2
Ultimate Load
For 2-3b
Ultimate Dead Load= 24.63kN/m x 1.4
34.48kN/m
Ultimate Live Load= 8.33kN/m x 1.6
13.33kN/m
Total Ultimate Load= (34.48+13.33)kN/m
1.08kN/m
8.55kN/m
3.6kN/m
9kN/m
9.0kN/m
2 3b 4
5m 2m
24.63kN/m 22.23kN/m
5.00kN/m
3.33kN/m
6.5kN/m
1.5kN/m
2 3b 4
5m 2m
8.33kN/m
47.81kN/m
2 3b 45m 2m
41.52kN/m
1
47.81kN/m
For 3b-4
Ultimate Dead Load= 22.23kN/m x 1.4
31.12kN/m
Ultimate Live Load= 6.5kN/m x 1.6
10.4kN/m
Total Ultimate Load= (31.12+10.4)kN/m
41.52kN/m
Reaction Forces
Total Load for Beam C/2b-3b = 47.81kN/m x 5m
239.05kN
Total Load for Beam C/3b-4 = 41.52kN/m x 2m
83.04kN
∑Ma=0
0= 239.05(2.5) + 109.62(5) + 83.04(6) - 7Rb
Rb= 234.9kN
∑Fy=0
0=239.05 + 109.62 + 83.04 - 234.9 - Ra
Ra=196.81kN
Shear Force Diagram
Bending Moment Diagram
Small Triangle = x/5 = 196.81/239.05
x=4.12
Positive Area = 1/2 x 196.81 x 4.12
405.43
Negative Area = 1/2 x (151.86+234.9) x2
386.76
Negative Area = 1/2 x 42.24 x (5-4.12)
18.59
Total Negative Area = 386.76 + 18.59
405.35
2 43b
5m 2m
83.04kN109.62kN
239.05kN
Rb=234.9kNRa=196.81kN
2 3b 45m 2m
196.81kN
-42.24kN
-151.86kN
-234.9kN
2 3b 45m 2m
405.43kN/m
405.43-405.35=0.08
2
GB23
Determine One Way or Two Way Slab:
Slab 3a-4a / E-F
Ly/Lx= 4/4
1, <2
(Two way slab)
Slab 3b-4a / D-E
Ly/Lx= 3/3
1, <2
(Two way slab)
Slab 2-3b / C-E
Ly/Lx= 5/5
1, <2
(Two way slab)
Slab self-weight= 0.15m x 24kN/m3
3.6kN/m2
Dead Load
Beam self-weight= 0.15m x 0.3m x 24kN/m3
1.08kN/m
Brickwall weight= 3.0m x 0.15m x 19kN/m3
8.55kN/m
Dead Load 2-3b / C-E (two way)= 3.6kN/m2 x 5/2 x 2/3
6.0kN/m
Dead Load 3b-4a / D-E (two way)= 3.6kN/m2 x 3/2 x 2/3
3.6kN/m
Dead Load 3a-4a / E-F (two way)= 3.6kN/m2 x 4/2 x 2/3
4.8kN/m
Total Dead Load
For 3a-3b = (1.08 + 8.55 + 6 + 4.8 )kN/m2
20.43kN/m2
For 3b-4a = (1.08 + 8.55 + 3.6 + 4.8 )kN/m2
18.03kN/m2
Live Load
Live Load on Slab 2-3b / C-E (two way)= 2.0kN/m2 x 5/2 x 2/3
3.33kN/m
Live Load on Slab 3b-4a / D-E (two way)= 2.0kN/m2 x 3/2 x 2/3
2.00kN/m
Live Load on Slab 3a-4a / E-F (two way)= 1.5kN/m2 x 4/2 x 2/3
2.0kN/m
Total Live Load
For 3a-3b = (3.33 + 2 )kN/m2
5.33kN/m2
For 3b-4a = (2 + 2)kN/m2
4kN/m2
Ultimate Load
For 3a-3b
Ultimate Dead Load= 20.43kN/m x 1.4
28.6kN/m
Ultimate Live Load= 5.33kN/m x 1.6
1.08kN/m
8.55kN/m
6kN/m
4.8kN/m
3.6kN/m
3a 3b 4a
1m 3m
20.43kN/m
18.03kN/m
2kN/m
3a 3b 4a
1m 3m
3.33kN/m
2N/m
4kN/m5.33kN/m
3a 3b 4a
1m 3m
1
8.53kN/m
Total Ultimate Load= (28.6+8.53)kN/m
37.13kN/m
For 3b-4a
Ultimate Dead Load= 18.03kN/m x 1.4
25.24kN/m
Ultimate Live Load= 4kN/m x 1.6
6.4kN/m
Total Ultimate Load= (25.24+6.4)kN/m
31.64kN/m
Reaction Forces
Total load on beam E/3a-3b= 37.13 x 1m
37.13kN
Total load on beam E/3b-4a= 31.64 x 3m
94.93kN
∑Ma=0
0=37.13(0.5) + 104.8(1) + 94.93 (2.5) = 4Rb
4Rb=360.68kN
Rb=90.17kN
∑Fy=0
0=37.13 + 104.8 + 94.93 - 90.17 - Ra
Ra=146.69kN
Shear Force Diagram
Bending Moment Diagram
Small Triangle = x/3 = 4.76/90.17
x=0.16
Positive Area = 1/2 x (146.69+109.56) x 1
127.83
Postive Area = 1/2 x 0.16 x 4.76
0.38
Total Positive Area = 127.83 + 0.38
128.04
Negative Area = 1/2 x 90.17 x (3-0.16)
128.04
37.13kN/m 31.64kN/m
37.13kN
94.93kN
3a 3b 4a
1m 3m
104.8kN/m
0.5m 1.5m
Rb=90.17kNRa=146.69kN
3a 3b 4a
1m 3m
146.69kN
109.56kN
4.76kN
-90.17kN
3a 3b 4a
1m 3m
128.04kN/m
128.21-128.04=0.17
2
1
2
GB24
Determine One Way or Two Way Slab:
Slab 3b-4a / C-E
Ly/Lx= 3/2
1.5, <2
(Two way slab)
Slab 3b-4a / D-E
Ly/Lx= 3/3
1, <2
(Two way slab)
Slab 2-3b / C-E
Ly/Lx= 5/5
1, <2
(Two way slab)
Slab self-weight= 0.15m x 24kN/m3
3.6kN/m2
Dead Load
Beam self-weight= 0.15m x 0.3m x 24kN/m3
1.08kN/m
Brickwall weight= 3.0m x 0.15m x 19kN/m3
8.55kN/m
Dead Load 2-3b / C-E (two way)= 3.6kN/m2 x 5/2 x 2/3
6.0kN/m
Dead Load 3b-4a / D-E (two way)= 3.6kN/m2 x 3/2 x 2/3
3.6kN/m
Dead Load 3a-4a / C-D (two way)= 3.6kN/m2 x 2/2 x 2/3
2.4kN/m
Total Dead Load
For E-D = (1.08 + 8.55 + 6 + 3.6 )kN/m2
19.23kN/m2
For D-C = (1.08 + 8.55 + 2.4 + 6 )kN/m2
18.03kN/m2
Live Load
Live Load on Slab 3b-4a / D-E (two way)= 2.0kN/m2 x 3/2 x 2/3
5.0kN/m
Live Load on Slab 2-3b / C-E (two way)= 2.0kN/m2 x 5/2 x 2/3
3.33kN/m
Live Load on Slab 3b-4a / C-D (two way)= 1.5kN/m2 x 2/2 x 2/3
1.0kN/m
Total Live Load
For E-D = (2 + 3.33 )kN/m2
5.33kN/m2
For D-C = (3.33 + 1 )kN/m2
4.33kN/m2
Ultimate Load
For E-D
Ultimate Dead Load= 19.23kN/m x 1.4
26.92kN/m
Ultimate Live Load= 5.33kN/m x 1.6
8.53kN/m
Total Ultimate Load= (26.92+8.53)kN/m
1.08kN/m
8.55kN/m
2.4kN/m
6kN/m
3.6kN/m
E D C
3m 2m
19.23kN/m 18.03kN/m
3.33kN/m
2kN/m
4.33kN/m
1kN/m
E D C
3m 2m
5.33kN/m
35.45kN/m
E D C3m 2m
32.17kN/m
1
35.45kN/m
For D-C
Ultimate Dead Load= 18.03kN/m x 1.4
25.24kN/m
Ultimate Live Load= 4.33kN/m x 1.6
6.93kN/m
Total Ultimate Load= (25.24+6.93)kN/m
32.17kN/m
Reaction Forces
Total Load for Beam 3b / E-D = 35.45kN/m x 3m
106.34kN
Total Load for Beam 3b / D-C = 32.17kN/m x 2m
64.34kN
∑Ma=0
0= 106.34 (1.5) + 43.74(3) + 64.34(4) = 5Rb
Rb= 109.62kN
∑Fy=0
0= 106.34 + 43.74 + 64.34 - 109.62 - Ra
Ra=104.8kN
Shear Force Diagram
Bending Moment Diagram
Small Triange = x/3 = 104.8/106.34
x=2.96
Positive Area = 1/2 x 104.8 x 2.96
155.1
Negative Area = 1/2 x 1.54 x (3-2.96)
0.03
Negative Area = 1/2 x (109.62 + 45.28) x 2
154.9
Total Negative Area = 0.03 + 154.9
154.93
E CD
3m 2m
64.34kN
43.74kN
106.34kN
Rb=109.62kNRa=104.8kN
E D C3m 2m
104.8kN
-1.54kN
- 45.28kN
-109.62kN
E D C3m 2m
155.1kN/m
155.1-154.9=0.2
2

More Related Content

What's hot

Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
Ivy Yee
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension junAh Jun
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
Joe Onn Lim
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
Wen Yee
 
B.structure report
B.structure reportB.structure report
B.structure report
jiuaN59
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
Patch Yuen
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
douglasloon
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
Winnie Ang
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
Ong Seng Peng Jeff
 
Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculation
kimberlywjs
 
Design of box
Design of boxDesign of box
Design of box
Abhilash Chandra Dey
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
Sheau Hui Tan
 

What's hot (13)

Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Structure extension jun
Structure extension junStructure extension jun
Structure extension jun
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)Building Structures Report (Group and Individual)
Building Structures Report (Group and Individual)
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
Floor Plan calculation
Floor Plan calculationFloor Plan calculation
Floor Plan calculation
 
Design of box
Design of boxDesign of box
Design of box
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
 

Similar to Gb22, 23, 24, 20 shensin

Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
Joyce Wee
 
Building structure
Building structure Building structure
Building structure
yenweizheng
 
Individual calculation
Individual calculation Individual calculation
Individual calculation
Jamie Lee
 
Structures
StructuresStructures
Structures
Penny3688
 
Building structure real
Building structure realBuilding structure real
Building structure realong93
 
Building Structure
Building Structure Building Structure
Building Structure
Nicole Foo
 
Building structures final
Building structures finalBuilding structures final
Building structures final
Jamie Lee
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
Jy Chong
 
B structure
B structure B structure
B structure
Andy Heng
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4
Lam Yu
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
Ken Wong
 
4444444444
44444444444444444444
4444444444
mrstore
 
Lamyu 1
Lamyu 1Lamyu 1
Lamyu 1
Lam Yu
 
1622828460.pdf
1622828460.pdf1622828460.pdf
1622828460.pdf
mohammadjalal26
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
Jing Fan Koh
 
Yung Part, structure
Yung Part, structureYung Part, structure
Yung Part, structure
Yung Kai
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
jisunfoo
 
B structure power point
B structure power pointB structure power point
B structure power point
Anderson Wong
 
Rcc box culvert
Rcc box culvertRcc box culvert
Rcc box culvert
ManonmaniA3
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
Lam Yu
 

Similar to Gb22, 23, 24, 20 shensin (20)

Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
Building structure
Building structure Building structure
Building structure
 
Individual calculation
Individual calculation Individual calculation
Individual calculation
 
Structures
StructuresStructures
Structures
 
Building structure real
Building structure realBuilding structure real
Building structure real
 
Building Structure
Building Structure Building Structure
Building Structure
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
 
B structure
B structure B structure
B structure
 
Lamyu 4
Lamyu 4Lamyu 4
Lamyu 4
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
 
4444444444
44444444444444444444
4444444444
 
Lamyu 1
Lamyu 1Lamyu 1
Lamyu 1
 
1622828460.pdf
1622828460.pdf1622828460.pdf
1622828460.pdf
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Yung Part, structure
Yung Part, structureYung Part, structure
Yung Part, structure
 
Building Structures Final Compilation
Building Structures Final CompilationBuilding Structures Final Compilation
Building Structures Final Compilation
 
B structure power point
B structure power pointB structure power point
B structure power point
 
Rcc box culvert
Rcc box culvertRcc box culvert
Rcc box culvert
 
Lamyu 2
Lamyu 2Lamyu 2
Lamyu 2
 

Recently uploaded

1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 

Recently uploaded (20)

1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 

Gb22, 23, 24, 20 shensin

  • 1. GB22 Determine One Way or Two Way Slab: Slab 3b-4a / C-D Ly/Lx= 3/2 1.5, <2 (Two way slab) Slab 3b-4a / D-E Ly/Lx= 3/3 1, <2 (Two way slab) Slab self-weight= 0.15m x 24kN/m3 3.6kN/m2 Dead Load Beam self-weight= 0.15m x 0.3m x 24kN/m3 1.08kN/m Brickwall weight= 3.0m x 0.15m x 19kN/m3 8.55kN/m Dead Load 3b-4a / C-D (two way)= 3.6kN/m2 x 2/2 3.6kN/m Dead Load 3b-4a / D-E (two way)= 3.6kN/m2 x 3/2 x 2/3 3.6kN/m Total Dead Load = (1.08 + 8.55 + 3.6 + 3.6 )kN/m2 16.83 kN/m Live Load Live Load 3b-4a / C-D = 1.5kN/m2 x 2/2 1.5kN/m Live Load 3b-4a / D-E = 2.0kN/m2 x 3/2 x 2/3 2.0kN/m Total Live Load = (1.5+2) kN/m 3.50kN/m Ultimate Load Ultimate Dead Load= 16.83kN/m x 1.4 23.56kN/m Ultimate Live Load= 3.5kN/m x 1.6 5.6kN/m Total Ultimate Load= (23.56+5.6)kN/m 29.16kN/m Reaction Forces Total Load = 29.16kN/m x 3m 87.48kN ∑Ma=0 0= -3Rb + 87.48(1.5) Rb= 43.74kN ∑Fy=0 0=43.74+Ra-87.48 Ra=43.74kN Shear Force Diagram Bending Moment Diagram Positive Area= 1/2 x 2 x 43.74 32.81kN/m Negative Area= 1/2 x 2 x 43.74 32.81kN/m 1.08kN/m 3b 4a3m 3.6kN/m 8.55kN/m 3.6kN/m 16.83kN/m 1.5kN/m 3b 4a3m 3.5kN/m 2.0kN/m 29.16kN/m 3b 4a 3m 87.48kN 3b 4a 3m 1.5m 87.48kN Rb=43.74kNRa 87.48kN Rb=43.74kNRa=43.74kN 3b 4a 3m 43.74kN/m -43.74kN/m 3b 4a 3m 32.81kN/m 32.81-32.81=0 1
  • 2. 2
  • 3. 3
  • 4. 4
  • 5. 5
  • 6. 6
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. 10
  • 11. 11
  • 12. 12
  • 13. GB20 Determine One Way or Two Way Slab: Slab 2-4 / B-C Ly/Lx= 7/5 1.4, <2 (Two way slab) Slab 2-3b / C-D Ly/Lx= 5/5 1, <2 (Two way slab) Slab 3b-4a / C-D Ly/Lx= 3/2 1.5, <2 (Two way slab) Slab self-weight= 0.15m x 24kN/m3 3.6kN/m2 Dead Load Beam self-weight= 0.15m x 0.3m x 24kN/m3 1.08kN/m Brickwall weight= 3.0m x 0.15m x 19kN/m3 8.55kN/m Dead Load 2-4 / B-C (two way)= 3.6kN/m2 x 5/2 9.0kN/m Dead Load 2-3b / C-E (two way)= 3.6kN/m2 x 5/2 x 2/3 6.0kN/m Dead Load 3b-4a / C-D (two way)= 3.6kN/m2 x 2/2 3.6kN/m Total Dead Load For 2-3b = (1.08 + 8.55 + 9 + 6 )kN/m2 24.63kN/m2 For 3b-4 = (1.08 + 8.55 + 9 + 3.6 )kN/m2 22.23kN/m2 Live Load Live Load on Slab 2-4 / B-C (two way)= 2.0kN/m2 x 5/2 5.0kN/m Live Load on Slab 2-3b / C-E (two way)= 2.0kN/m2 x 5/2 x 2/3 3.33kN/m Live Load on Slab 3b-4a / C-D (two way)= 1.5kN/m2 x 2/2 1.5kN/m Total Live Load For 2-3b = (5 + 3.33 )kN/m2 8.33kN/m2 For 3b-4 = (5 + 1.5 )kN/m2 6.5kN/m2 Ultimate Load For 2-3b Ultimate Dead Load= 24.63kN/m x 1.4 34.48kN/m Ultimate Live Load= 8.33kN/m x 1.6 13.33kN/m Total Ultimate Load= (34.48+13.33)kN/m 1.08kN/m 8.55kN/m 3.6kN/m 9kN/m 9.0kN/m 2 3b 4 5m 2m 24.63kN/m 22.23kN/m 5.00kN/m 3.33kN/m 6.5kN/m 1.5kN/m 2 3b 4 5m 2m 8.33kN/m 47.81kN/m 2 3b 45m 2m 41.52kN/m 1
  • 14. 47.81kN/m For 3b-4 Ultimate Dead Load= 22.23kN/m x 1.4 31.12kN/m Ultimate Live Load= 6.5kN/m x 1.6 10.4kN/m Total Ultimate Load= (31.12+10.4)kN/m 41.52kN/m Reaction Forces Total Load for Beam C/2b-3b = 47.81kN/m x 5m 239.05kN Total Load for Beam C/3b-4 = 41.52kN/m x 2m 83.04kN ∑Ma=0 0= 239.05(2.5) + 109.62(5) + 83.04(6) - 7Rb Rb= 234.9kN ∑Fy=0 0=239.05 + 109.62 + 83.04 - 234.9 - Ra Ra=196.81kN Shear Force Diagram Bending Moment Diagram Small Triangle = x/5 = 196.81/239.05 x=4.12 Positive Area = 1/2 x 196.81 x 4.12 405.43 Negative Area = 1/2 x (151.86+234.9) x2 386.76 Negative Area = 1/2 x 42.24 x (5-4.12) 18.59 Total Negative Area = 386.76 + 18.59 405.35 2 43b 5m 2m 83.04kN109.62kN 239.05kN Rb=234.9kNRa=196.81kN 2 3b 45m 2m 196.81kN -42.24kN -151.86kN -234.9kN 2 3b 45m 2m 405.43kN/m 405.43-405.35=0.08 2
  • 15. GB23 Determine One Way or Two Way Slab: Slab 3a-4a / E-F Ly/Lx= 4/4 1, <2 (Two way slab) Slab 3b-4a / D-E Ly/Lx= 3/3 1, <2 (Two way slab) Slab 2-3b / C-E Ly/Lx= 5/5 1, <2 (Two way slab) Slab self-weight= 0.15m x 24kN/m3 3.6kN/m2 Dead Load Beam self-weight= 0.15m x 0.3m x 24kN/m3 1.08kN/m Brickwall weight= 3.0m x 0.15m x 19kN/m3 8.55kN/m Dead Load 2-3b / C-E (two way)= 3.6kN/m2 x 5/2 x 2/3 6.0kN/m Dead Load 3b-4a / D-E (two way)= 3.6kN/m2 x 3/2 x 2/3 3.6kN/m Dead Load 3a-4a / E-F (two way)= 3.6kN/m2 x 4/2 x 2/3 4.8kN/m Total Dead Load For 3a-3b = (1.08 + 8.55 + 6 + 4.8 )kN/m2 20.43kN/m2 For 3b-4a = (1.08 + 8.55 + 3.6 + 4.8 )kN/m2 18.03kN/m2 Live Load Live Load on Slab 2-3b / C-E (two way)= 2.0kN/m2 x 5/2 x 2/3 3.33kN/m Live Load on Slab 3b-4a / D-E (two way)= 2.0kN/m2 x 3/2 x 2/3 2.00kN/m Live Load on Slab 3a-4a / E-F (two way)= 1.5kN/m2 x 4/2 x 2/3 2.0kN/m Total Live Load For 3a-3b = (3.33 + 2 )kN/m2 5.33kN/m2 For 3b-4a = (2 + 2)kN/m2 4kN/m2 Ultimate Load For 3a-3b Ultimate Dead Load= 20.43kN/m x 1.4 28.6kN/m Ultimate Live Load= 5.33kN/m x 1.6 1.08kN/m 8.55kN/m 6kN/m 4.8kN/m 3.6kN/m 3a 3b 4a 1m 3m 20.43kN/m 18.03kN/m 2kN/m 3a 3b 4a 1m 3m 3.33kN/m 2N/m 4kN/m5.33kN/m 3a 3b 4a 1m 3m 1
  • 16. 8.53kN/m Total Ultimate Load= (28.6+8.53)kN/m 37.13kN/m For 3b-4a Ultimate Dead Load= 18.03kN/m x 1.4 25.24kN/m Ultimate Live Load= 4kN/m x 1.6 6.4kN/m Total Ultimate Load= (25.24+6.4)kN/m 31.64kN/m Reaction Forces Total load on beam E/3a-3b= 37.13 x 1m 37.13kN Total load on beam E/3b-4a= 31.64 x 3m 94.93kN ∑Ma=0 0=37.13(0.5) + 104.8(1) + 94.93 (2.5) = 4Rb 4Rb=360.68kN Rb=90.17kN ∑Fy=0 0=37.13 + 104.8 + 94.93 - 90.17 - Ra Ra=146.69kN Shear Force Diagram Bending Moment Diagram Small Triangle = x/3 = 4.76/90.17 x=0.16 Positive Area = 1/2 x (146.69+109.56) x 1 127.83 Postive Area = 1/2 x 0.16 x 4.76 0.38 Total Positive Area = 127.83 + 0.38 128.04 Negative Area = 1/2 x 90.17 x (3-0.16) 128.04 37.13kN/m 31.64kN/m 37.13kN 94.93kN 3a 3b 4a 1m 3m 104.8kN/m 0.5m 1.5m Rb=90.17kNRa=146.69kN 3a 3b 4a 1m 3m 146.69kN 109.56kN 4.76kN -90.17kN 3a 3b 4a 1m 3m 128.04kN/m 128.21-128.04=0.17 2
  • 17. 1
  • 18. 2
  • 19. GB24 Determine One Way or Two Way Slab: Slab 3b-4a / C-E Ly/Lx= 3/2 1.5, <2 (Two way slab) Slab 3b-4a / D-E Ly/Lx= 3/3 1, <2 (Two way slab) Slab 2-3b / C-E Ly/Lx= 5/5 1, <2 (Two way slab) Slab self-weight= 0.15m x 24kN/m3 3.6kN/m2 Dead Load Beam self-weight= 0.15m x 0.3m x 24kN/m3 1.08kN/m Brickwall weight= 3.0m x 0.15m x 19kN/m3 8.55kN/m Dead Load 2-3b / C-E (two way)= 3.6kN/m2 x 5/2 x 2/3 6.0kN/m Dead Load 3b-4a / D-E (two way)= 3.6kN/m2 x 3/2 x 2/3 3.6kN/m Dead Load 3a-4a / C-D (two way)= 3.6kN/m2 x 2/2 x 2/3 2.4kN/m Total Dead Load For E-D = (1.08 + 8.55 + 6 + 3.6 )kN/m2 19.23kN/m2 For D-C = (1.08 + 8.55 + 2.4 + 6 )kN/m2 18.03kN/m2 Live Load Live Load on Slab 3b-4a / D-E (two way)= 2.0kN/m2 x 3/2 x 2/3 5.0kN/m Live Load on Slab 2-3b / C-E (two way)= 2.0kN/m2 x 5/2 x 2/3 3.33kN/m Live Load on Slab 3b-4a / C-D (two way)= 1.5kN/m2 x 2/2 x 2/3 1.0kN/m Total Live Load For E-D = (2 + 3.33 )kN/m2 5.33kN/m2 For D-C = (3.33 + 1 )kN/m2 4.33kN/m2 Ultimate Load For E-D Ultimate Dead Load= 19.23kN/m x 1.4 26.92kN/m Ultimate Live Load= 5.33kN/m x 1.6 8.53kN/m Total Ultimate Load= (26.92+8.53)kN/m 1.08kN/m 8.55kN/m 2.4kN/m 6kN/m 3.6kN/m E D C 3m 2m 19.23kN/m 18.03kN/m 3.33kN/m 2kN/m 4.33kN/m 1kN/m E D C 3m 2m 5.33kN/m 35.45kN/m E D C3m 2m 32.17kN/m 1
  • 20. 35.45kN/m For D-C Ultimate Dead Load= 18.03kN/m x 1.4 25.24kN/m Ultimate Live Load= 4.33kN/m x 1.6 6.93kN/m Total Ultimate Load= (25.24+6.93)kN/m 32.17kN/m Reaction Forces Total Load for Beam 3b / E-D = 35.45kN/m x 3m 106.34kN Total Load for Beam 3b / D-C = 32.17kN/m x 2m 64.34kN ∑Ma=0 0= 106.34 (1.5) + 43.74(3) + 64.34(4) = 5Rb Rb= 109.62kN ∑Fy=0 0= 106.34 + 43.74 + 64.34 - 109.62 - Ra Ra=104.8kN Shear Force Diagram Bending Moment Diagram Small Triange = x/3 = 104.8/106.34 x=2.96 Positive Area = 1/2 x 104.8 x 2.96 155.1 Negative Area = 1/2 x 1.54 x (3-2.96) 0.03 Negative Area = 1/2 x (109.62 + 45.28) x 2 154.9 Total Negative Area = 0.03 + 154.9 154.93 E CD 3m 2m 64.34kN 43.74kN 106.34kN Rb=109.62kNRa=104.8kN E D C3m 2m 104.8kN -1.54kN - 45.28kN -109.62kN E D C3m 2m 155.1kN/m 155.1-154.9=0.2 2