Chapter (1) Outlines
Code Definition
Code Chapters
Scope
Buildings and Structures
Famous Structures in Egypt
Code Objective
Basic of load determination & code Enhancement
Eng.Mohamed Ismail Kotb
Chapter (1)
Objective
Eng.Mohamed Ismail Kotb
Chapter (1)
Objective
Safety
Safety
Economic
Economic
Function
Function
Serviceability
Serviceability
Performance
Performance
Durability
Durability
Aesthetic
Aesthetic
Environment
Environment Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Safety during Operation and Occupancy
Building code requirements aim to design safe building and structures in
operation during building or structure life time (50 years)
A walkway at the Hyatt Regency
in Kansas City collapsed
A wedding ended in tragedy when
the venue's floor collapsed
The Tacoma Narrows Bridge
twisted and buckled in the wind
before collapsing in 1940
Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Safety during Operation and Occupancy
Building code requirements aim to design safe building and structures
during operation during building or structure life time (50 years).
Collapse of ceiling of terminal 2E of
Charles De Gaulle Airport, France
Collapse of Minneapolis steel
highway bridge
Collapse of roof of Sultan Mizan
Zainal Abidin Stadium, Malaysia
Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Safety during construction
Building code requirements aim to design safe building and
structures during construction phase
Collapse of a foot over-bridge
during the construction phase
near Jawahar Lal Nehru Stadium,
INDIA, 2010.
Failure due to Buckling of piers
during construction
An under-construction flyover
connecting BKC main road & Santa
Cruz–Chembur Link Road
collapsed.
Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Safety during construction
Building code requirements aim to design safe building and
structures during construction phase
Half of the bridge fell into the ravine
below
The pillar holding up the bridge
toppled over
Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Safety during construction
Building code requirements aim to design safe building and
structures during construction phase
Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Economic
Building code requirements aim to design building and structures
with economic cost based on the following philosophy :-
❑ Building code define only the minimum loads to make the
design safe and economic.
❑ Building code define maximum allowable serviceability limits
without affecting service conditions of building.
❑ Define the life period of residential building is 50 years.
❑ Adopting LRFD (Ultimate) combinations method.
❑ Depend on the ductility of structures to contribute in resisting
seismic forces.
Eng.Mohamed Ismail Kotb
Chapter (1) Objective
 Function
Building code requirements aim to satisfy client requirements
regarding function during operation and occupancy in design of
buildings and structures.
 Serviceability
Building code requirements aim to control deflection of slabs,
limit the floor vibration control the lateral drift subjected to
wind loads and also the inter story drift for structure subjected
to seismic forces.
Eng.Mohamed Ismail Kotb

More Related Content

What's hot

Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
National building codes
National building codesNational building codes
National building codesSelf employed
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildingsYamini K
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONSANJEEV Wazir
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Sankar Anand
 
Pier & bridge guide
Pier & bridge guidePier & bridge guide
Pier & bridge guidePRATAP MISHRA
 
Peb structures
Peb structuresPeb structures
Peb structureshlksd
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction AdvancementsAkhil Saxena
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionvaignan
 
2.0 Framework Structural System
2.0 Framework Structural System2.0 Framework Structural System
2.0 Framework Structural SystemYaya Hamid
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and CostingSakshi Kirar
 
Design and Detailing of RC structures
Design and Detailing of RC structuresDesign and Detailing of RC structures
Design and Detailing of RC structuresgssnie
 
6 portal frames
6 portal frames6 portal frames
6 portal framesPrabhu mk
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
Feasibility studies for construction of railway
Feasibility studies for construction of railwayFeasibility studies for construction of railway
Feasibility studies for construction of railwayNawid Qasemy
 

What's hot (20)

Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
National building codes
National building codesNational building codes
National building codes
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTION
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
 
Pier & bridge guide
Pier & bridge guidePier & bridge guide
Pier & bridge guide
 
Peb structures
Peb structuresPeb structures
Peb structures
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
 
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introductionM.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
M.Tech Structural Engineering Project on Voided and Cellular Bridge introduction
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
2.0 Framework Structural System
2.0 Framework Structural System2.0 Framework Structural System
2.0 Framework Structural System
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Steeel
SteeelSteeel
Steeel
 
Design and Detailing of RC structures
Design and Detailing of RC structuresDesign and Detailing of RC structures
Design and Detailing of RC structures
 
High rise building
High rise buildingHigh rise building
High rise building
 
6 portal frames
6 portal frames6 portal frames
6 portal frames
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Feasibility studies for construction of railway
Feasibility studies for construction of railwayFeasibility studies for construction of railway
Feasibility studies for construction of railway
 

Similar to ECP-201_ Ch.1 Introduction- LEC2 _Part 1.pdf

ECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdf
ECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdfECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdf
ECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdfmohamed Ismail
 
ECP-201_ Ch.1 Introduction - LEC1.pdf
ECP-201_ Ch.1 Introduction - LEC1.pdfECP-201_ Ch.1 Introduction - LEC1.pdf
ECP-201_ Ch.1 Introduction - LEC1.pdfmohamed Ismail
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET Journal
 
ECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdf
ECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdfECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdf
ECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdfmohamed Ismail
 
Building Maintenance Solutions
Building Maintenance SolutionsBuilding Maintenance Solutions
Building Maintenance Solutionsit-monarch
 
Business profile 2016
Business profile  2016Business profile  2016
Business profile 2016Rana Imran
 
FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERAYMAN NAWAM
 
ACE305: Aircraft Components Design and Manufacture
ACE305: Aircraft Components Design and ManufactureACE305: Aircraft Components Design and Manufacture
ACE305: Aircraft Components Design and ManufactureDr Mohamed Elfarran
 
updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cvWagdi Wahba
 

Similar to ECP-201_ Ch.1 Introduction- LEC2 _Part 1.pdf (20)

ECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdf
ECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdfECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdf
ECP-201_ Ch.1 Introduction- LEC2 _Part 2.pdf
 
ECP-201_ Ch.1 Introduction - LEC1.pdf
ECP-201_ Ch.1 Introduction - LEC1.pdfECP-201_ Ch.1 Introduction - LEC1.pdf
ECP-201_ Ch.1 Introduction - LEC1.pdf
 
Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
IRJET- Comparative Analysis of Aluminium Formwork Building and Conventional F...
 
ADEL SALAMA CV
ADEL SALAMA CVADEL SALAMA CV
ADEL SALAMA CV
 
ECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdf
ECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdfECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdf
ECP-201_ Ch.2 Definitions of Design Loads _Lecture 1.pdf
 
Rishabh kumar
Rishabh kumarRishabh kumar
Rishabh kumar
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
Mohamed Hegab CV111
Mohamed Hegab CV111Mohamed Hegab CV111
Mohamed Hegab CV111
 
Building Maintenance Solutions
Building Maintenance SolutionsBuilding Maintenance Solutions
Building Maintenance Solutions
 
Business profile 2016
Business profile  2016Business profile  2016
Business profile 2016
 
Raz training report
Raz training reportRaz training report
Raz training report
 
Mohamed Morshed
Mohamed MorshedMohamed Morshed
Mohamed Morshed
 
Mohamed Ashraf_CV
Mohamed Ashraf_CVMohamed Ashraf_CV
Mohamed Ashraf_CV
 
FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGER
 
ACE305: Aircraft Components Design and Manufacture
ACE305: Aircraft Components Design and ManufactureACE305: Aircraft Components Design and Manufacture
ACE305: Aircraft Components Design and Manufacture
 
Sabri CV
Sabri CVSabri CV
Sabri CV
 
updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cv
 
Connstruction engg ppt 2016
Connstruction engg ppt 2016Connstruction engg ppt 2016
Connstruction engg ppt 2016
 

More from mohamed Ismail

1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf
1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf
1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdfmohamed Ismail
 
Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...
Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...
Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...mohamed Ismail
 
Creep Load of concrete_ECP-201_ Ch.4 _Lecture 9.pdf
Creep Load of concrete_ECP-201_ Ch.4  _Lecture 9.pdfCreep Load of concrete_ECP-201_ Ch.4  _Lecture 9.pdf
Creep Load of concrete_ECP-201_ Ch.4 _Lecture 9.pdfmohamed Ismail
 
Creep of Concrete زحف الخرسانة ECP-201_ Ch.4 _Lecture 8.pdf
Creep of Concrete زحف الخرسانة ECP-201_ Ch.4  _Lecture 8.pdfCreep of Concrete زحف الخرسانة ECP-201_ Ch.4  _Lecture 8.pdf
Creep of Concrete زحف الخرسانة ECP-201_ Ch.4 _Lecture 8.pdfmohamed Ismail
 
ECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdf
ECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdfECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdf
ECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdfmohamed Ismail
 
ECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdf
ECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdfECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdf
ECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdfmohamed Ismail
 
ECP-201_ Ch.4 Temprature Load_Lecture 4.pdf
ECP-201_ Ch.4 Temprature Load_Lecture 4.pdfECP-201_ Ch.4 Temprature Load_Lecture 4.pdf
ECP-201_ Ch.4 Temprature Load_Lecture 4.pdfmohamed Ismail
 
ECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdf
ECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdfECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdf
ECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdfmohamed Ismail
 
ECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdf
ECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdfECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdf
ECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdfmohamed Ismail
 
ECP-201_ Ch.4 Live Load_Lecture 1.pdf
ECP-201_ Ch.4 Live Load_Lecture 1.pdfECP-201_ Ch.4 Live Load_Lecture 1.pdf
ECP-201_ Ch.4 Live Load_Lecture 1.pdfmohamed Ismail
 
Dead Load -Examples_ شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdf
Dead Load -Examples_  شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdfDead Load -Examples_  شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdf
Dead Load -Examples_ شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdfmohamed Ismail
 
ECP-201_ Ch.3 Dead Load_Lecture 1.pdf
ECP-201_ Ch.3 Dead Load_Lecture 1.pdfECP-201_ Ch.3 Dead Load_Lecture 1.pdf
ECP-201_ Ch.3 Dead Load_Lecture 1.pdfmohamed Ismail
 
Reliability and LRFD Specification شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...
Reliability and LRFD Specification   شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...Reliability and LRFD Specification   شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...
Reliability and LRFD Specification شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...mohamed Ismail
 
Resistance and resistance factor in LRFD شرح الكود المصرى للأحمال ECP-201_ C...
Resistance and resistance factor in LRFD  شرح الكود المصرى للأحمال ECP-201_ C...Resistance and resistance factor in LRFD  شرح الكود المصرى للأحمال ECP-201_ C...
Resistance and resistance factor in LRFD شرح الكود المصرى للأحمال ECP-201_ C...mohamed Ismail
 
LRFD Load combination ECP-201_ Ch.2 _Lecture 3.pdf
LRFD  Load combination ECP-201_ Ch.2 _Lecture 3.pdfLRFD  Load combination ECP-201_ Ch.2 _Lecture 3.pdf
LRFD Load combination ECP-201_ Ch.2 _Lecture 3.pdfmohamed Ismail
 
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdfECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdfmohamed Ismail
 
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdfECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdfmohamed Ismail
 
PRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdfPRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdfmohamed Ismail
 
The best value for procurement
The best value for procurementThe best value for procurement
The best value for procurementmohamed Ismail
 
fidic history and publications
fidic history and publicationsfidic history and publications
fidic history and publicationsmohamed Ismail
 

More from mohamed Ismail (20)

1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf
1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf
1-The Most Leaning towers in the world_ ECP-201_Lecture 12.pdf
 
Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...
Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...
Dynamic Load on Buildings الأحمال الديناميكية على المبانى _ECP-201_ Ch.4 _Lec...
 
Creep Load of concrete_ECP-201_ Ch.4 _Lecture 9.pdf
Creep Load of concrete_ECP-201_ Ch.4  _Lecture 9.pdfCreep Load of concrete_ECP-201_ Ch.4  _Lecture 9.pdf
Creep Load of concrete_ECP-201_ Ch.4 _Lecture 9.pdf
 
Creep of Concrete زحف الخرسانة ECP-201_ Ch.4 _Lecture 8.pdf
Creep of Concrete زحف الخرسانة ECP-201_ Ch.4  _Lecture 8.pdfCreep of Concrete زحف الخرسانة ECP-201_ Ch.4  _Lecture 8.pdf
Creep of Concrete زحف الخرسانة ECP-201_ Ch.4 _Lecture 8.pdf
 
ECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdf
ECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdfECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdf
ECP-201_ Ch.4 Shrinkage Load for Concrete in ECP_Lecture 7.pdf
 
ECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdf
ECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdfECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdf
ECP-201_ Ch.4 Shrinkage Types of Concrete_Lecture 6.pdf
 
ECP-201_ Ch.4 Temprature Load_Lecture 4.pdf
ECP-201_ Ch.4 Temprature Load_Lecture 4.pdfECP-201_ Ch.4 Temprature Load_Lecture 4.pdf
ECP-201_ Ch.4 Temprature Load_Lecture 4.pdf
 
ECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdf
ECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdfECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdf
ECP-201_ Ch.4 Horizontal Loads on Parapet _Lecture 3.pdf
 
ECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdf
ECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdfECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdf
ECP-201_ Ch.4 Live Load on Roofs and Examples _Lecture 2.pdf
 
ECP-201_ Ch.4 Live Load_Lecture 1.pdf
ECP-201_ Ch.4 Live Load_Lecture 1.pdfECP-201_ Ch.4 Live Load_Lecture 1.pdf
ECP-201_ Ch.4 Live Load_Lecture 1.pdf
 
Dead Load -Examples_ شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdf
Dead Load -Examples_  شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdfDead Load -Examples_  شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdf
Dead Load -Examples_ شرح الكود المصرى للأحمال ECP-201_ Ch.3 _Lecture 2.pdf
 
ECP-201_ Ch.3 Dead Load_Lecture 1.pdf
ECP-201_ Ch.3 Dead Load_Lecture 1.pdfECP-201_ Ch.3 Dead Load_Lecture 1.pdf
ECP-201_ Ch.3 Dead Load_Lecture 1.pdf
 
Reliability and LRFD Specification شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...
Reliability and LRFD Specification   شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...Reliability and LRFD Specification   شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...
Reliability and LRFD Specification شرح الكود المصرى للأحمال ECP-201_ Ch.2 _...
 
Resistance and resistance factor in LRFD شرح الكود المصرى للأحمال ECP-201_ C...
Resistance and resistance factor in LRFD  شرح الكود المصرى للأحمال ECP-201_ C...Resistance and resistance factor in LRFD  شرح الكود المصرى للأحمال ECP-201_ C...
Resistance and resistance factor in LRFD شرح الكود المصرى للأحمال ECP-201_ C...
 
LRFD Load combination ECP-201_ Ch.2 _Lecture 3.pdf
LRFD  Load combination ECP-201_ Ch.2 _Lecture 3.pdfLRFD  Load combination ECP-201_ Ch.2 _Lecture 3.pdf
LRFD Load combination ECP-201_ Ch.2 _Lecture 3.pdf
 
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdfECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2B_Example.pdf
 
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdfECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdf
ECP-201_ Ch.2 Load combinations (ASD & LRFD )_Lecture 2.pdf
 
PRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdfPRMG195 - Rsik Management Case Study.pdf
PRMG195 - Rsik Management Case Study.pdf
 
The best value for procurement
The best value for procurementThe best value for procurement
The best value for procurement
 
fidic history and publications
fidic history and publicationsfidic history and publications
fidic history and publications
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

ECP-201_ Ch.1 Introduction- LEC2 _Part 1.pdf

  • 1. ECP-201 Egyptian Code for Loads Prepared By Eng: Mohamed Ismail Kotb Email: m.ismailkotb@gmial.com Tel: 01121549164 Eng.Mohamed Ismail Kotb
  • 3. Chapter (1) Outlines Code Definition Code Chapters Scope Buildings and Structures Famous Structures in Egypt Code Objective Basic of load determination & code Enhancement Eng.Mohamed Ismail Kotb
  • 6. Chapter (1) Objective  Safety during Operation and Occupancy Building code requirements aim to design safe building and structures in operation during building or structure life time (50 years) A walkway at the Hyatt Regency in Kansas City collapsed A wedding ended in tragedy when the venue's floor collapsed The Tacoma Narrows Bridge twisted and buckled in the wind before collapsing in 1940 Eng.Mohamed Ismail Kotb
  • 7. Chapter (1) Objective  Safety during Operation and Occupancy Building code requirements aim to design safe building and structures during operation during building or structure life time (50 years). Collapse of ceiling of terminal 2E of Charles De Gaulle Airport, France Collapse of Minneapolis steel highway bridge Collapse of roof of Sultan Mizan Zainal Abidin Stadium, Malaysia Eng.Mohamed Ismail Kotb
  • 8. Chapter (1) Objective  Safety during construction Building code requirements aim to design safe building and structures during construction phase Collapse of a foot over-bridge during the construction phase near Jawahar Lal Nehru Stadium, INDIA, 2010. Failure due to Buckling of piers during construction An under-construction flyover connecting BKC main road & Santa Cruz–Chembur Link Road collapsed. Eng.Mohamed Ismail Kotb
  • 9. Chapter (1) Objective  Safety during construction Building code requirements aim to design safe building and structures during construction phase Half of the bridge fell into the ravine below The pillar holding up the bridge toppled over Eng.Mohamed Ismail Kotb
  • 10. Chapter (1) Objective  Safety during construction Building code requirements aim to design safe building and structures during construction phase Eng.Mohamed Ismail Kotb
  • 11. Chapter (1) Objective  Economic Building code requirements aim to design building and structures with economic cost based on the following philosophy :- ❑ Building code define only the minimum loads to make the design safe and economic. ❑ Building code define maximum allowable serviceability limits without affecting service conditions of building. ❑ Define the life period of residential building is 50 years. ❑ Adopting LRFD (Ultimate) combinations method. ❑ Depend on the ductility of structures to contribute in resisting seismic forces. Eng.Mohamed Ismail Kotb
  • 12. Chapter (1) Objective  Function Building code requirements aim to satisfy client requirements regarding function during operation and occupancy in design of buildings and structures.  Serviceability Building code requirements aim to control deflection of slabs, limit the floor vibration control the lateral drift subjected to wind loads and also the inter story drift for structure subjected to seismic forces. Eng.Mohamed Ismail Kotb