Curriculum Vitae
Personal Information:-
Name :Ahmed Hassan Aboul AZm
Position : project manager
Date of Birth :1/12/1954
Nationality : Egyptian.
Marital Status :Marriage
E-mail : a.aboulazm@muhaidibco.com
Tel.: 0567264640


 BSc Civil Engineering, Faculty of Engineering, Cairo University (June 1978)
 Primary , preparatory & secondary school Lycee AL Horreya cairo Egypt
Seminars,Courses&workshopsAttended:
 Time Management
 Contracts
 Team building
 Safety
 Negotiation Skills
 Learning Organization
 Leadership Skills
 Communication Skills

Positionsheld
From 2009 till now ProjectManager
From 2006 till 2009 ProjectsManager A
From 2001 till 2006 Structure Manager
From 1996 till 2001 Project Manager
From 1993 till 1996 constructionmanager
From 1978 till 1993 see history
Employment History
Project Manager from 2013 till now AL MUHAIDIB CONTRACTING CO.
Project manager from 2009 till 2012 Saudi bin ladin group
KING saud bin abdulaziz health university (Jeddah bahra)
Project Manager/ construction manager, 1993 to 2009
Industrial Construction & Engineering Co. (SIAC), Cairo, Egypt
Projects manager from 2006 to 2009.
Managing the construction of the following cement factories
1- South Valley cement plant (BeniSweif) :
2- AL Arish cement plant (2 line) North Sina
3- Al Sweedy cement plant EinShokhrna
Project Manager Form 2005 to 2006.
 Extension of Qatar National Cement Plant Project
All civil construction works for the extension of the cement plant .
Structure Manager Form 2001to 2005.
 San Stefano Complex, Project
Project comprises the Four Seasons Hotel & residential towers (800 apartments) three underground floors
(car park for 2000 cars)shopping malls, 10 cinemas, health clubs, restaurants and two swimming pools.
Project Manager From 1999to 2000.
 Ezz Hot Strips Mill Project.
The largest hot strip mill in the Middle East with total capacity of 1,200,000 tons per year hot rolled
steel coils and thin sheets.
The work involved about 3,000,000 m2 leveling and 145,000 cm of concrete.
Technical project Manager From 1998to 1999.
 Suez Steel Mini Mill Project.
Technical Office Manager, responsible for the management of the site technical office that handled
Construction detailed drawing, quantity, surveying, payment certificates submittals technical
details and variation orders for a fast track contract (design & build) for the complete constructions
of steel melt shop and billet casting plant. Work involved 30,000 m3 of concrete and 5,000 tons of
steel structure.
Project Manager From 1996 to 1997.
 Sharm EL-Sheikh Shopping Mall Project
Complete construction of top quality finishing, electrical & air conditioning works.
Construction Manager From 1995to 1996.
 Metro Underground Stations Project.
Complete construction & finishing of two metro Stations.
Construction Manager From 1994to 1995.
 Metro Workshops Project.
Complete construction for the central Workshop building ( total built area is ,42,000 m2 )
Construction Manager From1993to 1994.
 BeniSuef Sub-Station Project.
Sub – station 66/11/220 kva civil works and infrastructure works.
Technical Office Manager, 1990 up to 1992
Al Soaib Establishment, Jeddah, Saudi Arabia
Responsible for the following:
 Preparing construction drawings for (masonry works, windows, doors…etc )
 Surveying quantities of materials both imported and locally manufactured.
 Reviewing quantities drawn and works done of contractors and suppliers and preparing their
invoices together with the engineer’s invoices.
 Preparing contracts made with contractors and suppliers and preparing their invoices in
accordance with the contract.
 Preparing the project’s requisitions and analyzing prices and discussing them with the engineer till
approval (construction works, any damages caused by the delay in the engineer’s submission of the
drawings… etc, )
 Preparing list of and submitting materials and following up till the approval on submitting every
material in accordance with the project’s specifications.
Senior Site Engineer, 1985 up to 1989
Arab Contractors (Osman Ahmed Osman Co.), Cairo, Egypt
 Metro Project, Line # 1.
 Sharm El Sheikh Airport Project
Site Engineer. 1978 up to 1984
GUPCo. Gulf of Suez Petroleum Company, Cairo, Egypt.
Construction of R/S area
Skills:
Computer Micro soft office
Brief & jobdescription&responsibilities:
Duties include project constructionmanagement for a number of major projects, being responsible for fulfilling
the key performance Indicators set foreach project.AS well as directing individual Site Engineers and Project
Staff to meet the projecttargets accordingthe planned time frame within the allocated resources through
effectiveimplementation of modern management.
Responsibilities :
 Managing resources and Sub- contractors
 Handling the contractual issues and monthly invoice
 Attending weekly progress and coordination meeting ….etc
 Managing civil operation , construction and engineering works
 Setting status reports target dates…. Etc to achieve execution schedule
 Monitoring quality control to ensure that the construction specifications are adhered to
for different items
 Monitoring the progress and managing the project’s cost control
 Solving construction problems and any daily issue on hand
 Meeting deadlines and operational requirements imposed in executing work in a war
zone environment
Objectives:
Exceeding thirty three (33) years of extensive experience in the field of construction business through a
multiplicity of sizeable projects and with various nature and complexity serving the wide spectrum of
construction industry including but not limited to industrial plants ; power plants; commercial, administration,
residential buildings and hotels, acting as site engineer ,technical office , construction manager , Project
manager &Projects manager for major contracts both in Egypt and the region
Ahmed Aboul Azm

More Related Content

What's hot

What's hot (20)

M Kamal
M Kamal M Kamal
M Kamal
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
eng. nabih cv
eng. nabih cveng. nabih cv
eng. nabih cv
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
 
CV 21-08-2016
CV 21-08-2016CV 21-08-2016
CV 21-08-2016
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsman
 
Ahmed Adel Mohamed Nasser
Ahmed Adel Mohamed NasserAhmed Adel Mohamed Nasser
Ahmed Adel Mohamed Nasser
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.C V Eng_Hisham AlRefaey_ Senior Civil Eng.
C V Eng_Hisham AlRefaey_ Senior Civil Eng.
 
Amr El-Metwally CV
Amr El-Metwally CVAmr El-Metwally CV
Amr El-Metwally CV
 
mamoud hamdi (1)
mamoud hamdi (1)mamoud hamdi (1)
mamoud hamdi (1)
 
osama C.V
osama  C.V osama  C.V
osama C.V
 
yasser radwan
yasser radwanyasser radwan
yasser radwan
 
Ayman akef cv 2019
Ayman akef cv 2019Ayman akef cv 2019
Ayman akef cv 2019
 
Mahmoud CV 11-2015
Mahmoud CV 11-2015Mahmoud CV 11-2015
Mahmoud CV 11-2015
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 

Viewers also liked

Calendari setembre 2013
Calendari setembre 2013Calendari setembre 2013
Calendari setembre 2013iesramonllull
 
Surrealismo miguel
Surrealismo miguelSurrealismo miguel
Surrealismo miguelcvocedac
 
Inspire DGT 創意部案例分享 20161107
Inspire DGT 創意部案例分享 20161107Inspire DGT 創意部案例分享 20161107
Inspire DGT 創意部案例分享 20161107inspire digital
 
Bmx I Skateparks
Bmx I SkateparksBmx I Skateparks
Bmx I Skateparksraul
 
Rafiz arma
Rafiz armaRafiz arma
Rafiz armagundul28
 
Determinismo e seconda legge della dinamica
Determinismo e seconda legge della dinamicaDeterminismo e seconda legge della dinamica
Determinismo e seconda legge della dinamicaFabrizio Rota
 
Entrenamiento para la Innovación
Entrenamiento para la InnovaciónEntrenamiento para la Innovación
Entrenamiento para la InnovaciónYolanda Hernández
 
תלבושת אחידה קיץ ווחורף
תלבושת אחידה קיץ ווחורףתלבושת אחידה קיץ ווחורף
תלבושת אחידה קיץ ווחורףmaromamuta
 
Análisis de la información
Análisis de la informaciónAnálisis de la información
Análisis de la informaciónmiguelhijar
 
Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015
Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015
Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015Visit Pilar de la Horadada
 
Tecnologías antiguas y_modernas
Tecnologías antiguas y_modernasTecnologías antiguas y_modernas
Tecnologías antiguas y_modernasveronica0316
 
Sabbath school lesson 12, 3rd quarter of 2015
Sabbath school lesson 12, 3rd quarter of 2015Sabbath school lesson 12, 3rd quarter of 2015
Sabbath school lesson 12, 3rd quarter of 2015David Syahputra
 

Viewers also liked (19)

61419
6141961419
61419
 
DIAGRAMA
DIAGRAMADIAGRAMA
DIAGRAMA
 
Calendari setembre 2013
Calendari setembre 2013Calendari setembre 2013
Calendari setembre 2013
 
Surrealismo miguel
Surrealismo miguelSurrealismo miguel
Surrealismo miguel
 
Inspire DGT 創意部案例分享 20161107
Inspire DGT 創意部案例分享 20161107Inspire DGT 創意部案例分享 20161107
Inspire DGT 創意部案例分享 20161107
 
Presentation3
Presentation3Presentation3
Presentation3
 
Bmx I Skateparks
Bmx I SkateparksBmx I Skateparks
Bmx I Skateparks
 
Rafiz arma
Rafiz armaRafiz arma
Rafiz arma
 
Determinismo e seconda legge della dinamica
Determinismo e seconda legge della dinamicaDeterminismo e seconda legge della dinamica
Determinismo e seconda legge della dinamica
 
Entrenamiento para la Innovación
Entrenamiento para la InnovaciónEntrenamiento para la Innovación
Entrenamiento para la Innovación
 
תלבושת אחידה קיץ ווחורף
תלבושת אחידה קיץ ווחורףתלבושת אחידה קיץ ווחורף
תלבושת אחידה קיץ ווחורף
 
Pro Exercise Connect
Pro Exercise ConnectPro Exercise Connect
Pro Exercise Connect
 
Análisis de la información
Análisis de la informaciónAnálisis de la información
Análisis de la información
 
Test2
Test2Test2
Test2
 
Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015
Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015
Informe Resultados Estadísticos Tourist Info Pilar de la Horadada 2015
 
Tecnologías antiguas y_modernas
Tecnologías antiguas y_modernasTecnologías antiguas y_modernas
Tecnologías antiguas y_modernas
 
23 Tierra estella horarios de visitas verano 2003
23  Tierra estella   horarios de visitas verano 200323  Tierra estella   horarios de visitas verano 2003
23 Tierra estella horarios de visitas verano 2003
 
Sabbath school lesson 12, 3rd quarter of 2015
Sabbath school lesson 12, 3rd quarter of 2015Sabbath school lesson 12, 3rd quarter of 2015
Sabbath school lesson 12, 3rd quarter of 2015
 
Polivit informacion
Polivit informacionPolivit informacion
Polivit informacion
 

Similar to Ahmed Aboul Azm

Similar to Ahmed Aboul Azm (20)

updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cv
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
 
cv 8-8-2016
cv 8-8-2016cv 8-8-2016
cv 8-8-2016
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 
Amgad Cv 2014
Amgad Cv 2014Amgad Cv 2014
Amgad Cv 2014
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Eng Hisham cv
Eng Hisham cvEng Hisham cv
Eng Hisham cv
 
CV update
CV updateCV update
CV update
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
ENG.AMIR ALI ABDELMAGIED C.V. & PROFILE @ March- 2016
 
Ahmed Ragab C.V
Ahmed Ragab C.VAhmed Ragab C.V
Ahmed Ragab C.V
 
mohamed solyman Cv22
mohamed solyman Cv22 mohamed solyman Cv22
mohamed solyman Cv22
 
Summery
SummerySummery
Summery
 

Ahmed Aboul Azm

  • 1. Curriculum Vitae Personal Information:- Name :Ahmed Hassan Aboul AZm Position : project manager Date of Birth :1/12/1954 Nationality : Egyptian. Marital Status :Marriage E-mail : a.aboulazm@muhaidibco.com Tel.: 0567264640    BSc Civil Engineering, Faculty of Engineering, Cairo University (June 1978)  Primary , preparatory & secondary school Lycee AL Horreya cairo Egypt Seminars,Courses&workshopsAttended:  Time Management  Contracts  Team building  Safety  Negotiation Skills  Learning Organization  Leadership Skills  Communication Skills 
  • 2. Positionsheld From 2009 till now ProjectManager From 2006 till 2009 ProjectsManager A From 2001 till 2006 Structure Manager From 1996 till 2001 Project Manager From 1993 till 1996 constructionmanager From 1978 till 1993 see history Employment History Project Manager from 2013 till now AL MUHAIDIB CONTRACTING CO. Project manager from 2009 till 2012 Saudi bin ladin group KING saud bin abdulaziz health university (Jeddah bahra) Project Manager/ construction manager, 1993 to 2009 Industrial Construction & Engineering Co. (SIAC), Cairo, Egypt Projects manager from 2006 to 2009. Managing the construction of the following cement factories 1- South Valley cement plant (BeniSweif) : 2- AL Arish cement plant (2 line) North Sina 3- Al Sweedy cement plant EinShokhrna Project Manager Form 2005 to 2006.  Extension of Qatar National Cement Plant Project All civil construction works for the extension of the cement plant . Structure Manager Form 2001to 2005.  San Stefano Complex, Project Project comprises the Four Seasons Hotel & residential towers (800 apartments) three underground floors (car park for 2000 cars)shopping malls, 10 cinemas, health clubs, restaurants and two swimming pools. Project Manager From 1999to 2000.  Ezz Hot Strips Mill Project. The largest hot strip mill in the Middle East with total capacity of 1,200,000 tons per year hot rolled steel coils and thin sheets. The work involved about 3,000,000 m2 leveling and 145,000 cm of concrete. Technical project Manager From 1998to 1999.  Suez Steel Mini Mill Project. Technical Office Manager, responsible for the management of the site technical office that handled Construction detailed drawing, quantity, surveying, payment certificates submittals technical details and variation orders for a fast track contract (design & build) for the complete constructions
  • 3. of steel melt shop and billet casting plant. Work involved 30,000 m3 of concrete and 5,000 tons of steel structure. Project Manager From 1996 to 1997.  Sharm EL-Sheikh Shopping Mall Project Complete construction of top quality finishing, electrical & air conditioning works. Construction Manager From 1995to 1996.  Metro Underground Stations Project. Complete construction & finishing of two metro Stations. Construction Manager From 1994to 1995.  Metro Workshops Project. Complete construction for the central Workshop building ( total built area is ,42,000 m2 ) Construction Manager From1993to 1994.  BeniSuef Sub-Station Project. Sub – station 66/11/220 kva civil works and infrastructure works. Technical Office Manager, 1990 up to 1992 Al Soaib Establishment, Jeddah, Saudi Arabia Responsible for the following:  Preparing construction drawings for (masonry works, windows, doors…etc )  Surveying quantities of materials both imported and locally manufactured.  Reviewing quantities drawn and works done of contractors and suppliers and preparing their invoices together with the engineer’s invoices.  Preparing contracts made with contractors and suppliers and preparing their invoices in accordance with the contract.  Preparing the project’s requisitions and analyzing prices and discussing them with the engineer till approval (construction works, any damages caused by the delay in the engineer’s submission of the drawings… etc, )  Preparing list of and submitting materials and following up till the approval on submitting every material in accordance with the project’s specifications. Senior Site Engineer, 1985 up to 1989 Arab Contractors (Osman Ahmed Osman Co.), Cairo, Egypt  Metro Project, Line # 1.  Sharm El Sheikh Airport Project
  • 4. Site Engineer. 1978 up to 1984 GUPCo. Gulf of Suez Petroleum Company, Cairo, Egypt. Construction of R/S area Skills: Computer Micro soft office Brief & jobdescription&responsibilities: Duties include project constructionmanagement for a number of major projects, being responsible for fulfilling the key performance Indicators set foreach project.AS well as directing individual Site Engineers and Project Staff to meet the projecttargets accordingthe planned time frame within the allocated resources through effectiveimplementation of modern management. Responsibilities :  Managing resources and Sub- contractors  Handling the contractual issues and monthly invoice  Attending weekly progress and coordination meeting ….etc  Managing civil operation , construction and engineering works  Setting status reports target dates…. Etc to achieve execution schedule  Monitoring quality control to ensure that the construction specifications are adhered to for different items  Monitoring the progress and managing the project’s cost control  Solving construction problems and any daily issue on hand  Meeting deadlines and operational requirements imposed in executing work in a war zone environment Objectives: Exceeding thirty three (33) years of extensive experience in the field of construction business through a multiplicity of sizeable projects and with various nature and complexity serving the wide spectrum of construction industry including but not limited to industrial plants ; power plants; commercial, administration, residential buildings and hotels, acting as site engineer ,technical office , construction manager , Project manager &Projects manager for major contracts both in Egypt and the region