MOKHTAR FAWZY RESUME 
 
PERSONAL DATA
Name: Mokhtar Fwazy Mokhtar
Nationality: Egyptian.
Marital Status: Married.
Date of Birth: 14 December 1981
Military Service: Permanent Exempt.
Address: Military buildings Block 47G flat 43 - Tosson– Alexandria - Egypt
Telephones:
Home 002 03 5621728.
Mobile 002 01159553304 - +96893913074
Driver's Licenses:
Private Egyptian License.
Private Qatar License
Private Oman License
Private Bahrain License
Engineers Syndicate ID: 31/00577.
E-mail: m.fawzy@aici.com.eg
eng_mokhtarfawzy@yahoo.com.
CAREER OBJECTIVE
A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills
and broaden my knowledge about Construction Manager.
EDUCATION
Alexandria University – Faculty of Engineering
B.Sc. in Civil Engineering –2005-
With Very good degree in airports and highways engineering project.
LANGUAGES
 Arabic: Mother Tongue
 English: Good Reading, Writing and Speaking
Computer Skills:
 Microsoft Office Self Study
 AutoCAD Self Study
PERSONAL SKILLS
 Public relation & Cooperation.
MOKHTAR FAWZY RESUME 
 
 Dealing with people & ability to work within a team
 Self-motivated active work
 Ready to work anywhere anytime.
TRAINING COURSES
 PADI SCUBA Diving [Open Water Diver]
 PCC AIRFIELED PAVING WORKSHOP [Transportation System Center, Al Musannah AB,
Oman].
 Confined Space Entry Course‐Training Institute – Oman
 OSHA 30-Hour outreach training for the construction industry – June 2013 – Oman. 
 Fire Protection System Training – TREMCO – Bahrain  
 
CAREER PROFILE & JOB DESCRIPTION
As a Civil Construction
 PCC AIRFIELED PAVING (new asphalt/concrete taxi way using slip form paver, connecting it to the
run way, And have paved and unpaved shoulders, edge lights and area/security lights. Fuel Tanks,
storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with
appropriate cathode protection.)
 Diving Engineer checking placing of (GRP Pipes – Concrete Cubes – Accropodes and Rocks)
in the offshore Projects
 Placing and installation for GRP pipe lines of Intake and Discharge pipe lines for Elec. Power
Planet.(Offshore works).
 Driving Piles and Sheet piles (temporary and permanent).(near shore and off shore works).
 Follow up of all sites work (Earth work - Insulation – Concrete – Repair – Masonry work –
most of finishing activities – Pavements).
 Flow up & create the method statement for the each activity. (MS)
 Reporting on construction activities within the framework of Daily / weekly / monthly reporting
by site management.
 Follow up the inspection test Plan (ITP) for the project activities.
 coordinating between QC & Technical Office follow up progress of the daily, weekly, monthly,
reports
As a Quality Control & Quality Assurance Engineer – QA/QC
 To assist the site engineer to inspect the permanent work, including delivered materials, in order to
verify conformance with the contract quality requirements and the implementation of the company
corporate quality system in accordance with ISO 9001:2000.
 Certifying all Quality Control Submittals and assure that they comply with the Contract Documents
and Specifications
 Flow up & create Quality Control plan. (QCP)
 Flow up & create [Inspection Test Plan "ITP" for work complying with project specifications].
 Follow up calibrations certificates & reports.
MOKHTAR FAWZY RESUME 
 
COMPANIES PROFILE
American International Contractors INC. AICI
www.AICI.org
August 2016 – up to present..
 Project : Airlift Apron – Alumsanah Air Base – Oman
 Profession: Construction Manager.
 Owner: Royal Air Force at Oman RAFO.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $24.4 million Dollars).
 Summary of work:
 The Project consists of the construction of an aircraft parking apron of approximately
164,000 square meters along with miscellaneous upgrades to the surrounding airfield
and taxiways.
 The civil works of the project are construction of:
 Mobilization and De-mobilization including, Laydown Area, Batch Plant, material and
equipment storage area, and all temporary facilities, structures, and utilities.
 Construction of the complete Airlift Apron (56000m3 of paving concrete).
 Construction of the Apron Access Road
Archirodon Construction (overseas) CO. S.A.
www.Archirodon.net 
July 2015 – July206.
 Project : Salehia Airport development- 2000 pound capacity shelter - Salehia Air Base- EGYPT
 Profession: Construction Manager.
 Owner: EGYPTIAN AIR FORCES.
 Budget: (Total value of the project 100 million L.E).
 Summary of work:
Construct of 2000 pond capacity of reinforced concrete shelters (30 Pcs) 4800m3 of RC Concrete 4500 m3 of
PC laying concrete each, with 3600m3 of sand backfilling each, Taxi way paving concrete connected to the
main Run way, industrial and technical building ( 24 PCs), admin building (49 Pcs ). Underground site utilities
(elec., communication).
American International Contractors INC. AICI
www.AICI.org
December 2014 – June 2015..
 Project : United Kingdom Maritime Component Command ( UKMCC ), Mina Salman Navy
Base, Bahrain
MOKHTAR FAWZY RESUME 
 
 Profession: Construction Manager.
 Owner: UK Navy.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $9.75 million Dollars).
 Summary of work:
 The base bid includes the construction of the FSU facility, Headquarter facility and all utility
connection, Vehicle sunshade, entrance canopy, Gray water collection system, irrigation system and
landscaping.
 The civil works of the project are construction of:
Concrete foundation, Steel Structure, Roof and walls sandwich panels, Rollup doors, S.O.G. for all 
levels, Gypsum and cement board walls, CMU walls, Ceramic tiles, fire rated and blast windows, fire 
rated and blast doors, Cambridge doors, wooden doors, Acoustical Ceiling, plaster and painting 
system, Roof membrane and insulation system, sound insulation walls, fire rated walls, Mechanical 
and electrical systems serving building and vehicles maintenance operation.  
American International Contractors INC. AICI
www.AICI.org
December 2013 – December 2014.
 Project : FY11 Tactical Ramp/ Vehicle Maintenance Facility Al Udeid, Qatar
 Profession: Construction Manager.
 Owner: US Air Force USAF.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $42 million Dollars).
 The civil works of the project are construction of:
 Vehicle maintenance facility is a 2 stories building consist of refueling area, offices area, 
workshop areas and store area, works in this building summarized as below: 
1. Concrete foundation. 
2. Steel structure. 
3. Roof and walls sandwich panels. 
4. Rollup doors. 
5. S.O.G. for all levels. 
6. Oil changing pit. 
7. Overhead crane. 
8. Mechanical and electrical systems serving building and vehicles maintenance operation. 
9. Roads & parking lot. 
10. Paving sidewalk. 
11. CMU walls 
12. Insulation for fire resistance areas. 
13. Plastering and painting. 
14. Acoustical ceiling system. 
15. Electrical substation building and mechanical chiller yard.  
16. Underground utilities (mechanical and electrical). 
MOKHTAR FAWZY RESUME 
 
 Tactical Ramp is 50,000 M3 of concrete for Concrete pavement parking apron with 
compression sealant and pavement marking. 
American International Contractors INC. AICI
www.AICI.org
September 2012 – November 2013.
 Projects : (Airlift Ramp & Fuel Facilities) & ( Parallel Taxiway Extension) Al Musannah Air Base,
Oman
 Profession: Construction Section Head.
 Owner: Royal Air Force at Oman RAFO.
 Consultant: US Army Corps of Engineer.
 Budget:(Total value of the project US $57 million Dollars).
Archirodon Construction (overseas) CO. S.A.
www.Archirodon.net 
January 2012 – September 2012
 Project: Banha Power Station, 750 MW Combined Cycle Project, Kaluobya, Egypt. (CP 102 )
 Profession: Construction Section Head. Intake and Discharge Structure ( Offshore Work )
 Owner: “West Delta Electricity Production”
 Consultant: " Power Generation Engineering and Services Company – PGESCO”
 Budget: (Total value of the project US $50 million Dollars).
 The civil works of the project are construction of:
The work for this Contract Package is subdivided: Site development, Underground Utilities, Power Generation
Facilities, Auxiliary Facilities, Ancillary Facilities, Electrical and Mechanical Work.
American International Contractors INC. AICI
www.AICI.org
June 2010 – November 2011
 Project: Construction of a Close Air Support CAS Parking Apron DOHA – QATAR
 Profession: Senior Site Engineer.
 Owner: United States Army - Air Force - Al Udeid Air Base.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $50 million Dollars).
 The civil works of the project are construction of:
(new asphalt/concrete taxi way using slip form paver, connecting it to the run way, and have paved
and unpaved shoulders, edge lights and area/security lights. One fuel storage tank, Electrical Building,
Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)
Archirodon Construction (overseas) CO. S.A.
www.Archirodon.net 
December 2009 – June 2010
MOKHTAR FAWZY RESUME 
 
 Project: Tripoli Harbor Libya Break Water Reconstruction TRIPOLI – LIBYA
 Profession: Marine Site Engineer.
 Owner: “Libyan Maritime and Port Authority”
 Consultant: "Royal Haskoning – Consultant Engineering”
 Budget: (Total value of the project US $300 million Dollars).
 The civil works of the project are construction of:
(Pre-Cast Concrete Works for cubes “10t, 15t,20t & 30t” – Pre-Cast Concrete Work for Accropodes
6.3m3 & 9.00m3 – Concrete Repair for parapet breakwater- Placing of rocks class (2-4t),(3-5),(5-
8),Cubes & Accropodes for break water along with 4700m.)
Archirodon Construction (Overseas) CO. S.A.
 
www.Archirodon.net 
October 2008 - November 2009.
 Project: SidiKrir Power Plant 750 MW Combined Cycle Project – Offshore Works - ALEXANDRIA–
EGYPT
 Profession: Marine Site Engineer.
 Owner: “West Delta Electricity Production”
 Consultant: "Power Generation Engineering and Services Company – PGESCO”
 Budget: (Total value of the project US $85 million Dollars).
 The civil works of the project are construction of:
(Earth Work – Dredging Works – Installation of onshore and offshore “FRP” Fiber glasses Reinforced
Plastic Pipes – Pre-Cast Concrete Works for mattresses – Sheet Piles for Temporary Jetty.)
American International Contractors INC. AICI
www.AICI.org
April 2007-Jullay 2008
 Project: King Abdalla II Special Operation Training Center (KASOTC) - AMMAN – JORDAN
 Profession: Site Engineer.
 Owner: Jordanian Army.
 Consultant: US Army Corps of Engineer.
 Budget: (Total value of the project US $90 million Dollars).
 The civil works of the project are construction of:
Dormitory Buildings, Administration Buildings, Tactical Buildings, Workshop, Warehouse, Ordinance
Storage Buildings, Shooting Range (300m & 100m), Pump House, Water Tanks, 11Kv Electrical Sub
Station, Retaining Walls, Earth works including 930,000m3 Cut, 483,000m3 Fill, 9,0Km Asphalt
Roads,2.8Km Drain Channel Box and Pipe Culverts, All related utilities including Potable Water Pipe
Lines, Sewer Pipe Lines and Electrical works.
Archirodon Construction (Overseas) CO. S.A.
MOKHTAR FAWZY RESUME 
 
www.Archirodon.net 
January 2007 – April 2007
 Projects: Mooring dolphin Repair Works –Offshore Works- MIDTAP Jetty – Dekhela Port
ALEXANDRIAEGYPT
 Profession: QC Civil engineer
 Owner & Consultant: Middle East Oil Tankage & Pipe Lines (MIDTAP).
 Budget: (Total value of the project $5 million Dollars).
 The civil works of the project are construction of: Cut and Remove all damaged piles, Driving
New Piles, Construction of Dolphin and Walk way, Supports Located extend of MIDTAP Jetty, Pre-Cast
Concrete Units.
American International Contractors INC. AICI
www.AICI.org
January 2006 – January 2007
 Projects: Live Fire Fighting and Damage Control Trainer Complex Abo Qir – ALEXANDRIA -EGYPT
 Profession: QC Civil Engineer.
 Owner: Egyptian Naval Forces –Abo Qir Navy Base
 Consultant: Booz Allen Hamilton.
 Designer: Booz Allen Hamilton.
 Budget: (Total value of the project 12 million L.E)
 Time Schedule for the Project: 1 year (12 months)
 The civil works of the project are construction of: Concrete Activities, Interior and Exterior
Finishing Activities, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and
Electrical works. Asphalt Roads, Water Tank, Full Repair for Building{Cracks Injection, Shootcrete},
Concrete Helicopter Pad, Steel Skelton works.
Alexandria Construction Company (ACC), TallatMoustafa
August 2005 – December 2005
 Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA – EGYPT
 Profession: Site Engineer.
 Client: Four Seasons and San Stefano for Real Estate Investment
 Consultant: Dar Al-Handasa engineering’s Office.
 Budget: (Total value of the project US $95 million Dollars).
 Time Project Description :Project consists of four stories basement, five commercial mall, Two
towers {31 & 29 Repeated floors},Twenty Five Stories Four Seasons Five Stars Hotel, Three Floors
underground Parking, Landscapes, All Finishing activities, the project was over an 28,000m2
Murray & Roberts Contractors International Limited
MOKHTAR FAWZY RESUME 
 
January 2005 – July 2005
 Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA – EGYPT
 Profession: Site Engineer (Training Period).
 Client: Four Seasons and San Stefano for Real Estate Investment
 Consultant: Dar Al-Handasa engineering’s Office.
 Budget: (Total value of the project US $95 million Dollars).
REFERENCES
Recommendation & Certificates:
 Recommendation letters & certifications of graduation and all software are available upon requisition.
YEARS OF EXPERIENCES
 10 years in Construction Field
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full
My Resume Full

More Related Content

What's hot

ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015Ahmed Wadi
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad Sahi
 
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.vmohamed almansy
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترibrahim shukri el-eter
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDFKarim Ashry
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015Stan Fraley
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلصMohamed Hablas
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINALemad farrag
 
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkehadham daradkeh
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years expsameh todary
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume robbert1806
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMostafa Hassan
 

What's hot (19)

ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015
 
Yousef Abu Alwafa Resume
Yousef Abu Alwafa ResumeYousef Abu Alwafa Resume
Yousef Abu Alwafa Resume
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
 
cv
cvcv
cv
 
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.v
 
Sr Civil Engineer
Sr Civil EngineerSr Civil Engineer
Sr Civil Engineer
 
Mahmoud Abou-Elhamd
Mahmoud Abou-ElhamdMahmoud Abou-Elhamd
Mahmoud Abou-Elhamd
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
elsayed cv last
elsayed cv lastelsayed cv last
elsayed cv last
 
MB.cv
MB.cvMB.cv
MB.cv
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
 
SLFraley Resumeex 2015
SLFraley Resumeex 2015SLFraley Resumeex 2015
SLFraley Resumeex 2015
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
 
amr
amramr
amr
 
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkeh
 
head quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exphead quarter mechanical engineer 16 years exp
head quarter mechanical engineer 16 years exp
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - InfrastructuresMOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
MOSTAFA HASSAN-PROJECT MANAGER - Infrastructures
 

Similar to My Resume Full

Similar to My Resume Full (20)

ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
 
Ahm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 newAhm Elbouz_CV_ 2016 new
Ahm Elbouz_CV_ 2016 new
 
Ahmed el gohary cv
Ahmed el gohary cvAhmed el gohary cv
Ahmed el gohary cv
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
 
MCV
MCVMCV
MCV
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Mohamed Morshed
Mohamed MorshedMohamed Morshed
Mohamed Morshed
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
 
A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
updated wagdi cm cv
updated wagdi cm cvupdated wagdi cm cv
updated wagdi cm cv
 
emad_azab_CV
emad_azab_CVemad_azab_CV
emad_azab_CV
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 

My Resume Full

  • 1. MOKHTAR FAWZY RESUME    PERSONAL DATA Name: Mokhtar Fwazy Mokhtar Nationality: Egyptian. Marital Status: Married. Date of Birth: 14 December 1981 Military Service: Permanent Exempt. Address: Military buildings Block 47G flat 43 - Tosson– Alexandria - Egypt Telephones: Home 002 03 5621728. Mobile 002 01159553304 - +96893913074 Driver's Licenses: Private Egyptian License. Private Qatar License Private Oman License Private Bahrain License Engineers Syndicate ID: 31/00577. E-mail: m.fawzy@aici.com.eg eng_mokhtarfawzy@yahoo.com. CAREER OBJECTIVE A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills and broaden my knowledge about Construction Manager. EDUCATION Alexandria University – Faculty of Engineering B.Sc. in Civil Engineering –2005- With Very good degree in airports and highways engineering project. LANGUAGES  Arabic: Mother Tongue  English: Good Reading, Writing and Speaking Computer Skills:  Microsoft Office Self Study  AutoCAD Self Study PERSONAL SKILLS  Public relation & Cooperation.
  • 2. MOKHTAR FAWZY RESUME     Dealing with people & ability to work within a team  Self-motivated active work  Ready to work anywhere anytime. TRAINING COURSES  PADI SCUBA Diving [Open Water Diver]  PCC AIRFIELED PAVING WORKSHOP [Transportation System Center, Al Musannah AB, Oman].  Confined Space Entry Course‐Training Institute – Oman  OSHA 30-Hour outreach training for the construction industry – June 2013 – Oman.   Fire Protection System Training – TREMCO – Bahrain     CAREER PROFILE & JOB DESCRIPTION As a Civil Construction  PCC AIRFIELED PAVING (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, And have paved and unpaved shoulders, edge lights and area/security lights. Fuel Tanks, storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)  Diving Engineer checking placing of (GRP Pipes – Concrete Cubes – Accropodes and Rocks) in the offshore Projects  Placing and installation for GRP pipe lines of Intake and Discharge pipe lines for Elec. Power Planet.(Offshore works).  Driving Piles and Sheet piles (temporary and permanent).(near shore and off shore works).  Follow up of all sites work (Earth work - Insulation – Concrete – Repair – Masonry work – most of finishing activities – Pavements).  Flow up & create the method statement for the each activity. (MS)  Reporting on construction activities within the framework of Daily / weekly / monthly reporting by site management.  Follow up the inspection test Plan (ITP) for the project activities.  coordinating between QC & Technical Office follow up progress of the daily, weekly, monthly, reports As a Quality Control & Quality Assurance Engineer – QA/QC  To assist the site engineer to inspect the permanent work, including delivered materials, in order to verify conformance with the contract quality requirements and the implementation of the company corporate quality system in accordance with ISO 9001:2000.  Certifying all Quality Control Submittals and assure that they comply with the Contract Documents and Specifications  Flow up & create Quality Control plan. (QCP)  Flow up & create [Inspection Test Plan "ITP" for work complying with project specifications].  Follow up calibrations certificates & reports.
  • 3. MOKHTAR FAWZY RESUME    COMPANIES PROFILE American International Contractors INC. AICI www.AICI.org August 2016 – up to present..  Project : Airlift Apron – Alumsanah Air Base – Oman  Profession: Construction Manager.  Owner: Royal Air Force at Oman RAFO.  Consultant: US Army Corps of Engineer.  Budget: (Total value of the project US $24.4 million Dollars).  Summary of work:  The Project consists of the construction of an aircraft parking apron of approximately 164,000 square meters along with miscellaneous upgrades to the surrounding airfield and taxiways.  The civil works of the project are construction of:  Mobilization and De-mobilization including, Laydown Area, Batch Plant, material and equipment storage area, and all temporary facilities, structures, and utilities.  Construction of the complete Airlift Apron (56000m3 of paving concrete).  Construction of the Apron Access Road Archirodon Construction (overseas) CO. S.A. www.Archirodon.net  July 2015 – July206.  Project : Salehia Airport development- 2000 pound capacity shelter - Salehia Air Base- EGYPT  Profession: Construction Manager.  Owner: EGYPTIAN AIR FORCES.  Budget: (Total value of the project 100 million L.E).  Summary of work: Construct of 2000 pond capacity of reinforced concrete shelters (30 Pcs) 4800m3 of RC Concrete 4500 m3 of PC laying concrete each, with 3600m3 of sand backfilling each, Taxi way paving concrete connected to the main Run way, industrial and technical building ( 24 PCs), admin building (49 Pcs ). Underground site utilities (elec., communication). American International Contractors INC. AICI www.AICI.org December 2014 – June 2015..  Project : United Kingdom Maritime Component Command ( UKMCC ), Mina Salman Navy Base, Bahrain
  • 4. MOKHTAR FAWZY RESUME     Profession: Construction Manager.  Owner: UK Navy.  Consultant: US Army Corps of Engineer.  Budget: (Total value of the project US $9.75 million Dollars).  Summary of work:  The base bid includes the construction of the FSU facility, Headquarter facility and all utility connection, Vehicle sunshade, entrance canopy, Gray water collection system, irrigation system and landscaping.  The civil works of the project are construction of: Concrete foundation, Steel Structure, Roof and walls sandwich panels, Rollup doors, S.O.G. for all  levels, Gypsum and cement board walls, CMU walls, Ceramic tiles, fire rated and blast windows, fire  rated and blast doors, Cambridge doors, wooden doors, Acoustical Ceiling, plaster and painting  system, Roof membrane and insulation system, sound insulation walls, fire rated walls, Mechanical  and electrical systems serving building and vehicles maintenance operation.   American International Contractors INC. AICI www.AICI.org December 2013 – December 2014.  Project : FY11 Tactical Ramp/ Vehicle Maintenance Facility Al Udeid, Qatar  Profession: Construction Manager.  Owner: US Air Force USAF.  Consultant: US Army Corps of Engineer.  Budget: (Total value of the project US $42 million Dollars).  The civil works of the project are construction of:  Vehicle maintenance facility is a 2 stories building consist of refueling area, offices area,  workshop areas and store area, works in this building summarized as below:  1. Concrete foundation.  2. Steel structure.  3. Roof and walls sandwich panels.  4. Rollup doors.  5. S.O.G. for all levels.  6. Oil changing pit.  7. Overhead crane.  8. Mechanical and electrical systems serving building and vehicles maintenance operation.  9. Roads & parking lot.  10. Paving sidewalk.  11. CMU walls  12. Insulation for fire resistance areas.  13. Plastering and painting.  14. Acoustical ceiling system.  15. Electrical substation building and mechanical chiller yard.   16. Underground utilities (mechanical and electrical). 
  • 5. MOKHTAR FAWZY RESUME     Tactical Ramp is 50,000 M3 of concrete for Concrete pavement parking apron with  compression sealant and pavement marking.  American International Contractors INC. AICI www.AICI.org September 2012 – November 2013.  Projects : (Airlift Ramp & Fuel Facilities) & ( Parallel Taxiway Extension) Al Musannah Air Base, Oman  Profession: Construction Section Head.  Owner: Royal Air Force at Oman RAFO.  Consultant: US Army Corps of Engineer.  Budget:(Total value of the project US $57 million Dollars). Archirodon Construction (overseas) CO. S.A. www.Archirodon.net  January 2012 – September 2012  Project: Banha Power Station, 750 MW Combined Cycle Project, Kaluobya, Egypt. (CP 102 )  Profession: Construction Section Head. Intake and Discharge Structure ( Offshore Work )  Owner: “West Delta Electricity Production”  Consultant: " Power Generation Engineering and Services Company – PGESCO”  Budget: (Total value of the project US $50 million Dollars).  The civil works of the project are construction of: The work for this Contract Package is subdivided: Site development, Underground Utilities, Power Generation Facilities, Auxiliary Facilities, Ancillary Facilities, Electrical and Mechanical Work. American International Contractors INC. AICI www.AICI.org June 2010 – November 2011  Project: Construction of a Close Air Support CAS Parking Apron DOHA – QATAR  Profession: Senior Site Engineer.  Owner: United States Army - Air Force - Al Udeid Air Base.  Consultant: US Army Corps of Engineer.  Budget: (Total value of the project US $50 million Dollars).  The civil works of the project are construction of: (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, and have paved and unpaved shoulders, edge lights and area/security lights. One fuel storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.) Archirodon Construction (overseas) CO. S.A. www.Archirodon.net  December 2009 – June 2010
  • 6. MOKHTAR FAWZY RESUME     Project: Tripoli Harbor Libya Break Water Reconstruction TRIPOLI – LIBYA  Profession: Marine Site Engineer.  Owner: “Libyan Maritime and Port Authority”  Consultant: "Royal Haskoning – Consultant Engineering”  Budget: (Total value of the project US $300 million Dollars).  The civil works of the project are construction of: (Pre-Cast Concrete Works for cubes “10t, 15t,20t & 30t” – Pre-Cast Concrete Work for Accropodes 6.3m3 & 9.00m3 – Concrete Repair for parapet breakwater- Placing of rocks class (2-4t),(3-5),(5- 8),Cubes & Accropodes for break water along with 4700m.) Archirodon Construction (Overseas) CO. S.A.   www.Archirodon.net  October 2008 - November 2009.  Project: SidiKrir Power Plant 750 MW Combined Cycle Project – Offshore Works - ALEXANDRIA– EGYPT  Profession: Marine Site Engineer.  Owner: “West Delta Electricity Production”  Consultant: "Power Generation Engineering and Services Company – PGESCO”  Budget: (Total value of the project US $85 million Dollars).  The civil works of the project are construction of: (Earth Work – Dredging Works – Installation of onshore and offshore “FRP” Fiber glasses Reinforced Plastic Pipes – Pre-Cast Concrete Works for mattresses – Sheet Piles for Temporary Jetty.) American International Contractors INC. AICI www.AICI.org April 2007-Jullay 2008  Project: King Abdalla II Special Operation Training Center (KASOTC) - AMMAN – JORDAN  Profession: Site Engineer.  Owner: Jordanian Army.  Consultant: US Army Corps of Engineer.  Budget: (Total value of the project US $90 million Dollars).  The civil works of the project are construction of: Dormitory Buildings, Administration Buildings, Tactical Buildings, Workshop, Warehouse, Ordinance Storage Buildings, Shooting Range (300m & 100m), Pump House, Water Tanks, 11Kv Electrical Sub Station, Retaining Walls, Earth works including 930,000m3 Cut, 483,000m3 Fill, 9,0Km Asphalt Roads,2.8Km Drain Channel Box and Pipe Culverts, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and Electrical works. Archirodon Construction (Overseas) CO. S.A.
  • 7. MOKHTAR FAWZY RESUME    www.Archirodon.net  January 2007 – April 2007  Projects: Mooring dolphin Repair Works –Offshore Works- MIDTAP Jetty – Dekhela Port ALEXANDRIAEGYPT  Profession: QC Civil engineer  Owner & Consultant: Middle East Oil Tankage & Pipe Lines (MIDTAP).  Budget: (Total value of the project $5 million Dollars).  The civil works of the project are construction of: Cut and Remove all damaged piles, Driving New Piles, Construction of Dolphin and Walk way, Supports Located extend of MIDTAP Jetty, Pre-Cast Concrete Units. American International Contractors INC. AICI www.AICI.org January 2006 – January 2007  Projects: Live Fire Fighting and Damage Control Trainer Complex Abo Qir – ALEXANDRIA -EGYPT  Profession: QC Civil Engineer.  Owner: Egyptian Naval Forces –Abo Qir Navy Base  Consultant: Booz Allen Hamilton.  Designer: Booz Allen Hamilton.  Budget: (Total value of the project 12 million L.E)  Time Schedule for the Project: 1 year (12 months)  The civil works of the project are construction of: Concrete Activities, Interior and Exterior Finishing Activities, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and Electrical works. Asphalt Roads, Water Tank, Full Repair for Building{Cracks Injection, Shootcrete}, Concrete Helicopter Pad, Steel Skelton works. Alexandria Construction Company (ACC), TallatMoustafa August 2005 – December 2005  Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA – EGYPT  Profession: Site Engineer.  Client: Four Seasons and San Stefano for Real Estate Investment  Consultant: Dar Al-Handasa engineering’s Office.  Budget: (Total value of the project US $95 million Dollars).  Time Project Description :Project consists of four stories basement, five commercial mall, Two towers {31 & 29 Repeated floors},Twenty Five Stories Four Seasons Five Stars Hotel, Three Floors underground Parking, Landscapes, All Finishing activities, the project was over an 28,000m2 Murray & Roberts Contractors International Limited
  • 8. MOKHTAR FAWZY RESUME    January 2005 – July 2005  Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA – EGYPT  Profession: Site Engineer (Training Period).  Client: Four Seasons and San Stefano for Real Estate Investment  Consultant: Dar Al-Handasa engineering’s Office.  Budget: (Total value of the project US $95 million Dollars). REFERENCES Recommendation & Certificates:  Recommendation letters & certifications of graduation and all software are available upon requisition. YEARS OF EXPERIENCES  10 years in Construction Field