SlideShare a Scribd company logo
1 of 4
PROPOSED POSITION Site Manager
NAME OF FIRM: Consulting Engineering Group - CEGMAN
NAME OF STAFF: Mohamed Al Sayed Mahmoud Morshed
PROFESSION: Site Manager
DATE OF BIRTH: 19/3/1967
YEARS WITH
FIRM/ENTITY:
3 NATIONALITY Egyptian
MEMBERSHIP IN PROFESSIONAL SOCIETIES
- Egyptian Engineers Syndicate.
KEY QUALIFICATIONS:
Eng. Mohamed Morshed graduated from Cairo University, with B.Sc in Civil Engineering.
With over 20 years of experience , he achieved a solid track record in construction supervision as
a Site manager.
he supervised several projects and coordinates with main contractors and oversees
subcontractors plus Monitoring of project process.
He supervised several educational projects in Egypt such as Canadian International College and
Zewail City for Science and Technology.
He have qualified communications, time management and solving problems skills.
EDUCATION:
- Mini MBA – 2002
- B. Sc - Civil Engineering – 1990 -, Cairo University.
EMPLOYMENT RECORD:
0000 - Present Consulting Engineering Group - CEGMAN, Cairo, Egypt
Deputy – Project Manager ( Zewail City of Science and Technology )
DUTIES AND RESPONSIBILITIES
 Supervising contracted staff
 Making safety inspections and ensuring construction and site safety.
 Meeting subcontractors.
 checking and preparing site reports
SELECTED PROJECTS
 Zewail City of Science and Technology, Egypt.
Cost Of The Project
3.6 Billion pounds.
11/2008 – 12/2010 Mediterranean Company for Contracting (MCC)
Project Manager
SELECTED PROJECTS
 Administrative & Residential Building of MCC CO in Mew Cairo
(Six floors and basement of area 1800 m2/floor)
4/2006 – 11/2008 Genza Co for Establishing & Development, Egypt
Executive Site Manager
SELECTED PROJECTS
 Trees District (The Middle Region), 6 of October City.
(Total area of the project 25 acres and the total cost is about 100
Million Pounds. The project includes (31) buildings in addition to the
general arrangement of site and the interior Roads net)
1/2005 – 4/2006 Consulting Engineering Company ( Sabbor )
Project’s Executive Manager
SELECTED PROJECTS
 Ahram Canadian University in 6 of October City
(Second Stage).
Rehabilitation of (package and reversions) building from (stores) into
(private university)
(Faculty of Pharmacy- Faculty of Oral & Dental Medicine)
The total cost of the project is about (50) million pound.
1/2005 – 12/2005 Consulting Engineering Company ( Sabbor )
Supervisor
SELECTED PROJECTS
 The Islamic Centre of Mr. Ibrahim Nafeea.
8/2003 – 1/2005 Consulting Engineering Company (Sabbor)
Project’s Executive Manager
SELECTED PROJECTS
 Ahram Canadian University in 6 of October City
(First Stage ).
Rehabilitation of building (advertisement work shop) and turning it
from (stores) into (private university) (Computer Science – Business
Management).
The total cost of the project is about (50) million pound.
8/2000 – 8/2003 Consulting Engineering Company ( Sabbor )
Project’s Executive Manager
SELECTED PROJECTS
 Ahram Administration Building at Al-Galaa st
 In this project “3” underground floors (basements) of whole area
were executed as a garage for institutions officials by using a
system of “Diaphram wall” which executed by “Sefi Fontec” and
this system used to support adjacent buildings
 A studio was carry out at the back part with 500 M2 area for each
floor at height of 2 floor include (Control rooms – photography
studio – sound studio) including sound isolation weather (floor –
walls – roofs)
 The interior conference hall was executed at the back part with
700 M2 area for each floor at height 3 floors.
10/1998 - 2000 Pioneers Company
Executive Site Engineer
SELECTED PROJECTS
 Smash Academy Sport Club for Tennis at Cairo International
Airport ( Second Stage).
 A swimming pool of 700 m2 area.
 An administrative building of 1000 m2floor at height of 3 floor.
 Tennis play grounds (8 red color play grounds).
 Nets of drain works.
9/1997 – 9/1998 Consulting Engineering Company ( Sabbor )
Executive Site Engineer
SELECTED PROJECTS
 Al-Ahram Press Building (Electricity Station),6th October city
7/1997 – 10/1998 Consulting Engineering Company ( Sabbor )
Executive Site Engineer
SELECTED PROJECTS
 Al-Ahram Services and Stores Institute
8/1995 – 7/1996 Consulting Engineering Company ( Sabbor )
Executive Site Engineer
SELECTED PROJECTS
 Sarayah Al-Sultana - Zamalek
5/1994 – 8/1995 The Supporting Co. for Contracts
Site Engineer
SELECTED PROJECTS
 Coral Beach Village , Hurgada (Second Stage).
 (40) beach’s cabins’ and cafeteria
 Water drains tanks (80 m3 capacity) to be used in irrigation
4/1993 – 5/1995 Arab Co for Materials of Fiberglass Product
Site Engineer
SELECTED PROJECTS
 Nets of drain in first, sixth and seventh regions in 6 of October city.
 Nets of drain in New Beni-Suef City.
 Pressurized Pipelines of Port Fouad City.
1/1992 – 1/1993 The Egyptian Co for Contracts (EMAS)
Executive Engineer
SELECTED PROJECTS
 Faisal Islamic Bank (Damanhour City).
LANGUAGES:
- Arabic – Mother Tongue
- English – Good – writing, reading and speaking

More Related Content

What's hot (20)

c.v_ahmed_samy
c.v_ahmed_samyc.v_ahmed_samy
c.v_ahmed_samy
 
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
 
CV (1)1
CV (1)1CV (1)1
CV (1)1
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
 
CV-Europass-20160927-AbdulwahidKhalaf-EN
CV-Europass-20160927-AbdulwahidKhalaf-ENCV-Europass-20160927-AbdulwahidKhalaf-EN
CV-Europass-20160927-AbdulwahidKhalaf-EN
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Eman Nasser - Resume
Eman Nasser - ResumeEman Nasser - Resume
Eman Nasser - Resume
 
Omar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab_CVECG
Omar Khattab_CVECG
 
Ahmed CV
Ahmed CVAhmed CV
Ahmed CV
 
Cv update
Cv updateCv update
Cv update
 
C.V
C.VC.V
C.V
 
Curriculum vitae rana
Curriculum vitae ranaCurriculum vitae rana
Curriculum vitae rana
 
C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)C. V ALI ALLAM MOHAMED ALLAM (new)
C. V ALI ALLAM MOHAMED ALLAM (new)
 
CV update
CV updateCV update
CV update
 
Khaled cv07
Khaled cv07Khaled cv07
Khaled cv07
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-Baky
 
cv 16
cv 16cv 16
cv 16
 
Ashraf Zayed CV _Final_
Ashraf Zayed CV _Final_Ashraf Zayed CV _Final_
Ashraf Zayed CV _Final_
 
CV-M'Mohsen
CV-M'MohsenCV-M'Mohsen
CV-M'Mohsen
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 

Viewers also liked

التنمية في مرحلة الطفولة المبكرة
التنمية في مرحلة الطفولة المبكرةالتنمية في مرحلة الطفولة المبكرة
التنمية في مرحلة الطفولة المبكرةBushra Kaddoura
 
Alexander Quintana Resume
Alexander Quintana ResumeAlexander Quintana Resume
Alexander Quintana ResumeAlex Quintana
 
Huggies every little bottom
Huggies every little bottom Huggies every little bottom
Huggies every little bottom My Pham
 
Docker Security in Production Overview
Docker Security in Production OverviewDocker Security in Production Overview
Docker Security in Production OverviewDelve Labs
 
Desarrollor de la internet
Desarrollor de la internetDesarrollor de la internet
Desarrollor de la internetnataly0624
 
LogiSolve.Pitchbook.2016
LogiSolve.Pitchbook.2016LogiSolve.Pitchbook.2016
LogiSolve.Pitchbook.2016Dave Youngbauer
 
Sistema de Bibliotecas UCS - Seção de Obras Raras
Sistema de Bibliotecas UCS - Seção de Obras RarasSistema de Bibliotecas UCS - Seção de Obras Raras
Sistema de Bibliotecas UCS - Seção de Obras RarasBiblioteca UCS
 
Day 1 introduction, 2016 17
Day 1 introduction, 2016 17Day 1 introduction, 2016 17
Day 1 introduction, 2016 17jtrometter
 
Derechos y garantías constitucionales. yulirma rea.
Derechos y garantías constitucionales. yulirma rea.Derechos y garantías constitucionales. yulirma rea.
Derechos y garantías constitucionales. yulirma rea.Ijauris Rea
 
Panorama actual de la industria panificadora en México
Panorama actual de la industria panificadora en MéxicoPanorama actual de la industria panificadora en México
Panorama actual de la industria panificadora en Méxicousapeec_mexico
 
Mitos y realidades del huevo
Mitos y realidades del huevoMitos y realidades del huevo
Mitos y realidades del huevousapeec_mexico
 

Viewers also liked (16)

التنمية في مرحلة الطفولة المبكرة
التنمية في مرحلة الطفولة المبكرةالتنمية في مرحلة الطفولة المبكرة
التنمية في مرحلة الطفولة المبكرة
 
Alexander Quintana Resume
Alexander Quintana ResumeAlexander Quintana Resume
Alexander Quintana Resume
 
Huggies every little bottom
Huggies every little bottom Huggies every little bottom
Huggies every little bottom
 
Docker Security in Production Overview
Docker Security in Production OverviewDocker Security in Production Overview
Docker Security in Production Overview
 
Desarrollor de la internet
Desarrollor de la internetDesarrollor de la internet
Desarrollor de la internet
 
ENTENDENDO OTDR
ENTENDENDO OTDRENTENDENDO OTDR
ENTENDENDO OTDR
 
Death of the batch job
Death of the batch jobDeath of the batch job
Death of the batch job
 
Presentation1
Presentation1Presentation1
Presentation1
 
LogiSolve.Pitchbook.2016
LogiSolve.Pitchbook.2016LogiSolve.Pitchbook.2016
LogiSolve.Pitchbook.2016
 
Sistema de Bibliotecas UCS - Seção de Obras Raras
Sistema de Bibliotecas UCS - Seção de Obras RarasSistema de Bibliotecas UCS - Seção de Obras Raras
Sistema de Bibliotecas UCS - Seção de Obras Raras
 
newSkills_09
newSkills_09newSkills_09
newSkills_09
 
Day 1 introduction, 2016 17
Day 1 introduction, 2016 17Day 1 introduction, 2016 17
Day 1 introduction, 2016 17
 
Derechos y garantías constitucionales. yulirma rea.
Derechos y garantías constitucionales. yulirma rea.Derechos y garantías constitucionales. yulirma rea.
Derechos y garantías constitucionales. yulirma rea.
 
Panorama actual de la industria panificadora en México
Panorama actual de la industria panificadora en MéxicoPanorama actual de la industria panificadora en México
Panorama actual de la industria panificadora en México
 
Mitos y realidades del huevo
Mitos y realidades del huevoMitos y realidades del huevo
Mitos y realidades del huevo
 
6º básico a semana 05 al 09 de septiembre
6º básico a semana 05 al 09 de septiembre6º básico a semana 05 al 09 de septiembre
6º básico a semana 05 al 09 de septiembre
 

Similar to Mohamed Morshed

Similar to Mohamed Morshed (20)

Ahmed Aboul Azm
Ahmed Aboul AzmAhmed Aboul Azm
Ahmed Aboul Azm
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
 
Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0Ahmed Adel EL-HENNAWY summary CV V1.0
Ahmed Adel EL-HENNAWY summary CV V1.0
 
ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015ahmed mohammed elsaied wadi 26-04-2015
ahmed mohammed elsaied wadi 26-04-2015
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Ahmed Zahran C.V
Ahmed Zahran C.VAhmed Zahran C.V
Ahmed Zahran C.V
 
Mohamed Mizar CV
Mohamed Mizar CVMohamed Mizar CV
Mohamed Mizar CV
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Hesham Magdy curriculum vitae
Hesham Magdy curriculum vitaeHesham Magdy curriculum vitae
Hesham Magdy curriculum vitae
 
M Kamal
M Kamal M Kamal
M Kamal
 
Mostafa Abbassy CV-2016(All Project)
Mostafa Abbassy CV-2016(All Project)Mostafa Abbassy CV-2016(All Project)
Mostafa Abbassy CV-2016(All Project)
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
En c.v
En c.v En c.v
En c.v
 
CV
CVCV
CV
 
Khaled HSE
Khaled HSEKhaled HSE
Khaled HSE
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 

Mohamed Morshed

  • 1. PROPOSED POSITION Site Manager NAME OF FIRM: Consulting Engineering Group - CEGMAN NAME OF STAFF: Mohamed Al Sayed Mahmoud Morshed PROFESSION: Site Manager DATE OF BIRTH: 19/3/1967 YEARS WITH FIRM/ENTITY: 3 NATIONALITY Egyptian MEMBERSHIP IN PROFESSIONAL SOCIETIES - Egyptian Engineers Syndicate. KEY QUALIFICATIONS: Eng. Mohamed Morshed graduated from Cairo University, with B.Sc in Civil Engineering. With over 20 years of experience , he achieved a solid track record in construction supervision as a Site manager. he supervised several projects and coordinates with main contractors and oversees subcontractors plus Monitoring of project process. He supervised several educational projects in Egypt such as Canadian International College and Zewail City for Science and Technology. He have qualified communications, time management and solving problems skills. EDUCATION: - Mini MBA – 2002 - B. Sc - Civil Engineering – 1990 -, Cairo University. EMPLOYMENT RECORD: 0000 - Present Consulting Engineering Group - CEGMAN, Cairo, Egypt Deputy – Project Manager ( Zewail City of Science and Technology ) DUTIES AND RESPONSIBILITIES  Supervising contracted staff  Making safety inspections and ensuring construction and site safety.  Meeting subcontractors.  checking and preparing site reports SELECTED PROJECTS  Zewail City of Science and Technology, Egypt. Cost Of The Project 3.6 Billion pounds.
  • 2. 11/2008 – 12/2010 Mediterranean Company for Contracting (MCC) Project Manager SELECTED PROJECTS  Administrative & Residential Building of MCC CO in Mew Cairo (Six floors and basement of area 1800 m2/floor) 4/2006 – 11/2008 Genza Co for Establishing & Development, Egypt Executive Site Manager SELECTED PROJECTS  Trees District (The Middle Region), 6 of October City. (Total area of the project 25 acres and the total cost is about 100 Million Pounds. The project includes (31) buildings in addition to the general arrangement of site and the interior Roads net) 1/2005 – 4/2006 Consulting Engineering Company ( Sabbor ) Project’s Executive Manager SELECTED PROJECTS  Ahram Canadian University in 6 of October City (Second Stage). Rehabilitation of (package and reversions) building from (stores) into (private university) (Faculty of Pharmacy- Faculty of Oral & Dental Medicine) The total cost of the project is about (50) million pound. 1/2005 – 12/2005 Consulting Engineering Company ( Sabbor ) Supervisor SELECTED PROJECTS  The Islamic Centre of Mr. Ibrahim Nafeea. 8/2003 – 1/2005 Consulting Engineering Company (Sabbor) Project’s Executive Manager SELECTED PROJECTS  Ahram Canadian University in 6 of October City (First Stage ). Rehabilitation of building (advertisement work shop) and turning it from (stores) into (private university) (Computer Science – Business Management). The total cost of the project is about (50) million pound.
  • 3. 8/2000 – 8/2003 Consulting Engineering Company ( Sabbor ) Project’s Executive Manager SELECTED PROJECTS  Ahram Administration Building at Al-Galaa st  In this project “3” underground floors (basements) of whole area were executed as a garage for institutions officials by using a system of “Diaphram wall” which executed by “Sefi Fontec” and this system used to support adjacent buildings  A studio was carry out at the back part with 500 M2 area for each floor at height of 2 floor include (Control rooms – photography studio – sound studio) including sound isolation weather (floor – walls – roofs)  The interior conference hall was executed at the back part with 700 M2 area for each floor at height 3 floors. 10/1998 - 2000 Pioneers Company Executive Site Engineer SELECTED PROJECTS  Smash Academy Sport Club for Tennis at Cairo International Airport ( Second Stage).  A swimming pool of 700 m2 area.  An administrative building of 1000 m2floor at height of 3 floor.  Tennis play grounds (8 red color play grounds).  Nets of drain works. 9/1997 – 9/1998 Consulting Engineering Company ( Sabbor ) Executive Site Engineer SELECTED PROJECTS  Al-Ahram Press Building (Electricity Station),6th October city 7/1997 – 10/1998 Consulting Engineering Company ( Sabbor ) Executive Site Engineer SELECTED PROJECTS  Al-Ahram Services and Stores Institute 8/1995 – 7/1996 Consulting Engineering Company ( Sabbor ) Executive Site Engineer SELECTED PROJECTS  Sarayah Al-Sultana - Zamalek 5/1994 – 8/1995 The Supporting Co. for Contracts Site Engineer SELECTED PROJECTS  Coral Beach Village , Hurgada (Second Stage).  (40) beach’s cabins’ and cafeteria  Water drains tanks (80 m3 capacity) to be used in irrigation
  • 4. 4/1993 – 5/1995 Arab Co for Materials of Fiberglass Product Site Engineer SELECTED PROJECTS  Nets of drain in first, sixth and seventh regions in 6 of October city.  Nets of drain in New Beni-Suef City.  Pressurized Pipelines of Port Fouad City. 1/1992 – 1/1993 The Egyptian Co for Contracts (EMAS) Executive Engineer SELECTED PROJECTS  Faisal Islamic Bank (Damanhour City). LANGUAGES: - Arabic – Mother Tongue - English – Good – writing, reading and speaking